EQUIPMENT
1. Using the BOP configuration illustrated in Figure S10-001 below answer the
following three questions by answering YES or NO.
(The questions are based on whether the operations can be physically
performed and do not represent the field practice or operating procedure of any
company).
HYDRAULIC HYDRAULIC
SIDE OUTLET SIDE OUTLET
VALVE VALVE
Figure S10-001
1a. Can the well be killed with no drill string in the hole and the well shut-in under
pressure using the Blind/Shear ram?
a) Yes.
b) No.
1 point
1b. Could the packing in the annular preventer be replaced with no drill string in the
hole and the well shut-in with the Blind/Shear rams?
a) Yes.
b) No.
1 point
1c. With no pipe in the hole and the well shut-in under pressure with the Blind/Shear
rams. Could the energisable ring gasket in the API Flange below the 5 inch Pipe
Rams be replaced if it started to leak?
a) Yes.
b) No.
1 point
3. Which type of rubber can be installed in an annular BOP while working with oil?
(Select TWO answers)
a) Nitrile rubber.
b) Natural rubber.
c) Neoprene rubber.
1 point
4. Calculate the minimum hydraulic closing pressure for a ram preventer with a
Maximum Rated Working Pressure of 5 000 psi and a closing ratio of 7:1
Figure S10-002
5 points
Figure S10-003
8. In which order should the valves for the choke line be installed on a surface BOP
stack with a ‘Rated Working Pressure’ of 10000 psi, according to best practice?
(Note: Inside is closest to the BOP).
a) 3000 psi
b) 1500 psi
c) 1000 psi.
d) 2000 psi
1 points
10. There is only one inside BOP with a NC50 (4-1/2 inch IF) pin/box connection on
the rig.
Which of the following crossovers must be on the rig floor while tripping?
(Select TWO answers)
3 points
Figure S10-004
11a. ____ Seal seat.
7 points
12. Which of the following factors limit the success of a diverter operation when a
shallow gas blowout occurs?
(Select THREE answers)
13. A cup-type test tool is used on a drill pipe test joint to pressure test a Surface
BOP.
DATA:
From the data, calculate the tension on the drill pipe test joint.
3 points
14. On a land or platform rig what is the API maximum closing time for annular
preventers over 20-inch ID?
a) 60 seconds.
b) 45 seconds.
c) 30 seconds.
d) 15 seconds
1 point
Figure S10-005
5 points
16. Most of the conventional front packer elements fitted on ram BOPs are enclosed
between steel plates.
17. A set of pipe rams is closed, on which two gauges will a pressure reduction be
seen?
(Select TWO answers)
18. On a Driller’s remote BOP control panel on a surface installed BOP a ram close
function is activated.
Green light went out
Red light came on
Annular pressure remained steady
Manifold pressure remained steady
Accumulator pressure remained steady.
a) The pressure switch for the pumps on the hydraulic BOP control unit is
malfunctioning.
b) The electric driven triplex pump on the BOP control unit is malfunctioning.
c) The selector (operating) valve (3-position/4-way valve) is stuck in the ‘Ram open
position’.
d) There is a leak in the hydraulic line between the hydraulic BOP control unit and the
BOP.
e) There is a blockage in the hydraulic line between the hydraulic BOP control unit
and the BOP.
3 points
19. The Driller activated a ram close function from the remote BOP panel on a
surface BOP installation, and then observed that the manifold pressure
continued to drop and did not rise back up.
What is the reason?
a) The hydraulic closing line to the BOP is plugged.
b) There is a leak in the hydraulic line to the BOP.
c) The 3-position/4-way valve on the hydraulic BOP control unit failed to operate.
d) The light bulb has blown.
2 points
20. A 40 gallon accumulator bottle is pre-charged with nitrogen to 1000 psi. Oil is
pumped into the accumulator until its maximum system pressure of 3000 psi is
reached. The BOP is functioned and the system pressure drops to a minimum of
1200 psi.
a) What is the volume of gas in the accumulator when at its maximum system
operating pressure?
b) What is the volume of gas in the accumulator when at its minimum system
operating pressure?
c) Calculate the volume of usable fluid than can be recovered between its maximum
and minimum system operating pressures.
1 point
21. Figures S10-006 illustrates the profiles of two API type flanges.
Figure S10-006
Which of the following flanges has a direct "flange face to flange face" contact
when made up?
3 points
22. Which one of the following statements defines “Well Pressure Assistance”?
a) The pressure exerted by the well on the exposed surface of the piston gives a
resultant force that is added to the force produced by the pressure in the closing
chamber.
b) The well pressure acting on the piston produces an increasing pressure in the
closing chamber.
c) The pressure exerted by the well on the exposed surface of the piston gives a
resultant force is subtracted from the force produced by the pressure in the closing
chamber.
3 points
23. Inside blowout preventers (stab-in non-return safety valves) should be placed on
the rig floor at all times, ready for use, to fit the tubulars being used.
(TWO ANSWERS)
3 points
24. Why is a master control valve fitted to the remote BOP control panel on the rig
floor?
25. A long series of electric logs will be carried out in a well with limited
overbalance value.
a) The correct rams for the riser/lubricator are installed and pressure tested.
b) A set of shear/blind rams is replaced with a set of pipe rams.
c) No particular equipment or operation is required.
2 points
26. Some mud/gas separators are fitted with “hot loops” to circulate clean mud into
the mud/gas separator (via the hot mud inlet shown in the diagram S10-007)
when a kick is being circulated out.
Figure S10-007
3 points
EQUIPMENT