From : AI Department
Week No. : 48 (Period 25 Nov – 1 Dec 2018)
Subject : Week 48-2018 R&D Highlights
Copies : File
Agritech Improvement :
Imagery at 3 August 2018, with Altitude 30 meter using DJI Phantom 3 Pro
Research & Development DepartmentWeekly Report
Suggest :
Need to continued identification Moko attack with aerial image with :
a) Moko attack in banana plant in every stage of age plant
b) Using drone with minimum image resolution 50% from 2.1 cm/pixel.
Research & Development DepartmentWeekly Report
B. Findthe best result of Raster Image for counting population in Artificial Intelligence Project, at
sucker seed plant.
1. Photo with Phantom 3 pro & Phantom 4 pro drone with pix4D app for android, not suitable
because the result look small and not detail with fly height 50m, and must fly low (20 - 25 m
above ground) for better result but difficult to processing raster.
2. Photo with Inspire 2 drone (industrial drone) with pix4D app for android and fly height 70m,
not suitable because the image is not clearly and darker photo.
3. Photowith Inspire 2 drone (industrial drone) with Precision Flight app for android, fly height
70m and try some camera setting, not suitable because has a not clearly photo and darker
photo.
4. Photo with Inspire 2 drone (industrial drone) with pix4D app for iOS/Apple, suitable, with
setting : high = 70 meter above ground, overlap 90%, speed 4,4 m/s.
Support Data
Banana Collapse
Research & Development DepartmentWeekly Report
Water direction
Research & Development DepartmentWeekly Report
Layout above can be used as a reference for making a secondary channel paln and
maintenance on 067B. RGB layout can be use update condition, DSM for update surface height
and water management update Water Flow (WF), Water logging (WL) and Flow Direction (WD)
conditions at location 067B.
The details of the plan for the secondary channel treatment design plot the no.3 location of
067B aerial photography as follows :
Research & Development DepartmentWeekly Report
Aerial photo data can be use to secondary channel maintenance design plan at location
067B, the analyst can be tested because the data used is based on coordinates and elevation
values taken by Geodetic GPS. The elevation value is generated by DSM data so that it can
know the height difference in that location, water logging data can determine the potential of
inundation so that it can determine the number and tertiary channel points in the location and
water direction data can provide information on flow direction and the amount of water flow
determine secondary channel points.
There are the result of geostatistic mapping in pH H 2O, pH KCl, Potassium and
Magnesium :
pH H2O each point pH H2O compossite each plot pH H2O average each plot
pH KCl each point pH KCl compossite each plot 3 pH KCl average each plot
3. Potassium each point 2. Potassium compossite each plot 1. Potassium average each plot
1. Magnesium each point 1. Magnesium compossite each plot 3 Magnesium average each plot
Research & Development DepartmentWeekly Report
There are recommendation of dolomite application for location 067B based Geostatistic
Spatial Analysis :
G. Land Rehabilitation
Compost is an organic fertilizer product from manure and other waste. Base on research
experiments show that the compost application can improves soil structure, soil water holding
capacity, and consequently improved crop growth and yield. Base on this result need enlarge
trial at production scale.
Result :
1. Application of organic fertilizer requery a very high cost up to Rp. 17.000.000 / Ha
2. Application of organic fertilizer up to 50 Ton, has a better vegetative growth compared with
no application of organic fertilizer
3. Application of organic fertilizer up to 50 Ton, has C-Organic soil higher when compared with
ground without application of organic fertilizer up to the age of 6 BST
4. Application of organic fertilizer up to 50 Ton. has soil pH higher when compared with ground
without application of organic fertilizer up to the age of 6 BST
5. The results of the analysis of plant growth show that the application of 50 tons / ha of
organic fertilizer is better than the application of 20 tons / ha of organic fertilizer and control
6. Application of 50 tons / ha of organic fertilizer produces large fruit on average as much as
61%, more than the application of organic fertilizer 20 tons / ha and control
7. Application of organic fertilizers improves the Soil parameters (C-organic, P, K, Ca, Mg, etc)
but after harvesting soil parameter has decreased and the same with control
I. Mapping DIV 2, Location 086 and 087 for Identification Condition (update) on September until
November 2018. On November the Surjan Project System for Pandan Wangi Coconut on
September not yet.
J. Identification of Water Management in Location 086. base data DSM per-September 2018
analyst water management can be application for support project of Land Conservation and
Rehabilitation.
