Note: l. Answer unj; FIYE fall qwestions, selectimg
wtleast TWA qaestio*cs from each part"
()
2" Use of IS:1343*198CI is perruaitted.
co
o
3..Asswme any wissing data switably.
a
PART'_ A
a.
g.
'oo Define the following :
c)
i)Tendon ii) Pretensioning iii) Post tensioning iv) Load baiancing (EB &{arks)
()x b. Explain how PSC is more advantageous as colllpared to RCC. (t)6 Marks)
c. Explain with neat sketch, Freyssinet system of post tensioning.
lo
(86 Mari<s)
iir)
-*L
a. A concrete beam with a doubie overhang has the middle equal to 10 rn and the equal
aoo
.iI
9d ib
overhang on either side is 2.5 m. Determine the profile of the prestressing cabtre with an
effective force of, 250 kN which can balance a uniformly distributed load of 8 kNim on the
bearn, which included the self weight of the beam. Sketch the cable profile marking the
ik
-o eccentricity of cable at the suppoft and midspan. (10 Marks)
f:
b. A rectangular concrete beam of cross section 120 mmwide and 300 mm deep is prestressed
by a straight cable carrying an effective force of 180 kN at an eccentricity of "50 mm. The
,r.
beam supports an imposed load of 3.14 kN/m over a span of 6 rn. If the modulus of rupture
w
.n=
o() of concrete is 5 N/mrn2, evaluate the load factor against cracking assurning the selfweight of
concrete as 24 kN/m3 (1CI Marks)
ia
5r0
oP
initially tensioned to a stress of I 100 N/mm2, calculate ttrre effective stress after all losses,
given the following:
:9
F* Relaxation of steel: 70 N/rnm2 ; Skinkage of concrete :300 x 10-6
Creep of concrete : 1 .6 i E, : 210 kN/mm2 and E. : 31.5 kN/mm2 (12 Marks)
o.w
oi
.p
qE b. A sirnply supported post tensioced concrete beam of span i5 m has a rectanguXar cross
92F
section 300 x 800 mm. The prestress at ends is 1300 kN lvith zero eccentricity and 250 mm
!0
at the centre the cable profile being parabolic. Assuming k:0.00i5 per ra'r and p:0.35.
w
>\ (F
^no Determine the loss of stress dile to &iction at the centre of the beam" (08 Marks)
3oo
(06 Marks)
=9
(.)
b. .A. PSC beam of rectangular section 120 nen'l wide and 300 mm deep;spans over 6 m. The
^-
\,< beam is prestressed by straight cabie carryirrg an effective fbrce of 180 kI.{ at an eccentricity
w
m
double T girderusing IS : 1343 provisions. (14 Marks)
6a. A concrete beam of rectangular section, 200 mrn wide and 400 rnm deep, is prestressed by a
co
a parabolic cable iocated at an eccentricity of 100 mm at midspan andzero at the supports. If
the beam has a span of 10 m and carries a uniformly distributed live troad of 4 kNim, find the
effective force necessary in the cable for zero shear stress at the support section. For this
condition calcuJate the principal siresses. The density of concrete is'24 kN/m3. (10 Marks)
g.
if tire support section of a FSC bearn 100 mm wide and 250 mm deep is required to support
an ultirnate shear force of 80 kN" The compressive prestress at the centroidal axis is
lo
5 N/rnrn2. The characteristic cube streflgth of,concrete is 40 N/mm2. The cover to the tension
reinforcernent is 50 mrn. if the characteristic tensile strength of stirrups is 415 N/mm2,
design suitahle shear reinforcements in the section using iS code recomrnendations.rs
7a. ib
Explain the ananysis of anchorage zone stresses in post tensioned members. How is the
burstirag tensile f,orce calculated?
Marks)
ik
(08 Marks)
1^
A high tensile cable cornprising 12 strands of i5 mm dia with an effective force of 2500 kN
is anchoreri concentrically in an end block of a post-tensioned beam. The end biock is
400 mm wide and 800 mm deep and the anchor plate is 200 mm wide by 250 mm deep.
w
Design suitabtre anchorage zone reinforcements using Fe415 grade HYSD bars using
IS: i343 code provisions. (i2 Marks)
ia
and limiting tensile and compressive stress to tr.5 MPa and iB MFa respectively. Calculate
the rninimum" possible depth and the prestressing force and corresponding eccentricity.
Take D":24'kN/rn3" (20 Marks)
*****
.p