CONSTRUCTION NOTES 30 BAR DIA. 30 BAR DIA.

MAIN REINFORCEMENTS TO BE

VERIFY DEPRESSION
(min.) (min.)
CONTINUOUS (TOP & BOTT. BARS)
TABLE OF LAP SPLICE & ANCHORAGE LENGTH

D=FOR BEAM
t=FOR SLAB
A. GENERAL WHERE JOINTS IS AT POINT OF

550
NOTES: STRESS, PROVIDE SHEAR RODS

550
1. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL DRAWINGS UNLESS OTHERWISE LAP SPLICES LENGTH WITH ENGINEERS APPROVAL
BAR SIZES ANCHORAGE 1. YIELD STRESS OF HOOPS = 40 KSI
SHOWN OR NOTED. MODIFY TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS. (MM) LENGTH (M)
TYPE "A" TYPE "B" 2. D = USE MAXIMUM COLUMN DIMENSION,
2. SHOP DRAWINGS WITH ERECTION AND PLACING DIAGRAMS OF ALL STRUCTURAL STEELS, 1/6 CLEAR HEIGHT OR 18" (450mm) 50
MISCELLANEOUS IRON, PRE-CAST CONCRETE ETC. SHALL BE SUBMITTED FOR ENGINEERS 0.40 0.30 0.60 (MIN.) (MIN.)
WHICHEVER IS GREATER. 550
APPROVAL BEFORE FABRICATION. D=FOR BEAM

D/3
0.45 0.35 0.60 3. NUMBER OF HOOP TIES SAME AS PER
2t=FOR SLAB

D/3

D
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS BEFORE ALL WORK IS TO BEGIN CHECK WITH COLUMN TIES SCHEDULE.
MECHANICAL AND ELECTRICAL CONTRACTORS FOR CONDUITS PIPE SLEEVES, ETC., TO BE 30 BAR DIA.

D/3
0.61 0.40 0.60 4. ALL CONCRETE REINFORCEMENT DETAIL
EMBEDDED IN CONCRETE. (min.)
0.76 0.56 0.60
SHOULD BE DONE IN ACCORDANCE WITH BEAM
4. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ADEQUATE SHORING & BRA- ACI DETAILING MANUAL 1980 PUB SP-66
CINGS OF THE STRUCTURE FOR ALL LOADS THAT MAYBE IMPOSED DURING CONSTRUCTION. 1.10 0.90 0.68
TYPICAL SLAB & BEAM TYPICAL DETAIL FOR BEAM
550
B. CONCRETE & REINFORCEMENT 1.40 1.20 0.86
CONSTRUCTION JOINT DET. OR SLAB CHANGE SOFFIT
DOWEL BARS TO
1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM WITH THE LATEST NATIONAL BUILDING CODE OF
1.90 1.40 1.12
TYPICAL CONNECTION DETAIL FLR. SLAB OR BEAM MATCH VERT. BARS
THE PHILIPPINES AND NSCP 2010 2.41 1.84 1.43
OF R.C. WALL AT CORNERS

(DOWEL)
2. ALL CONCRETE SHALL DEVELOP A MIN. COMPRESSIVE STRENGTH AT THE END OF TWENTY 1. ALL JOINTS AND CELLS

400
NOTES:

VERIFY ARCHITECTURAL
EIGHT (28) DAYS W/ CORRESPONDING MAXIMUM SIZE AGGREGATE & SLUMPS AS FOLLOWS. H CONTAINING REINFORCING
1. TYPE "A" BUNDLED BARS
MID-DEPTH OF SLAB BARS SHALL BE FILLED
TYPE "B" INDIVIDUAL BARS CROSS-TIE
LOCATION 28 DAYS STRENGTH MAX. SIZE AGGREGATE MAX. SLUMP MAIN REINFORCEMENTS AT EACH CORNER WITH CONCRETE GROUT.
2. NOT MORE THAN 33% OF THE BARS SHALL BE TO BE CONTINUOUS 2. FOR REINFORCEMENTS SEE

350mm. MAX.
FOUNDATION FOOTING 20.7 Mpa (3000 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM) SPLICED WITHIN THE REQUIRED LAP LENGTH
CONSTRUCTION NOTES.
COLUMNS 20.7 Mpa (3000 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM) 10 @ 300 O.C. BOTT. BARS
dm

H
40
BEAMS, SLABS 20.7 Mpa (3000 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM) in.

(DOWEL)
400
400
SLAB ON GRADE 17.0 Mpa (2500 PSI) 3/4 IN. (19 MM) 4 IN. (100 MM) FOR FLOOR SLAB ONLY

t/3 t/3
t/3

t
3. ALL REINFORCING BARS SHALL CONFORM TO ASTM A615 GRADE 33 ( Fy = 230 MPa ) FOR DIAMETER 12 &
PLAN

CONF. REINF.
SMALLER BARS AND GRADE 40 ( Fy = 275 MPa ) FOR DIA. 16 AND LARGER BARS. JOINT HOOP SPACE @ "2Sh" WHEN SLAB 38mm
OPENING CLEAR
4. IN GENERAL, THE LATEST EDITION OF ACI-315, MANUAL OF STANDARD PRACTICE DETAILING
LAP SPLICE LENGTH: THERE ARE BEAMS HAVING WIDTH OF MAIN REINFORCEMENT
TYP. SECTION OF MASONRY

JOINT REINF. D
AT ANY LEVEL NO MORE THAN AT LEAST ONE-HALF THE COLUMN
REINFORCED CONCRETE STRUCTURES SHALL BE ADHERED TO UNLESS OTHERWISE SHOWN
PARTITION REINFORCEMENTS

t OR 1/4 D
ALTERNATE BARS SHOULD BE WIDTH & DEPTHS NOT LESS THAN

400
t
OR NOTED. SLEEVES FOR UTILITY
SPLICED. MIN. DISTANCE BET. THREE QUARTERS OF THE DEEPEST PIPES MAX. 1/5 D

D
H (CLEAR HEIGHT OF COL.)
5. MAINTAIN MINIMUM CONCRETE COVER FOR REINFORCING STEEL AS FOLLOWS. TWO ADJACENT BARS SPLICES BEAM THAT FRAME INTO FOUR

CONF. REINF.PER SCHEDULE CONF. REINF.


SUSPENDED SLABS 20 mm SHALL BE 600mm. SIDES OF THE COLUMN. ALL OTHER IN TWO WAY SLAB EXTEND DOWN INTO EDGE BEAM. EXTENDED
SLAB ON GRADE 40 mm CONDITIONS USE HOOPS @ "Sh" CENTERS. BARS UP TO BEAM SUPPORT

WITHIN CENTER
L EACH SIDE OF SLEEVES

D
HALF OF "H"

Sh
BEAM STIRRUPS AND COLUMN TIES 40 mm BARS MIN. OF 1,200 (4'-0") INTO BARS.
OMIT TRIMMER BARS WHERE
WHERE CONCRETE IS EXPOSED TO
EARTH BUT POURED AGAINST FORMS 50 mm
0.25L
TYP. DET. FOR SLEEVES OPENING IS FRAMED BY BEAM

COLUMN TIES AS
TOP BARS @ SUPPORT (CONT.)
WHERE CONCRETE IS DEPOSITED
DIRECTLY AGAINST EARTH 75 mm
REQ'D. BOTT. BARS @ SUPPORT
FOR COL. BAR SPLICES SEE TABLE
OF MIN. LAP SPLICE LENGTH OF
THRU CONCRETE BEAM TYP. SLAB OPENING DET. 0
60
COLUMN REINFORCEMENT

JT. REINF.
CONF. REINF. TIES LAT. TIES

0
60
6. SPLICES SHALL BE SECURELY WIRED TOGETHER & SHALL LAP OR EXTEND IN ACCORDANCE Dbar
W/ TABLE 1 (TABLE OF LAP SPLICE & ANCHORAGE LENGTH) UNLESS OTHERWISE SHOWN

Sh
ON DRAWINGS. SPLICES SHALL BE STAGGERED WHENEVER POSSIBLE.

