The Republic Of The Union Of Myanmar

Ministry of Electric Power


Myanma Electric Power Enterprise

Power System Development Scheme of MEPE

Location - Naypyitaw
Date -2.7.2013
2

Contents

 About Our Country

 Current Situation in Myanma Power


System

 Upgrading Plan for the System (5


Years Plan)

 Conclusion

 Question and Answer


3
4

Brief Introduction to The Republic of Union of Myanmar

Area of Country 261, 229.73 sq-mile(677,000 km2) Kachin

Population around 59.78 million(as of 2011)


Sagaing

The country consists of Shan


Chin
States Regions
Mandalay

(1) Kachin (1) Sagaing Rakhaing Magway


Kayar
(2) Kayah (2) Tanintharyi Bago

Kayin
(3) Kayin (3) Bago Ayeyarwaddy
Yangon
Mon
(4) Chin (4) Magway

(5) Mon (5) Mandalay


Tanintharyi

(6) Rakhaing (6) Yangon

(7) Shan (7) Ayeyarwaddy


Main facts abstract from Geography of Myanmar 5

1} According to the land form and climate of Myanmar, there


are rich hydro power resources in Northern and Eastern
Regions of Myanmar. There are more than 15 Hydro Power
Resources which were the capacity >1000MW in that
Mandalay
regions.

2) Myanmar have the border with the China, India and


Thailand. Therefore the power trade to these country can be
achieved.

3) Yangon is the most populated region and it has about 7


millions peoples. Yangon has the main sea port and Industry
Zones. Therefore, Yangon is the biggest load center of
Naypyitaw Myanmar. Mandalay, Naypyitaw and Ayeyarwaddy regions are
also have the high population density and the power demand
is increasing rapidly.

Yangon
6
7

Background History for Power System


• The voltage levels of the Myanmar electrical power system are
– 500 kV
– 230 kV
– 132 kV
– 66 kV
– 33 kV
– 11 kV.
• The national grid has no direct connections to other grids of neighboring
countries.
• The network comprises
- 44 overhead lines at 230 kV with a total length of 3979 km
- 41 overhead lines at 132 kV with a total length of 2334 km
- 100 overhead lines at 66 kV with a total length of 3729 km
- 11 overhead lines at 33 kV having a total length of 27 km.
• The 230 kV and 132 kV overhead lines are interconnecting approximately 69
substations.
• The above details are valid for the transmission system only and do not include
the distribution network.
Dapein(1) 8
Location of Power Station within 240MW

Myanma Power System Shweli(1)


600MW
Thapanzeik
30 MW
Sedawgyi
29,51 3,56 25 MW
% %
Yeywa
790 MW Zawgyi(2)
Kyungchaung 12 MW
66,93 54.3 MW Kinda
56 MW Zawgyi(1)
% 18 MW
Mone
75 MW Tigyit Keng Taung
Mann 54 MW
36.9 MW 120 MW
Hydro Gas Coal Kyeeon Kyeewa
74 MW
Paunglaung Baluchaung(1)
280 MW 28 MW
Shwedaung Kabau Baluchaung(2)
55.35MW ng 168 MW
30MW Thauk-ye- Hydropower plant
Installed Myanma khat(2)
Myanaun Kun 120 MW Gas-fired power plant
Sr Description Qty Capacity Power Foreign 60 MW
g Coal-fired power plant
(MW) System 34.7MW Yenwe
25 MW Shwegy Steam turbine power plant
in
1 Hydropower 20 2,780.0 2,259.0 521 Zaungt 75 MW
Hlawga u
2 Gas-fired 14 996.05 996.05 - 154.2 MW 20 MW
3 Coal-fired 1 120.0 120.0 - 54.55 MW
Ywama Thaketa Thaton
Total 35 3,896.05 3,375.05 521 70.3 MW 92 MW 50.95 MW
52 MW 53.6 MW
Ahlone Mawlamyain
154.2 MW g
121 MW 12 MW 8
Power Stations in Myanmar (as of Dec’ 2012) 9
Existing Power Station (Hydro, Gas-fired and Coal-fired Thermal)
Hydropower Output (MW) Gas-fired Output (MW)
1 Baluchaung -1 28 1 Kyungchaung 54.3
2 Baluchaung -2 168 2 Mann 36.9
3 Yeywa 790 3 Shwedaung 55.35
4 Kinda 56 4 Mawlamyaing 12
5 Sedawgyi 25 5 Myanaung 34.7
6 Zawgyi -1 18 6 Hlawga 154.2+54.55=208.75
7 Zawgyi -2 12 7 Ywama 70.3+52=122.3
8 Thapanzeik 30 8 Ahlone 154.2+121=275.2
9 Mone 75 9 Thaketa 92+53.6=145.6
10 Paunglaung 280 10 Thaton 50.95
11 Kabaung 30 Subtotal 996.05
12 Yenwe 25
Coal-fired Output (MW)
13 Zaungtu 20
1 Tigyit 120
14 Shweli -1 600(300)
15 Keng taung 54
16 Shwegyin 75
17 Kun 60
18 Kyeeon Kyeewa 74
19 Dapein-1 240(221)
Existing Power System Total = 3,896.05(3375.05)MW
20 Thauk-ye-khat(2) 120
Subtotal 2780(521)
Note: Output in parentheses is power supply to Myanmar from JV Projects.
10
Power Supply Status of Myanmar in 2012
(Dry and Rainy Season)

