Beruflich Dokumente
Kultur Dokumente
I. PEKERJAAN PERSIAPAN
1 Pembersihan Perataan Tanah Lokasi 323.25 M2 18,062.00 5,838,541.50
2 Pengukuran/Pemasangan bouwplank 36.00 M1 99,830.80 3,593,908.80
3 Bangsal Kerja, Gudang, & Ruang Direksi 32.00 M2 1,518,667.15 48,597,348.80
4 Papan Nama Proyek 1.00 Ls 500,000.00 500,000.00
5 Mobilisasi/Demobilisasi 1.00 Ls 750,000.00 750,000.00
6 Dokumentasi dan Pelaporan 1.00 Ls 1,000,000.00 1,000,000.00
7 Pembersihan Akhir 1.00 Ls 500,000.00 500,000.00
60,779,799.10
II. PEKERJAAN TANAH
1 Galian tanah 211.48 M3 51,761.60 10,946,481.05
2 Mengurug kembali bekas galian 1/4 x 52.87 M3 24,819.96 1,312,223.84
3 Urugan Pasir dibawah pondasi 3.04 M3 473,300.40 1,437,886.62
4 Timbunan Tanah dibawah lantai dipadatkan 137.73 M3 64,702.00 8,911,082.95
5 Urugan Pasir dibawah lantai 31.18 M2 473,300.40 14,755,139.97
37,362,814.43
III. PEKERJAAN PASANGAN / BETON
Pas. Batu Kosong 4.46 M3 632,198.16 2,822,132.59
1 Pas. pondasi Batu Kali 1 : 4 15.28 M3 1,168,095.40 17,843,825.33
5 Pas. Dinding batu bata Trasraam 1 : 2 10.90 M3 199,006.86 2,169,672.29
1 Pas. dinding batu bata 1 : 5 251.87 M3 183,846.10 46,305,318.21
2 Plesteran Pondasi Dan Tangga 1:3 81.90 M2 70,043.54 5,736,566.25
2 Plesteran + Acian dinding Batu bata 1 : 4 503.74 M2 67,969.96 34,239,187.65
3 Plesteran + Acian dinding transram 1 : 2 21.81 M2 73,107.66 1,594,112.44
3 Plesteran Beton + Acian 1 : 3 18.34 M2 70,043.54 1,284,598.60
4 Pek.beton bertulang 1 : 2 : 3 :
- Sloof 25/30 ### 90.00 Kg 5.64 M3 5,645,634.60 31,841,379.14
- Kolom 10x10 ### 390.00 Kg 0.67 M3 11,786,955.90 7,838,325.67
- Kolom 35x35 170.00 Kg 2.02 M3 9,328,485.74 18,855,201.80
- Kolom 40x50 130.00 Kg 11.00 M3 9,037,849.74 99,416,347.14
- Balok Atap 15/20 ### 160.00 Kg 1.82 M3 11,470,311.56 20,818,615.48
- Balok Atap 20/25 ### 210.00 Kg 2.10 M3 12,110,835.56 25,432,754.68
- Balok Lantai 20/30 190.00 Kg 7.44 M3 11,696,625.80 87,022,895.95
- Plat Lantai 12 CM 170.00 Kg 18.29 M3 8,314,283.62 152,032,911.70
- Plat Atap 10 CM 180.00 Kg 1.32 M3 7,254,883.62 9,576,446.38
- Lisplank Beton Untuk Talang 10.00 Kg - M3 7,566,146.12 -
- Pondasi Telapak 130 X 130 170.00 Kg 8.79 M3 5,405,066.50 47,499,724.40
792,285,553.27
IV. PEKERJAAN KAYU DAN PENUTUP ATAP
1 Kosen pintu, Jendelah dan Ventilasi 4.82 M3 10,572,452.00 51,000,493.49
2 Daun Pintu Panel Papan Kls I 41.73 M2 745,262.00 31,099,783.26
3 Daun Pintu tripleks 0,30 mm Lapis Seng Plat 0.03 5.60 M2 603,927.80 3,381,995.68
4 Daun Jendela Kaca 5 mm Bingkai Kayu Kls I 45.00 M2 599,415.60 26,973,702.00
5 Pekerjaan Kaca 3 mm 31.31 M2 309,636.03 9,693,960.97
4 Kuda-kuda dan Konsol Kayu Kls I - M2 9,451,708.00 -
6 Gording 5/10 Kayu Kls II A - M2 6,407,928.00 -
6 Skor Angin Kayu 5/10 Kls II - M2 6,407,928.00 -
7 Kasau dan Ring Genteng - M2 109,496.10 -
8 Lysplank Kayu 1/30 Kls I - M2 299,111.20 -
9 Atap Genteng Metal Roof - M2 106,569.44 -
10 Bubungan Genteng Metal Roof 37.25 M1 411,208.10 15,317,501.73
11 Plafond Tripleks 5 mm + Rangka Kayu Kls II 456.75 M2 148,188.80 67,685,234.40
12 Lis Plafond Profil 2/5 Cm 189.60 M1 54,571.84 10,346,820.86
13 Mur Baut - Bh 31,536.01 -
14 Angker Baut - Bh 31,536.01 -
15 Beugel - Bh 31,536.01 -
215,499,492.39
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN JUMLAH
V. PEKERJAAN LANTAI
1 Lantai Rabat Beton Tebal 5 cm camp. 1 : 3 : 6 311.75 M2 55,391.20 17,268,206.60
4 Plesteran dan acian Lantai 311.75 M2 23,106.28 7,203,384.04
6 Pek. Lantai Keramik 40x40 486.00 M2 383,325.16 186,296,029.70
7 Pekerjaan Lantai Keramik WC/KM 20x20 2.40 M2 265,515.16 637,236.39
8 Pekerjaan Dinding WC/KM 20x20 67.20 M2 483,632.64 32,500,113.41
12 Pekerjaan Dinding Keramik 40x40 (63.52) M2 383,325.16 (24,348,814.42)
219,556,155.73
VI. PEKERJAAN CAT
1 Cat dinding dgn Matex 2x termasuk 1x Plamir (Baru) 667.50 M2 43,820.08 29,249,902.45
2 Cat Plafond dgn Matex 2x termasuk 1x Plamir (Baru) 456.75 M2 43,820.08 20,014,820.89
3 Cat Pintu, Jendela, Kosen, Ventilasi dan Lysplank 120.60 M2 27,088.75 3,266,838.24
4 3x dgn Glotex/Platone (Baru)
5 Cat Atap Seng - M2 35,812.15 -
52,531,561.57
VII. PEKERJAAN KUNCI
1 - Kunci Pintu 2 Slaag 32.00 Bh 241,614.12 7,731,651.84
2 Kunci Pintu KM/WC 1 Slaag Merk Ancor 4.00 Bh 214,462.60 857,850.40
2 Engsel Pintu Kuningan Kwalitas Baik 144.00 Bh 77,206.03 11,117,668.32
3 Engsel Jendela Dan Ventilasi Kuningan Kwalitas Baik 150.00 Bh 57,594.02 8,639,103.00
4 Kait Angin Kwalitas Baik 150.00 Bh 79,548.04 11,932,206.00
5 Grendel Pintu 96.00 Bh 79,548.04 7,636,611.84
6 Grendel Jendela 150.00 Bh 79,548.04 11,932,206.00
59,847,297.40
VIII. PEKERJAAN INSTALASI LISTRIK
IX PEKERJAAN SANITASI
2 Kloset Duduk INA / TOTO ( Lengkap ) - Bh 1,974,514.30 -
TERBILANG : ENAM RATUS SEMBILAN PULUH EMPAT JUTA DELAPAN RATUS DELAPAN BELAS RIBU RUPIAH
MENYETTUUI
PEMBANTU REKTOR
BIDANG ADMINISTRASI DAN KEUANGAN
………………………………………………………
NIP………………………………..
REKAPITULASI U M U M
PROYEK :
P E K E R J AA N : REHABILITASI PUSKESMA PEMBANTU TOLIWANG
LOKASI : DESA TOLIWANG
TAHUN ANGGARAN : 2005
Dibulatkan 1,744,144,000.00
TERBILANG : ENAM PULUH EMPAT JUTA DELAPAN RATUS LIMA PULUH TUJUH RIBU RUPIAH
………………………………………………………
NIP………………………………..
ANGKA MAX. 11 DIGIT ANGKA #VALUE! TERBILANG : EMPAT RATUS
8 9 10
#VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
GOBLOK BANGET SIH, TAU BEKING RAB KA' NYANDA
BUSYETTT !!!!! LEBIH BAIK BUAT BELI KOREK KUPING, KALO KURANG LOE TAM
GILE BENER !!! BUAT APAAN TUH DUIT SEGITU, NGAK ONGKOS BUAT BAPIKIR
LEBIH BAGUS TIDUR JOO !!! KALO MO URISIN DUIT CUMA SEGITU !!!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE! #VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
G, KALO KURANG LOE TAMBAH NECH !!!
K ONGKOS BUAT BAPIKIR
CUMA SEGITU !!!