D
7. ALL ANCHOR BOLTS, DOWELS, AND OTHER INSERTS SHALL BE PROPERLY POSITIONED & 0.165L SPLICE
BOTTOM BARS NOTE: LE

D JOINT REINF.
AT MID SPAN
SECURED IN PLACE PRIOR TO PLACING OF CONCRETE. ALL CONCRETE REINF. DETAIL SHOULD
0.22L EXTRA TOP BARS BE DONE IN ACCORDANCE WITH ACI

60
8. THE CONTRACTOR SHALL NOTE AND PROVIDE ALL MISCELLANEOUS CURBS, SILLS, STOOLS, @ SUPPORT

CONF. REINF.

0
DETAILING MANUAL (LATEST EDITION)
EQUIPMENT'S AND MECHANICAL BASES THAT ARE REQUIRED BY THE ARCHITECTURAL,
ELECTRICAL, AND MECHANICAL DRAWINGS. BAR DIAMETER MINIMUM BEND EXTENSION
9. ALL CONCRETE SHALL BE KEPT MOIST FOR A MINIMUM OF SEVEN CONSECUTIVE DAYS TYP. DETAIL OF COL. LAP SPLICE Dbar RADIUS R LE TYPICAL CORNER SLAB DETAIL
IMMEDIATELY AFTER POURING BY THE USE OF WET BURLAP FOG SPRAYING, CURING 3Dbar 12Dbar
COMPOUNDS OR OTHER APPROVED METHODS. & EXT. GIRDER TO COL. CONNECT. TYPICAL COLUMN ELEV. SHOWING 4Dbar 12Dbar NOTE:
10. STRIPPING OF FORMS AND SHORES: PROVIDE THESE ADDITIONAL BARS FOR
FOUNDATION 24 HRS. DOWELS AND TIES SPACING 90 DEG. STANDARD HOOK FOR ALL OPENINGS PLUS BARS (NOT
SHOWN) PARALLEL TO SIDE OF OPENING
SUSPENDED SLAB EXCEPT WHEN
ADDITIONAL LOADS ARE IMPOSED 8 DAYS NONSTIRRUP REINFORCEMENT EQUAL TO THE NUMBER OF TERMINATED
BARS AT OPENING
WALLS 18 HRS.
BEAMS 14 DAYS 12 THK. EXPANSION JOINT SEE ARCHITECTURAL & MECHANICAL
WITH MASTIC FILLER Dbar PLANS FOR SLAB OPENING LOCATION.
FOR SIZE AND SPACING
C. MASONRY AND CONCRETE BLOCKS OF HOR. & VERT. BARS
SEE CONSTRUCTION NOTES D
CHB WALL DOOR
1. ALL NON-LOAD BEARING TYPE CONCRETE BLOCKS SHALL HAVE A UNIT WEIGHT NOT TO

(DOWEL)
(DOWEL)

OPENING

400
EXCEED 80 PCF. FOR LOAD BEARING TYPE, TYPE CONCRETE BLOCKS, A MINIMUM DOWEL BARS TO MATCH
FOR SIZE AND SPACING
400

CHB VERT. BARS


COMPRESSIVE STRENGTH OF 6.90 MPA SHALL BE DEVELOPED. OF HOR. & VERT. BARS
SEE CONSTRUCTION NOTES. LE
38mm CLEAR WINDOW
SIDE OF OPENINGS.

200
FOR SIZE AND SPACING BAR DIAMETER MINIMUM BEND EXTENSION OPENING
3. LINTEL BEAMS SHALL BEAR AT LEAST 8 INCHES (200 MM) ON EACH SIDE OF MASONRY OF HOR. & VERT. BARS
Dbar DIAMETER D LE
SEE CONSTRUCTION NOTES.
WALL OPENING. SECTION 6Dbar 4Dbar >60
4. WALL REINFORCEMENTS SHALL BE AS FOLLOWS: CHB WALL

WALL THICKNESS VERTICAL REINFORCEMENT HORIZONTAL REINFORCEMENT


OPENING OR END WALL 8Dbar 4Dbar >60
200 (MIN) 200 (MIN)
CORNER WALL
6 IN. (150 MM)
4 IN. (100 MM)
180 DEG. STANDARD HOOK FOR
5. REINFORCING BARS SHALL BE LAPPED A MINIMUM OF 30 BAR DIAMETERS WHERE SPLICE
NONSTIRRUP REINFORCEMENT TYP. EXTERIOR WINDOW. & DOOR OPENING
CHB WALL R.C. COLUMN OR WALL @ 150 O.C.
DOWELS FROM FOOTING OR SLABS SHALL EXTEND INTO THE BLOCK WALL A MINIMUM OF
30 BAR DIAMETERS, AND DOWELS TO MATCH. DOWEL BARS TO MATCH
CHB HOR. BARS CHB WALL
6. ALL CELLS CONTAINING REINFORCING BARS OR INSERTS SHALL BE SOLIDLY FILLED WITH 12 THK. EXPANSION JOINT SEE CONSTRUCTION NOTES
CONCRETE GROUT (REFER TO SPECIFICATIONS). 12 THK. EXPANSION JOINT FOR MASONRY WALL REIN-
WITH MASTIC FILLER DOWEL TO MATCH DOWEL TO MATCH
WITH MASTIC FILLER FORCEMENTS (TYPICAL)
FIN. FLR. LVL. CHB VERT. BARS CHB VERT. BARS
OPENING

VARIES
D. FOUNDATION BARS TYPICAL WHERE DEPRESSED
300 300 SLAB OCCURS
1. FOUNDATION DESIGN WAS BASED ON SOIL BEARING CAPACITY OF 95.76 KPA
(DOWEL)

NAT. GRD. LVL. (TYP.) (TYP.)

DOWEL

DOWEL
DOWEL BARS TO MATCH
400

400

400
CHB VERTICAL BARS

600 (MIN.)
FOR SIZE AND SPACING
OF HOR. & VERT. BARS FIN. FLR. LVL. FIN. FLR. LVL.
SEE CONSTRUCTION NOTES. 400 @ 300 O.C.

250

250

250
(DOWEL)

INTERSECTION WALL INTERSECTING R.C. COL. OR WALL ELEVATION


400 400 400
TYP. DET. OF LINTEL BEAM
TYPICAL CONNECTION DETAIL OF MASONRY WALL AT CHB WALL OPENING TYPICAL CHB FOOTING DETAILS ( WHERE APPLICABLE )
TRACED BY : (COPIED FROM ORIGINAL PLAN)
PROJECT & LOCATION: SHEET CONTENTS: CHECKED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

JOVEN MARK D. ORIEL


PROPOSED TWO (2) - STOREY DPWH Engineering Assistant
DISTRICT ENGINEERING OFFICE CONSTRUCTION NOTES CHECKED BY :
BUILDING, MANCAROGO, BISLIG CITY,
RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
Asst. Chief, Planning & Design Section
SMITH S. SOLIS
Engineer II
150 100 150 mm thick C.H.B.

100mm thick C.H.B.

150mm thick C.H.B. 100mm thick C.H.B. VARIES


400 / 500

100 100
C.H.B. HOR. BARS C.H.B. HOR. BARS

100
100mm thick C.H.B.
HOR. BARS

500, max.
VERT. BARS VERT. BARS
FIN. GRD. LN. FIN. GRD. LN.
C.H.B. HOR. BARS

200

200
NAT. GRD. LN. NAT. GRD. LN.
C.H.B. HOR. BARS C.H.B. HOR. BARS VERT. BARS
VERT. BARS

350

300
850 NATURAL G. L.