Dry season : 1,298 MW (May 18, 2012 /10:00)

Rainy season : 1,796 MW (October 18, 2012 /20:00)

(Maximum power supply as of December 31, 2012)


11

Monthly Generation in GWh (2009 to 2012)


Month 2009 2010 2011 2012
Janurary 509 520 771 856
Februrary 471 485 722 840
March 528 568 819 910
Apri 508 562 795 824
May 516 538 824 792
Jun 522 568 829 843
July 607 723 888 945
August 672 767 892 950
Setember 651 767 860 950
October 672 774 892 981
November 601 773 869 974
December 573 765 873 939
Total 6830 7810 10034 10804
100
200
300
400
500
600
700
800
900
1000

0
509
Janurary 520
771
856
471
Februrary 485
722
840
528
March 568
819
910
508
Apri 562
795
824
516
May 538

2009
824
792
522
Jun 568

2010
829
843
607
July 723

2011
888
945
672
767

2012
August
892
950
651
Setember 767
860
950
672
October 774
892
Monthly Generation in GWh (2009 to 2012)

981
601
November 773
869
974
573
December 765
873
939
12
Monthly Power Generation(by Power Producer) (2007 to 2012) 13

Monthly Power Generation (2007.01 - 2012.08)


1,000

900 HPGE
MOEP1 MEPE
Others Total
Power Generation (GWh/month)

800

700

600

500

400

300

200

100

0
Jul-07

Jul-08

Jul-09

Jul-10

Jul-11

Jul-12
Jan-07

Apr-07

Apr-08

Apr-09
Oct-07

Jan-08

Oct-08

Jan-09

Oct-09

Jan-10

Apr-10

Oct-10

Jan-11

Apr-11

Oct-11

Jan-12

Apr-12
Month
Yeywa (790MW)
Yenwe (25MW) COD: Dec. 2010
COD: Feb. 2007
Kabaung (30MW) Shwegyin (75 MW)
Shweli -1(600MW) COD: Oct. 2011
COD: Mar. 2008 COD: May. 2009 Kun (60MW)
COD: Jul. 2012
Kengtawng (54MW)
COD: Mar. 2009 Kyeeon Kyeewa (74 MW)
COD: Aug. 2012
Power Consumption (1990 to 2009) 14

Power Consumption(by Use) Power Consumption(by Use)


一般、家庭用
一般、家庭用
Household 工業用
工業用
Industrial 商業用
商業用その他(外灯等)
Commercial その他(外灯等)
Others (lighting) (FY 2009)
6,000
000
Commercial
商業用, その他(外灯
Others (lighting),
5,000
Power Generation (GMh)

1,071GWh, 等),
57 GWh,
57GWh,1%
000 4,000
21% 1% 一般、家庭
Household
用,
2,015GWh,
000 3,000 41%

2,000
000
1,000

000 -
Industrial
工業用,
1990 1995 2000 2003 2004 2005 2006 2007 2008 2009
1,850GWh,
000 Fisical year
37%

2,500,000
Power Consumption per Consumer 5,000
2,500,000
- 2,500,000 2,500,000
5,000 5,000
5,000

Comsumed Energy per Consumer


Comsumed Energy per Consumer

Energy per Consumer


Since 2006, the number of consumer

Comsumed Energy per Consumer


Number of Consumers (No.)

1990 1995 2000 2003 2004 2005 2006 2007 2008 2009
Number of Consumers (No.)

2,000,000 4,000
Number of Consumers (No.)