RENCANA ANGGARAN BIAYA ( RAB )
V. PEKERJAAN CAT
1 Perbaikan Cat Profil Beton luar ( Kupas Plamiran) 183.60 M2 13,620.60 2,500,742.16
2 Cat dinding lama Luar 2x Lapis 535.60 M2 28,342.42 15,180,198.62
3 Cat dinding lama Dalam 2 x Lapis 144.50 M2 22,877.62 3,305,815.68
4 Cat kolom bantu 25.50 M2 43,820.08 1,117,412.00
5 Cat Bidang Plafond 248.49 M2 27,088.75 6,731,385.07
28,835,553.53
VI. PEKERJAAN INSTALASI LISTRIK
1 Titik Lampu + Instalasi 55.00 Titik 220,000.00 12,100,000.00
2 Lampu Philips 20 Watt 15.00 Bh 79,750.00 1,196,250.00
3 Lampu Philips 13 Watt 16.00 Bh 60,500.00 968,000.00
4 Lampu Philips 8 Watt 9.00 Bh 49,500.00 445,500.00
5 Pemasangan Kabel Listrik NYM 2.5 x 3 250.00 M1 19,475.00 4,868,750.00
6 Saklar Ganda 10.00 Bh 51,370.00 513,700.00
7 Saklar AC 7.00 Bh 110,000.00 770,000.00
8 Saklar Tunggal 4.00 Bh 51,370.00 205,480.00
9 Stop Kontak 8.00 Bh 51,370.00 410,960.00
21,478,640.00
Sub Total ( A) 373,113,735.33
C. PEKERJAAN LANTAI II
I. PEKERJAAN PASANGAN
1 Pas. dinding 1/2 bata Pres Pabrikasi 8x25x50 (ringan) 167.34 M2 218,082.00 36,494,190.81
2 Pas. 1 Bata Pres Pabrikasi 8x25x50 ( Panggung) 5.90 M2 436,164.00 2,573,367.60
3 Urugan Batu Apung ( Panggung) 12.90 M3 412,500.00 5,321,250.00
4 Ornamen Profil sudut 7x7 cm 14.40 M1 23,106.28 332,730.49
5 Plester+ Acian Profil dinding 20x10 cm 25.00 M2 70,043.54 1,751,088.60
6 Plester+ Acian Profil dinding 10x10 cm 25.20 M2 70,043.54 1,765,097.31
7 Plesteran Dek Atap 1 : 3 (Level Kemiringan 2%) 94.50 M2 70,043.54 6,619,114.91
8 Plesteran + Acian dinding Batu bata 1 : 4 334.68 M2 67,969.96 22,748,403.72
9 Plesteran Beton dan Profil 1 :3 + Acian 52.50 M2 70,043.54 3,677,286.06
10 Papan Nama (GEDUNG SERBAGUNA) 1.00 Ls 10,000,000.00 10,000,000.00
91,282,529.49
II. PEKERJAAN STRUKTUR
1 Kolom Beton K-275
- Kolom Utama K2 35/35 150.00 Kg 7.45 M3 9,037,849.74 67,313,904.86
- Kolom Praktis 12/10 150.00 Kg 0.25 M3 9,037,849.74 2,277,538.13
2 Balok Beton Elevasi +8.80 K-275
- Balok RB1 25/80 170.00 Kg 6.00 M3 9,611,989.80 57,671,938.80
- Balok RB2 25/40 170.00 Kg 6.80 M3 9,611,989.80 65,361,530.64
- Balok Anak BE 15/25 150.00 Kg 1.65 M3 8,970,369.80 14,801,110.17
- Ring Balok Atap 12/20 150.00 Kg 1.73 M3 8,970,369.80 15,500,799.01
3 Plat Beton Atap Tbl. 10 cm Elevasi +8.80 K-275
- Plat Lantai Beton Atap 120.00 Kg 5.75 M3 7,254,883.62 41,715,580.82
- Plat Konsul Jendela dan Atap Lbr. 40cm 2.30 M3 6,615,843.62 15,242,903.70
279,885,306.14
III. PEKERJAAN KUSEN JENDELA DAN ALAT PENGGANTUNG
1 Pek, Kosen pintu dan Jendela alumunium (putih) 206.60 M1 201,788.10 41,689,422.29
2 Daun Jendela kaca 5 mm Rangka Alumunium 24.18 M2 1,216,660.04 29,414,459.79
3 Pemasangan Kaca Mati 5 mm jendela 46.48 M2 309,636.03 14,392,501.95
4 Engsel Jendela 56.00 Bh 57,594.02 3,225,265.12
5 Grendel Jendela 28.00 Bh 79,548.04 2,227,345.12
90,948,994.26
IV. PEKERJAAN PLAFOND
1 Pek. Rangka Plafond besi hollow 243.00 M2 135,547.28 32,937,989.04
2 Pek. Plafond Gipsum 243.00 M2 91,916.25 22,335,648.75
3 Pek. Pas Lis profil Gipsum 68.20 M1 54,571.84 3,721,799.49
58,995,437.28
V. PEKERJAAN LANTAI
1 Pek. Pagar Besi (Pengaman Void) 7.75 M' 938,658.02 7,274,599.69
2 Pek. Lantai Keramik Granit 60x60 213.38 M2 643,365.16 137,278,041.87
144,552,641.55
VI. PEKERJAAN ATAP
1 Pek. Rangka Atap Baja Ringan 236.96 M2 313,471.35 74,279,079.58
2 Pek. Atap Spandek 236.96 M2 109,290.81 25,897,170.43
3 Pek Lisplank GRC 6mm lbr.20 cm 86.30 M1 145,960.08 12,596,354.90
112,772,604.91
VII. PEKERJAAN CAT
1 Cat dinding Luar 270.04 M2 51,865.48 14,005,836.82
2 Cat dinding Dalam 167.34 M2 43,820.08 7,332,922.06
3 Cat Bidang Plafond 243.00 M2 27,088.75 6,582,566.25
27,921,325.13
VIII. PEKERJAAN INSTALASI LISTRIK
1 Titik Lampu + Instalasi 37.00 Titik 220,000.00 8,140,000.00
2 Lampu Philips 20 Watt 15.00 Bh 79,750.00 1,196,250.00
3 Lampu Philips 13 Watt 7.00 Bh 60,500.00 423,500.00
4 Lampu Philips 8 Watt 6.00 Bh 49,500.00 297,000.00
5 Pemasangan Kabel Listrik NYM 2.5 x 3 300.00 M1 19,475.00 5,842,500.00
6 Saklar Ganda 8.00 Bh 51,370.00 410,960.00
7 Saklar AC 8.00 Bh 110,000.00 880,000.00
8 Stop Kontak 7.00 Bh 51,370.00 359,590.00
9 Panel Box Sekring 30/40 1.00 Bh 979,000.00 979,000.00
10 Ranning Tes dan SLO 1.00 Ls 2,000,000.00 2,000,000.00
20,528,800.00
Sub Total ( B) 826,887,638.77
SUTINI M.NUR, ST
Direktris
REKAPITULASI RENCANA ANGGARAN BIAYA
SUTINI M.NUR, ST
Direktris
ESTIMATE ENGINEERING (EE)
I. PEKERJAAN PERSIAPAN
1 Pembersihan Perataan Tanah Lokasi 323.25 M2 18,062.00 5,838,541.50
2 Pengukuran/Pemasangan bouwplank 36.00 M1 99,830.80 3,593,908.80
3 Bangsal Kerja, Gudang, & Ruang Direksi 32.00 M2 1,518,667.15 48,597,348.80
4 Papan Nama Proyek 1.00 Ls 500,000.00 500,000.00
5 Mobilisasi/Demobilisasi 1.00 Ls 750,000.00 750,000.00
6 Dokumentasi dan Pelaporan 1.00 Ls 1,000,000.00 1,000,000.00
7 Pembersihan Akhir 1.00 Ls 500,000.00 500,000.00
60,779,799.10
II. PEKERJAAN TANAH
1 Galian tanah 211.48 M3 51,761.60 10,946,481.05
2 Mengurug kembali bekas galian 1/4 x 52.87 M3 24,819.96 1,312,223.84
3 Urugan Pasir dibawah pondasi 3.04 M3 473,300.40 1,437,886.62
4 Timbunan Tanah dibawah lantai dipadatkan 137.73 M3 64,702.00 8,911,082.95
5 Urugan Pasir dibawah lantai 31.18 M2 473,300.40 14,755,139.97
37,362,814.43
III. PEKERJAAN PASANGAN / BETON
V. PEKERJAAN LANTAI
1 Lantai Rabat Beton Tebal 5 cm camp. 1 : 3 : 6 311.75 M2 55,391.20 17,268,206.60
4 Plesteran dan acian Lantai 311.75 M2 23,106.28 7,203,384.04
6 Pek. Lantai Keramik 40x40 486.00 M2 383,325.16 186,296,029.70
7 Pekerjaan Lantai Keramik WC/KM 20x20 2.40 M2 265,515.16 637,236.39
8 Pekerjaan Dinding WC/KM 20x20 67.20 M2 483,632.64 32,500,113.41
12 Pekerjaan Dinding Keramik 40x40 (63.52) M2 383,325.16 (24,348,814.42)
219,556,155.73
VI. PEKERJAAN CAT
1 Cat dinding dgn Matex 2x termasuk 1x Plamir (Baru) 667.50 M2 43,820.08 29,249,902.45
2 Cat Plafond dgn Matex 2x termasuk 1x Plamir (Baru) 456.75 M2 43,820.08 20,014,820.89
3 Cat Pintu, Jendela, Kosen, Ventilasi dan Lysplank 120.60 M2 27,088.75 3,266,838.24
4 3x dgn Glotex/Platone (Baru)
5 Cat Atap Seng - M2 35,812.15 -
52,531,561.57
VII. PEKERJAAN KUNCI
1 - Kunci Pintu 2 Slaag 32.00 Bh 241,614.12 7,731,651.84
2 Kunci Pintu KM/WC 1 Slaag Merk Ancor 4.00 Bh 214,462.60 857,850.40
2 Engsel Pintu Kuningan Kwalitas Baik 144.00 Bh 77,206.03 11,117,668.32
3 Engsel Jendela Dan Ventilasi Kuningan Kwalitas Baik 150.00 Bh 57,594.02 8,639,103.00
4 Kait Angin Kwalitas Baik 150.00 Bh 79,548.04 11,932,206.00
5 Grendel Pintu 96.00 Bh 79,548.04 7,636,611.84
6 Grendel Jendela 150.00 Bh 79,548.04 11,932,206.00
59,847,297.40
9 MCB - Bh 80,000.00 -
IX PEKERJAAN SANITASI
-
REKAPITULASI RENCANA ANGGARAN BIAYA
TERBILANG : ENAM RATUS SEMBILAN PULUH EMPAT JUTA DELAPAN RATUS DELAPAN BELAS RIBU RUPIAH
MENYETTUUI
PEMBANTU REKTOR
BIDANG ADMINISTRASI DAN KEUANGAN
………………………………………………………
NIP………………………………..
