QMS ACTIVITIES DETAIL

SR NO ACTIVITIES DESCRIPTION REQUIREMENTS RESPONSIBILITY STATUS

1 Provide proper stand for keep angle, road etc 600 ft pipe of 1 inch QMS TEAM A/O
100 ft angle of
2 Provide proper stand for keep Feed roll A/O
50mmx50mmx 5 mm QMS TEAM
3 Arrangement of Rack as per lay out Ajay Gupta / QMS TEAM Under process

4 Keep all material with identification and proper Place. Ajay Gupta / QMS TEAM Under process

5 Before keep all items 5"s" Must be required in all area. Ajay Gupta / QMS TEAM
6 Provide Training to all supervisor and must be follow up

For keep other heavy tool we need to make arrangement of ( 1 requirement given to supplier but
7 Rack Required QMS TEAM
inch length x 1.5 inch width block in side wall ) as per lay out. awaiting for quotation.

visited at our company on dated 13.02


8 Provide Safety Equipment supplier. QMS TEAM and given all detail about safety
products.
Supplier ( P N SAFTECH
9 Quotation required for all items
PVT LTD )
Finalize the qty of safety products and model, and payment release the P.O of Mr. Deepak Singh & Mr.
10 With the discussion with our Director
teams and condition. required qty of items Shiv Prakash

Mr. Deepak Singh & Mr. Meeting held on dated 13.02.09 with
11 Proper stand required for Raw Material storage area in plant-2. Jignesh Sheth & Mr. Vinay supplier and he will provide drawing,
Kumar design and quotation for that.

signature in indent and finalize the


12 Templates for both the plant required to be order. release the P.O Mr. Dheeraj ji ( Director )
payment teams for supplier.

300 Kg angle till pending due to this


13 Angle required for as per our indent requirement indent 01 Mr. Aroraji & Mr. M.B.Singh our work will be suffer on 19.02.09,