Beruflich Dokumente
Kultur Dokumente
APPENDIX- B
CERTIFICATION OF BTS FOR COMPLIANCE OF THE EMF EXPOSURE LEVELS (CALCULATION OF EIRP/EIRPth)
B-I : SITE DATA & TECHNICAL PARAMETERS
Name of BTS : BOH(HP/02/5271/0185/0016/03/01/01473) Date : 23-Sep-2017
Item Units BSNL-GSM Remarks
Site ID DEBOH1
Name BOH
Date of Commissioning 23-Sep-17
DATA
Note :We hereby confirm that the above site is compliant to the EMF levels as specified by DoT and effective at present. Digital signature of Authorized Signatory / Person (BSNL,HP)
Digitally signed
Harish by Harish Gupta
Date:
Certificate Id : HP/02/5271/0185/0016/03/01/01473/NS/23092017
Gupta 2017.09.23
13:26:32 +05'30' Page 1 of 7
Corner Details :
Building 0 (B0) EIRPth at the Building Roof Top Corners and other points on the periphery of exclusion zone
Distance from
Corners Height (mts)
Tower (mts)
C1 0 8.00
C2 0 9.00
C3 0 9.70
C4 0 4.70
OSS Snapshot-DHKADH-0726
OSS Snapshot-DHKADH-0726
PANORAMIC PHOTOS-DHKADH-0726
SIGNAGE PHOTOS-DHKADH-0726
Caution Danger