DAFTAR PERHITUNGAN VOLUME
PEKERJAAN TANAH
1. GALIAN TANAH PONDASI
GALIAN PONDASI JALUR 1
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
0.70 M1 0.70 M1 0.63 M1 0.441 M2 86.80 M1 38.28 M3
GALIAN PONDASI JALUR 1
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.00 M1 0.00 M2 0.00 M1 0.00 M3
GALIAN PONDASI TELAPK 1
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG JUMLAH VOLUME
1.30 M1 1.30 M1 5.00 M1 6.50 M2 1.30 M1 20.00 Bh 169.00 M3
GALIAN PONDASI TELAPAK 2
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG JUMLAH VOLUME
0.00 M1 0.00 M1 0.00 M1 0.00 M2 0.00 M1 0.00 Bh 0.00 M3
GALIAN PONDASI RABAT
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
0.15 M1 0.15 M1 0.40 M1 0.06 M2 70.00 M1 4.20 M3
GALIAN SALURAN
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.00 M1 0.00 M2 0.00 M1 0.00 M3
211.48 M3
2. URUGAN PASIR
URUGAN PASIR DIBAWAH PONDASI 1
LEBAR TEBAL LUAS PANJANG VOLUME
0.70 M1 0.05 M1 0.04 M2 86.80 M1 3.04 M3
URUGAN PASIR DIBAWAH PONDASI 2
LEBAR TEBAL LUAS PANJANG VOLUME
0.00 M1 0.05 M1 0.00 M2 0.00 M1 0.00 M3
3.04 M3
URUGAN PASIR DIBAWAH LANTAI 1
LEBAR TEBAL LUAS PANJANG VOLUME
10.00 M1 0.10 M1 1.00 M2 20.00 M1 20.00 M3
URUGAN PASIR DIBAWAH LANTAI 2
LEBAR TEBAL LUAS PANJANG VOLUME
3.50 M1 0.10 M1 0.35 M2 6.00 M1 2.10 M3
URUGAN PASIR DIBAWAH LANTAI TERAS
LEBAR TEBAL LUAS PANJANG VOLUME
1.50 M1 0.10 M1 0.15 M2 60.50 M1 9.08 M3
31.18 M3
2. URUGAN TANAH
URUGAN Tanah DIBAWAH LANTAI 1
LEBAR TEBAL 1 TEBAL 2 LUAS PANJANG VOLUME
10.00 M1 0.50 M1 0.50 M1 5.00 M2 20.00 M1 100.00 M3
URUGAN Tanah DIBAWAH LANTAI 2
LEBAR TEBAL 1 TEBAL 2 LUAS PANJANG VOLUME
3.50 M1 0.50 M1 0.50 M1 1.75 M2 6.00 M1 10.50 M3
URUGAN Tanah DIBAWAH LANTAI TERAS
LEBAR TEBAL 1 TEBAL 2 LUAS PANJANG VOLUME
1.50 M1 0.30 M1 0.30 M1 0.45 M2 60.50 M1 27.23 M3
137.73 M3
PEKERJAAN BETON
1. PASANGAN BATU KOSONG
PAS. BATU KOSONG 1
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
0.60 M1 0.60 M1 0.15 M1 0.09 M2 49.60 M1 4.464 M3
PAS. BATU KOSONG 2
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.15 M1 0 M2 0.00 M1 0 M3
4.46 M3
2. PASANGAN BATU KALI
PAS. BATU KALI 1
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
0.30 M1 0.60 M1 0.55 M1 0.2475 M2 49.60 M1 12.276 M3
PAS. BATU KALI 2
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
0.15 M1 0.15 M1 0.40 M1 0.06 M2 50.00 M1 3 M3
15.276 M3
PAS. BATU KALI UNTUK RABAT KELILING
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.55 M1 0 M2 0.00 M1 0 M3
PAS. BATU KALI UNTUK SALURAN
LBR ATAS LBR BAWAH TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.00 M1 0 M2 0.00 M1 0 M3
15.28 M3
2. SLOOF
- Sloof 12/15
LEBAR TINGGI LUAS PANJANG VOLUME
0.12 M1 0.15 M1 0.02 M2 - M1 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
55.56 277.78 0.44 134.44 29.85 5.00 277.78 249.44 279.29 KG 270.00 KG
- Sloof 15/20
LEBAR TINGGI LUAS PANJANG VOLUME
0.15 M1 0.20 M1 0.03 M2 38.85 M1 1.17 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
33.33 166.67 0.6 110.00 24.42 4.00 133.33 119.73 144.15 KG 140.00 KG
- Sloof 25/30
LEBAR TINGGI LUAS PANJANG VOLUME
0.20 M1 0.30 M1 0.06 M2 94.00 M1 5.64 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
16.67 83.33 0.9 82.50 18.32 5.00 83.33 74.83 93.15 KG 90.00 KG
2. KOLOM
- Kolom 10x10
LEBAR PANJANG LUAS TINGGI JUMLAH VOLUME
0.10 M1 0.10 M1 0.01 M2 3.50 M1 19.00 Bh 0.67 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
100.00 500.00 0.3 165.00 36.63 4.00 400.00 359.20 395.83 KG 390.00 KG
- Kolom 15x15
LEBAR PANJANG LUAS TINGGI JUMLAH VOLUME
0.15 M1 0.15 M1 0.02 M2 1.00 M1 14.00 Bh 0.32 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
44.44 222.22 0.5 122.22 27.13 4.00 177.78 159.64 186.78 KG 180.00 KG
- Kolom 12x20
LEBAR PANJANG LUAS TINGGI JUMLAH VOLUME
0.12 M1 0.20 M1 0.02 M2 0.00 M1 0.00 Bh 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
41.67 208.33 0.54 123.75 27.47 4.00 166.67 149.67 177.14 KG 170.00 KG
- Kolom Bulat 30x30
LEBAR PANJANG LUAS TINGGI JUMLAH VOLUME
0.27 M1 0.27 M1 0.07 M2 0.00 M1 0.00 Bh 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
14.24 71.20 0.96 75.19 16.69 0.00 0.00 0.00 8.00 113.92 179.88 196.57 170.00 KG
- Kolom 30x30
LEBAR PANJANG LUAS TINGGI JUMLAH VOLUME
0.30 M1 0.30 M1 0.09 M2 5.00 M1 14.00 Bh 6.30 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
11.11 55.56 1.1 67.22 26.55 0.00 0.00 0.00 8.00 88.89 140.36 166.91 160.00 KG
- Kolom 35x35
LEBAR PANJANG LUAS TINGGI JUMLAH VOLUME
0.35 M1 0.35 M1 0.12 M2 5.50 M1 3.00 Bh 2.02 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
8.16 40.82 1.3 58.37 23.06 0.00 0.00 0.00 12.00 97.96 154.68 177.73 170.00 KG
- Kolom 40x50
LEBAR PANJANG LUAS TINGGI JUMLAH VOLUME
0.40 M1 0.50 M1 0.20 M2 5.50 M1 10.00 Bh 11.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 19 Pjg Besi 19 Kg Besi 19 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
5.00 33.33 1.7 62.33 24.62 0.00 0.00 0.00 14.00 70.00 110.53 135.15 130.00 KG
2. BALOK
- Balok Latei 8/15
LEBAR TINGGI LUAS PANJANG VOLUME
0.08 M1 0.15 M1 0.01 M2 77.90 M1 0.93 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
83.33 416.67 0.36 165.00 36.63 4.00 333.33 299.33 335.96 KG 330.00 KG
- Balok Atap 15/20
LEBAR TINGGI LUAS PANJANG VOLUME
0.15 M1 0.20 M1 0.03 M2 60.50 M1 1.82 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 KG BESI / M3 DIBULATKAN
33.33 333.33 0.6 220.00 48.84 4.00 133.33 119.73 168.57 KG 160.00 KG
- Balok Atap 10/20
LEBAR TINGGI LUAS PANJANG VOLUME
0.10 M1 0.20 M1 0.02 M2 36.00 M1 0.72 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
50.00 500.00 0.5 275.00 61.05 4.00 200.00 179.60 - 0.00 0.00 240.65 240.00 KG
- Balok Atap 20/25
LEBAR TINGGI LUAS PANJANG VOLUME
0.20 M1 0.25 M1 0.05 M2 42.00 M1 2.10 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 06 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
20.00 133.33 0.8 117.33 26.05 0.00 0.00 0.00 6.00 120.00 189.48 215.53 210.00 KG
- Balok Lantai 20/30
LEBAR TINGGI LUAS PANJANG VOLUME
0.20 M1 0.30 M1 0.06 M2 124.00 M1 7.44 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
16.67 83.33 0.9 82.50 32.59 2.00 33.33 29.93 5.00 83.33 131.58 194.10 190.00 KG
- Balok Lantai 25/40
LEBAR TINGGI LUAS PANJANG VOLUME
0.25 M1 0.40 M1 0.10 M2 86.50 M1 8.65 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
10.00 66.67 1.2 88.00 34.76 2.00 20.00 17.96 5.00 50.00 78.95 131.67 130.00 KG
- Balok Lantai 35/70
LEBAR TINGGI LUAS PANJANG VOLUME
0.35 M1 0.70 M1 0.25 M2 18.10 M1 4.43 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
4.08 27.21 2 59.86 23.65 4.00 16.33 14.66 9.00 36.73 58.00 96.31 90.00 KG
- Balok Lantai 30/65
LEBAR TINGGI LUAS PANJANG VOLUME
0.30 M1 0.65 M1 0.20 M2 20.00 M1 3.90 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 19 Pjg Besi 19 Kg Besi 19 KG/M3 DIBULATKAN
5.13 34.19 1.8 67.69 26.74 4.00 20.51 18.42 10.00 51.28 114.15 159.31 150.00 KG
- Balok Luifel Lantai
LEBAR TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.00 M2 0.00 M1 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
#DIV/0! #DIV/0! -0.1 #DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! 5.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! KG
- Balok Atap 11/15
LEBAR TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.00 M2 0.00 M1 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