2,000,000
2,000,000 4,000 4,000
2,000,000 4,000 has increased, however, power
Fisical year

(kwh/Consumer)
(kwh/Consumer)

(kwh/Consumer)
consumption per consumer has

(kwh/Consumer)
1,500,000 3,000
1,500,000
1,500,000 3,000 3,000
1,500,000 3,000 decreased.
1,000,000 2,000
1,000,000
1,000,000
1,000,000
2,000 2,000
2,000
→ Restriction of power consumption

Comsumed
(ex. planned outage) is thought to be
500,000 1,000
500,000
500,000
500,000
1,000 1,000
1,000 one of the reasons of the reduction
- 0
above.
-- 0 0
1990- 1995 2000 2003 2004 2005 2006 2007 2008 2009 0
1990 1995
1990 19952000 20032003
2000 2004 2005
2004 2006
20052007 2008 2007
2006 2009 2008 2009
1990 1995 2000 2003 year
Fisical 2004 2005 2006 2007 2008 2009
FisicalFisical
year year
Fisical year
Consumers Consumption per consumers (KWh/consumer)
Consumers
Consumers Consumption
Consumption per consumers
per consumers (KWh/consumer)
(KWh/consumer)
Consumers Consumption per consumers (KWh/consumer)
15
Energy Mix (MWh) Energy Mix (MWh)
(by Power Producer)2009 (by Power Producer)2010
217 406 351 515
1 578 856 3% 5%
23% 1 802 754
23%

5 656 509
5 033 601 72%
74%

Hydro Station Gas-Fired Coal-Fired Hydro Station Gas-Fired Coal-Fired


(MWh) Station (MWh) Thermal (MWh) Station (MWh) Thermal
Station (MWh) Station (MWh)

Energy Mix (MWh) Energy Mix (MWh)


(by Power Producer)2011 (by Power Producer)2012
266 223
379 328 3%
2 845 575
2 476 327 4%
26%
25%

7 177 899
71%
7 722 780
71%

Hydro Station Gas-Fired Coal-Fired Hydro Station Gas-Fired Coal-Fired


(MWh) Station (MWh) Thermal (MWh) Station (MWh) Thermal
Station (MWh) Station (MWh)
16

Electrification Ratio

No Description Quantity

1 Population 59.78 million

2 Numbers of Household 8.92 million

3 Electrified Household 2.575 million

4 Percentage 28.86 %

1 % increment in electrified household covers 89,200 households and is


expected to be consumed 18187 MWh/yr.
17
18
Situation for Installed Capacity, Demand and Generation in upto 2015-2016 19
for first five year plan

7000
6000 6823.05

5000 4871,6
3851,6 4584
4000 3911
rainy
rainy
3000 2509 3259
2420
2000 2060 1841
Dry
rainy
2370 Dry 2725
Dry

1000
0
MW
2013
2014
2015
Demand Available in Dry Available in Wet Installed Capacity

19
During 2015-16, Generation Mix Condition of Total Installed Capacity 20

In Myanma Power System

During
Total
2015-16,
Sr. Installed
Description Installed
No Capacity 0,73
Capacity
(MW)
(MW) %
40,45
52.66 %
1. Hydro 501 2,760
%
2. Coal 300 420