850

100 250
BARS
SEE SCHEDULE OF
DOWEL BARS TO MATCH
FOOTING BMS
250 100mm THK. WELL- WITH VERT. BARS @600mm

250
BARS BARS
COMPACTED GRAVEL FILL FTB O.C. DOWEL BARS
650
100

100
100mm THK. WELL-COMPACTED 100mm THK. WELL-COMPACTED 100mm THK. WELL-COMPACTED
GRAVEL FILL GRAVEL FILL GRAVEL FILL
400 400
WF - 3 C.H.B. WALL on FTB
WF - 1 WF -2
1 2 3 4 5 6 7 8
7 EQUAL BAYS @ 5000 = 35000mm
2 DETAIL OF WALL-FOOTINGS (WF) 2900 5000 10000 5000 5000 1300 3700 5000 2550
SCALE 1 : 20 m.
S-2 2000 3250 1700 3300
1775
SC-5 SC-5
F-1,C-4 SC-2 F-1,C-1 SC-5 SC-5 F-1,C-1 F-1,C-4
F-1,C-1 WF-1 SC-2 SC-2 F-1,C-1
SC-2 SC-2

WF-1
DESIGN CRITERIA : F-1,C-1 F-1,C-1

1500

WF-1
WF-1
WF-1

WF-1

WF-1

WF-1
WF-1

WF-1
WF-1
WF-1

WF-1
SC-2 WF-1 WF-1

925
FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 WF-1
1. DEAD LOAD :
CONCRETE
D
STEEL

2350
FINISH = 1.50 kPa

FTB-3
FTB-3
2. LIVE LOAD :

3500
CORRIDOR / STAIR = 4.80 kPa WF-1
SC-1 WF-1

FTB-1
5000

FTB-2

FTB-2
OFFICE = 2.40 kPa

FTB-2
SC-1 SC-1

FTB-2
FTB-3
ROOF = 1.00 kPa WF-2

6250
WF-2
STAIR = 4.80 kPa

2650
F-2a,C-2 F-2,C-4 F-2,C-1 F-2,C-1 F-2,C-1 F-2,C-1 F-2,C-4 F-2,C-2

WF-2

WF-2
3. SEISMIC LOAD AS PER NSCP 2010 RECOMMENDATIONS

WF-2
Cv I WF-2

1200
V = ----------W WHERE : FTB-1 WF-2

2700
FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1
RT R = 8.5 C

WF-2
3 EQUAL BAYS @ 5000 = 15000mm

WF-2
I = 1.0

WF-2
1250
WF-3 2650
2.5 Ca I Cv = 0.64 Nv SC-3 WF-2 WF-2 WF-2 WF-2 WF-2 WF-2
V max = ----------------W Ca = 0.44 Na 4
SLAB ON FILL

(SEE STAIR DET.)


550
(SEE STAIR DET.)
R Na = 1.20 4 WF-3 WF-2 WF-2 S-9
Nv = 1.60 S-9 TEMP. BARS@ 350mm O.C. EACH WAY

FTB-1
FTB-1
2500

FTB-2

FTB-2

FTB-2

FTB-2

FTB-2

FTB-2

1500
WF-2
V min = 0.11 Ca I W W = SEISMIC DEAD WEIGHT
4. WIND LOAD AS PER NSCP 2010 RECOMMENDATIONS
WIND SPEED = 250 kPH (ZONE II)

1150 600
WF-3 WF-2 WF-2 WF-2 WF-2 WF-2 WF-2 WF-2
5. ALLOWABLE DESIGN STRESSES , MPa
CONCRETE SC-3
f'c = 21.00 MPa @28 DAYS FOR BEAMS, COLUMNS, SLABS, FOOTINGS WF-3
FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1
f'c = 17 MPa @28 DAYS FOR SLAB - ON - FILL
REINFORCING STEEL BARS , MPa
B
1200

WF-2 dry wall partition

2625
F-2a,C-1 F-2,C-4 F-2,C-1 F-2,C-1 F-2,C-1 F-2,C-1 F-2,C-4 dry wall partition F-2,C-1

WF-2
STRUCTURAL STEEL ASTM - A36
6250

FTB-4

FTB-4
FOR TRUSSES, BRACING, & STRUTS f'c = 248.00 MPa
5000

FTB-2

FTB-2

FTB-2

FTB-2

FTB-2
FTB-2
FOR PURLINS, USE COLD FORMED LIGHT GAGE SHAPES f'c = 124.00 MPa
SC-2 dry wall partition SC-2
MASONRY UNIT - CHB
NONE LOAD BEARING CHB , WALLS f'c = 2.40 MPa WF-2 dry wall partition
F-2,C-4 F-2,C-4 F-2,C-4 F-2,C-4
2375

2375
STRUCTURAL BOLTS F-1,C-1 F-3,C-3 F-3,C-3 F-1,C-1
ASTM A307 FOR ANCHOR BOLTS
WELDS E - 60xx ELECTRODE
6. FOUNDATION A

WF-1
WF-1
FTB-1

WF-1
600
ALLOWABLE SOIL BEARING CAPACITY = 95.76 kPa FTB-1 FTB-1 FTB-1 FTB-1 FTB-1 FTB-1

WF-1
850
1500

1500
WF-1

1950
2000

F-1a
NOTE : SC-4 SC-4
WF-1
1150

WF-1
WF-1
WF-3
WF-1 F-1a F-1a F-1a F-1a F-1a F-1a F-1a F-1a F-1a F-1a F-1a F-1a F-1a F-1a F-1a F-1a WF-1

500
1. IN CASE THE ACTUAL ALLOWABLE SOIL BEARING CAPACITY IS FOUND LESS THAN THE ASSUMED 95.76 kpa,

WF-1
WF-1

WF-1

WF-3
NOTIFY THE DIRECTOR , BUREAU OF DESIGN FOR PROPER REVISION OF FOOTINGS . WF-1
F-1,C-1
2. NO FOOTING SHALL REST ON FILL .

1200
3250 1622 1306 1306 0 1306 7 EQUAL SPACES = 7389 1750 3250
3. ON ROOF TRUSSES CONSTRUCTION , THE CONTRACTOR / FABRICATOR SHALL SUBMIT SHOP
DRAWING DETAILS OF TRUSSES PRIOR TO ITS INSTALLATION FOR APPROVAL BY THE
BUREAU OF DESIGN.
1 FOUNDATION PLAN

WF-3
S-2 SCALE 1 : 100 M. 5700 WF-3 (SEE STAIR DET.) WF-3
300
4
S-9

TRACED BY : (COPIED FROM ORIGINAL PLAN)


PROJECT & LOCATION: SHEET CONTENTS: CHECKED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

JOVEN MARK D. ORIEL


PROPOSED TWO (2) - STOREY DPWH - DESIGN CRITERIA Engineering Assistant
DISTRICT ENGINEERING OFFICE - FOUNDATION PLAN CHECKED BY :
BUILDING, MANCAROGO, BISLIG CITY, - DETAIL OF WALL FOOTINGS RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
Asst. Chief, Planning & Design Section
1
FACE OF SC-3
2650
1400

SEE DETAIL 7 / S-11


SEE DETAIL 4 & 5 / S-11 12mm THK. GUSSET
50 x 75 x 3mm TUBULAR 150 PLATE DIMENSION
STEEL PURLINS SPACED AS SHOWN
AS SHOWN
13 13
6mm THK.
ANCHOR BOLT
GUSSET PLATE 2-6mm THK. STEEL PIPE
6mm THK. 50 100 WELDED TO B.I. PIPE

30
6mm THK.