#DIV/0! #DIV/0! -0.1 #DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! - #DIV/0! #DIV/0! #DIV/0! #DIV/0! KG
- Balok Atap 20/30
LEBAR TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.00 M2 0.00 M1 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
#DIV/0! #DIV/0! -0.1 #DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! - #DIV/0! #DIV/0! #DIV/0! #DIV/0! KG
- Balok Atap 20/40
LEBAR TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.00 M2 0.00 M1 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
#DIV/0! #DIV/0! -0.1 #DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! - #DIV/0! #DIV/0! #DIV/0! #DIV/0! KG
- Balok Atap 30/40
LEBAR TINGGI LUAS PANJANG VOLUME
0.30 M1 0.40 M1 0.12 M2 18.40 M1 2.21 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
8.33 55.56 1.3 79.44 31.38 4.00 33.33 29.93 8.00 66.67 105.27 166.58 160.00 KG
- Balok Atap 30/50
LEBAR TINGGI LUAS PANJANG VOLUME
0.00 M1 0.00 M1 0.00 M2 0.00 M1 0.00 M3
Pjg/KG (M1) Jml Bgl (Bh) Pjg Bgl/Bh Pjg Bgl Ttl Kg Bgl 08 Jml Besi 12 Pjg Besi 12 Kg Besi 12 Jml Besi 16 Pjg Besi 16 Kg Besi 16 KG/M3 DIBULATKAN
#DIV/0! #DIV/0! -0.1 #DIV/0! #DIV/0! 0.00 #DIV/0! #DIV/0! - #DIV/0! #DIV/0! #DIV/0! #DIV/0! KG
2. PLAT LANTAI
- Plat Lantai 12 CM
LEBAR SATUAN TINGGI LUAS PANJANG LEBAR VOLUME
1.00 M1 0.11 M1 0.11 M2 1.00 M1 174.15 M1 18.29 M3
Pjg/KG (M1) JML B H PJG B H ST KG B H KG B.H/M3 JML B V PJG B V ST KG B V KG B.V/M3 KG/M3 DIBULATKAN
9.52 141 140.78 0.62 86.84 16 150.16 0.62 92.6258632 179.47 170.00 KG
- Plat Atap 10 CM
LEBAR SATUAN TINGGI LUAS PANJANG LEBAR VOLUME
1.00 M1 0.10 M1 0.10 M2 1.00 M1 13.20 M1 1.32 M3
Pjg/KG (M1) JML B H PJG B H ST KG B H KG B.H/M3 JML B V PJG B V ST KG B V KG B.V/M3 KG/M3 DIBULATKAN
10.00 148 147.77 0.62 91.15 16 157.67 0.62 97.26 188.41 180.00 KG
2. LISPLANK
- Lisplank Beton Untuk Talang
LEBAR SATUAN lebar LUAS PANJANG LEBAR VOLUME
1.00 M1 1.00 M1 1.00 M2 0.00 M1 1.00 M1 0.00 M3
Pjg/KG (M1) JML B H PJG B H ST KG B H KG B.H/M3 JML B V PJG B V ST KG B V KG B.V/M3 KG/M3 DIBULATKAN
1.00 16 16 0.395 6.22 16 15.77 0.395 6.22 12.45 10.00 KG
- Lisplank Beton
LEBAR SATUAN lebar LUAS PANJANG LEBAR VOLUME
1.00 M1 0.60 M1 0.60 M2 62.50 M1 0.07 M1 2.63 M3
Pjg/KG (M1) JML B H PJG B H ST KG B H KG B.H/M3 JML B V PJG B V ST KG B V KG B.V/M3 KG/M3 DIBULATKAN
1.67 26 26 62.500 1596.53 16 26.28 0.395 10.37 1606.90 1600.00 KG
2. PONDASI TELPAK
- Pondasi Telapak 130 X 130
LEBAR SATUAN Tinggi LUAS PANJANG LEBAR JUMLAH VOLUME
1.00 M1 0.40 M1 0.40 M2 1.30 M1 1.30 M1 13.00 8.79 M3
Pjg/KG (M1) JML B H PJG B H ST KG B H KG B.H/M3 JML B V PJG B V ST KG B V KG B.V/M3 KG/M3 DIBULATKAN
2.50 56 56 1.579 88.59 23 57.75 1.579 91.20 179.79 170.00 KG
2. TANGGA BETON
- Tangga Beton/Pond.Tangga & Blk Bordes
LEBAR SATUAN Tinggi LUAS PANJANG LEBAR JUMLAH VOLUME
1.00 M1 0.15 M1 0.15 M2 9.00 M1 1.10 M1 1 1.49 M3
Pjg/KG (M1) JML B H PJG B H ST KG B H KG B.H/M3 JML B V PJG B V ST KG B V KG B.V/M3 KG/M3 DIBULATKAN
6.67 99 99 0.617 60.99 16 105.11 0.617 64.84 125.83 120.00 KG
1. KUDA-KUDA
- Pek. Kuda-Kuda Type 1
Tinggi Kayu Lebar Kayu Luas Kayu Panjang Kayu Jumlak Kuda-Kuda VOLUME
0.12 M1 0.08 M1 0.01 M1 - M1 - Bh - M3
- Pek. Kuda-Kuda Type 2
Tinggi Kayu Lebar Kayu Luas Kayu Panjang Kayu Jumlak Kuda-Kuda VOLUME
- M1 - M1 - M1 - M1 - Bh - M3
- Pek. Kuda-Kuda Type 3
Tinggi Kayu Lebar Kayu Luas Kayu Panjang Kayu Jumlak Kuda-Kuda VOLUME
- M1 - M1 - M1 - M1 - Bh - M3
1. GORDING
- Gording Type 1
Lebar Atas Lebar Bawah Panjang Rata2 Tinggi Jumlah Gording Luas Kayu Dan Jlh Jenis VOLUME
- M1 - M1 - M1 - M1 1.00 Bh - - - M3
- Gording Type 2
Lebar Atas Lebar Bawah Panjang Rata2 Tinggi Jumlah Gording Luas Kayu VOLUME
- M1 - M1 - M1 - M1 1.00 Bh - - - M3
- Gording Type 2
Lebar Atas Lebar Bawah Panjang Rata2 Tinggi Jumlah Gording Luas Kayu VOLUME
- M1 - M1 - M1 - M1 1.00 Bh - - - M3
- Gording Type 2
Lebar Atas Lebar Bawah Panjang Rata2 Tinggi Jumlah Gording Luas Kayu VOLUME
- M1 - M1 - M1 - M1 1.00 Bh - - - M3
1. BALOK ANGIN
- Pek. Balok Angin
Tinggi Lebar Panjang Jumlah Jumlak Kuda-Kuda Luas Kayu VOLUME
- M1 - M1 - M1 - Bh - M2 - M3
- Pek. Mur-Baut
VOLUME
- M1
- Pek. Angker-Baut
VOLUME
- M1
- Pek. Begel
VOLUME
- M1
- Rabat Keliling
Panjamg Lebar Tebal VOLUME
- M1 1.00 M1 1.00 M1 - M2
- Rabat Saluran
Panjamg Lebar Tebal VOLUME
- M2 0.20 M2 1.00 M2 - M2
- Lantai Keramik WC/KM
Luas Type 1 Luas Type 2 Luas Type 3 VOLUME
2.40 M2 - M2 - M2 2.40 M2
- Dinding Keramik WC/KM
Luas Type 1 Luas Type 2 Luas Type 3 VOLUME
10.26 M2 - M2 - M2 10.26 M2
-Pekerjaan Dinding Keramik 40/40
Tinggi Panjang Luas Lubang VOLUME
1.20 M1 43.00 M1 51.60 M2 115.12 (63.52) M2
BIAYA (Rp.)
NO URAIAN JENIS PEKERJAAN KETERANGAN
BAHAN TENAGA TOTAL
A PEKERJAAN PERSIAPAN
1 1 m' Pagar Sementara dari kayu tinggi 2 meter 376,168.40 76,788.80 452,957.20
2 1 m' Pagar Sementara dari Dari Seng Gelombang tinggi 2 meter 477,923.40 76,788.80 554,712.20
3 1 m' Pagar Sementara dari Kawat Duri tinggi 1,8 meter 419,771.20 65,128.80 484,900.00
4 1 m' Pengukuran dan Pemasangan Bouwplank 73,736.60 26,094.20 99,830.80
5 1 m2 Pembuatan Kantor Sementara, dengan Lantai Plesteran 12,945,126.70 653,422.00 13,598,548.70
6 1 m2 Pembuatan Gudang Semen dan Alat - alat 1,119,785.15 398,882.00 1,518,667.15
7 1 m2 Membersihkan Lapangan dan Perataan - 18,062.00 18,062.00
8 1 m2 Pembuatan Bak adukan Ukuran (40 x 50 x 20) cm 3,997,090.40 36,987.06 4,034,077.46
9 1 m2 Pembuatan Jalan Sementara 80,564.00 123,002.00 203,566.00
10 1 m3 Bongkaran Beton Bertulang - 820,009.52 820,009.52
11 1 m3 Bongkaran Dinding Tembok Bata Merah - 781,597.52 781,597.52
B PEKERJAAN TANAH
C PEKERJAAN BETON
E PEKERJAAN SANITASI
F PEKERJAAN PENGECATAN
H PEKERJAAN PLESTERAN
I PEKERJAAN KAYU
1 1 m3 pasang kusen pintu dan jendela kayu Kls. I 7,075,640.00 3,496,812.00 10,572,452.00
2 1 m3 pasang kusen pintu dan jendela kayu Kls. II A 4,242,040.00 3,251,512.00 7,493,552.00
3 1 m3 pasang kusen pintu dan jendela kayu borneo 7,718,880.00 2,428,382.00 10,147,262.00
4 1 m3 pasang kusen pintu dan jendela kayu Kls. II 4,627,680.00 2,428,382.00 7,056,062.00
5 1 m2 pasang pintu klamp kayu Kls. I 50.00 140,365.17 140,415.17
6 1 m2 pasang pintu klam kayu Kls. II 139,992.90 187,951.72 327,944.62
7 1 m2 pasang pintu panel kayu Kls. I 277,410.00 467,852.00 745,262.00
8 1 m2 pasang pintu panel kayu Kls. II 154,256.00 467,852.00 622,108.00
9 1 m2 pasang pintu dan jendela kaca kayu Kls. I 225,134.00 374,281.60 599,415.60
10 1 m2 pasang pintu dan jendela kaca kayu Kls.II 134,974.00 374,281.60 509,255.60
11 1 m2 pasang pintu dan jendela kaca kayu borneo 225,134.00 374,281.60 599,415.60
12 1 m2 pasang jalusi ventilasi kayu Kls. I 411,673.60 568,832.00 980,505.60
13 1 m2 pasang pintu dan jendela jalusi kayu Kls. II 246,809.60 594,440.00 841,249.60
14 1 m2 pasang pintu Taekwood rangkap, rangka kayu Kls. I 204,682.54 349,681.20 554,363.74
15 1 m2 pasang pintu plywood rangkap, rangka kayu Kls. II 154,192.94 349,681.20 503,874.14
16 1 m2 pasang Ventilasi kayu Kls. II 61,333.50 337,381.00 398,714.50
17 1 m2 pasang jalusi mati kusen kayu Kls. II 234,871.50 337,381.00 572,252.50
18 1 m2 pasang pintu plywood rangkap, rangka kayu borneo 77,910.00 349,681.20 427,591.20
19 1 m2 pasang pintu teakwood rangkap, rangka kayu jati 194,290.00 349,681.20 543,971.20
