1 Provide proper stand for keep angle, road etc 600 ft pipe of 1 inch QMS TEAM A/O
100 ft angle of
2 Provide proper stand for keep Feed roll A/O
50mmx50mmx 5 mm QMS TEAM
3 Arrangement of Rack as per lay out Ajay Gupta / QMS TEAM Under process
4 Keep all material with identification and proper Place. Ajay Gupta / QMS TEAM Under process
5 Before keep all items 5"s" Must be required in all area. Ajay Gupta / QMS TEAM
6 Provide Training to all supervisor and must be follow up
For keep other heavy tool we need to make arrangement of ( 1 requirement given to supplier but
7 Rack Required QMS TEAM
inch length x 1.5 inch width block in side wall ) as per lay out. awaiting for quotation.
Mr. Deepak Singh & Mr. Meeting held on dated 13.02.09 with
11 Proper stand required for Raw Material storage area in plant-2. Jignesh Sheth & Mr. Vinay supplier and he will provide drawing,
Kumar design and quotation for that.