The steel found in the
field does not match
the steel found in the
Beam on
Structural project.
rooftop
Add 4 #6 steel rebar
on the bottom face of
the beam.
A request is made to
improve the perimeter
security system found
on the roof of the
project. It is
recommended that the
Security Roof life line lifeline supports be
made of #8 rebar. As
well as to reduce the
clearances between
supports or to increase
the diameter of the
rope.
it is requested to use a
thicker wire and to
hold in more points
Security Service stairs
the ladder of service of
the construction
personnel.