Sie sind auf Seite 1von 6

BILLS OF QUANTITIES (BOQ) FOR UPGRADING MUGEMA ROAD TO

FLEXIBLE ROAD
Table : Bills of quantity for Mugema road design

ITEM DESCRIPTION UNITS QUANTITY RATE AMOUNT


BILL NO 1:
PRELIMINARIES
AND GENERAL
ITEMS
1.1 Construction of site office LS

1.2 Maintenance LS
services during
Construction
1.3 Removal and Relocation and PS
Protection of existing utilities
(where not specifically
identified in the Bills)
Bills)
1.4 Allow for traffic management LS
by provision of road signs,
road cones and traffic police
personnel to control traffic

1.5 Allow for two project No.


signboards

1.6 Contractor's Charges and %


Profit
associated with
dministration of Item 1.1
above (ceiling of 6%
allowable)

1.7 Total of Bill No. 1


2.1 SITE CLEARANCE
ITEM DESCRIPTION UNITS QUANTITY RATE AMOUNT
2.1.1 Clearing and m²
grabbing including
removal of grass,
silt and debris to
spoil for a depth not
exceeding 0.5m
depth as instructed
by the Engineer.
2.1.1a Cut and remove No
trees from site
including removing
stumps and roots
2.1.1b Excavation to a m3
depth exceeding
0.5m
2.1.2 Disposal off all m²
debris and excess
material which
cannot be spread
within the road
reserve to a
distance exceeding
350m. Spread all
excess material as
directed by the
Engineer.
2.1.3 Establishment of m
road alignment and
setting out road
works
Total for bill No.
2.1
2.2 DRAINAGE
ITEM DESCRIPTION UNITS QUANTITY RATE AMOUNT
2.2.1 Clear and reshape side m
drains, spread excess
material within the road
reserve with approval of the
Engineer.

2.2.2 Excavate soft M


material for new side
drains, catch water drains
and dispose of excavated
material as directed by the
Engineer.

2.2.3 Blinding of excavated trench M

2.2.4 Form work for the drains M

2.2.5 Concrete to be poured in m3


formwork made

2.2.6 supply Culvert diameter NO


900mm (for access cross
culverts

2.2.7 Demolish existing structure M


and dispose off debris

Total for bill No. 2.2


2.3.1 PAVEMENT WORKS
Reconstruction (all stations )( full width)
ITEM DESCRIPTION UNITS QUANTITY RATE AMOUNT
2.3.1.1 Place Treatment m²
Scarification of
existing gravel
surface to a depth
not exceeding
150mm, shape and
re-compact to 95%
MDD at
BS1377:Part
4:1990 compaction,
to form subbase
layer.

2.3.1.1a E.O Item 2.3.1.1 for


junction
2.3.1.2 Scarify and cart to m³
spoil unwanted
material.
2.3.1.3 Provide and N0
transport approved
machine crushed
stone, CRS
(granular base) up
to 4500mm spread
and compact in
layers, not
exceeding 200mm
to at least 102%
Mod. AASHTO
material for fill and
subgrade

2.3.1.4 Provide approved m³


murram, transport,
spread, shape and
compact to 98%
MDD compaction,
not exceeding
150mm on granular
subbase for
carriageway
reconstruction as
directed by the
Engineer.
ITEM DESCRIPTION UNITS QUANTITY RATE AMOUNT
2.3.1.5 Prepare base course m³
surface, provide,
heat and spray
MC30 cutback
bitumen prime coat
at a rate sufficient
for the road as
directed by the
Engineer for
blinding
2.3.1.6 Asphalt m³

2.3.1.7 Concrete kerbs to m³


be used on the road
Sub - total for bill
No. 2.3.1

2.3.2 ROAD FURNITURE & ROAD SIGN POSTS


2.3.2.1 Apply furniture on m²
road, zebra crossing
2.3.2.2 Road sign posts NO
2.3.2.3 Rubish pit NO
Sub - total 2.3.2
BILL NO. 3:
STREET LIGHTS
Supply and erect NO
solar street lights of
tubular poles
conforming to IS
2713-1980. Pole
designation
410SP15, 9m
long.Base hole
painting of red
oxide and two coats
of silver white
aluminum
paint.The poles
should be
embedded in a
concrete block in
ratio 1:3:6 and the
block be continued
up to 300mm above
the ground and
1200mm below the
ground level.
SUMMARY OF THE BILL OF QUANTITIES MUGEMA ROAD (850m)

Bill Description Amount (Ugx)


No.
1 Preliminaries and
General items
2.1 Site Clearance
2.2 Drainage
2.3 Pavement works.
3 Road furniture and
sign posts
4 Street Lights
Contingency (10%)
TOTAL