20 1 m2 pasang pintu teakwood rangkap, rangka kayu Kls. I 194,290.00 349,681.20 543,971.20
21 1 m2 pasang pintu plywood & formika, rangka kayu Kls. I 253,401.80 443,251.60 696,653.40
22 1 m2 pasang pintu plywood &formika rangka kayu Kls. II 203,555.44 443,251.60 646,807.04
23 1 m2 pasang pintu teakwood & formika rangka kayu Kls. I 216,860.04 443,251.60 660,111.64
24 1 m2 pasang pintu teakwood & formika rangka kayu Kls. I ( divernis ) 156,250.00 443,251.60 599,501.60
25 1 m2 pasang pintu formika double, rangka kayu Kls. I 295,950.04 481,646.00 777,596.04
26 1 m2 pasang pintu formika double, rangka kayu Kls. II 245,460.44 481,646.00 727,106.44
27 1 m3 pasang konstruksi kuda - kuda kayu Kls. I 7,304,420.00 2,147,288.00 9,451,708.00
28 1 m3 pasang konstruksi kuda - kuda kayu Kls. II 4,470,820.00 4,086,280.00 8,557,100.00
29 1 m3 pasang konstruksi kuda -kuda kayu borneo 7,304,420.00 4,086,280.00 11,390,700.00
30 1 m3 pasang konstruksi kuda-kuda kayu kruing 7,304,420.00 4,086,280.00 11,390,700.00
31 1 m3 pasang kaso + reng genteng kodok kayu Kls. II 49,764.30 52,019.00 101,783.30
32 1 m3 pasang kaso + reng genteng kodok kayu borneo 49,764.30 52,019.00 101,783.30
33 1 m3 pasang kaso + reng genteng monier kayu Kls. II 57,477.10 52,019.00 109,496.10
34 1 m2 pasang kaso + reng genteng monier kayu kamper 57,477.10 52,019.00 109,496.10
35 1 m2 pasang kaso + reng genteng Metal kayu Kls. II 57,477.10 52,019.00 109,496.10
36 1 m2 pasang kaso + reng atap sirap kayu Kls. II 640,956.00 62,422.80 703,378.80
37 1 m2 pasang kaso + reng atap sirap kayu barneo 640,956.00 62,422.80 703,378.80
38 1 m2 pasang angka langit - langit (0.61 x 1.22) m, kayu jati 79,513.80 103,097.50 182,611.30
39 1 m2 pasang rangka langit - langit (0.61 x 1.22) m, kayu Kls. II 48,601.80 103,097.50 151,699.30
40 1 m2 pasang angka langit - langit (1.00 x 1.00) m, kayu borneo 112.00 103,097.50 103,209.50
41 1 m2 pasang angka langit - langit (0.305 x 0.61) M, kayu jati 151,432.70 129,107.00 280,539.70
42 1 m2 pasang angka langit - langit (0.305 x 0.61) m, kayu Kls. II 92,184.70 129,107.00 221,291.70
43 1 m2 pasang angka langit - langit (30 x 60) cm, kayu borneo 92,184.70 129,107.00 221,291.70
44 1 m2 pasang rangka langit - langit (0.305 x 0.305) cm, kayu Kls. II 178,324.80 155,116.50 333,441.30
45 1 m2 pasang angka langit - langit (30 x 30) cm, kayu kamper 108,772.80 79,029.50 187,802.30
46 1 m2 pasang angka langit - langit (30 x 30) cm, kayu borneo 108,772.80 79,029.50 187,802.30
47 1 m2 pasang lisplang ukuran (2 x 25) cm, kayu Kls. I 258,458.50 40,652.70 299,111.20
48 1 m2 pasang lisplang ukuran (3 x 20) cm, kayu Kls. II 155,418.50 39,888.20 195,306.70
49 1 m2 pasang lisplang ukuran (3 x 20) cm, kayu jati 71,918.90 43,813.00 115,731.90
50 1 m2 pasang lisplang ukuran (3 x 20) cm, kayu kamper 43,582.90 43,813.00 87,395.90
51 1 m2 pasang lisplang ukuran 2 x (3 x 20) cm, kayu Klas. I 515,987.00 61,578.00 577,565.00
52 1 m2 pasang lisplang ukuran 2 x (2 x 20) cm, kayu Kls. I 323,015.00 31,856.00 354,871.00
53 1 m2 pasang lisplang ukuran 2 x (2 x 20) cm, kayu Kls. II 194,215.00 31,856.00 226,071.00
54 1 m2 pasang rangka dinding pemisah kayu Kls. II 104,519.60 89,166.00 193,685.60
55 1 m2 pasang rangka dinding pemisah kayu borneo 104,519.60 89,166.00 193,685.60
56 1 m2 pasang rangka dinding pemisah teakwood rangkap, rangka kayu Kls. II 104,519.60 89,166.00 193,685.60
57 1 m2 pasang rangka dinding pemisah plywood rangkap, rangka kayu Kls. II 185,497.60 107,364.40 292,862.00
58 1 m2 pasang dinding lambrizring dari papan Kls. I 50,839.30 322,093.20 372,932.50
59 1 m2 pasang plywood tebal 4 mm, + Rangka untuk dinding 65,039.88 13,426.95 78,466.83
60 1 m1 pasang list plafon Gipsum 49,113.75 5,458.09 54,571.84
L PEKERJAAN ATAP
1 1 m2 pasang atap genteng palentong kecil 25,000.00 28,936.27 53,936.27
2 1 m2 pasang atap genteng kodok / glazzur 25,000.00 28,936.27 53,936.27
3 1 m2 pasang atap genteng palentong super / besar 12,000.00 26,790.72 38,790.72
4 1 m2 pasang genteng bubung palentong 13,032.00 26,790.72 39,822.72
5 1 m2 pasang bubung genteng kodok glazzur 13,032.00 74,484.08 87,516.08
6 1 m2 pasang bubung genteng palentong besar 12,032.00 74,484.08 86,516.08
7 1 m2 pasang roof light fibreglass (180 x 90 ) cm 45,712.50 26,508.13 72,220.63
8 1 m2 pasang atap asbes gelombang ( 2.50 x 0.92 m ) x 5 mm 34,122.40 27,770.27 61,892.67
9 1 m2 pasang atap asbes gelombang ( 2.25 x 0.92 m ) x 5 mm 35,882.40 27,770.27 63,652.67
10 1 m2 pasang atap asbes gelombang ( 2.00 x 0.92 m ) x 5 mm 33,242.40 26,876.08 60,118.48
11 1 m2 pasang atap asbes gelombang ( 1.80 x 0.92 m ) x 5 mm 870.00 26,876.08 27,746.08
12 1 m2 pasang atap asbes gelombang ( 3.00 x 1.05 m ) x 4 mm 470.00 26,876.08 27,346.08
13 1 m2 pasang atap asbes gelombang ( 2.70 x 1.05 m ) x 4 mm 540.00 26,876.08 27,416.08
14 1 m2 pasang atap asbes gelombang ( 2.40 x 1.05 m ) x 4 mm 560.00 26,508.13 27,068.13
15 1 m2 pasang atap asbes gelombang ( 2.10 x 1.05 m ) x 4 mm 630.00 26,508.13 27,138.13
16 1 m2 pasang atap asbes gelombang ( 1.5 x 1.05 m ) x 4 mm 920.00 26,508.13 27,428.13
17 1 m2 pasang atap asbes gelombang ( 3.00 x 1.08 m ) x 6 mm 490.00 26,508.13 26,998.13
18 1 m2 pasang atap asbes gelombang ( 2.70 x 1.08 m ) x 6 mm 500.00 26,508.13 27,008.13
19 1 m2 pasang atap asbes gelombang ( 2.4 x 1.08 m ) x 6 mm 580.00 26,508.13 27,088.13
20 1 m2 pasang atap asbes gelombang ( 2.1 x 1.08 m ) x 6 mm 610.00 26,508.13 27,118.13
21 1 m2 pasang atap asbes gelombang ( 1.80 x 1.08 m ) x 6 mm 690.00 26,508.13 27,198.13
22 1 m2 pasang Atap steel gelombang 0.92 m 120,875.00 27,625.51 148,500.51
23 1 m2 pasang nok steel gelombang 1.05 m 40,250.00 27,625.51 67,875.51
24 1 m2 pasang nok stel gelombang 1.08 m 45,750.00 27,625.51 73,375.51
25 1 m2 pasang nok paten 0.92 m 7,200.00 27,625.51 34,825.51
26 1 m2 pasang nok paten 1.05 m 7,200.00 27,625.51 34,825.51
27 1 m2 pasang nok paten 1.08 m 7,200.00 27,625.51 34,825.51
28 1 m2 pasang nok sel rata 0.92 m 7,100.00 32,557.36 39,657.36
29 1 m2 pasang nok sel rata 1.05 m 7,100.00 27,625.51 34,725.51
30 1 m2 pasang atap genteng beton 61,604.50 38,394.40 99,998.90
31 1 m2 pasang atap genteng aspal 7,780.00 61,854.10 69,634.10
32 1 m2 pasang atap Multi roof 69,327.40 37,242.04 106,569.44
33 1 m2 pasang atap sirap 60,200.00 54,864.92 115,064.92
34 1 m2 pasang Nok genteng Beton 334,419.30 76,788.80 411,208.10
35 1 m2 pasang Rangka Atap Kayu Gording kls 1 78,351.30 46,785.20 125,136.50
36 1 m pasang Bubungan/Nok Kayu kls 1 116,146.46 41,653.20 157,799.66
J PEKERJAAN LANTAI
a. Bahan
a. Bahan
- Dolken Kayu Ø 8-10/400 cm 1.250 Btg x Rp. 59,800.00 = Rp. 74,750.00
- Kayu 0.180 M3 x Rp. 3,856,400.00 = Rp. 694,152.00
- kayu Biasa 0.850 Kg x Rp. 3,856,400.00 = Rp. 3,277,940.00
- Besi Strip 1.100 Kg x Rp. 14,012.00 = Rp. 15,413.20
- Semen Portland 35.000 Kg x Rp. 2,082.80 = Rp. 72,898.00
- Pasir Pasang 0.150 M3 x Rp. 592,400.00 = Rp. 88,860.00
- Pasir Beton 0.100 M3 x Rp. 421,600.00 = Rp. 42,160.00
- Koral Beton 0.150 M3 x Rp. 536,400.00 = Rp. 80,460.00
- Bata Merah 30.000 Bh x Rp. 2,400.00 = Rp. 72,000.00
- Seng Plat 1.500 Lbr x Rp. 155,600.00 = Rp. 233,400.00
- Jendela Nako 2.000 Bh x Rp. 4,119,900.00 = Rp. 8,239,800.00
- Kaca Polos 0.080 M2 x Rp. 261,000.00 = Rp. 20,880.00
- Kunci Tanam 0.150 Bh x Rp. 151,470.00 = Rp. 22,720.50
