No Description Volume Unit Rate

A Mobilization/Demobilization , accomodation and Preparation for All Survey Activities


1 Mob / demob for all personnel (including site engineer, surveyor, technician, and helper) 1 ls

2 Preparation of site facilities and safety


2.1 PPE & Safety Accessories (for 82 personnel) 1 ls
2.2 Survey Supply 1 ls
2.3 Accessories & sparepart for maintenance 1 ls
3 Accomodation for all personnel 1 ls
4 Local transportation to support all survey activities (including rent LV, fuel and driver) 1 ls

B Topography Survey
1 STA Installation 47 km
2 BM Installation 48 unit
3 Pengamatan GPS Geodetic 48 unit
4 Detail Topography Measurement
- Main Road 39 km
- Ramp 8 km
5 Processing and Drawing (CAD format) 47 km
6 Reporting 1 ls

C Soil Investigation Survey


1 Machine mobilization/demobilization 1 ls
2 Moving & Setting up drill rig 86 no
3 Drilling work (max. depth up to 12m, 92 points) 1,032 m
4 SPT (interval 3.0 m depth, for each borehole) 344 no
5 Corebox Provision 206 no
6 Data Analysis and Reporting 1 ls

D Survey Coredrill an
1 Coredrill 184 point
2 Repair coredrill hole 184 point
3 Visual Observation for Structure 23 point
4 UPV Test & Hammer Test for Concrete Material on Structure 23 point
5 Data Analysis and Reporting 1 ls

E Engineering Work
1 Quantity Surveyor (133 Structures and 42 km length of at-grade and pavement including soil improvement)
1 ls

2 Analysis dan Engineering Design Service to Support QS 1 ls