Beruflich Dokumente
Kultur Dokumente
Full BS
• 4: Purposes
• 5: Process
• 6: Management
• 7: Implementation
• Annex: Examples
Overview
© 2014 AEC3
Facility
Site Project
Scope
© 2014 AEC3
subject of
ADDRESS ! exchange
spatial temporal
extent extent
IFC2x3 and COBie2.4
Facility,
Project Site, Project
COBie,
Space most BIM applications
Facility
Zones regionNon-overlapping
Non-overlapping Type Systems
Not over-
location lapping
Component
Building
© 2014 AEC3
Facility
Not over-
Space lapping Component
COBie2.4
Operational information
Spares Jobs Resources
Solid, fluid Inspection, Repair Skills, Tools
Ifc Construction Product Ifc Task Ifc Construction Equipment
Resource Resource
Supplementary information
Impact Issue Connection Assembly Coordinate Document Attribute
Cost, Carbon H&S, Design MEP, Controls Equipment Positions Other sources Specification
© 2014 AEC3
Purposes
• 1: Concepts
COBie deliverables are bound by
EIR
• 4: Purposes BS1192 Part 4
dPoW
• 5: Process
• 6: Management
• 7: Implementation
• Annex: Examples
4: Purposes
Support for … Mandatory … Excluded …
Registration of assets Yes
Benefits: capacity and utilisation Yes
Benefits: security and surveillance Yes
Benefits: repurposing Yes
Impacts: predicated and actual Yes
Impacts: operations Yes
Impacts: maintenance and repair Yes
Impacts: replacement Yes
Impacts: decommissioning and disposal Yes
Compliance and regulatory responsibilities Yes
© 2014 AEC3
Process
• 1: Concepts
• Annex: Examples
Facility Processes
Site
Project In-use
• Use
Handover
Construct
• Operate
Design
•
Brief
Maintain
Project
• Renew
•
•
•
•
© 2014 BSI
© 2014 BSI
Management
• 1: Concepts
• 4: Purposes Validity
Structure
• 5: Process Consistency
• 6: Management Completeness
• 7: Implementation
• Annex: Examples
COBie, COBie chameleon
© 2014 AEC3
or or
or or