950
ALUMINUM METAL GUSSET PLATE GUSSET PLATE 50mm x 50mm x 4.5mm STANDARD WASHER
CLADDING (BY OTHERS) BEARING PLATE AND NUTS
300

210
30
SEE DETAIL 2 / S-11 TOP / EDGE LINE STD. WASHERS AND

67

67
OF CANOPY NUTS

110
150
SECOND FLR. LN. B ALUMINUM CLADDING

55
(+ACCESSORIES) (BY

120
OTHERS)
6mm THK. GUSSET PLATE 155 12mm THK. STEEL

175
VERIFY
2 63mm x 63mm x 8mm PLATE WELDED TO TOP

800

131
VERT. WEB MEMBER 55 CHORD OF CT-2
2 44mm x 44mm x
6mm THK. SEE DETAIL 3 / S-11 50 x 75 x 3mm TUBULAR
5mm WEB MEMBERS FULL WELD

120
GUSSET PLATE xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx STEEL PURLIN EACH SIDE
2 50mm x 50mm x 8mm ANGULAR CEILING LINE
(TOP CHORD & BOTTOM CHORD) TOP CHORD OF CT-2 TOP CHORD OF CT-2
6mm THK. 50mm x 50mm x 4.5mm
GUSSET PLATE BEARING PLATE FULL WELD
3 @ 700 549 B 250
EACH SIDE
7 ELEVATION "B-B"
6 DETAIL S-11 SCALE 1 : 5 M.
SCALE 1 : 5 M.
S-11
1 ELEVATION OF CANTILEVER TRUSS (CT-2)
SCALE 1 : 20 m.
S-11

10mm THICK x 250mm x


250mm STEEL PLATE
250

230 100 80
60 130 60 ANCHOR BOLTS W/
TOP CHORD SC-3 70 X 70 X 10mm STEEL PLATE
OF CT-2 WASHERS AND NUTS
50
30

60

60
55

50
50

100
10mm THK. STEEL PLATE
230 x 250 x 6mm 230 x 250 x 6mm THK. STEEL 155 ( FULLY WELDED TO STEEL

xxxxxxxx
STEEL PLATE PLATE WELDED TO PLATE )
250

250
130

130
120

2 s- 63 x 63 x 8mm
120

WELDED TO 10mm THK. x 250 x 250mm


250

2 63 x 63 x 8mm VERT. WEB MEMEBERS


STEEL PLATE

100
LONG ANCHOR BOLT W/ LONG ANCHOR BOLT
50
50

60

60
50mm x 50mm x 4.5mm WASHERS AND NUTS
STEEL PLATE
30

30 30 50 2-6mm THK. STEEL PLATE


FULL WELD
115 30 30 EACH SIDE LONG ANCHOR BOLT
BOTTOM CHORD 2-10mm THICK STEEL
230 OF CT-2 B.I. PIPE PLATE WELDED TO
10mm THICK x 250mm x
250mm STEEL PLATE

2 DET. CONN. OF CT-2 TO SC-3 ( @UPPER PLATE ) 3 DET. CONN. OF CT-2 TO SC-3 ( @LOWER PLATE ) 4 DETAIL 5 ELEVATION "A-A"
SCALE 1 : 5 M. SCALE 1 : 5 M. SCALE 1 : 5 M. SCALE 1 : 5 M.
S-11 S-11 S-11 S-11

TRACED BY : (COPIED FROM ORIGINAL PLAN)


PROJECT & LOCATION: SHEET CONTENTS: CHECKED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

JOVEN MARK D. ORIEL


PROPOSED TWO (2) - STOREY DPWH - ELEVATION OF CANTILEVER TRUSS (CT-2) Engineering Assistant
DISTRICT ENGINEERING OFFICE - DET. CONN. OF CT-2 TO SC-3, DETAIL AND CHECKED BY :
BUILDING, MANCAROGO, BISLIG CITY, - ELEVATION OF "A-A" / "B-B" RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
Asst. Chief, Planning & Design Section
310 x 310 R.C. PEDESTAL
D

250mm x 250mm x 12mm


C-1 BASE PLATE with 5mm THK. GUSSET PLATE
@ 4 FACES
@300mm O.C.
ANCHOR BOLTS

LB-3
@ 120mm O.C.
BUTT WELD CONCRETE COVERING
LANDING

200
125
100mm SLAB ON GRADE
@ 300mm O.C. EACH WAY

100
60
1250 TOP OF SIDEWALK 100mm WELL-COMPACTED
GRAVEL BEDDING

100

100
100
500
3 DETAIL OF R.C. CANOPY ( @ REAR )
SCALE 1 : 20 m.
S-12 REST @ 150mm O.C.

200
210 WELDED TO STEEL PLATE 100mm WELL-COMPACTED
FULL WELD TO STEEL PLATE GRAVEL BEDDING

100mm COMPACTED
SUBGRADE
550
200

5 ELEVATION ( F-1a )
120

SCALE 1 : 10 M.
S-12

R.C. SLAB
550
210 x 210 x 6mm STEEL PLATE FOOTING

STEEL PIPE
BUTT WELD 40 40
250mm x 250mm x 12mm
BASE PLATE
4mm THICK GUSSET PLATES

STEEL PIPE

40
550

310
170
2 ELEVATION
SCALE: 1: 5 M.

40
S-12

ANCHOR BOLT
210 210 x 210 x 6mm
STEEL PLATE 170
WELDED TO

310 310mm x 310mm PEDESTAL with


STEEL PIPE
( PEDESTAL )
210

120

@ 150mm O.C.

6 P L A N ( F-1a )
SCALE : 1:10 M.
S-12
ANCHOR BAR WELDED

PLAN TO STEEL PLATE


4 CONN. DETAIL OF STEEL PIPE TO CONCRETE PEDESTAL
1 CONN. DETAIL OF STEEL PIPE TO R.C. SLAB S-12 SCALE 1 : 10 M.

SCALE 1 : 5 M.
S-12

TRACED BY : (COPIED FROM ORIGINAL PLAN)


PROJECT & LOCATION: SHEET CONTENTS: CHECKED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

CONN. DET. OF STEEL PIPE TO R.C. SLAB (F-1a) JOVEN MARK D. ORIEL
PROPOSED TWO (2) - STOREY DPWH Engineering Assistant
PLAN AND ELEVATION
DISTRICT ENGINEERING OFFICE CHECKED BY :
BUILDING, MANCAROGO, BISLIG CITY, CONNECTION DET. OF STEEL PIPE CONCRETE
PEDESTAL ( F-1a ) PLAN AND ELEVATION RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
Asst. Chief, Planning & Design Section
DETAIL OF R.C. CAN0PY ( @ REAR )
150
250

250 100
350

500
450

300
300

150
with with with with
5 @ 100, REST @ 150mm O.C. with 5 @ 100, REST @ 150mm O.C. 5 @ 100, REST @ 200mm O.C.
5 @ 100, REST @ 150mm O.C. 5 @ 100, REST @ 150mm O.C.

