ROL 1C1D : Construction of Sullage Water Treatment Plant & Pump Sum
ID Task Name Duration Start Finish 2018 2019 2020
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 951 INTERCEPTOR WORK 829.5 days 5/1/17 3/10/19 952 Preliminaries 819.5 days 5/1/17 21/9/19 953 Site survey 14 days 17/7/17 1/8/17 954 Soil investigation 63 days 7/6/17 18/8/17 955 Protection of adjacent building 5.6 days 11/12/17 16/12/17 956 Utilities piloting 0 days 5/1/17 6/9/17 957 Confirmation of interceptor coordinate 1 day 10/11/17 10/11/17 958 Environmental Management Plan 279.4 days 1/2/18 12/1/19 961 Settlement monitoring after completion 7 days 17/4/18 24/4/18 962 Inspection and maintenance 254.51 days 13/11/18 21/9/19 965 Sullage Water Treatment Plant 492.5 days 1/1/18 29/8/19 966 Site preparation 131 days 1/1/18 11/6/18 967 Site clearing & demolition works 25 days 1/1/18 31/1/18 968 Relocation of Utilities 118 days 17/1/18 11/6/18 969 Relocation of CELCOM utilities 81 days 6/3/18 11/6/18 970 Relocation of TNB cable 8 days 17/1/18 11/2/18 971 Relocation of TIME DOT COM cable 81 days 17/1/18 11/5/18 972 Sub‐Structure 189.5 days 6/3/18 24/10/18 973 Excavation & Platform preparation 6 days 6/3/18 12/3/18 974 Micropile for wall & hacking (300mm) 150 days 21/3/18 8/10/18 975 Capping beam 35 days 12/9/18 24/10/18 976 Structure 174 days 24/10/18 25/5/19 977 Micropile for foundation (250mm) 118 days 24/10/18 19/3/19 978 RC foundation 35 days 2/3/19 12/4/19 979 Beam and Slab 35 days 27/3/19 8/5/19 980 Waterproofing to structure 7 days 8/5/19 16/5/19 981 Installation of biomedia 7 days 16/5/19 25/5/19 982 Architectural 25 days 25/5/19 26/6/19 983 Brickworks 14 days 25/5/19 13/6/19 984 Install overflow box and pipe to river 7 days 7/6/19 15/6/19 985 Door installation 2 days 15/6/19 18/6/19 986 Stairs installation 7 days 18/6/19 26/6/19 987 Installation of oil coeleascer media 7 days 15/6/19 24/6/19 988 Electrical 63 days 15/6/19 29/8/19 989 Cabling works 14 days 15/6/19 2/7/19 990 Installation of Distribution Board & Local 7 days 2/7/19 10/7/19 Control Panel 991 Motor Control Center @ Jalan Bunus 21 days 10/7/19 5/8/19 992 Cabling works & busbar installation 7 days 10/7/19 18/7/19 993 Installation of Motor Control Center 7 days 18/7/19 26/7/19 994 Installation TNB meter panel 7 days 26/7/19 5/8/19 995 Switchroom & Blower Room 21 days 5/8/19 29/8/19 996 Cabling works 7 days 5/8/19 13/8/19 997 Installation of light fittings 7 days 13/8/19 21/8/19 998 Earthing 7 days 21/8/19 29/8/19 999 Mechanical 50 days 15/6/19 14/8/19 1000 Grit & Grease Chamber 7 days 2/7/19 10/7/19 1001 Installation of float switch 7 days 2/7/19 10/7/19 Page 1 ROL 1C1D : Construction of Sullage Water Treatment Plant & Pump Sum ID Task Name Duration Start Finish 2018 2019 2020 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 1002 Bioreactor 28 days 15/6/19 18/7/19 1003 UPVC diffuser Piping works 14 days 15/6/19 2/7/19 1004 Installation of diffuser c/w accessories 14 days 2/7/19 18/7/19 1005 Outlet facilities 14 days 10/7/19 26/7/19 1006 Installation of recycle pump (2 nos) 7 days 10/7/19 18/7/19 1007 Cabling works c/w accessories 7 days 18/7/19 26/7/19 1008 Blower room 14 days 18/7/19 5/8/19 1009 Installation of HDG steel pipe