Sie sind auf Seite 1von 1

Revision 00

TP-BM JV. Issue Date May,16


HSE Hoist Checklist Next Review -
TPBM-AMS-HS-CHL-6.11.16 Page 1 of 1

FREQUENCY NAME OF PROJECT DATE


Daily From:_________ To: _________
Make / Model No. Location / Area. SWL / No. of Persons. Serial No.
Kg / Nos.
CHECKS
MON TUE WED THU FRI SAT SUN REMARKS
( If ok  If not ok )
PRE-START CHECK
Condition of mast, wire rope, cage & travel path.

Base enclosure. (Buffers, Water accumulation,


Housekeeping, door lock.)

Trailing power cable, Cable guides and rubber pads.

Hoist Door and locks.

Housekeeping inner car and roof.

Oil leak from gear box.

All control switches (On/Off, Up/Down, Emergency


stop) are functioning properly.
All limit switches (Main Doors, Roof door, slack rope
switch) are functioning properly.

Cabin Lights

3rd party Certificate, Emergency contact Numbers, First


Aid box and Fire Extinguisher placed in cage.
Drop Test

Operator Qualified & Trained

POST START CHECK

Brakes (Running car up and down)

Upper and lower limit switches working.

Sufficient clearance between cage and landing


platform in all landing areas.(Between 3 – 5 cm)
Landing Platform.(Stable, guardrail, toe board, door
locked, Access not obstructed)
All rollers are working smoothly.(No abnormal sound,
No vibration)

Resistor unit.(No overheating and Cooling fans are


working)

Safety Device. (No abnormal sound).

Visual inspection of ties, cathead and Sheaves.

First Shift Operator Initial

Second Shift Operator Initial

Last Tie at Level: _________


Operator Certificate Valid up to: _________________
Last Platform at Level: _________ rd
Hoist 3 party certificate valid up to: _________________
Last Cable Guide at Level: _________

P&M (Name):________________________ Signature: __________________

Safety (Name):________________________ Signature: __________________

Das könnte Ihnen auch gefallen