3. Gas 2,878.15 3,593.05


6,16
4. Solar 50 50 %
Hydro Coal Gas Solar
Total 3,729.15 6,823.05

20
MOGE Gas Allocation and MOEP Gas Requirement of 21
Gas Fired Power Plants
Installed Capacity Gas(mmscfd) Generation if
Current
Off-Shore In-Land more Gasis
Sr Plant Name Generation
Alloc Requir available
Nos Total Allocati Require (MW)
MW (MW)
on ment ation ement
Hlawga 33.3 3 99.90
1 33.80 39.00 - - 88.00 116.00
STG 54.3 1 54.3
Ywama 18.45 2 36.90
2 NEDO 24.0 1 24.00 24.64 28.00 - - 50.00 57.00
STG 9.4 1 9.40
Ahlone 33.3 3 99.90
3 30.60 39.00 - - 76.00 116.00
STG 54.3 1 54.30
Tharkayta 19 3 57.00
4 28.03 29.00 - - 57.00 69.00
STG 35 1 35.00
Yangon Total 16 470.70 117.07 135.00 - - 271.00 358.00
1 Shwetaung 18.45 3 55.35 14.35 27.00 - - 20.50 39.00
18.45 1 18.45
2 Myanaung 6.00 9.00 - - 12.00 15.00
16.25 1 16.25
18.45 1 18.45
3 Thatone 22.34 25.00 - - 35.00 37.00
16.25 2 32.50
4 Mawlamying 6.00 2 12.00 2.17 4.00 - - 3.00 6.00
5 Kyunchaung 18.10 3 54.30 - - 9.92 18.00 24.50 39.00
6 Mann 18.45 2 36.90 - - - 12.00 Spare 26.00
Local Total 15 244.20 44.86 65.00 9.92 30.00 95.00 162.00
Yangon + Local TOTAL 31 714.90 161.93 200.00 9.92 30.00 366.00 520.00
Gas Fired Power Plants and Gas Engines Constructed 22
by Foreign and Local Investments in Yangon
Current
Installed Capacity Allocation
(mmscfd) Current
Production
Sr Plant Name Off-Shore Generation Remark
Efficiency
Alloca Require (MW)
Nos Total
MW
tion ment
(19) Gas Engines are
in Operation.
1 Hlawga (Zeya) 1 52 54.55 5.00 15.86 18.00 94.73% Installation of 1st stage
is100%completed
Installation is80%
2 Ywama (MSP) 4 13 52 - 16.57 - completed
(2) GasTurbinesare in
Ahlone (Toyo Operation.
3 42.0 3 121.0 26.50 29.80 72.00 90% 1st stage Simple cycle
- Thai)
is100%completed
1st stage Installation is
Tharkayta 15.00 100%completed and
4 3.35 16 53.6 - - (6)GasEngineshave
(CIC)
been tested.
5 Ywama(EGAT) 120 2 240 - 80 ` Underconstruction

TOTAL 86 521.15 31.5 157 90.00


Installed Capacity and Gas Requirement of MOEP Power Plants 23
and Foreign and Local Investment Power Plants
Installed Gas Requirement
S Capacity(MW) (mmscfd)
Plant Name 1st 2nd 1st Remark
r 2nd
Stag Stag Total Stag Total
Stage
e e e
Hlawga
1 Hydrolancang 243 243 468 53.5 53.5 107
(China)
Ywama(EGAT)
2 Donated by 240 - 240 80 - 80
Thailand
Tharkayta
3 167 336 503 40 40 80
BKB( Korea)
Tharkayta
4 127 386 513 30 89 119
UREC(China)
Mawlamying
5 (Myanmar 100 130 230 21 29 50
Lighting)
Kyaukphyu(MOEP
6 100 - 100 20 - 20
)
Gas Turbine Power Plant Projects of State Own and Private 24
Investment from Year 2013-2014 to Year 2015-2016

Yearly Requirement of Off-Shore Gas (mmscfd)


Total Gas
Plant Name 2013 2014 2015 Requirem
2014 2015 2016 ent
Ywama(EGAT)
Donated by Thailand 80.00 - - 80.00
Kyaukphyu(MOEP) - 20.00 - 20.00
Hlawga
- 53.50 53.50 107.00
Hydrolancang(China)
Tharkayta BKB (Korea) - 40.00 40.00 80.00
Tharkayta UREC (China) - 30.00 89.00 119.00
Mawlamying
- 21.00 29.00 50.00
(Myanmar Lighting)
Kanpouk
- 50.00 50.00 100.00
(Dawei Power Utilities)

TOTAL 80.00 214.50 261.50 556.00


Gas Allocation and Gas Requirement for MOEP and Foreign and 25
Local Investment Gas Fired Power Plants

Gas Gas Planned Gas


Sr Fiscal Year Allocation Requirement Allocation Shortage
Gas Remark
(mmscfd) (mmscfd) (mmscfd) (mmscfd) Plant Name
(mmscfd)

Ywama (EGAT) 80.00 2014 Jan


100.00 Myan Shwe Pyi 8.92 2014 Jan
1 2013-2014 171.85 387.23 (2014 115.38 CIC 7.50 2014 Jan
January) Toyo Thai 14.50 2014 Jan
Zeya 4.06 2014 Jan
Hydrolancang (China) 53.50 2014 Nov
BKB(Korea) 40.00 2015 Feb
UREC (China) 30.00 2014 Dec
2 2014-2015 271.85 601.73 - 329.88
Myanmar Lighting 21.00 2014 April
Kyaukphyu(MOEP) 20.00 2014 Dec
Dawei Power Utilities 50.00 2015 March
Hydrolancang (China) 53.50 2015 May
BKB(Korea) 40.00 2016 Jan
3 2015-2016 271.85 863.23 - 591.38 UREC (China) 89.00 2016 March
Myanmar Lighting 29.00 2015 Oct
Dawei Power Utilities 50.00 2016 Feb
Status of Implementation of Projects (Transmission Lines & Substations), 26
On-going and will be Completed During (2012-2013) Financial Years

