PRR-ULAB-#001

Date: September 24, 2018.

Project: Dos Catrinas – Four Seasons

Location: Punta de Mita, Bahía de Banderas, Nayarit, México.

Inspection report – URBANOLAB


Action to be
Subject Description Detail
performed

The column should be


patched up as the
Column C-6,
Structural gravel was segregated
Axis C’-5
at the bottom of the
column

The soil mechanics


laboratory should be
soil
asked to test the
consolidation
Structural compaction of the base
of the
of the elevator. Before
elevator pit
starting the foundation
work

The columns of the


masonry wall must be
anchored to the T-14
Masonry wall
Structural beam. The use of
on Stairs
mortar is authorized
for the casting of this
area.

Página 1 de 2
The steel found in the
field does not match
the steel found in the
Beam on
Structural project.
rooftop
Add 4 #6 steel rebar
on the bottom face of
the beam.

A request is made to
improve the perimeter
security system found
on the roof of the
project. It is
recommended that the
Security Roof life line lifeline supports be
made of #8 rebar. As
well as to reduce the
clearances between
supports or to increase
the diameter of the
rope.

it is requested to use a
thicker wire and to
hold in more points
Security Service stairs
the ladder of service of
the construction
personnel.

Página 2 de 2