Sie sind auf Seite 1von 1

Consturction of

Double Storey
Residential
Houses

1. General 2. Site Work 3. Foundation 6. Exterior 7. Utility Rough-B97Ins 9. Landscaping


4. Framing 5. Dry In 8. Interior 10. Final
Condition Finishes and Complete and Grounds
Finishes Acceptance
Concrete Work
2.1 Clear and 3.1 Excavate for
foundations 4.1 Install 1st 5.1 Install 1st 6.1 Complete
1.1 Sign 1.2 Apply For grub lot floor joists floor sheathing 9.1 Pour 10.1 Complete
exterior brick 8.3 Paint And 8.5 Finish 8.6 Finish 8.8 Carpet, Tile
Contract and Permits 7.1 Rough-in 8.1 Insulation 8.2 Dry Wall 8.4 Cabinets 8.7 Finish HVAC concrete final inspection
Wallpaper Plumbing Electrical and Appliances
notice to 3.2 Form plumbing driveway and for certificate of
2.2 Install
proceed temporary basement walls 4.2 Lay 1st floor 5.2 Install 2nd sidewalks occupancy
6.2 Complete
1.2.1 Secure power service decking floor sheathing 8.1.1 Place wall 8.2.1 Install 8.3.1 Texture all 8.4.1 Install 1st 8.5.1 Complete 8.6.1 Complete 8.7.1 Complete 8.8.1 Tile entry,
exterior siding 7.2 Conduct
foundation insulation - 1st drywall - 1st except entry floor - kitchen 1st floor - 1st floor circuits 1st floor - zone kitchen and
permit 3.3 Place concrete rough-in 9.2 Install
for foundations & floor floor walls and kitchen - 1st cabinets kitchen to service panel 1 HVAC baths 10.2 Cleanup for
2.3 Install 4.3 Frame 1st 5.3 Install roof plumbing plumbing backyard fence occupancy
basement walls floor
underground floor walls decking inspection
8.1.2 Place wall 8.2.2 Install 8.4.2 Install 1st 8.6.2 Complete 8.7.2 Complete
utilites 8.8.2 Carpet 1st
1.2.2 Secure insulation - 2nd drywall - 1st floor - master 8.5.2 Complete 2nd floor 2nd floor - zone
3.4 Cure basement 4.4 Frame 1st 7.3 Place 8.3.2 Paint all floor 9.3 Sod and 10.3 Perform
framing permit 5.4 Install felt, floor floor overhead bath and guest 1st floor - circuits to 2 HVAC
walls for 7 days floor corners concrete for except entry complete final walk-
flashing and cabinets master bath and service panel
basement floor and kitchen - 1st plantings - front through
shingles 8.2.3 Install floor guest plumbing yard
8.1.3 Place 8.7.3 Conduct 8.8.3 Carpet 2nd inspection
1.2.3 Secure 3.5 Strip basement 4.5 Install 2nd drywall 2nd 8.6.3 Conduct
ceiling HVAC inspection floor
electrical permit wall forms floor joists 7.4 Rough-in floor walls 8.4.3 Install 2nd finish electrical
5.5 Hang 1st insulation - 2nd 8.5.3 Complete
electrical 8.3.3 Hang floor - hall bath inspection 9.4 Sod and
floor exterior floor 2nd floor - hall 10.4 Complete
wallpaper entry and private bath complete
doors 8.2.4 Install bath and private punch list items
3.6 4.6 Frame 2nd and kitchen - 1st cabinets 8.8.4 Install plantings -
1.2.4 Secure drywall 2nd bath plumbing 8.6.4 Complete
Waterproof/insulat floor decking 7.5 Conduct 8.1.4 Conduct floor appliances backyard
plumbing permit floor overhead communications
e basement walls rough-in insulation
5.6 Install 1st wiring - phone,
electrical inspection 8.4.4 Install
4.7 Frame 2nd floor windows 8.2.5 Tape and 8.5.4 Conduct cable,
inspection 8.3.4 Texture all chair rails,
3.7 Perform floor walls float 1st floor finish plumbing computer, alarm
1.2.5 Secure - 2nd floor crown moldings, inspection
foundation drywall
HVAC permit trim
inspection 5.7 Install 2nd 7.6 Rough-in
4.8 Frame 2nd floor windows HVAC
floor corners 8.2.6 Tape and 8.3.5 Paint all -
float 2nd floor 2nd floor
1.2.6 Secure drywall
miscellaneous 7.7 Conduct
permits 4.9 Complete rough-in HVAC
roof framing inspection 8.3.5 Paint
exterior siding &
trim work
4.10 Conduct
framing 7.8 Rough-in
inspection communication
- phone, cable,
computer, alarm