SR.

ANSWER
CHECK LIST Preparer Reviewer Approver
NO. (Y/N/NA)
A Document Presentation - Title Block
Is the format of document as per the project
1 (YES/NO)
standard?
Is the Document number as per VMS
2 (YES/NO)
document no. format?
Are the Document titles, Revision Numbers,
3 Dates, Scale, Sheet size, number of sheets (YES/NO)
correctly indicated?
Is the Correct Logo of the company is
4 (YES/NO)
indicated?
Is the Correct Logo and name of the client
5 (YES/NO)
indicated?
Is the style of the date entered in the correct
6 (YES/NO)
format? (DD/MM/YY or MM/DD/YY).
Are the Names of Prepared, Checked &
7 (YES/NO)
Approved by indicated?
8 Is the status of issue properly indicated? A/C (YES/NO)
Is the purpose of modification in revision table
9 indicated? (First issue or If commented by (YES/NO)
client, the Ref. letter no. etc.)
Is spell check has been performed before
10 (YES/NO)
check print or not.
If drawing is made in two or more sheets, then
11 check if proper continuation details from one (YES/NO)
sheet to another is provided or not?
B Specific Technical Points.
Building Hazard classification checked as per
12 (YES/NO)
NFPA/IS?
Check the type of Sprinkler system as per
13 (YES/NO)
NFPA/IS : Foam or water system?
Check the type of fire protection system as per
14 client & Code requirement and same has been (YES/NO)
shown in schematic?
Are all the levels of various floors indicated in
15 document is as per the final architectural (YES/NO)
layout?
Design Procedure (As per IS 15105)
16 Hazard Class (Low/Moderate/high)
Assumed area of operation (AMAO) & design
17
density as per referred standards.
Calculate water demand based on AMAO
18
operation
Pipe sizing based on sprinkler layout
19
(Flow/velocity)
Pressure drop & Pump Head calculation for
20
remote sprinkler branch
21 Sprinkler selection: major points
K factor
Temp rating
Sprinkler finish (corrosion resistant)
Alarm Valve & its assembly selection as per
22
main header pipe size
Installation points
Check whether sprinkler coverage, distance
23 between two sprinkler branch and distance
between two sprinklers as per hazard class.

Spacing w.r.t to Rafter, Colum & beam (to


24
avoid interference in spray pattern)
Check for pipe routing w.r.t roof layout
25
(Turbojets & Skylight)
Check for sprinkler layout type (Tree vs Ring
26
main)
Check for Location of test sprinkler-Open
27
head type
Check for Location of drain valve based on
28
slope of roof.
Check isolation valves (butterfly valve / sluice
29 valve) are provided in the system for
maintenance purpose?
Check whether all isolation valves (butterfly
30 valve / sluice valve) given in the system are at
workable height or not?
Check whether fire brigade connection is
31 provided at building face? (size of fire brigade
connection should be 150 mm)
If there is future expansion in the project,
please check that future expansion is
considered in current Sprinkler system.
Also check whether designed pipe size can
32 accommodate water requirement of future
expansion.
Also check that in schematic blind flange and
isolation valves are provided for future
expansion or not?
Check whether ring main pipe from pump
33 house to building is designed on the velocity
max of 5 m/s?
Check system has been designed as per
34 hydraulically calculated method or pipe
schedule method?
Check Sprinkler branch pipe size is limited for
35
velocity of 6-10 m/s.
Check whether alarm valve with butterfly valve
pressure gauge and pressure switch is
36
provided in the main sprinkler water supply
pipe?
Check whether 50NB drain pipe for sprinklers
37
and 25NB test lines are provided or not?
check interface with architectural and
38
civil/structure has been checked or not?