SC-1 SC-2 SC-3 SC-4 SC-5


From FOUNDATION TO SECOND FLOOR BEAM From FOUNDATION TO SECOND FLOOR BEAM From FOUNDATION TO SECOND FLOOR BEAM From FOUNDATION TO SECOND FLOOR BEAM From FOUNDATION TO SECOND FLOOR BEAM
N O T E : ADOPT SC-2 AS VERTICAL STIFFENER
FOR CHB PARAPET WALL

2 DETAIL OF STIFFENER COLUMNS (SC)


SCALE 1 : 20 M.
S-3
600 600

TOP LN. of RB ROOF LEVEL COLUMN

50
TOWARDS THE CENTER FROM TOP OF

SCHEDULE OF COLUMNS
2nd FLR. BEAM & BOTTOM OF RB

FROM FOUNDATION TO FROM GROUND FLOOR FROM SECOND FLOOR


MARK
GROUND FLOOR TO SECOND FLOOR TO ROOF

450 450 450

450

450

450
C-1
SECOND F. L.
50

5@ 150, REST @250mm O.C. 5@ 150,REST @250mm O.C. 5@ 150, REST @250mm O.C.
50

2 TIES / SET 2 TIES / SET 2 TIES / SET


W 450 450 450
TOWARDS THE CENTER FROM FFL. &

GRID

450

450

450
C-2
BOTTOM OF 2nd FLR. BEAM

W/2
BAR - X

FTB

75mm, clr.
5@ 150, REST @250mm O.C. 5@ 150, REST @250mm O.C. 5@ 150, REST @250mm O.C
COLUMN Re-BARS, See Schedule of Columns 3 TIES / SET 3 TIES / SET 3 TIES / SET.
750 750 750

25 25

GROUND F. L. See Schedule of Columns

500

500

500
L/2

BAR - Y C-3
920

FINISH G. L.
varies

650
NATURAL G. L. 5@ 150, REST @250mm O.C 5@ 150, REST @250mm O.C. 5@ 150, REST @250mm O.C.
COLUMN 3 TIES / SET 3 TIES / SET 3 TIES / SET
L

FTB FTB GRID


FTB

FTB
FTB
450 450 450
400, typ.
FOOTING Re-BARS, Each Way
1500

450

450
450
C-4

100mm THK. WELL-COMPACTED GRAVEL FILL, Typical


W 5@ 150, REST @250mm O.C. 5@ 150, REST @250mm O.C. 5@ 150, REST @250mm O.C.
2 TIES / SET 2 TIES / SET 2 TIES / SET
ELEVATION
75mm, clr.
100mm THK. WELL-COMPACTED GRAVEL FILL, Typical
1 REFERENCE COLUMN-FOOTING
S-3
N. T. S. P L A N

TRACED BY : (COPIED FROM ORIGINAL PLAN)


PROJECT & LOCATION: SHEET CONTENTS: CHECKED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

JOVEN MARK D. ORIEL


PROPOSED TWO (2) - STOREY DPWH - REFERENCE COLUMN-FOOTING Engineering Assistant
DISTRICT ENGINEERING OFFICE - DETAIL OF STIFFENER COLUMNS CHECKED BY :
BUILDING, MANCAROGO, BISLIG CITY, - SCHEDULE OF COLUMN RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
Asst. Chief, Planning & Design Section
400

L
500 500
10000

500
PLACE AS SHOWN
MH MH
PILE REBARS DOWELED
INTO CAST FOOTING

W
COLUMN

MH MH

500

500
ELEVATION

500 500

1 SCHEDULE OF MICRO PILE P L A N


N. T. S.
S-3

TRACED BY : (COPIED FROM ORIGINAL PLAN)


PROJECT & LOCATION: SHEET CONTENTS: CHECKED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

JOVEN MARK D. ORIEL


PROPOSED TWO (2) - STOREY DPWH Engineering Assistant
- REFERENCE COLUMN-FOOTING
DISTRICT ENGINEERING OFFICE - DETAIL OF STIFFENER COLUMNS CHECKED BY :
BUILDING, MANCAROGO, BISLIG CITY, - SCHEDULE OF COLUMN RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
Asst. Chief, Planning & Design Section
BOTTOM BARS BENT -UP BOTTOM BARS (ALONG
ALTERNATE BARS @ S/4 LONG SPAN) BENT-UP
(ALONG SHORT SPAN ) BENT-UP ALTERNATE BARS
ALTERNATE BARS @ L/4
@ L/4 ( ALONG LONG SPAN )

( ALONG LONG SPAN )

100
SHORT SPAN ( S ) SHORT SPAN ( S ) SHORT SPAN ( S )
LONG SPAN ( L ) LONG SPAN ( L ) LONG SPAN ( L )

2 TYPICAL DETAIL OF SUSPENDED SLABS


S-4 SCALE : 1 : 20 M.

CL
1 2 3 4 5 6 7 8
7 EQUAL BAYS @ 5000 = 35000mm

1200 5000 5000 5000 5000 5000 5000 5000 1200


2000
50 x 75 x 3mm 4 3 4
@700mm TUBULAR S-8 S-12 S-8
PURLINS
2B-7 2B-7

2CB-2
SC-5 SC-5

2CB-2
SC-2 2B-7 SC-2 2B-7 SC-2 2B-7 SC-2 SC-2 2B-7 SC-2
R.C. CANOPY
250

250
SC-2 SC-2 2B-3

2CB-1
2CB-1

2CB-2
2B-3

2CB-2
1500

2CB-2

2CB-2
2CB-1

2CB-1
( SEE DETAIL )
1000

2CB-2

2CB-2
2CB-2

2CB-2
OPEN OPEN OPEN OPEN

D 2B-2 2B-2 2B-2 2B-2 2B-2 2B-2 2B-2


2800

2800
2B-6

2B-6
2S-6 (LB-3 BELOW) 2S-6
LINE OF DEPRESSED
OPEN
2350

2B-6

2S-5 LINE OF DEPRESSED LINE OF DEPRESSED SLAB (SEE ARCH'L.


2CB-1 SLAB (SEE ARCH'L. SLAB (SEE ARCH'L. PLANS/DETAILS)
2B-4 PLANS/DETAILS) PLANS/DETAILS) 2CB-1
5000

2B-3

2B-3

2B-3

2B-3

2B-3

2B-3

2B-3

2B-3
2S-1 2S-1 STAIRWELL 2S-1 2S-1 2S-1
(LB-2 BELOW)

2950
2400
2650

2B-4

STAIRWELL 2S-6

2B-1 2B-1 2B-1 2B-1 2B-1 2B-1 2B-1


C 2CB-1
3 EQUAL BAYS @ 5000 = 15000mm

850

OPEN
SC-3
CT-2
2CB-1

3000
2B-6
CANOPY 2S-6
5000

3300

2B-3

2B-3

2B-3

2B-3

2B-3

2B-3

2B-3

2B-3
(W/ ALUM. METAL 2S-1 2S-2 2S-2 2S-2 2S-2 2S-2 2S-1
CLADDING)

2CB-1
CT-2 SCHEDULE OF SLABS

1775
SC-3
1425
850

2B-1 2B-1 2B-1 2B-1 2B-1 2B-1 2B-1 REINFORCING BARS


B
MARK THICKNESS REMARKS
LINE OF DEPRESSED PARALLEL TO PARALLEL TO
2900 LINE OF DEPRESSED SLAB (SEE ARCH'L.
2425

2950
SLAB (SEE ARCH'L. PLANS/DETAILS)
LONG SPAN SHORT SPAN
PLANS/DETAILS)
5000

2B-3

2B-3

2B-3

2B-3
2B-3

2B-3

2B-3

2B-3

2B-3
SC-2 2S-1 2S-1 2S-1 2S-1 2S-1 2S-1 2S-1 SC-2 UP ALTERNATE @ L/4 FROM UP ALTERNATE @ L/4 FROM TWO WAY
2CB-1 2S-1 125mm+FIN.
LINE OF DEPRESSED FACE OF SUPPORT FACE OF SUPPORT REINFORCEMENTS
2CB-1 SLAB (SEE ARCH'L.
2350

PLANS/DETAILS) TWO WAY


2S-2 -DO- UP ALTERNATE @ L/4 FROM UP ALTERNATE @ L/4 FROM
2800

2800
2B-6
2B-6

2S-6 2S-6 FACE OF SUPPORT FACE OF SUPPORT REINFORCEMENTS


2B-2 2B-2 2B-2 2B-2 2B-2 2B-2 2B-2
A
750

750
TWO WAY
2CB-1

2CB-1

2CB-1

2CB-1
2S-3 -DO- UP ALTERNATE @ L/4 FROM UP ALTERNATE @ L/4 FROM
2CB-1

2CB-1
2S-4 REINFORCEMENTS
2000

2CB-1 2S-4 2S-4 2S-4 2CB-1 FACE OF SUPPORT FACE OF SUPPORT

1250
2B-3

2B-3
SC-4 SC-4 ONE WAY
2S-4 -DO- UP ALTERNATE @ L/4 FROM

4400
2B-4 2S-1 2B-4 TEMP. BARS REINFORCEMENTS
FACE OF SUPPORT
4 4
1200 3250 1750 S-8 1750 3250 1200 UP ALTERNATE @ L/4 FROM ONE WAY
S-8 2S-5 -DO- TEMP. BARS REINFORCEMENTS
2B-3 FACE OF SUPPORT