- Plywood 4 mm 0.060 Lbr x Rp. 161,550.00 = Rp. 9,693.00
JUMLAH = Rp. 12,945,126.70
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Tenaga
a. Tenaga
- Pekerja 6.667 Oh x Rp. 116,600.00 = Rp. 777,372.20
- Mandor 0.033 Oh x Rp. 128,040.00 = Rp. 4,225.32
JUMLAH = Rp. 781,597.52
JUMLAH (a) = Rp. 781,597.52
a. Tenaga
b. Tenaga
b. Tenaga
b. Tenaga
b. Tenaga
b. Tenaga
b. Tenaga
b. Tenaga
b. Tenaga
b. Tenaga
9 1 m3 Urugan Kembali
b. Tenaga
11 1 m3 Urugan Pasir
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
c. Tenaga
- Pekerja 0.500 OH x Rp. 116,600.00 = Rp. 58,300.00
- Tukang Batu 0.200 OH x Rp. 122,650.00 = Rp. 24,530.00
- Operator 0.003 OH x Rp. 152,900.00 = Rp. 458.70
- Mandor 0.050 OH x Rp. 128,040.00 = Rp. 6,402.00
Sub Jumlah (b) = Rp. 89,690.70
JUMLAH (a) + (b) = Rp. 314,968.70
PEKERJAAN PONDASI
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
- Pekerja 0.800 Oh x Rp. 116,600.00 = Rp. 93,280.00
- Tukang kayu 2.000 Oh x Rp. 122,650.00 = Rp. 245,300.00
- Kepala Tukang 0.200 Oh x Rp. 152,900.00 = Rp. 30,580.00
- Mandor 0.040 Oh x Rp. 128,040.00 = Rp. 5,121.60
JUMLAH = Rp. 374,281.60
JUMLAH (a) + (b) = Rp. 599,415.60
10 1 m2 pasang pintu dan jendela kaca kayu Kls.II
a. Bahan
- papan 0.035 m3 x Rp. 3,856,400.00 = Rp. 134,974.00
JUMLAH = Rp. 134,974.00
b. Tenaga
- Pekerja 0.800 Oh x Rp. 116,600.00 = Rp. 93,280.00
- Tukang kayu 2.000 Oh x Rp. 122,650.00 = Rp. 245,300.00
- Kepala Tukang 0.200 Oh x Rp. 152,900.00 = Rp. 30,580.00
- Mandor 0.040 Oh x Rp. 128,040.00 = Rp. 5,121.60
JUMLAH = Rp. 374,281.60
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
- pekerja 0.800 Oh x Rp. 116,600.00 = Rp. 93,280.00
- Tukang kayu 2.500 Oh x Rp. 122,650.00 = Rp. 306,625.00
- Kepala Tukang 0.250 Oh x Rp. 152,900.00 = Rp. 38,225.00
- Mandor 0.040 Oh x Rp. 128,040.00 = Rp. 5,121.60
JUMLAH = Rp. 443,251.60
a. Bahan
- papan 0.0196 m3 x Rp. 6,432,400.00 = Rp. 126,075.04
- paku biasa 1/2 " -1 " 0.3 kg x Rp. 23,250.00 = Rp. 6,975.00
- lem kayu 0.8 Lt x Rp. 11,800.00 = Rp. 9,440.00
- play wood 4 x 8 x 4 mm 0.5 Lbr x Rp. 74,370.00 = Rp. 37,185.00
- formika 4 x 8 0.5 Lbr x Rp. 74,370.00 = Rp. 37,185.00
JUMLAH = Rp. 216,860.04
b. Tenaga
- pekerja 0.800 Oh x Rp. 116,600.00 = Rp. 93,280.00
- Tukang kayu 2.500 Oh x Rp. 122,650.00 = Rp. 306,625.00
- Kepala Tukang 0.250 Oh x Rp. 152,900.00 = Rp. 38,225.00
- Mandor 0.040 Oh x Rp. 128,040.00 = Rp. 5,121.60
JUMLAH = Rp. 443,251.60
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
- Kayu Terentang 0.200 M3 x Rp. 3,856,400.00 = Rp. 771,280.00
- Paku biasa 2" - 5" 1.500 Kg x Rp. 23,250.00 = Rp. 34,875.00
- Pipa PVC 3" 4.000 M x Rp. 56,210.00 = Rp. 224,840.00
- Besi Beton Polos 200.000 Kg x Rp. 14,012.00 = Rp. 2,802,400.00
- Kawat Beton 2.500 Kg x Rp. 25,990.00 = Rp. 64,975.00
- Semen Portland 323.000 Kg x Rp. 2,082.80 = Rp. 672,744.40
- Pasir Beton 0.520 M3 x Rp. 421,600.00 = Rp. 219,232.00
- Koral Beton 0.780 M3 x Rp. 536,400.00 = Rp. 418,392.00
JUMLAH = Rp. 5,208,738.40
b. Tenaga
- Pekerja 3.900 Oh x Rp. 116,600.00 = Rp. 454,740.00
- Tukang Batu 0.350 Oh x Rp. 122,650.00 = Rp. 42,927.50
- Tukang kayu 1.040 Oh x Rp. 122,650.00 = Rp. 127,556.00
- Tukang besi 1.050 Oh x Rp. 122,650.00 = Rp. 128,782.50
- Kepala Tukang 0.245 Oh x Rp. 152,900.00 = Rp. 37,460.50
- Mandor 0.165 Oh x Rp. 128,040.00 = Rp. 21,126.60
JUMLAH = Rp. 812,593.10
a. Bahan
- Kayu Terentang 0.200 M3 x Rp. - = Rp. -
- Paku biasa 2" - 5" 1.500 Kg x Rp. - = Rp. -
- Minyak bekisting 0.400 Lt x Rp. - = Rp. -
- Besi Wermes 10.000 M2 x Rp. 22,000.00 = Rp. 220,000.00
- Kawat Beton 0.500 Kg x Rp. 25,990.00 = Rp. 12,995.00
- Semen Portland 323.000 Kg x Rp. 2,082.80 = Rp. 672,744.40
- Pasir Beton 0.520 M3 x Rp. 421,600.00 = Rp. 219,232.00
- Koral Beton 0.780 M3 x Rp. 536,400.00 = Rp. 418,392.00
JUMLAH = Rp. 1,543,363.40
b. Tenaga
- Pekerja 3.900 Oh x Rp. 116,600.00 = Rp. 454,740.00
- Tukang Batu 0.350 Oh x Rp. 122,650.00 = Rp. 42,927.50
- Tukang kayu 1.040 Oh x Rp. 122,650.00 = Rp. 127,556.00
- Tukang besi 1.050 Oh x Rp. 122,650.00 = Rp. 128,782.50
- Kepala Tukang 0.245 Oh x Rp. 152,900.00 = Rp. 37,460.50
- Mandor 0.165 Oh x Rp. 128,040.00 = Rp. 21,126.60
JUMLAH = Rp. 812,593.10
a. Bahan
- Kayu Terentang 0.200 M3 x Rp. 3,856,400.00 = Rp. 771,280.00
- Paku biasa 2" - 5" 1.500 Kg x Rp. 23,250.00 = Rp. 34,875.00
- Minyak bekisting 0.400 Lt x Rp. 39,850.00 = Rp. 15,940.00
- Besi Beton Polos 170.000 Kg x Rp. 14,012.00 = Rp. 2,382,040.00
- Kawat Beton 3.000 Kg x Rp. 25,990.00 = Rp. 77,970.00
- Semen Portland 323.000 Kg x Rp. 2,082.80 = Rp. 672,744.40
- Pasir Beton 0.520 M3 x Rp. 421,600.00 = Rp. 219,232.00
- Koral Beton 0.780 M3 x Rp. 536,400.00 = Rp. 418,392.00
JUMLAH = Rp. 4,592,473.40
b. Tenaga
- Pekerja 3.900 Oh x Rp. 116,600.00 = Rp. 454,740.00
- Tukang Batu 0.350 Oh x Rp. 122,650.00 = Rp. 42,927.50
- Tukang kayu 1.040 Oh x Rp. 122,650.00 = Rp. 127,556.00
- Tukang besi 1.050 Oh x Rp. 122,650.00 = Rp. 128,782.50
- Kepala Tukang 0.245 Oh x Rp. 152,900.00 = Rp. 37,460.50
- Mandor 0.165 Oh x Rp. 128,040.00 = Rp. 21,126.60
JUMLAH = Rp. 812,593.10
a. Bahan
- Kayu Terentang 0.270 M3 x Rp. 3,856,400.00 = Rp. 1,041,228.00
- Paku biasa 2" - 5" 2.000 Kg x Rp. 23,250.00 = Rp. 46,500.00
- Minyak bekisting 0.600 Lt x Rp. 39,850.00 = Rp. 23,910.00
- Besi Beton Polos 200.000 Kg x Rp. 14,012.00 = Rp. 2,802,400.00
- Kawat Beton 4.000 Kg x Rp. 25,990.00 = Rp. 103,960.00
- Semen Portland 323.000 Kg x Rp. 2,082.80 = Rp. 672,744.40
- Pasir Beton 0.520 M3 x Rp. 421,600.00 = Rp. 219,232.00
- Koral Beton 0.780 M3 x Rp. 536,400.00 = Rp. 418,392.00
JUMLAH = Rp. 5,328,366.40
b. Tenaga
- Pekerja 4.850 Oh x Rp. 116,600.00 = Rp. 565,510.00
- Tukang Batu 0.350 Oh x Rp. 122,650.00 = Rp. 42,927.50
- Tukang kayu 1.560 Oh x Rp. 122,650.00 = Rp. 191,334.00
- Tukang besi 1.400 Oh x Rp. 122,650.00 = Rp. 171,710.00
- Kepala Tukang 0.331 Oh x Rp. 152,900.00 = Rp. 50,609.90
- Mandor 0.170 Oh x Rp. 128,040.00 = Rp. 21,766.80
JUMLAH = Rp. 1,043,858.20
a. Bahan
- Kayu Terentang 0.270 M3 x Rp. 3,856,400.00 = Rp. 1,041,228.00
- Paku biasa 2" - 5" 2.000 Kg x Rp. 23,250.00 = Rp. 46,500.00
- Minyak bekisting 0.600 Lt x Rp. 39,850.00 = Rp. 23,910.00
- Besi Beton Polos 120.000 Kg x Rp. 14,012.00 = Rp. 1,681,440.00
- Kawat Beton 2.400 Kg x Rp. 25,990.00 = Rp. 62,376.00
- Semen Portland 323.000 Kg x Rp. 2,082.80 = Rp. 672,744.40
- Pasir Beton 0.520 M3 x Rp. 421,600.00 = Rp. 219,232.00
- Koral Beton 0.780 M3 x Rp. 536,400.00 = Rp. 418,392.00
JUMLAH = Rp. 4,165,822.40
b. Tenaga
- Pekerja 4.850 Oh x Rp. 116,600.00 = Rp. 565,510.00
- Tukang Batu 0.350 Oh x Rp. 122,650.00 = Rp. 42,927.50
- Tukang kayu 1.560 Oh x Rp. 122,650.00 = Rp. 191,334.00
- Tukang besi 1.400 Oh x Rp. 122,650.00 = Rp. 171,710.00
- Kepala Tukang 0.331 Oh x Rp. 152,900.00 = Rp. 50,609.90
- Mandor 0.170 Oh x Rp. 128,040.00 = Rp. 21,766.80
JUMLAH = Rp. 1,043,858.20
a. Bahan
- Kayu Terentang 0.270 M3 x Rp. 3,856,400.00 = Rp. 1,041,228.00
- Paku biasa 2" - 5" 2.000 Kg x Rp. 23,250.00 = Rp. 46,500.00
- Minyak bekisting 0.600 Lt x Rp. 39,850.00 = Rp. 23,910.00
- Besi Beton Polos 150.000 Kg x Rp. 14,012.00 = Rp. 2,101,800.00
- Kawat Beton 3.000 Kg x Rp. 25,990.00 = Rp. 77,970.00
- Semen Portland 323.000 Kg x Rp. 2,082.80 = Rp. 672,744.40
- Pasir Beton 0.520 M3 x Rp. 421,600.00 = Rp. 219,232.00
