Beruflich Dokumente
Kultur Dokumente
All other
objects on each Numbers sheet were placed on separate worksheets. Please be aware that formula
calculations may differ in Excel.
MF rev (5)
MF rev (2)
MF rev
MF rev (3)
MF rev (4)
MAHLE FILTER SYSTEMS PROCES
INDIA PARWANOO.
Part No : Generic
Start
Inspection of
Child Parts
10
Center Tube
Paper Paper Roll
Center Tube
A
Humidification/IR Heating (If
Reqd.)
20
Humidifier
Paper Pleating (Check Pleat
Depth)
30 Paper Pleating
O.K.
Pre curing
40
IR HEATER
Curing
60 Paper Cutting
Cutting
3
Count No. of pleats
Counting
Side Sealing
70
Side sealing
Sub Assembly
80
Sub Assly
Uniform pleat
Distribution
C
90
T/C Embedment
100
B/C Embedment
110
4
ISSUED BY :
Part No : Generic
O.K.
Height gauging
120
Height Gauging
Grommet Fitment
130
Grommeting
5
Visual inspection
160
O.K.
Final Packaging
170
Packing
QC Check &
preshipment audit
180
O.K.
End
ISSUED BY :
6
PROCESS FLOW DIAGRAM
DOC
Rev No.: 1.4 PAGE
Revised Dt : 10.05.11 DATE
Department : Process Engg. APPROVED BY :
B
Cap Preheating if
ing (If required (90)
Cap
Preheater
C
Pleat
7
ats Reset Counter
NOT O.K.
A
B
Sub Assembly
nt B/ cap Embedment
manual - 2
8
Controled Copy Stamp
CONTROLLED COPY
(If in Red)
DOC
Rev No.: 1.4 PAGE
Revised Dt : 10.05.11 DATE
Department : Process Engg. APPROVED BY :
NOT O.K.
OK
OK Centrifuging (150)
Centrifuging
9
NOT O.K.
NOT O.K.
Take Necessary Action
10
: PIL/QAF(I.4.2) -32 (MF)
: 1 OF 2
: 25.05.06
F.Head Process Engg.
11
Adjust Marker setting
Pack
setting
12
: PIL/QAF(I.4.2) - 32 (MF)
: 2 OF 2
: 25.05.06
F.Head Process Engg.
Reject
13
14
MAHLE FILTER SYSTEMS PROCES
INDIA PARWANOO.
Part No : Generic
Start
Inspection of
Child Parts
10
Center Tube
Paper Paper Roll
Center Tube
A
Humidification/IR Heating (If
Reqd.)
20
Humidifier
Paper Pleating (Check Pleat
Depth)
30 Paper Pleating
O.K.
Pre curing
40
IR HEATER
Curing
60 Paper Cutting
Cutting
Counting
Side Sealing
70
Side sealing
Sub Assembly
80
Sub Assly
Uniform pleat
Distribution
C
90
T/C Embedment
100
B/C Embedment
110
16
ISSUED BY :
Part No : Generic
O.K.
Height gauging
120
Height Gauging
Grommet Fitment
130
Grommeting
17
Visual inspection
160
O.K.
Final Packaging
170
Packing
QC Check &
preshipment audit
180
O.K.
End
ISSUED BY :
18
PROCESS FLOW DIAGRAM
DOC
Rev No.: 1.0 PAGE
Revised Dt : 3.04.11 DATE
Department : Process Engg. APPROVED BY :
B
Cap Preheating if
ing (If required (90)
Cap
Preheater
C
Pleat
Side Sealing
A
B
y Sub Assy
nt B/ cap Embedment
manual - 2
20
Controled Copy Stamp
CONTROLLED COPY
(If in Red)
DOC
Rev No.: 1.0 PAGE
Revised Dt : 3.04.11 DATE
Department : Process Engg. APPROVED BY :
NOT O.K.
OK
OK Centrifuging (150)
Centrifuging
21
NOT O.K.
NOT O.K.
Take Necessary Action
22
: PIL/QAF(I.4.2) -11 (MF)
: 1 OF 2
: 25.05.06
F.Head Process Engg.