Transmission Lines Substations


500 230 132 500 kV 230 kV 132 kV 66 kV
Sr State / Region 66 kV33 kV
kV kV kV
(mile)(mile) No. MVA No. MVA No. MVA No. MVA
(mile) (mile) (mile)
1 KACHIN STATE
2 KAYAR STATE 110 3.5 1 100
3 KAYIN STATE 1 20
4 CHIN STATE 89 3 9
5 MON STATE
6 RAKHINE STATE 226 3 300 1 5
7 SHAN STATE (SOUTH) 33 1 5
8 SHAN STATE (EAST)
9 SHAN STATE (NOUTH) 162 4 22
10 SAGAING REGION
TANINTHARYI
11
REGION
12 BAGO REGION (EAST)
BAGO REGION
13 130
(WEST)
14 MAGWAY REGION
15 MANDALAY REGION 146 80 10 1 100
AYEYARWADDY
16 40 1 100
REGION
Status of Implementation of Projects (Transmission Lines & Substations), 27
On-going and will be Completed During (2013-2014) Financial Years
Transmission Lines Substations
500 230 132 66 500 kV 230 kV 132 kV 66 kV
Sr State / Region 33 kV
kV kV kV kV
(mile) No. MVA No. MVA No. MVA No. MVA
(mile)(mile)(mile)(mile)
1 KACHIN STATE 285 34 3 300 3 22
2 KAYAR STATE
3 KAYIN STATE 12 1 5
4 CHIN STATE 85 3 15
5 MON STATE 50 3 52
6 RAKHINE STATE 65 175 6 60
SHAN STATE
7 1 100
(SOUTH)
8 SHAN STATE (EAST)
SHAN STATE
9 33 2 10
(NOUTH)
1
SAGAING REGION 80 1 100 1 100 1 10
0
TANINTHARYI
11 132 2 200 2 20
REGION
1 BAGO REGION
117
2 (EAST)
1 BAGO REGION
50 100
3 (WEST)
1
MAGWAY REGION 85 1 100
Status of Implementation of Projects (Transmission Lines & Substations), 28
On-going and will be Completed During (2014-2015) Financial Years
Transmission Lines Substations
500 230 132 66 500 kV 230 kV 132 kV 66 kV
Sr State / Region 33 kV
kV kV kV kV
(mile) No. MVA No. MVA No. MVA No. MVA
(mile)(mile)(mile)(mile)
1 KACHIN STATE 60 55 1 60 1 10
2 KAYAR STATE 145 2 150 3 65
3 KAYIN STATE 80 27 2 200 1 5
4 CHIN STATE
5 MON STATE 53 3 90
6 RAKHINE STATE 288 8 47
SHAN STATE
7 20
(SOUTH)
8 SHAN STATE (EAST)
SHAN STATE
9 60 188 2 160 4 45
(NOUTH)
1
SAGAING REGION 30 1 100 2 10
0
TANINTHARYI
11
REGION
1 BAGO REGION
2 1000
2 (EAST)
1 BAGO REGION
3 (WEST)
1
MAGWAY REGION 300 175 4 360 1 60 5 29
Status of Implementation of Projects (Transmission Lines & Substations), 29
On-going and will be Completed During (2015-2016) Financial Years
Transmission Lines Substations
500 230 132 66 500 kV 230 kV 132 kV 66 kV
Sr State / Region 33 kV
kV kV kV kV
(mile) No. MVA No. MVA No. MVA No. MVA
(mile)(mile)(mile)(mile)
1 KACHIN STATE
2 KAYAR STATE
3 KAYIN STATE
4 CHIN STATE 60 1 2
5 MON STATE 38 1 10
6 RAKHINE STATE
SHAN STATE
7
(SOUTH)
8 SHAN STATE (EAST)
SHAN STATE
9 38 1 5
(NOUTH)
1
SAGAING REGION
0
TANINTHARYI
11 10
REGION
1 BAGO REGION
2 (EAST)
1 BAGO REGION
60
3 (WEST)
1
MAGWAY REGION 1 60
Status of Implementation of Projects (Transmission Lines & Substations), 30
On-going and will be Completed During (2012-2013) To (2015-2016) Financial Years
Transmission Lines Substations
132 33 500 kV 230 kV 132 kV 66 kV
Sr State / Region 500 230
kV 66 kV kV
kV kV
(mile (mile) (mile No. MVA No. MVA No. MVA No. MVA
(mile) (mile)
) )
1 KACHIN STATE 285 60 89 3 300 1 60 4 32
2 KAYAR STATE 110 3.5 145 1 100 2 150 3 65
3 KAYIN STATE 80 39 2 200 3 30
4 CHIN STATE 234 7 26
5 MON STATE 141 7 152
6 RAKHINE STATE 191 463 3 300 15 112
SHAN STATE
7 53 1 100 1 5
(SOUTH)
8 SHAN STATE (EAST)
SHAN STATE
9 60 421 1 160 11 82
(NOUTH)
10 SAGAING REGION 80 30 1 100 2 200 3 20
TANINTHARYI
11 142 2 200 2 20
REGION
BAGO REGION
12 117 2 1000
(EAST)
BAGO REGION
13 50 290
(WEST)
14 MAGWAY REGION 385 175 4 360 2 120 5 29
15 MANDALAY REGION 146 80 38 10 1 500 3 300 3 300 3 60
31
List of Project To be Implemented by Myanma Electric Power Enterprise,
Ministry of Electric Power Under (5) Years Plan
(2012-2013) To (2015-2016)
Transmission Lines Substations
Line Installed
Voltage Voltage No of
No of Line Length Capacity
(kV) (kV) Substation
(km) (MVA)
500 3 313 500 3 1500