1 2 3
Rainfall Mapping PG1 and PG2 :
Dasarian 1, period 01-10 November 2018
Dasarian 2, period 11-20 November 2018
Dasarian 3, period 21-30 November 2018
1 2 3
Rainfall Mapping PG3 :
1. Dasarian 1, period 01-10 November 2018
2. Dasarian 2, period 11-20 November 2018
3. Dasarian 3, period 21-30 November 2018
Research & Development DepartmentWeekly Report
TGI Conversion
The counting of banana trees in field with FIJI application not suitable if the value will be
added 10 value in each range starts in value 100 until 255. The result of counting have a high
variation from data. So the counting with FIJI would be try in other range until find the best
range.
Research & Development DepartmentWeekly Report
C.
Aerial Photo location 066B take on 9 November 2018 for plan observations of flow
direction, inundation and sedimentation in location. Before location 066B was carried out
validation using the Catchment Area 22 lay out to find out the water velocity potential with the
water flow layout, the potential for inundation by laying out water logging and flow direction
with the lay out water direction at location 066B.
The initial validation at location 066B resulted in the determination of the sedimentation
observation point, for the sedimentation observation area of half the location 066B which was 5.45
Ha. The total sedimentation observation points amounted to 10 points and observations were
made after the rain. Observations in November were conducted on the dates of 8, 12 ,23 and 30
November 2018.
Research & Development DepartmentWeekly Report
Update mapping area is done because of the shape of the vegetation or plants that
change, the current status of the location is finished planting with large sucker seeds. The 066B
location area mapping uses DJI Phantom 3 and uses virtual GCP. The following results are location
066B :
1. Mapping Area Location 066B in 2017 2.Mapping Area Location 066B in 2018
Update location map mapping 066B provides information on flow direction density, this is
shown in the image taken in 2018 and as a comparison of images taken 2017. The use of virtual
GCP data is the value of coordinates taken from CA 22 raster data that has previously been
measured with Geodetic GPS, which is used for processing the 066B update area does not differ
much and there is no difference or previous coordinate raster shift and aerial photo processing
with Pix4D.
The use of virtual GCP can be used when finding an object that has not changed or
shifted, for example a culvert building, security office or offices and other buildings. The update
data has been re-validated and the results are currently in accordance with the conditions in the
field and to better ensure that it is necessary to observe after rain with a large discharge.
The observation of WWTP location planning activities at location 017D Catchment Area 23
PG1 was carried out on November 14-15 2018. The first observation was carried out by looking at
the culvert connection between River 072D to River 071D and the second day of observation
conducted by searching directly to location 071D by using the CA 23 aerial photo map that was
flown in August 2017.
Research & Development DepartmentWeekly Report
Identification using the Water Direction CA 23 lay out to see the direction of flow at
location 071D, the results of the investigation showed that the potential for flooding at the
location of 071D was seen as a dwarf plant. The search is continued by looking at the channel
form from the culvert to the toll road, searching directly to the location and using the DJI
Phantom 3.
Details of tracking observations of IPAL location plan for 017D CA 23.
F. Updatingof Deepening-River in Location 025F & 025E Catchment Area 12 from using RGB
February 2017
Updating location at 025F & 025E on 1 November 2018, mapping the area using the DJI
Phantom 3 and using a virtual GCP. Location of the depth of the location of 025F & 025E entered
CA 12 PG1 has been flown in February 2018, as for the differences can be seen in the picture
below:
H. Decomposer
Decomposer application after the chopper increase decomposition rate process, reducing
volunteer growth and increasing soil availability of organic in the soil that can be absorbed by
plants
Result :
Temporary result :
1. Application pre decomposition with dose 10 ton/ha (tricoderma, geotrhicum and control)
After spray
application
3. Planting process.
4. (Demo Plot at 056F1) - Application dose 125 L/ha after FH, 2000 kg/ha dolomite after
chopping, and control. The current land condition is the chopper application.
Research & Development DepartmentWeekly Report
In treatment C (application of 100L / Ha humic acid) does not show a significant increase
from 0 BSA to 3 BSA, this also occurs in control treatments in parameters (C-organic,
phosphate, and soil potassium).
Research & Development DepartmentWeekly Report
Next Project
A. Building Web GIS using GeoServer, collaboration with IT