Beruflich Dokumente
Kultur Dokumente
Location - Naypyitaw
Date -2.7.2013
2
Contents
Conclusion
Kayin
(3) Kayin (3) Bago Ayeyarwaddy
Yangon
Mon
(4) Chin (4) Magway
Yangon
6
7
0
509
Janurary 520
771
856
471
Februrary 485
722
840
528
March 568
819
910
508
Apri 562
795
824
516
May 538
2009
824
792
522
Jun 568
2010
829
843
607
July 723
2011
888
945
672
767
2012
August
892
950
651
Setember 767
860
950
672
October 774
892
Monthly Generation in GWh (2009 to 2012)
981
601
November 773
869
974
573
December 765
873
939
12
Monthly Power Generation(by Power Producer) (2007 to 2012) 13
900 HPGE
MOEP1 MEPE
Others Total
Power Generation (GWh/month)
800
700
600
500
400
300
200
100
0
Jul-07
Jul-08
Jul-09
Jul-10
Jul-11
Jul-12
Jan-07
Apr-07
Apr-08
Apr-09
Oct-07
Jan-08
Oct-08
Jan-09
Oct-09
Jan-10
Apr-10
Oct-10
Jan-11
Apr-11
Oct-11
Jan-12
Apr-12
Month
Yeywa (790MW)
Yenwe (25MW) COD: Dec. 2010
COD: Feb. 2007
Kabaung (30MW) Shwegyin (75 MW)
Shweli -1(600MW) COD: Oct. 2011
COD: Mar. 2008 COD: May. 2009 Kun (60MW)
COD: Jul. 2012
Kengtawng (54MW)
COD: Mar. 2009 Kyeeon Kyeewa (74 MW)
COD: Aug. 2012
Power Consumption (1990 to 2009) 14
1,071GWh, 等),
57 GWh,
57GWh,1%
000 4,000
21% 1% 一般、家庭
Household
用,
2,015GWh,
000 3,000 41%
2,000
000
1,000
000 -
Industrial
工業用,
1990 1995 2000 2003 2004 2005 2006 2007 2008 2009
1,850GWh,
000 Fisical year
37%
2,500,000
Power Consumption per Consumer 5,000
2,500,000
- 2,500,000 2,500,000
5,000 5,000
5,000
1990 1995 2000 2003 2004 2005 2006 2007 2008 2009
Number of Consumers (No.)
2,000,000 4,000
Number of Consumers (No.)
2,000,000
2,000,000 4,000 4,000
2,000,000 4,000 has increased, however, power
Fisical year
(kwh/Consumer)
(kwh/Consumer)
(kwh/Consumer)
consumption per consumer has
(kwh/Consumer)
1,500,000 3,000
1,500,000
1,500,000 3,000 3,000
1,500,000 3,000 decreased.
1,000,000 2,000
1,000,000
1,000,000
1,000,000
2,000 2,000
2,000
→ Restriction of power consumption
Comsumed
(ex. planned outage) is thought to be
500,000 1,000
500,000
500,000
500,000
1,000 1,000
1,000 one of the reasons of the reduction
- 0
above.
-- 0 0
1990- 1995 2000 2003 2004 2005 2006 2007 2008 2009 0
1990 1995
1990 19952000 20032003
2000 2004 2005
2004 2006
20052007 2008 2007
2006 2009 2008 2009
1990 1995 2000 2003 year
Fisical 2004 2005 2006 2007 2008 2009
FisicalFisical
year year
Fisical year
Consumers Consumption per consumers (KWh/consumer)
Consumers
Consumers Consumption
Consumption per consumers
per consumers (KWh/consumer)
(KWh/consumer)
Consumers Consumption per consumers (KWh/consumer)
15
Energy Mix (MWh) Energy Mix (MWh)
(by Power Producer)2009 (by Power Producer)2010
217 406 351 515
1 578 856 3% 5%
23% 1 802 754
23%
5 656 509
5 033 601 72%
74%
7 177 899
71%
7 722 780
71%
Electrification Ratio
No Description Quantity
4 Percentage 28.86 %
7000
6000 6823.05
5000 4871,6
3851,6 4584
4000 3911
rainy
rainy
3000 2509 3259
2420
2000 2060 1841
Dry
rainy
2370 Dry 2725
Dry
1000
0
MW
2013
2014
2015
Demand Available in Dry Available in Wet Installed Capacity
19