230 28 2227 230 30 3420

132 3 63.5 132 10 1030

66 58 1900 66 73 748

33 1 10 33 - -

Total 94 4513.5 Total 116 6698


32
33
34
500 KV Power Transmission Plan In Myanmar

 500kV ShweLi(3)- ThaPyaWa (Proposal Stage)


Double Circuit Line (250)miles
ShweLi(3)
1050MW

ThaPyaWa
 500kV ThaPyaWa – Taungoo (Contracted Stage)
MongTon
Double Circuit Line (153.3)miles
7000MW

Taungoo

KarmarNut  500kV MongTon-Taungoo (Proposal Stage)


MyaungTagar
Double Circuit Line (230)miles

 500kV Taungoo-KamarNat (Proposal Stage)


Double Circuit Line (117 )miles

 500kV KamarNat-MyaungTagar (Proposal Stage)


Double Circuit Line (50)miles
Gas Requirement of MOEP Power Plants and Foreign and Local 35
Investment Power Plants

Year 2015 - 2016

GasRequirement (mmscfd) Installed Capacity


Sr Plant Name
(MW)
Off-Shore In-Land

1 MOEP 200.00 30.00 714.90

2 Private 77.23 - 281.15

3 EGAT 80.00 - 240.00

4 Foreign Investment 476.00 - 2357.00

TOTAL 833.23 30.00 3593.05

If (476 mmscfd) of Gas is more allocated than Year 2013-2014, (2357 MW) of
Energy can be more generated.
Demand Forecasting for 30 Years (Stat: 2011-2030) 36
၄၄၄၄၄
20000

၄၄၄၄၄
19000 18,904

၄၄၄၄၄ Rapidly Growth၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄


Regular Growth Slowly Growth
18000 ၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄ 17624

၄၄၄၄၄
17000
16450

၄၄၄၄၄ 16,623
16000 15372
15587
၄၄၄၄၄
15000 14384
14632
၄၄၄၄၄
14000 13477
13752
၄၄၄၄၄
13000 12619
12941
၄၄၄၄၄
12000 11653 12,557
12194
11918
10869 11394
၄၄၄၄၄
11000 11324
10159 10771
10668
10000
၄၄၄၄၄ 10257
9517 9779
10007
9000
၄၄၄၄ 8861 9406 9279
8276 8860 8818
8000
၄၄၄၄ 7754 8319 8394
7287 7832 8003
7393 7642
7000
၄၄၄၄ 6871 7274
6997
6938
5941 6640
6000
၄၄၄၄ 5642 6631
5372 6351
5128 5746 6095
5478
5000 5235
၄၄၄၄ 5013 5089 5284
4910
4744
4000
၄၄၄၄

MW
THANK YOU FOR YOUR KIND ATTENTION

Q&A

U Maung Maung
Chief Engineer
Power Transmission Project
Department (PTP)
Myanmar Electric Power Enterprise
(MEPE)
Ministry of Electric Power(MOEP)
37

Das könnte Ihnen auch gefallen