TWO WAY
650 650 2S-6 -DO- UP ALTERNATE @ L/4 FROM UP ALTERNATE @ L/4 FROM
REINFORCEMENTS
5000 5000 5000 5000 5000 5000 5000 FACE OF SUPPORT FACE OF SUPPORT

( SEE SHEET NO. S-12 )


1 SECOND FLOOR FRAMING PLAN
S-4 SCALE : 1 : 100 M.

TRACED BY : (COPIED FROM ORIGINAL PLAN)


PROJECT & LOCATION: SHEET CONTENTS: CHECKED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

JOVEN MARK D. ORIEL


PROPOSED TWO (2) - STOREY DPWH Engineering Assistant
- SECOND FLOOR FRAMING PLAN
DISTRICT ENGINEERING OFFICE - TYPICAL DETAIL OF SUSPENDED SLABS CHECKED BY :
BUILDING, MANCAROGO, BISLIG CITY, - SCHEDULE OF SLABS RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
Asst. Chief, Planning & Design Section
SCHEDULE OF BEAMS AND GIRDERS SCHEDULE OF BEAMS AND GIRDERS
SIZES (mm) REINFORCEMENT BARS BAR ARRANGEMENT SIZES (mm) REINFORCEMENT BARS BAR ARRANGEMENT

STIRRUPS SIZE STIRRUPS SIZE


MARK WIDTH DEPTH SUPPORT MID - SPAN EXT. MID. INT. REMARKS MARK BREADTH DEPTH SUPPORT MID - SPAN EXT. MID. INT. REMARKS
AND SPACING AND SPACING

b t TOP BOTTOM TOP BOTTOM SUPP. SPAN SUPP. b t TOP BOTTOM TOP BOTTOM SUPP. SPAN SUPP.

250 400 8@100,REST LB - 1 250 300 6@100,REST


2B - 1 @200mm O.C.
@200mm O.C.

2B - 2 250 400 8@100,REST LB - 2 250 300 6@100,REST


@200mm O.C. @200mm O.C.

2B - 3 250 400 8@100,REST LB - 3 250 450 6@100,REST


@200mm O.C. @200mm O.C.

2B - 4 250 400 8@100,REST


@200mm O.C.
SCHEDULE OF FOOTING TIE BEAMS (FTB)
REINFORCING BARS BAR ARRANGEMENT

2B - 5 250 350 8@100,REST MARK SIZES AT SUPPORT AT MID - SPAN AT AT AT STIRRUPS REMARKS
@200mm O.C. EXT. MID INT.
TOP BOTTOM TOP BOTTOM SUPP. SPAN SUPP.

2B - 6 200 350 8@100,REST 1@50,8@100,


FTB - 1 250 x 400 REST@250 O.C.
@200mm O.C.

1@50,8@100,
FTB - 2 250 x 400 REST@250 O.C.
2B - 7 150 350 4@100,REST
@200mm O.C.
1@50,8@100,
TYPICAL @
FTB - 3 250 x 400 REST@250 O.C.
2CB-1 250 400 8@100,REST SUPPORT AND
@FREE END
@200mm O.C. 1@50,8@100,
FTB - 4 250 x 400 REST@250 O.C.
TYPICAL @
2CB-2 350 4@100,REST SUPPORT AND
150
@FREE END
@200mm O.C.
SCHEDULE OF FOOTING
DIMENSION DEPTH REINFORCING BARS
RB - 1 300 400 8@100,REST FROM N.G.L.
@200mm O.C. MARK REMARKS
WIDTH LENGTH THICKNESS 'D' BAR - X BAR - Y
(W) (L) (t)
RB - 2 300 400 8@100,REST SQUARE
@200mm O.C. F-1 2200 2200 350 1500
FOOTING

SQUARE
RB - 3 300 400 8@100,REST F-2 2400 2400 400 1500
FOOTING
@200mm O.C.
RECTANGULAR
F - 2a 2400
2 2700
2 400 1500
FOOTING
RB - 4 300 400 8@100,REST
@200mm O.C. SQUARE
F-3 2600 2600 450 1500
FOOTING
PROVIDE
RB - 5 150 800 8@100,REST
@200mm O.C. WEB BARS
GRID GRID GRID
TYPICAL @ L3 = CLEAR SPAN
SUPPORT AND L1 L2 = CLEAR SPAN
RCB-1 350 450 8@100,REST
@FREE END L3 / 3 L3 /3
@200mm O.C.
L2 /3 L2 /3 TOP BARS @ TOP BARS @
TYPICAL @ MIDSPAN EXT. SUPPORT
RCB-2 300 400 8@100,REST SUPPORT AND
@FREE END
@200mm O.C.

TYPICAL @
RCB-3 350 450 8@100,REST SUPPORT AND
@FREE END CANTILEVER BEAM BOTTOM BARS BOTTOM BARS
@200mm O.C. BOTTOM BARS
@ INT. SUPPORT @ MIDSPAN @ EXT. SUPPORT
L2 /5 L2 /5 L3 /5 L3 /5
TYPICAL @
RCB-4 350 450 8@100,REST SUPPORT AND
@200mm O.C.
@FREE END
TYPICAL BEAM ELEVATION
NOT TO SCALE

TRACED BY : (COPIED FROM ORIGINAL PLAN)


PROJECT & LOCATION: SHEET CONTENTS: CHECKED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

JOVEN MARK D. ORIEL


PROPOSED TWO (2) - STOREY DPWH - SCHEDULE OF BEAMS AND GIRDERS Engineering Assistant
DISTRICT ENGINEERING OFFICE - SCHEDULE OF FOOTING TIE BEAMS CHECKED BY :
BUILDING, MANCAROGO, BISLIG CITY, - SCHEDULE OF FOOTING
- TYPICAL BEAM ELEVATION RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
Asst. Chief, Planning & Design Section
GRID GRID GRID

0
5000 5000
APEX OF
TOP CHORD

SOFAT OF
BOTTOM CHORD

T-1 LINE T-1 LINE T-1 LINE

STANDARD TURNBUCKLES.