- Koral Beton 0.780 M3 x Rp. 536,400.00 = Rp. 418,392.00
JUMLAH = Rp. 4,601,776.40
b. Tenaga
- Pekerja 4.850 Oh x Rp. 116,600.00 = Rp. 565,510.00
- Tukang Batu 0.350 Oh x Rp. 122,650.00 = Rp. 42,927.50
- Tukang kayu 1.560 Oh x Rp. 122,650.00 = Rp. 191,334.00
- Tukang besi 1.400 Oh x Rp. 122,650.00 = Rp. 171,710.00
- Kepala Tukang 0.331 Oh x Rp. 152,900.00 = Rp. 50,609.90
- Mandor 0.170 Oh x Rp. 128,040.00 = Rp. 21,766.80
JUMLAH = Rp. 1,043,858.20
a. Bahan
- Kayu Terentang 0.400 M3 x Rp. 3,856,400.00 = Rp. 1,542,560.00
- Paku biasa 2" - 5" 4.000 Kg x Rp. 23,250.00 = Rp. 93,000.00
- Minyak bekisting 2.000 Lt x Rp. 39,850.00 = Rp. 79,700.00
- Besi Beton Polos 300.000 Kg x Rp. 14,012.00 = Rp. 4,203,600.00
- Kawat Beton 6.000 Kg x Rp. 25,990.00 = Rp. 155,940.00
- Semen Portland 323.000 Kg x Rp. 2,082.80 = Rp. 672,744.40
- Pasir Beton 0.520 M3 x Rp. 421,600.00 = Rp. 219,232.00
- Koral Beton 0.780 M3 x Rp. 536,400.00 = Rp. 418,392.00
- Kayu Balok 0.150 M3 x Rp. 3,856,400.00 = Rp. 578,460.00
- Plywood 9 mm 3.500 Lbr x Rp. 161,550.00 = Rp. 565,425.00
- Dolken kayu galam Ø 8-10/4 m 26.000 Btg x Rp. 59,800.00 = Rp. 1,554,800.00
JUMLAH = Rp. 10,083,853.40
b. Tenaga
- Pekerja 7.300 Oh x Rp. 116,600.00 = Rp. 851,180.00
- Tukang Batu 0.350 Oh x Rp. 122,650.00 = Rp. 42,927.50
- Tukang kayu 3.300 Oh x Rp. 122,650.00 = Rp. 404,745.00
- Tukang besi 2.100 Oh x Rp. 122,650.00 = Rp. 257,565.00
- Kepala Tukang 0.750 Oh x Rp. 152,900.00 = Rp. 114,675.00
- Mandor 0.250 Oh x Rp. 128,040.00 = Rp. 32,010.00
JUMLAH = Rp. 1,703,102.50
a. Bahan
b. Tenaga
b. Tenaga
b. Tenaga
a. Bahan
- Kayu Terentang 0.320 M3 x Rp. 3,856,400.00 = Rp. 1,234,048.00
- Paku biasa 2" - 5" 3.200 Kg x Rp. 23,250.00 = Rp. 74,400.00
- Minyak bekisting 1.600 Lt x Rp. 39,850.00 = Rp. 63,760.00
- Besi Beton Polos 150.000 Kg x Rp. 14,012.00 = Rp. 2,101,800.00
- Kawat Beton 3.000 Kg x Rp. 25,990.00 = Rp. 77,970.00
- Semen Portland 323.000 Kg x Rp. 2,082.80 = Rp. 672,744.40
- Pasir Beton 0.520 M3 x Rp. 421,600.00 = Rp. 219,232.00
- Koral Beton 0.780 M3 x Rp. 536,400.00 = Rp. 418,392.00
- Kayu Balok 0.120 M3 x Rp. 3,856,400.00 = Rp. 462,768.00
- Plywood 9 mm 2.800 Lbr x Rp. 161,550.00 = Rp. 452,340.00
- Dolken kayu galam Ø 8-10/4 m 32.000 Btg x Rp. 59,800.00 = Rp. 1,913,600.00
JUMLAH = Rp. 7,691,054.40
b. Tenaga
- Pekerja 5.800 Oh x Rp. 116,600.00 = Rp. 676,280.00
- Tukang Batu 0.350 Oh x Rp. 122,650.00 = Rp. 42,927.50
- Tukang kayu 2.800 Oh x Rp. 122,650.00 = Rp. 343,420.00
- Tukang besi 1.050 Oh x Rp. 122,650.00 = Rp. 128,782.50
- Kepala Tukang 0.420 Oh x Rp. 152,900.00 = Rp. 64,218.00
- Mandor 0.185 Oh x Rp. 128,040.00 = Rp. 23,687.40
JUMLAH = Rp. 1,279,315.40
JUMLAH (a) + (b) = Rp. 8,970,369.80
30 1 m3 Membuat Balok beton bertulang 100.00 Kg + bekisting
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
4 1 m2 Pengecatan Bidang Kayu Baru ( 1 lapis plamir ), 1 lapis cat dasar, 3 lapis cat
penutup
a. Bahan
b. Tenaga
b. Tenaga
5 1 m2 Pengecatan Tembok Baru Eksterior ( anti lumut ), 1 lapis cat dasar, 2 lapis cat
penutup
a. Bahan
b. Tenaga
b. Tenaga
b. Tenaga
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
- Meni besi 0.200 Kg x Rp. 72,987.50 = Rp. 14,597.50
- Meni besi 0.100 Kg x Rp. 37,870.00 = Rp. 3,787.00
- Kuas 0.010 Bh x Rp. 82,475.00 = Rp. 824.75
- Perancah 0.002 M3 x Rp. 3,856,400.00 = Rp. 7,712.80
JUMLAH = Rp. 26,922.05
b. Tenaga
ANGKUT
HARGA KEUNTUNGA
NO JENIS BAHAN SPESIFIKASI SATUAN DILOKASI
DASAR (Rp) N PIHAK KE
(Rp.)
II (Rp.)
1 Semen (PC) Tonasa Zak 50 kg 87,400.00 8,000.00 8,740.00
Kg 1,748.00 160.00 174.80
2 Semen warna Kg 23,000.00 700.00 2,300.00
Semen (PC) Bosowa Zak 50 kg 85,000.00 8,000.00 8,500.00
3 Kawat Beton Kg 23,000.00 690.00 2,300.00
4 Kawat Bronjong /m 14,100.00 423.00 1,410.00
5 Kawat Duri /Rol 12,300.00 369.00 1,230.00
6 Kawat Ram Besi /m 17,800.00 534.00 1,780.00
Kawat Ram /m2 28,600.00 858.00 2,860.00
7 Besi Beton Kg 12,400.00 372.00 1,240.00
7 Besi Beton Dia. 6 mm Staf 33,900.00 1,017.00 3,390.00
8 Besi Beton Dia. 8 mm Staf 46,000.00 1,380.00 4,600.00
9 Besi Beton Dia. 10 mm Staf 71,000.00 2,130.00 7,100.00
10 Besi Beton Dia. 12 mm Staf 104,000.00 3,120.00 10,400.00
11 Besi Beton Dia. 14 mm Staf 153,000.00 4,590.00 15,300.00
12 Besi Beton Dia. 16 mm Staf 187,000.00 5,610.00 18,700.00
13 Besi Beton Dia. 19 mm Staf 267,000.00 8,010.00 26,700.00
14 Besi Beton Dia. 22 mm Staf 351,000.00 10,530.00 35,100.00
15 Besi Beton Dia. 25 mm Staf 414,000.00 12,420.00 41,400.00
16 Besi Beton Dia. 32 mm Staf 728,000.00 21,840.00 72,800.00
HARGA
KET
DILOKASI (Rp.)
104,140.00
2,082.80
26,000.00
101,500.00
25,990.00
15,933.00
13,899.00
20,114.00
32,318.00
14,012.00
38,307.00
51,980.00
80,230.00
117,520.00
172,890.00
211,310.00
301,710.00
396,630.00
467,820.00
822,640.00
23,250.00
26,000.00
32,270.00
30,620.00
271,200.00
190,750.00
74,370.00
117,550.00
161,550.00
184,870.00
350,320.00
50,500.00
86,800.00
110,025.00
46,775.00
40,450.00
36,600.00
54,890.00
66,990.00
103,290.00
121,440.00
59,455.00
80,208.33
97,350.00
26,583.33
34,466.67
137,316.67
229,056.67
275,000.00
357,500.00
8,580.00
12,980.00
16,280.00
10,670.00
18,590.00
29,370.00
56,210.00
88,990.00
105,105.00
1,980.00
1,980.00
2,640.00
4,400.00
6,270.00
8,690.00
14,740.00
18,370.00
2,400.00
19,200.00
4,095.00
39,570.00
22,000.00
385,000.00
9,350.00
57,860.00
77,880.00
119,570.00
24,420.00
28,050.00
50,050.00
35,900.00
33,700.00
24,950.00
21,237.50
7,700.00
36,987.50
6,820.00
330.00
232,600.00
1,927,500.00
41,120.00
55,362.50
77,500.00
93,312.50
80,662.50
93,312.50
112,920.00
153,400.00
155,600.00
80,800.00
55,370.00
44,975.00
137,320.00
288,500.00
49,210.00
48,110.00
265,000.00
142,192.50
86,532.50
389.50
642.50
91,000.00
69,000.00
64,410.00
56,710.00
64,410.00
91,250.00
92,680.00
80,030.00
100,270.00
209,060.00
469,100.00
618,500.00
291,800.00
4,849,130.00
2,466,970.00
68,780.00
250,720.00
25,044.00
125,220.00
76,150.00
47,220.00
37,870.00
37,870.00
72,987.50
36,220.00
12,900.00
145,725.00
198,855.00
39,850.00
9,600.00
35,120.00
52,720.00
10,744.00
82,475.00
25,550.00
11,800.00
14,550.00
20,350.00
218,800.00
332,500.00
79,400.00
194,050.00
261,000.00
426,000.00
4,119,900.00
307,900.00
44,400.00
205,055.00
30,925.00
498,025.00
1,086,250.00
1,353,000.00
3,489,200.00
891,770.00
5,060,750.00
293,350.00
4,235,000.00
550,000.00
12,320.00
151,470.00
385,000.00
49,500.00
24,420.00
42,570.00
54,670.00
1,870,000.00
90,970.00
30,800.00
242,550.00
8,250.00
363,550.00
302,500.00
74,250.00
30,250.00
49,500.00
137,500.00
10,175.00
154,000.00
104,500.00
60,500.00
53,350.00
48,950.00
96,250.00
30,250.00
35,750.00
9,900.00
49,599.00
489,720.00
979,000.00
653,840.00
60,720.00
87,780.00
110,000.00
111,540.00
151,000.00
168,450.00
51,370.00
51,370.00
9,790.00
12,760.00
51,370.00
51,370.00
220,000.00
2,310.00
3,850.00
3,960.00
4,070.00
4,620.00
4,620.00
5,280.00
6,160.00
79,750.00
60,500.00
49,500.00
132,000.00
19,475.00
100,000.00
120,230.00
PEKERJAAN SANITASI
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Item Pek,
- Galian Tanah 10.500 m3 x Rp. 51,761.60 = Rp. 543,496.80
- Urugan Pasir 0.650 m3 x Rp. 473,300.40 = Rp. 307,645.26
- Pas, Batu Bata 1 : 3 14.000 m2 x Rp. 218,082.00 = Rp. 3,053,148.00
- Rabat Beton 1 : 3 : 5 0.660 m3 x Rp. 1,377,068.60 = Rp. 908,865.28