During 2015-16, Generation Mix Condition of Total Installed Capacity 20
During
Total
2015-16,
Sr. Installed
Description Installed
No Capacity 0,73
Capacity
(MW)
(MW) %
40,45
52.66 %
1. Hydro 501 2,760
%
2. Coal 300 420
20
MOGE Gas Allocation and MOEP Gas Requirement of 21
Gas Fired Power Plants
Installed Capacity Gas(mmscfd) Generation if
Current
Off-Shore In-Land more Gasis
Sr Plant Name Generation
Alloc Requir available
Nos Total Allocati Require (MW)
MW (MW)
on ment ation ement
Hlawga 33.3 3 99.90
1 33.80 39.00 - - 88.00 116.00
STG 54.3 1 54.3
Ywama 18.45 2 36.90
2 NEDO 24.0 1 24.00 24.64 28.00 - - 50.00 57.00
STG 9.4 1 9.40
Ahlone 33.3 3 99.90
3 30.60 39.00 - - 76.00 116.00
STG 54.3 1 54.30
Tharkayta 19 3 57.00
4 28.03 29.00 - - 57.00 69.00
STG 35 1 35.00
Yangon Total 16 470.70 117.07 135.00 - - 271.00 358.00
1 Shwetaung 18.45 3 55.35 14.35 27.00 - - 20.50 39.00
18.45 1 18.45
2 Myanaung 6.00 9.00 - - 12.00 15.00
16.25 1 16.25
18.45 1 18.45
3 Thatone 22.34 25.00 - - 35.00 37.00
16.25 2 32.50
4 Mawlamying 6.00 2 12.00 2.17 4.00 - - 3.00 6.00
5 Kyunchaung 18.10 3 54.30 - - 9.92 18.00 24.50 39.00
6 Mann 18.45 2 36.90 - - - 12.00 Spare 26.00
Local Total 15 244.20 44.86 65.00 9.92 30.00 95.00 162.00
Yangon + Local TOTAL 31 714.90 161.93 200.00 9.92 30.00 366.00 520.00
Gas Fired Power Plants and Gas Engines Constructed 22
by Foreign and Local Investments in Yangon
Current
Installed Capacity Allocation
(mmscfd) Current
Production
Sr Plant Name Off-Shore Generation Remark
Efficiency
Alloca Require (MW)
Nos Total
MW
tion ment
(19) Gas Engines are
in Operation.
1 Hlawga (Zeya) 1 52 54.55 5.00 15.86 18.00 94.73% Installation of 1st stage
is100%completed
Installation is80%
2 Ywama (MSP) 4 13 52 - 16.57 - completed
(2) GasTurbinesare in
Ahlone (Toyo Operation.
3 42.0 3 121.0 26.50 29.80 72.00 90% 1st stage Simple cycle
- Thai)
is100%completed
1st stage Installation is
Tharkayta 15.00 100%completed and
4 3.35 16 53.6 - - (6)GasEngineshave
(CIC)
been tested.
5 Ywama(EGAT) 120 2 240 - 80 ` Underconstruction
66 58 1900 66 73 748
33 1 10 33 - -
ThaPyaWa
500kV ThaPyaWa – Taungoo (Contracted Stage)
MongTon
Double Circuit Line (153.3)miles
7000MW
Taungoo
If (476 mmscfd) of Gas is more allocated than Year 2013-2014, (2357 MW) of
Energy can be more generated.
Demand Forecasting for 30 Years (Stat: 2011-2030) 36
၄၄၄၄၄
20000
၄၄၄၄၄
19000 18,904
၄၄၄၄၄
17000
16450
၄၄၄၄၄ 16,623
16000 15372
15587
၄၄၄၄၄
15000 14384
14632
၄၄၄၄၄
14000 13477
13752
၄၄၄၄၄
13000 12619
12941
၄၄၄၄၄
12000 11653 12,557
12194
11918
10869 11394
၄၄၄၄၄
11000 11324
10159 10771
10668
10000
၄၄၄၄၄ 10257
9517 9779
10007
9000
၄၄၄၄ 8861 9406 9279
8276 8860 8818
8000
၄၄၄၄ 7754 8319 8394
7287 7832 8003
7393 7642
7000
၄၄၄၄ 6871 7274
6997
6938
5941 6640
6000
၄၄၄၄ 5642 6631
5372 6351
5128 5746 6095
5478
5000 5235
၄၄၄၄ 5013 5089 5284
4910
4744
4000
၄၄၄၄
MW
THANK YOU FOR YOUR KIND ATTENTION
Q&A
U Maung Maung
Chief Engineer
Power Transmission Project
Department (PTP)
Myanmar Electric Power Enterprise
(MEPE)
Ministry of Electric Power(MOEP)
37