2-LC 200 x 75 x 25 x 2.5


2 ST-1 ELEVATION (TYPICAL )
SCALE : 1 : 50 M.
S-6

1 2 3 4 5 6 7 8
7 EQUAL BAYS @ 5000 = 35000mm

5000 10000 5000 10000 5000


1750 1750
2 7
750 S-8 S-8 750 300
350
RB-5 350

1000 300
RB-5 RB-5

RCB-4

RCB-2

RCB-3
RCB-4
RCB-3

RCB-2
RB-5

RCB-3
RB-5
1500
RB-5 RB-5

RCB3
750
D 300 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1
1350

RB-2

RB-2

RB-3

RB-3

RB-2

RB-2
5000

RB-2

RB2
S-8
3650

RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1


C
3 EQUAL BAYS @ 5000 = 15000mm

850

R.C. COUNTER FLASHING


2500

(SEE DETAIL 6 / S-8) TYPICAL


OTHER SIDE
3300

RB-2

RB-2

RB-2

RB-2

T-1 RB-2
RB-2

RB-3

RB-3
T-1

T-1
ST-1 ST-1 ST-1 ST-1 ST-1 ST-1 ST-1
5000

RIDGE LINE
T-1

T-1

T-1

T-1

T-1
2500

850

RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1


B
2900
3650

RB-4

RB-4

RB-3

RB-3

RB-3

RB-4

RB-4
5000

RB3
1350

RB-1 RB-1 RB-1 RB-1 RB-1 RB-1 RB-1


A
750

500 1000
RCB-2

RCB-3

RCB-2
RCB-3
RCB-1

RCB-1

RCB-1
2000

RCB-1
RCB-1

RB-5 RB-5 RB-5 RB-5

RCB-1
400
RB-5 RB-5
400 225 750 750 225 400
300

300
RB-5
3250 1750 LC - 150 x 50 x 18 x 3mm 1750 3250
SHOWN (TYPICAL PER BAY) with STANDARD TURN-BUCKLES @
PURLINS @ 700mm O.C., with 1
EVERY OTHER BAY
50 x 50 x 5 x 100mm CLIP ANGLE + S-8
1
3 5
S-8
S-8 S-8

(SC-2) ON BOTH ENDS @ EVERY VERTICAL GRIDS (2 to 7) & @MID-SPAN OF EVERY BAY
VERT. GRIDS OR 2500mm O.C. (MIN.) TYPICAL OTHER SIDE ( ALONG GRID "D") & ALONG
GRID "1" & "8"

1 ROOF FRAMING PLAN


SCALE 1 : 100 M.
S-6

TRACED BY : (COPIED FROM ORIGINAL PLAN)


PROJECT & LOCATION: SHEET CONTENTS: CHECKED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

JOVEN MARK D. ORIEL


PROPOSED TWO (2) - STOREY DPWH Engineering Assistant
DISTRICT ENGINEERING OFFICE - ROOF FRAMING PLAN
CHECKED BY :
BUILDING, MANCAROGO, BISLIG CITY,
RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
Asst. Chief, Planning & Design Section
300 300
6mm THK
250mm X 300mm X 12mm THK.
BASE PLATE
GUSSET PLATE A D
BOTTOM CHORD 200mm X 300mm X 12mm THK.
OF T-2 LC - 150 x 50 x 18 x 3.0mm
50 50 BASE PLATE PURLIN @ 700mm O.C.
25 mm THK. 50 50
LEVELLING GROUT
100

50

50
200

250
PC 1 : PURLIN CONNECTOR BENT PLATE -
LONG ANCHOR BOLTS 4mm x 125 x 125 (LEG) x 50mm (LEG) WITH

50

50
RB AND WASHERS

300
50 50

RB BOTTOM CORD
ANCHOR BOLT
OF T-1
CONNECTION OF G.I. SHEET 2 s- 50 x 50 x 6mm TOP CHORD /

100
BOTTOM CHORD
3 ROOFING TO PURLIN DETAIL ELEVATION DETAIL PLAN 6mm THK. GUSSET PLATE
SCALE: 1 : 50 M. 200 x 300 x 12mm THICK
S-7 BASE PLATE

400
RB-1 25mm THICK LEVELLING GROUT
1C TRUSS TO BEAM / COLUMN CONN. DETAIL 300mm LONG

SCALE: 1:10 M.
S-7 ANCHOR BOLTS
R.C. COLUMN

STANDARD NUT &


300
WASHER ( STAGGERED )

LC - 150 x 50 x 18 x 3.0mm 225 225


PURLINS @ 700mm O.C.

250
SPOT DETAIL ( END CONN. OF TRUSS TO
WEB MEMBERS 6mm THK.
GUSSET PLATE 6mm THK.
GUSSET PLATE
WEB MEMBERS 1A EXTERIOR ROOF BEAM )
SCALE: 1 : 10 M.
S-7
C of SYMMETRY
L
LC - 150 x 50 x 18 x 3.0mm
250
PC 1 : PURLIN
PURLINS @ 700mm O.C. J-BOLTS
CONNECTOR
TOP CHORD PC 1 : PURLIN CONNECTOR BENT PLATE - PER REQUIRED LENGTH
4mm x 125 x 125 (LEG) x 50mm (LEG) WITH
150 BOTTOM CHORD PER REQUIRED LENGTH
PC 1 : PURLIN CONNECTOR BENT PLATE - BOTTOM CHORD 6mm THK. AND WASHERS
4mm x 125 x 125 (LEG) x 50mm (LEG) WITH GUSSET PLATE

200
AND WASHERS

TRUSS-PURLIN-ROOF CONN. DETAIL 1C DETAIL 1D DETAIL 1F DETAIL 6mm THK.


2 S-7 SCALE : 1:10 M. S-7 SCALE : 1:10 M. GUSSET PLATE
SCALE : 1:10 M.
S-7 SCALE: 1:5 M. S-7
6mm THK. GUSSET
PER REQUIRED LENGTH PLATE (TYP.)

2 s- 63 x 63 x 6mm
TOP CHORD 1B DETAIL 1E DETAIL
SCALE : 1:10 M.
CL
1B
SCALE : 1:10 M. S-7
2 S-7 S-7
S-7 1E
A B S-7
APEX OF C
LC - 150 x 50 x 18 x 3.0mm
TRUSS PURLINS @ 700 mm O.C.
1F D
S-7
300

TOP OF
ROOF 2 s- 50 x 50 x 6mm 1C
BEAM RB-1 (TYPICAL WEB MEMBERS ) RB-1 S-7 1D RB-1 2 s- 63 x 63 x 6mm RB-1
COLUMN
S-7 BOTTOM CHORD
1A 3 EQUAL SPACES = 5000mm 4 EQUAL SPACE = 5000mm 3 EQUAL SPACES = 5000mm
S-7

15000
COLUMN
SCHEDULE OF WELD
GUSSET PLATE MEMBER SIZE OF FILLET
THICKNESS THICKNESS WELD, t
1 DET. ELEVATION OF TRUSS-1 ( T-1 ) 3.0 mm 3.0 mm
SCALE: 1 :30 M.
S-7 4.5 mm 4.5 mm
10 mm
6.0 mm 4.5 mm
8.0 mm 6.0 mm

TRACED BY : (COPIED FROM ORIGINAL PLAN)


PROJECT & LOCATION: SHEET CONTENTS: CHECKED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

JOVEN MARK D. ORIEL


DETAIL ELEVATION OF TRUSS-1 (T-1), DETAILS Engineering Assistant
PROPOSED TWO (2) - STOREY DPWH
1A TO 1F, TRUSS-PURLIN-ROOF CONN. DET.,
DISTRICT ENGINEERING OFFICE CONN. CHECKED BY :
BUILDING, MANCAROGO, BISLIG CITY, OF G.I. SHEET ROOFING TO PURLIN, TRUSS TO RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD BEAM / COLUMN CONN, DET. AND SCHEDULE OF Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
Asst. Chief, Planning & Design Section
WELD
A D A
2000
2225 1300
700
1475 750
550 150 600 300 150 1150 150 325 225
150 225

150

150

150
@ 200mm O.C. @400mm O.C.

150
@
@250mm O.C. @ 400mm O.C. 200mm O.C., WITH

1200
TEMP. BARS @ 400mm O.C.
1500

SPACED AS SHOWN

1500
@ 400mm O.C. 200mm O.C. WITH

1200
200 100
100
@ 150mm, O.C. @250mm O.C.

BARS @ 250mm O.C. @ 250mm, O.C. @ 250 mm O.C.

