Beruflich Dokumente
Kultur Dokumente
Document template obtained from the Health & Safety Executive, www.hse.gov.uk
When conducting a risk assessment, consider all the likely hazards, who may be harmed, property which may be damaged, and the controls
already in place. Then, for each likely hazard, bearing in mind the controls already in place, record the ‘risk assessment’ level (see table on
following page). The further action(s) to be considered will be determined by the level of risk assessment.
FILM PRODUCTION RISK ASSESSMENT
CONSEQUENCES
LIKELIHOOD Insignificant Minor Moderate Major Catastrophic
Producer Names Zuha Azhar,Elaf Khan,Mahnoor Waseem Director Names Zuha Azhar,Elaf Khan,Mahnoor Waseem
Hazard Persons who may Property which Risk controls already Risk Assessment Further action
be harmed may be damaged in place LOW, MODERATE, required to control
HIGH, EXTREME risk ***
(see table)
Cast: Undecided Car An isolated road was Had a expert driver
Crew: Zuha Camera chosen with rush hours so that we could
Car Crash Azhar,Elaf Microphone avoided to reach the HIGH drive safely
Lights locations.
Khan,Mahnoor
Waseem Mobile
phones
Sunglasses
Crew: Zuha Chart paper The crew were extra Expensive chart
Paper Cuts Azhar,Elaf careful when cutting LOW paper was used.
papers and used
Khan,Mahnoor scissors made for
Waseem children’s use.
Crew: Zuha Camera Crew advised to move The crew were given
Slipping from top Azhar,Elaf Microphone carefully and not carry EXTREME sneakers to wear
floor stairs Lights two pieces of instead of sandals.
Khan,Mahnoor equipment at once.
Mobile
Waseem
phones
Makeup
Canvas
jewelery
Delete contents of table below and input details specific to your production
Locations:
Old Lahore (Badshahi
Mosque)
Government School
Small shed house