N_Arc Consulting
BPL HOUSEHOLDS UNDER RGGVY 12th PLAN WORKS
INSTALLATION
STATUS GENERAL REMARKS IF ANY
SERVICED _
SERVICED
SERVICED
SERVICED
N_ARC THIRD PARTY INSPECTION REPORT OF BPL HOUS
DIVISION: MYSURU TALUK: HD KOTE
NO OF INSTALLATIONS INSPECTE
N_Arc Consulting
REPORT OF BPL HOUSEHOLDS UNDER RGGVY 12th PLAN WORKS
VILLAGE: JINNAHALLI
15A DP SWITCH
L&T MAKE 5-20 A WITH WITH SOCKETS,
MCCB C&R MAKE, 16 A PROVIDED WITH 8 TO BE SERVICED
SWITCHES AND PROVIDED
Sl no-56691321 WITH SWG WIRE
HOLDERS
SMC COVER PROVIDED PROVIDED
e Of Inspection: 21/07/2016
Guyset to be Provided
NO OF INSTALLATIONS INSPECTE
Inspected By CONTRACTOR
N_Arc Consulting
REPORT OF BPL HOUSEHOLDS UNDER RGGVY 12th PLAN WORKS
VILLAGE: MALLARADAHUNDI
15A DP SWITCH
L&T MAKE 5-20 A WITH WITH SOCKETS,
MCCB C&R MAKE, 16 A TO BE PROVIDED PROVIDED WITH 8 TO BE SERVICED
SWITCHES AND
Sl no-56689816 WITH SWG WIRE
HOLDERS
SMC COVER PROVIDED PROVIDED
CONTRACTOR REPRESENTATIVE
PLAN WORKS
e Of Inspection: 4/07/2016
1) Guyset to be provided
1) Guyset to be provided
2)SMC Box to be Earthed
DIVISION: MYSURU TALUK: HD KOTE
NO OF INSTALLATIONS INSPECTE
Inspected By CONTRACTOR
VILLAGE: NAYAKANAHUNDI
TO BE SERVICED
CONTRACTOR REPRESENTATIVE
e Of Inspection: 21/07/2016