300

300

300
@ 250mm, O.C. BOTHWAYS BOTHWAYS
TOP OF RB

150

150
200

400

400

400
RB-1 RB-1
@250mm O.C.
RB-1
@250mm, O.C. RB-5 O.C. BOTH WAYS
450

RB-5 250mm O.C. EACH WAY


RB-5

650
@250mm, O.C. 200mm O.C. 300

500
BARS @ 200mm, O.C.
150

SEE SCHEDULE OF BEAMS

100 150
AND GIRDERS FOR DETAILS
150
100 150 375 150 SHOWN SEE SCHEDULE OF BEAMS AND

BARS @ 250mm, O.C. 150 325 150 150


GIRDERS FOR DETAILS TYPICAL DETAIL SECTION
BOTHWAYS 3 PARAPET/ GUTTER (@ FRONT, ALONG GRID - A & GRID LINE BET. 1 & 2, 7 & 8)
DETAIL SECTION DETAIL SECTION S-8 SCALE 1:20 M.

1 PARAPET/ GUTTER (@ FRONT, ALONG GRID - A & BET. GRIDS 2 to 4 & 5 to 7) 2 PARAPET/ GUTTER (@ REAR, ALONG GRID - D & GRID LINE BET. 2 to 4 & 5 to 7)
S-8 SCALE 1:20 M. S-8 SCALE 1:20 M.

A 1 8
D
400 1000
625 225 525 1350 150
150
225 1125
300 150 100 100
TOP LINE OF R.C. COUNTER FLASHING
LOWER PARAPET W/ VARIABLE HEIGHT
(SEE ARCH'L
675

200
DRAWINGS)

175
EQUALLY SPACED @400mm O.C.
@ 400mm O.C.
100
1500

1500
@400mm O.C.
150

1200
150mm THK.
C.H.B. WALL
@ 400mm O.C.
SPACED AS SHOWN @250mm O.C.
150 EQUALLY SPACED 100 200
@400mm O.C.
TOP & BOTTOM BARS

300
SEE SCHEDULE OF @250mm, O.C.
1325

150mm THK. CHB WALL BEAMS AND GIRDERS

150
TOP BARS W/ 3-10mm
150

FOR DETAILS 250mm O.C.


TEMP. BARS

400
ROUGHENED SURFACE RB-1 RB-1
100

100 150

RB-1
300

500

800
@ 250mm O.C. E.W.
TOP & BOTTOM BARS
RB-5
2B-2

VERIFY
HOR. & VERT. BARS TOP & BOTTOM BARS
100
150

450 BOTTOM BARS

200
250 @250mm O.C. EACH WAY 500
150
1@50,3@100,
LB @ WINDOW
DETAIL SECTION
TOP & BOTTOM BARS REST@200mm O.C. 150
OPENING
7 PARAPET/ GUTTER (@ REAR, ALONG GRID - D & GRID LINE BET. 4 & 5)
S-8 SCALE 1:20 M.

DETAIL SECTION DETAIL SECTION


4 DETAIL SECTION(MEDIA AGUA) 5 PARAPET/ GUTTER (@ FRONT, ALONG GRID - A & BET. GRIDS 4 & 5) 6 R O O F PARAPET & R.C. COUNTER FLASHING ( TYP. @ GRID LINE 1 & 8 )
S-8 SCALE 1:20 M. S-8
SCALE 1:20 M. S-8 SCALE 1 : 20 M.

TRACED BY : (COPIED FROM ORIGINAL PLAN)


PROJECT & LOCATION: SHEET CONTENTS: CHECKED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

JOVEN MARK D. ORIEL


PROPOSED TWO (2) - STOREY DPWH Engineering Assistant
- PARAPET/GUTTER DETAILS
DISTRICT ENGINEERING OFFICE CHECKED BY :
BUILDING, MANCAROGO, BISLIG CITY,
RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
Asst. Chief, Planning & Design Section
2 EQUAL THREADS
5700 @ 300mm

100 200 200 100 CHAIR BARS

t=1
SPACED AS
SHOWN, NOSING BARS

00
GROUND FLR. LN. TEMPERATURE BARS

mm
100 100
PORCH FLOOR LEVEL

+F
THICK = 100mm

3 EQUAL RISES,@
IN.
481

160 481
+ FINISH
TOP OF SIDEWALK

481
DOWEL BARS TOP OF SIDEWALK
300 300

300

300
100mmTHK. WELL- COMPACT NATURAL GRADE LINE MAIN BARS
GRAVEL FILL 100mm THK. WELL-COMPACTED
GRAVEL FILL
100
3 DETAIL SECTION OF R. C. RAMP 100

S-9 SCALE 1 : 20 M. 4 DETAIL SECTION OF STAIR ON FILL


SCALE 1 : 20 m.
S-9
C D
1 2
5000
5000
CONTINUOUS / ANCHORED 8 EQUAL TREADS @ 275mm = 2200 mm
325 2475
1400 9 EQUAL TREADS @ 250mm = 2250mm TO 2B-1
ANCHORED TO 2B-3
SECOND FLOOR LINE
10
00

9 EQUAL RISERS @ 175mm = 1575mm


THICKNESS = 150mm + FINISH
THICKNESS = 170mm
TEMPERATURE BARS
10 EQUAL RISERS @ 175mm = 1750

TEMPERATURE BARS
TYPICAL 2B-3 2B-3
2B-4 THICKNESS = 125mm THICKNESS = 150mm + FINISH TYPICAL
+ FINISH
00
10 CHAIR BARS
CHAIR BARS

20 EQUAL RISERS @175 + FIN. = 3500mm


20 EQUAL RISERS @175 + FIN. = 3500mm
TEMPERATURE BARS 225
10
00
ANCHORED TO LB-1 & LB-3
BOTTOM BARS LB-3
AS SHOWN
225 CONTINUOUS / ANCHORED 1575 LANDING
TO LB-2
SHOWN TEMPERATURE 10 EQUAL TREADS @ 275mm = 2750mm
BARS

THICKNESS = 150mm + FIN.

11 EQUAL RISERS @ 175mm = 1925mm


THK = 150mm + FIN.
THICKNESS = 150mm + FINISH R.C. CANOPY
TYPICAL
10 EQUAL RISERS @ 175mm = 1750

TYPICAL LB-1
LB-2 THICKNESS = 170mm
LB-2
00 TEMPERATURE BARS
10
10
TEMPERATURE BARS 00 CHAIR BARS
CHAIR BARS

TEMPERATURE BARS
BOTTOM BARS 10
00
00
10

TEMPERATURE BARS

GROUND FLOOR LINE GROUND FLOOR LINE

300

300
FIN. GRD. LN.
FIN. GRD. LN.

VAR.

VAR.
150mm THICK STAIR
150mm THICK STAIR
WALL SUPPORT
NAT. GRD. LN. WALL SUPPORT
NAT. GRD. LN.

HOR. BARS E.F.


( EACH FACE ) @250mm O.C.
800

LONGITUDINAL TEMP. BARS VERT. BARS E.F. 800


100 250

100 250
500
500

1 DETAIL SECTION OF SERVICE STAIR


S-9 SCALE 1 : 20 M. 2 DETAIL SECTION OF MAIN STAIR
SCALE 1 : 20 M.
S-9
TRACED BY : (COPIED FROM ORIGINAL PLAN)
PROJECT & LOCATION: SHEET CONTENTS: CHECKED BY : SUBMITTED BY: RECOMMENDING APPROVED BY: APPROVED BY: SET NO. SHEET NO.

JOVEN MARK D. ORIEL


PROPOSED TWO (2) - STOREY DPWH - DETAIL OF STAIR (MAIN AND SERVICE STAIR) Engineering Assistant
DISTRICT ENGINEERING OFFICE - DETAIL OF R.C. RAMP AND STAIR ON FILL CHECKED BY :
BUILDING, MANCAROGO, BISLIG CITY,
RICARDO N. ORIEL FERDINAND C. ACMA CANDELARIO P. PORTILLO NOEL R. OCLARIT
BISLIG CITY SURIGAO DEL SUR 2ND LD Chief ,Planning & Design Section OIC - Assistant District Engineer District Engineer
Asst. Chief, Planning & Design Section