Pack
setting
24
: PIL/QAF(I.4.2) - 11 (MF)
: 2 OF 2
: 25.05.06
F.Head Process Engg.
Reject
25
26
MAHLE FILTER SYSTEMS PROCES
INDIA PARWANOO.
Part No : Generic
Start
Inspection of
Child Parts
10
Center Tube
Paper Paper Roll
Center Tube
A
Humidification/IR Heating (If
Reqd.)
20
Humidifier
Paper Pleating (Check Pleat
Depth)
30 Paper Pleating
O.K.
Paper Curing
50
Curing
60 Paper Cutting
Cutting
27
Count No. of pleats
Counting
Side Sealing
70
Side sealing
Sub Assembly
80
Sub Assly
Uniform pleat
Distribution
C
90
O.K.
T/C Embedment
100
O.K.
B/C Embedment
110
28
D
ISSUED BY :
Part No : Generic
O.K.
Height gauging
120
Height Gauging
Grommet Fitment
130
Grommeting
29
Visual inspection
160
O.K.
Final Packaging
170
Packing
QC Check &
preshipment audit
180
O.K.
End
ISSUED BY :
30
PROCESS FLOW DIAGRAM
DOC
PFD NO.: MF/R3 PAGE
Revised On : 2.05.09 DATE
Department : Process Engg. APPROVED BY :
B
Cap Preheating
ing (If (90)
Cap
Preheater
C
Pleat
31
ats Reset Counter
NOT O.K.
Reopen Pack
ent
1st Cap Dipping
NOT O.K.
ent
32
Controled Copy Stamp
CONTROLLED COPY
(If in Red)
DOC
PFD NO.: MF/R3 PAGE
Revised On : 2.05.09 DATE
Department : Process Engg. APPROVED BY :
NOT O.K.
OK
OK Centrifuging (150)
Centrifuging
33
Centrifuging
NOT O.K.
NOT O.K.
Take Necessary Action
34
: PIL/QAF(I.4.2)-32 (MF)
: 1 OF 2
: 25.05.06
F.Head Process Engg.
35
Adjust Marker setting
ting
36
: PIL/QAF(I.4.2)-32 (MF)
: 2 OF 2
: 25.05.06
F.Head Process Engg.
Reject
37
38
MAHLE FILTER SYSTEMS INDIA
PARWANOO.
PROCESS FLOW DIA
Part No : Generic
Start
Inspection of child
Parts
10
Center Tube
Paper Paper Roll
A
Humidification/IR Heating (If
Reqd.)
20
Pre curing
40
50 Paper Curing
60 Paper Cutting
Count No. of
pleats
Side Sealing
70
Sub Assembly
80
C
O.K.
39
T/C Embedment
100
40
PROCESS FLOW DIAGRAM
DOC : PIL/QAF(I.4.2)-32 (MF)
PFD NO.: MF/R3 PAGE : 1 OF 2
Revised On : 2.05.09 DATE : 25.05.06
Department : Process Engg. APPROVED BY : F.Head Process Engg.
ing (If B
Cap Preheating
(90) Cap
Preheater
C
Pleat
A
B
y
41
ent
1st Cap Dipping
ent
42
43
44
MAHLE FILTER SYSTEMS INDIA
PARWANOO.
PROCESS FLO
Part No : Generic
O.K.
120 Height gauging
Grommet Fitment
130
Grommeting
Visual inspection
160
O.K.
Final Packaging
170
Packing
QC Check &
preshipment audit
180
O.K.
End
45
46
Adjust Marker
setting
PROCESS FLOW DIAGRAM
DOC : PIL/QAF(I.4.2)-32 (MF)
PFD NO.: MF/R2 PAGE : 2 OF 2
Revised On : 2.05.09 DATE : 25.05.06
Department : Process Engg. APPROVED BY : F.Head Process Engg.
E Reject
NOT O.K.
NOT OK
Sample Leak esting
(140)
OK
Centrifuging (150)
NOT O.K.
47
48
49
50