Quotation Number : 069/Q/ITP/XI/2018 Customer : PT. Indonesia Teijin Film Solution


Date : Nopember 28th, 2018 Attention : Bpk. Ary
Your Ref : Cc : Bpk. Ardian
Revisi :
Revisi : Project : Install Lighting Basement area slitter
Revisi :

QUOTATION
Dear Sir,
Thank you for your kind inquery, we pleased to submit our quoatation as follows:

No Equipment Spesification Merk Q'ty Unit Price/unit Total Price


1. Material
a Supply Material Please see attachment attached 1 Lot Rp 8.554.714 Rp 8.554.714

Total Material Rp 8.554.714


2. Labour
a Labour Cost Please see attachment attached 1 Lot Rp 5.125.000 Rp 5.125.000

Total Labour Rp 5.125.000

Delivery to : PT.ITFS 1. Total Material Rp 8.554.714


Validity quotation : 1 week from date here of 2. Total Labour Rp 5.125.000
Term of Payment : 2 week after the date of invoice Total 1 + 2 Rp 13.679.714
: 100% After Finish Overhead 5% Rp 683.986
: This quotation exclude VAT 10% Grand Total Rp 14.363.700

Remark :

Attachment : 2 sheets

PT. Inti Teknindo Pratama

Heri Budiman
Manager
(0813-8762-9493)
DETAIL OF
INSTALL LIGHTING BASEMENT SLITTER AREA

No Description Spesifikasi Q'ty Unit Unit Total cost

A. SUPPLY MATERIAL
A.1 Install Lighting at basement of Slitter area
a.1.1 Cable NYM 3c X 2.5sq 100 M Rp 26.690 Rp 2.669.000
a.1.2 Conduit Pipe + socket PVC 1/2 inch clipsal 20 set Rp 16.429 Rp 328.571
a.1.3 Clem PVC PVC 1/2 inch clipsal 30 ea Rp 2.143 Rp 64.286
a.1.4 T-DOS 3 way PVC 1/2 inch clipsal 2 pcs Rp 53.571 Rp 107.143
a.1.5 Lamp Fload light 30W 30W Osram 4 set Rp 1.092.857 Rp 4.371.429
a.1.6 Switch box E-19 2 pcs Rp 107.143 Rp 214.286
a.1.7 Stop Contact 15A 220VAC 1 set Rp 107.143 Rp 107.143
a.1.8 Flexibel PVC 1/2 inch clipsal 4 M Rp 35.714 Rp 142.857
a.1.9 Accessories (clem, connector, etc) 1 Lot Rp 250.000 Rp 250.000
a.1.10 Consumable (cable ties, insulationl, etc) 1 Lot Rp 300.000 Rp 300.000

Total A Rp 8.554.714
B. LABOUR COST
B.1 Install Lighting at basement of Slitter area
b.1.1 Pulling Cable NYM 3c X 2.5sq 100 M Rp 9.500 Rp 950.000
b.1.2 Install Conduit PVC 1/2 inch clipsal 20 ea Rp 35.000 Rp 700.000
b.1.3 Install Fload light 30W 30W Osram 4 set Rp 150.000 Rp 600.000
b.1.4 Install Concent-T-Dos 15A 220VAC 1 lot Rp 125.000 Rp 125.000
b.1.5 Install Switch Box 2 set Rp 125.000 Rp 250.000
b.1.6 Installation accessories (Sock, clem, etc) 1 ea Rp 250.000 Rp 250.000

b.2 General Labour cost


b.2.4.1 Move De move 1 Lot Rp 750.000 Rp 750.000
b.2.4.2 Testing and commissioning 1 Lot Rp 750.000 Rp 750.000
b.2.4.3 Safety and tools 1 Lot Rp 750.000 Rp 750.000

Total Rp 5.125.000