B Topography Survey
1 STA Installation 47 km
2 BM Installation 48 unit
3 Pengamatan GPS Geodetic 48 unit
4 Detail Topography Measurement
- Main Road 39 km
- Ramp 8 km
5 Processing and Drawing (CAD format) 47 km
6 Reporting 1 ls
D Survey Coredrill an
1 Coredrill 184 point
2 Repair coredrill hole 184 point
3 Visual Observation for Structure 23 point
4 UPV Test & Hammer Test for Concrete Material on Structure 23 point
5 Data Analysis and Reporting 1 ls
E Engineering Work
1 Quantity Surveyor (133 Structures and 42 km length of at-grade and pavement including soil improvement)
1 ls
46