FIRST GREEN BUILDING WITH GRIHA REGISTERATION IN INDIAN RAILWAYS- 3 STAR GREEN RATING
RAIL NIRMAN NILAYAM
Civil Contractors : Sri. MVVSatyanarayana This is also the first Green Building
Structural Consultant : Sri Putrayya, Aadhaarshila for which certification fee was
sponsored by Ministry of New and
Electrical Consultant : M/S Watson, Hyderabad Renewable energy, Govt. of India.
Building is designed with 40% glazing area by using glass with low solar heat gain coefficient
an maximum transmission and with 2 cut outs to give more lighting thus reducing the
conventional energy demand.
Lighting is designed optimally.
— ECBC compliant energy-efficient artificial lighting design. — Multi sensors compatible to
DALI-based dimming of light system.
With above measures the power saving is to an extent of 20% is achieved compared to
similar buildings.
RENEWABLE ENERGY TECHNOLOGIES INSTALLED ON SITE:
• Installed capacity of solar energy to meet space conditioning and internal lighting loads: 38.63 KW.
• Installed 12 nos LED solar street light with programmable day light sensing controller.
Double glazing is used for first floor area which is having Air-conditioning to minimize energy consumption.
Paints containing low voc, low conductance 20 % and High reflectance 80% were used.
BUILDING PEROMANCE AS PER AUDIT REPORT
False ceiling with recyclable materials-
ENERGY
Gyp board and mineral accoustic fibre
Energy generated through scar PV- 50,374.1
were use which are certified green
KWh/year.
products.
Final EPI achieved -34.12 KWhm7kyear.
Actual reduction in EPI from base case-60%(24%
Sensor based urinals, taps and low flow
more
fixtures were provided to reduce water
than predicted.)
consumption.
Thermal comfort is met as per NBC 2005.
Lighing lux levels are met as recommended byNBC
Sewage treatment plant based on FAB (
2005.
Fluidized Aerobic Bioreactor )
Water and waste water
technology is installed to treat sewage
Water test report.iedicates coniormity to IS code
to tertiary standards and reuse for lawn
10500.
/ plant watering
Water consumptior in building-25,31,00 t/annum.
Total quantity of waste generated - Approx 12
RAINWATER HARVESTING is provided Kg/day.
for full quantity of rain water coming
Noise level
from the roof top and circulation areas
Outdoor noise levels are within acceptable limits
which is about 48 lakh litres a year
as per CPCB.
against consumption of about 25 lakh
Indoor noise levels are within acceptable limits as
litres per year.
per NBC 2005.