Sie sind auf Seite 1von 3

Division 01 General Requirements Section 01010 Summary of Work

Division 01 - General Requirements

Section 01010 - Summary of Work

1 Part 1: General
1 01 Summary
This Section is providing the summary of the works covered under the Contract set out
in the Contract Agreement (Part One: Principal Document of the Contract and Part
Two: General Conditions) and identifies other contracts -if any .

1 01 01 Section Includes
01.0 Work Covered by Contract Documents
02.0 Work Under Other Contracts
03.0 Products Delivered by Employer
04.0 Contractor’s Use of Site and Premises
05.0 Future Work
06.0 Work Sequence
07.0 Employer Occupancy

1 01 02 Related Sections and Documents


Part One of the Public Works Contract: Principal Document of the Contract
Part Two of the Public Works Contract: General Conditions
Handbook of on site supervision (see Definitions Section 01095)
01039 Co-ordination and Meetings.

1 02 Work Covered by Contract Documents


1 02 01 General
Note: Select one of the options marked with asterisk (*)!
The Contract is based entirely on unit prices as stipulated in the Contract Documents,
unless otherwise indicated.
Final design based on the preliminary design as indicated in the Contract Documents
* 01.0 is part of the Contract.
* 02.0 will be provided by the Employer.

1 02 02 Contract Description
Note: Specify here the scope of work: intention and purpose, trades and works
covered under this Contract and - possibly - trades and works excluded.

GSBC - Ministry of Public Works and Housing - Kingdom of Saudi Arabia


Division 01 General Requirements Section 01010 Summary of Work

1 03 Work Under Other Contracts


1 03 01 Work by the Employer

1 03 01 01 Award of Contracts
The Employer has awarded or will award a contract or contracts as indicated below.

1 03 01 02 Contracted Work

Note: Specify the work covered (e. g. Demolition, Elevators, etc.) either here or
elsewhere including a description, the association with this Contract, availability
of drawings, and the completion date, etc.

1 03 02 Work by Other Parties


Note: Specify here other contracts with participation of neither the Employer nor
the Contractor, if any.

1 04 Products Delivered by Employer


Note: Describe in general material and products to be delivered by the Employer.
In detail, those items, if any, have to be specified in the individual Sections under
Part 1: 1 01 03 ‘Products installed but not delivered under this Section’!

1 04 01 Employer's Responsibilities:
01.0 Employer will arrange for and deliver reviewed Shop Drawings, Product Data,
and Samples, to the Contractor.
02.0 Employer will arrange and pay for product delivery to Site.
03.0 On delivery, Employer will inspect products jointly with the Contractor.
04.0 Employer will submit claims for transportation damage and replace damaged,
defective, or deficient items.
05.0 Employer will arrange for manufacturer’s warranties, inspections, and service.

1 04 02 Contractor's Responsibilities:
01.0 Review Employer reviewed Shop Drawings, Product Data, and Samples.
02.0 Receive and unload products at Site; inspect for completeness or damage jointly
with Employer.
03.0 Handle, store, install and finish products.
04.0 Repair or replace items damaged after receipt.

1 05 Contractor’s Use of Site and Premises


Note: Specify in the following Clauses any restriction, limitation, or obstruction
to allow Employer occupancy (e.g. work by others, use by the public, etc.)

1 05 01 Use of Site and premises


01.0 Unlimited use unless otherwise indicated.

1 05 02 Access to Site
01.0 Unlimited access unless otherwise indicated.

GSBC - Ministry of Public Works and Housing - Kingdom of Saudi Arabia


Division 01 General Requirements Section 01010 Summary of Work

1 05 03 Emergency Building Exits During Construction


Note: Specify if required!

1 05 04 Construction Operations
Note: Specify if required!

1 05 05 Working Time
Note: Specify if required!

1 05 06 Utility Outages and Shutdown


Note: Specify obstructions, restrictions, or obstacles if any!

1 05 07 Survey Data
Note: Select one of the options marked with asterisk (*)!
* 01.0 Employer will provide Contractor with existing survey data, staking and other field
engineering services as indicated.
* 02.0 Employer’s survey data, staking and other field engineering services are not
available.
* 03.0 It is the task of the Contractor to establish all necessary survey data.

1 06 Future Work
Note: Specify the intention of any future work (e. g. installation lifts, additional
storeys, etc.).

1 07 Work Sequence
Note: Specify if the Work will be executed in stages/phases, Employer's
occupancy requirements during the construction period, and the co-ordination of
the construction schedule and operations with the Engineer.

1 08 Employer Occupancy
Note: Specify Employer’s intention of occupancy of the Work or portions
thereof, date(s) and/or period(s), and the reason (e. g. installation work by others)
in order to minimize conflicts to co-ordinate and schedule the Work.