- Plesteran 1 : 3 8.000 m2 x Rp. 70,043.54 = Rp. 560,348.35
- Plat Beton 0.370 m3 x Rp. 6,615,843.62 = Rp. 2,447,862.14
- Balok Beton 0.035 m3 x Rp. 7,996,763.80 = Rp. 279,886.73
- Batu Kerikil 0.730 m3 x Rp. 536,400.00 = Rp. 391,572.00
- Batu Karang/Gunung 0.630 m3 x Rp. 311,000.00 = Rp. 195,930.00
- Pipa Penguapan 1 1/2 inc 1.500 m1 x Rp. 59,455.00 = Rp. 89,182.50
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
- Sealent 0.050 kg x Rp. 42,500.00 = Rp. 2,125.00
- Kaca 1.100 m2 x Rp. 426,000.00 = Rp. 468,600.00
JUMLAH = Rp. 470,725.00
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
- Solar 1.000 Ltr x Rp. 9,600.00 = Rp. 9,600.00
- Minyak pelumas 0.100 Ltr x Rp. 39,850.00 = Rp. 3,985.00
JUMLAH = Rp. 3,985.00
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
- Pekerja 0.200 Oh x Rp. 116,600.00 = Rp. 23,320.00
- Tukang Kayu 0.200 Oh x Rp. 122,650.00 = Rp. 24,530.00
- Kepala Tukang 0.020 Oh x Rp. 152,900.00 = Rp. 3,058.00
- Mandor 0.001 Oh x Rp. 128,040.00 = Rp. 128.04
JUMLAH = Rp. 51,036.04
a. Bahan
- seng plat 3 x 6 bjls 28 0.500 Lbr x Rp. 155,600.00 = Rp. 77,800.00
- paku biasa 1/2" - 1" 0.015 Kg x Rp. 23,250.00 = Rp. 348.75
- kayu borneo, papan 0.010 m3 x Rp. 3,856,400.00 = Rp. 37,021.44
- flincote / meni besi 0.250 Kg x Rp. 37,870.00 = Rp. 9,467.50
JUMLAH = Rp. 124,637.69
b. Tenaga
- Pekerja 0.150 Oh x Rp. 116,600.00 = Rp. 17,490.00
- Tukang Kayu 0.400 Oh x Rp. 122,650.00 = Rp. 49,060.00
- Kepala Tukang 0.025 Oh x Rp. 152,900.00 = Rp. 3,822.50
- Mandor 0.001 Oh x Rp. 128,040.00 = Rp. 160.05
JUMLAH = Rp. 70,532.55
a. Bahan
- seng plat 3 x 6 bjls 28 0.500 Lbr x Rp. 155,600.00 = Rp. 77,800.00
- paku biasa 1/2" - 1" 0.015 Kg x Rp. 23,250.00 = Rp. 348.75
- kayu borneo, papan 0.019 m3 x Rp. 3,856,400.00 = Rp. 73,271.60
- flincote / meni besi 0.300 Kg x Rp. 37,870.00 = Rp. 11,361.00
JUMLAH = Rp. 162,781.35
b. Tenaga
- Pekerja 0.040 Oh x Rp. 116,600.00 = Rp. 4,664.00
- Tukang Kayu 0.400 Oh x Rp. 122,650.00 = Rp. 49,060.00
- Kepala Tukang 0.025 Oh x Rp. 152,900.00 = Rp. 3,822.50
- Mandor 0.001 Oh x Rp. 128,040.00 = Rp. 160.05
JUMLAH = Rp. 57,706.55
a. Bahan
- seng plat 3 x 6 bjls 28 0.300 Lbr x Rp. 155,600.00 = Rp. 46,680.00
- paku biasa 1/2" - 1" 0.100 Kg x Rp. 23,250.00 = Rp. 2,325.00
- kayu borneo, papan 0.019 m3 x Rp. 3,856,400.00 = Rp. 73,271.60
- flincote / meni besi 0.500 Kg x Rp. 37,870.00 = Rp. 18,935.00
JUMLAH = Rp. 141,211.60
b. Tenaga
- Pekerja 0.150 Oh x Rp. 116,600.00 = Rp. 17,490.00
- Tukang Kayu 0.250 Oh x Rp. 122,650.00 = Rp. 30,662.50
- Kepala Tukang 0.025 Oh x Rp. 152,900.00 = Rp. 3,822.50
- Mandor 0.001 Oh x Rp. 128,040.00 = Rp. 160.05
JUMLAH = Rp. 52,135.05
a. Bahan
- seng plat 3 x 6 bjls 24 0.300 Lbr x Rp. 77,500.00 = Rp. 23,250.00
- paku biasa 1/2" - 1" 0.100 Kg x Rp. 23,250.00 = Rp. 2,325.00
- kayu borneo, papan 0.019 m3 x Rp. 3,856,400.00 = Rp. 73,271.60
- flincote / meni besi 0.500 Kg x Rp. 37,870.00 = Rp. 18,935.00
JUMLAH = Rp. 117,781.60
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
- Rangka Baja Ringan Giga Steel 4.400 m1 x Rp. 23,698.75 = Rp. 104,274.50
- Reng Baja Ringan 3.300 m1 x Rp. 14,422.08 = Rp. 47,592.88
- Baut/ Acesoris 0.310 kg x Rp. 49,599.00 = Rp. 15,375.69
JUMLAH = Rp. 167,243.07
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
- Besi Holow 40 x 40 1.500 Btg x Rp. 35,900.00 = Rp. 53,850.00
- Besi Holow 40 x20 0.800 Btg x Rp. 33,700.00 = Rp. 26,960.00
- Paku Riffet 8.000 Bj x Rp. 500.00 = Rp. 4,000.00
JUMLAH = Rp. 84,810.00
b. Tenaga
- Pekerja 0.250 Oh x Rp. 116,600.00 = Rp. 29,150.00
- Tukang Besi Konstruksi 0.150 Oh x Rp. 122,650.00 = Rp. 18,397.50
Kepala Tukang 0.015 Oh x Rp. 152,900.00 = Rp. 2,293.50
- Mandor 0.007 Oh x Rp. 128,040.00 = Rp. 896.28
JUMLAH = Rp. 50,737.28
a. Bahan
- Gipsum 0.382 Lbr x Rp. 110,025.00 = Rp. 42,029.55
- Paku Riffet 12.000 Bj x Rp. 500.00 = Rp. 6,000.00
JUMLAH = Rp. 48,029.55
b. Tenaga
- Pekerja 0.200 Oh x Rp. 116,600.00 = Rp. 23,320.00
- Tukang Besi Konstruksi 0.150 Oh x Rp. 122,650.00 = Rp. 18,397.50
Kepala Tukang 0.010 Oh x Rp. 152,900.00 = Rp. 1,529.00
- Mandor 0.005 Oh x Rp. 128,040.00 = Rp. 640.20
JUMLAH = Rp. 43,886.70
a. Bahan
- Besi Holow 40 x 40 1.500 Btg x Rp. 35,900.00 = Rp. 53,850.00
- Plat GRC 6mm 0.400 Lbr x Rp. 50,500.00 = Rp. 20,200.00
- Paku Riffet 6.000 Bj x Rp. 7,700.00 = Rp. 46,200.00
JUMLAH = Rp. 120,250.00
b. Tenaga
- Pekerja 0.100 Oh x Rp. 116,600.00 = Rp. 11,660.00
- Tukang Besi Konstruksi 0.100 Oh x Rp. 122,650.00 = Rp. 12,265.00
Kepala Tukang 0.010 Oh x Rp. 152,900.00 = Rp. 1,529.00
- Mandor 0.002 Oh x Rp. 128,040.00 = Rp. 256.08
JUMLAH = Rp. 25,710.08
a. Bahan
- Metal wall stud 35mm x 40mm 2.000 m' x Rp. 24,950.00 = Rp. 49,900.00
- Metal wall track 30mm x 40mm 0.750 m' x Rp. 21,237.50 = Rp. 15,928.13
- Paku rivet 4.000 bh x Rp. 7,700.00 = Rp. 30,800.00
- Sekrup 6x1-1,5 8.000 bh x Rp. 7,700.00 = Rp. 61,600.00
- Gypsumboard 120x240 cm 9 mm 0.694 lbr x Rp. 110,025.00 = Rp. 76,357.35
- Textile tape 0.240 roll x Rp. 36,987.50 = Rp. 8,877.00
- Compound gypsum 6.000 Kg x Rp. 6,820.00 = Rp. 40,920.00
- Sekrup gypsum 16.000 bh x Rp. 330.00 = Rp. 5,280.00
- Amplas 0.500 lbr x Rp. 9,900.00 = Rp. 4,950.00
JUMLAH = Rp. 294,612.48
b. Tenaga
- Pekerja 0.200 Oh x Rp. 116,600.00 = Rp. 23,320.00
- Tukang Besi Konstruksi 0.600 Oh x Rp. 122,650.00 = Rp. 73,590.00
Kepala Tukang 0.060 Oh x Rp. 152,900.00 = Rp. 9,174.00
- Mandor 0.100 Oh x Rp. 128,040.00 = Rp. 12,804.00
JUMLAH = Rp. 118,888.00
a. Bahan
- Rangka besi siku 40.40.4 0.900 btg x Rp. 232,600.00 = Rp. 209,340.00
- Aluminium composite panel 0.328 m2 x Rp. 1,927,500.00 = Rp. 632,220.00
- Paku skrup 0.200 kg x Rp. 41,120.00 = Rp. 8,224.00
- Paku rivet 16.000 bh x Rp. 7,700.00 = Rp. 123,200.00
JUMLAH = Rp. 972,984.00
b. Tenaga
- Pekerja 0.600 Oh x Rp. 116,600.00 = Rp. 69,960.00
- Tukang Besi Konstruksi 0.600 Oh x Rp. 122,650.00 = Rp. 73,590.00
Kepala Tukang 0.050 Oh x Rp. 152,900.00 = Rp. 7,645.00
- Mandor 0.005 Oh x Rp. 128,040.00 = Rp. 640.20
JUMLAH = Rp. 151,835.20
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b.
Tenaga
- Pekerja 0.140 Oh x Rp. 116,600.00 = Rp. 16,324.00
- Tukang kayu 0.067 Oh x Rp. 122,650.00 = Rp. 8,217.55
- Kepala Tukang 0.007 Oh x Rp. 152,900.00 = Rp. 1,070.30
- Mandor 0.007 Oh x Rp. 128,040.00 = Rp. 896.28
JUMLAH = Rp. 26,508.13
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
a. Bahan
b. Tenaga
ANGKUT
GALIAN C KEUNTUNGAN HARGA
NO JENIS BAHAN SATUAN HARGA DASAR DILOKASI KET
15% PIHAK KE II (Rp.) DILOKASI (Rp.)
(Rp.)
1 Batu Kali / Batu Gunung M3 115,000.00 150,000.00 17,250.00 28,750.00 311,000.00
2 Batu Belah 15 - 20 cm M3 115,000.00 150,000.00 17,250.00 28,750.00 311,000.00
3 Batu Belah 10 - 15 cm M3 115,000.00 150,000.00 17,250.00 28,750.00 311,000.00
4 Batu Belah 7 - 10 cm M3 115,000.00 150,000.00 17,250.00 28,750.00 311,000.00
5 Batu Belah 5 - 7 cm M3 115,000.00 150,000.00 17,250.00 28,750.00 311,000.00
6 Batu Belah 3 - 5 cm M3 144,000.00 150,000.00 21,600.00 36,000.00 351,600.00
7 Batu Belah 2 - 3 cm M3 216,000.00 150,000.00 32,400.00 54,000.00 452,400.00
8 Batu Belah 1 - 2 cm M3 345,000.00 150,000.00 51,750.00 86,250.00 633,000.00
9 Batu Belah 0.5 - 1 cm (Split) M3 276,000.00 150,000.00 41,400.00 69,000.00 536,400.00
10 Kerikil Beton / Koral M3 276,000.00 150,000.00 41,400.00 69,000.00 536,400.00