c/w accessor7 days 18/7/19 26/7/19 1010 Installation of blower 2 nos 7 days 26/7/19 5/8/19 1011 Fire protection equipment 1 day 26/7/19 29/7/19 1012 Supply 2 nos fire extinguishers 1 day 26/7/19 29/7/19 1013 Ventilation system 14 days 29/7/19 14/8/19 1014 Installation of ventilation fan c/w accesso 7 days 29/7/19 6/8/19 1015 Cabling works 7 days 6/8/19 14/8/19 1016 SCADA 28 days 19/7/19 22/8/19 1017 Cabling works 21 days 19/7/19 14/8/19 1018 Supply and install SCADA system to the site 7 days 14/8/19 22/8/19 1019 Pump Sum 194.99 days 27/3/18 22/11/18 1020 Testing and commisioning 7 days 13/11/18 22/11/18 1021 Lorong Bunus 85.99 days 27/3/18 10/7/18 1022 Structure 57.99 days 27/3/18 5/6/18 1023 Excavation 2 days 27/3/18 28/3/18 1024 Construction of bases and slab 7 days 29/3/18 5/4/18 1025 Construction of wall & top slab 7 days 6/4/18 20/4/18 1026 Installation of manhole & trash screen 1 day 20/4/18 21/4/18 1027 Micropile for river wall 21 days 21/4/18 17/5/18 1028 Skin wall 7 days 17/5/18 25/5/18 1029 Capping beam 7 days 25/5/18 5/6/18 1030 Force main works 49 days 21/4/18 23/6/18 1031 Excavation of trench 35 days 21/4/18 5/6/18 1032 Laying of HDPE pipe 21 days 17/5/18 13/6/18 1033 Road reinstatement works 7 days 13/6/18 23/6/18 1034 Submersible pump 14 days 23/6/18 10/7/18 1035 Installation of Submersible pump at small 7 days 23/6/18 2/7/18 pump station 1036 Cabling works 7 days 2/7/18 10/7/18 1037 Jalan Melayu 116 days 23/6/18 13/11/18 1038 Structure 67 days 23/6/18 14/9/18 1039 Excavation 3 days 23/6/18 27/6/18 1040 Construction of bases and slab 7 days 27/6/18 5/7/18 1041 Construction of wall & top slab 7 days 5/7/18 13/7/18 1042 Installation of manhole & trash screen 1 day 13/7/18 14/7/18 1043 Micropile for river wall 21 days 14/7/18 8/8/18 1044 Skin wall 14 days 8/8/18 25/8/18 1045 Capping beam 14 days 25/8/18 14/9/18 1046 Force main works 84 days 14/7/18 26/10/18 1047 Excavation of trench 35 days 14/7/18 25/8/18 1048 Laying of HDPE pipe 35 days 8/8/18 24/9/18 Page 2 ROL 1C1D : Construction of Sullage Water Treatment Plant & Pump Sum ID Task Name Duration Start Finish 2018 2019 2020 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1 1049 Road reinstatement works 28 days 24/9/18 26/10/18 1050 Submersible pump 14 days 26/10/18 13/11/18 1051 Installation of Submersible pump at small 7 days 26/10/18 3/11/18 pump station 1052 Cabling works 7 days 3/11/18 13/11/18 1053 Non‐Return Valve 7 days 24/9/18 2/10/18 1054 500 mm DN non‐return valve 7 days 24/9/18 2/10/18 1055 1500 mm DN non‐ return valve 7 days 24/9/18 2/10/18 1056 Motor control center @ Jalan Melayu (2 nos)35 days 14/9/18 26/10/18 1057 Cabling works 14 days 14/9/18 2/10/18 1058 Installation of MCC 14 days 2/10/18 18/10/18 1059 Installation of TNB meter 7 days 18/10/18 26/10/18 1060 External Works 63 days 2/7/19 17/9/19 1061 Laying Subbase 14 days 2/7/19 18/7/19 1062 Laying Roadbase 14 days 18/7/19 5/8/19 1063 Laying Asphaltic Concrete 14 days 5/8/19 21/8/19 1064 Tiling and turfing works 21 days 21/8/19 17/9/19 1065 Finalization works 21 days 7/9/19 3/10/19 1066 Testing and commisioning 14 days 17/9/19 3/10/19 1067 Design submission and shop drawing 21 days 7/9/19 3/10/19 1068 O&M manual 21 days 7/9/19 3/10/19