QUOTATION
Dear Sir,
Thank you for your kind inquery, we pleased to submit our quoatation as follows:
Remark :
Attachment : 2 sheets
Heri Budiman
Manager
(0813-8762-9493)
DETAIL OF
INSTALL LIGHTING BASEMENT SLITTER AREA
A. SUPPLY MATERIAL
A.1 Install Lighting at basement of Slitter area
a.1.1 Cable NYM 3c X 2.5sq 100 M Rp 26.690 Rp 2.669.000
a.1.2 Conduit Pipe + socket PVC 1/2 inch clipsal 20 set Rp 16.429 Rp 328.571
a.1.3 Clem PVC PVC 1/2 inch clipsal 30 ea Rp 2.143 Rp 64.286
a.1.4 T-DOS 3 way PVC 1/2 inch clipsal 2 pcs Rp 53.571 Rp 107.143
a.1.5 Lamp Fload light 30W 30W Osram 4 set Rp 1.092.857 Rp 4.371.429
a.1.6 Switch box E-19 2 pcs Rp 107.143 Rp 214.286
a.1.7 Stop Contact 15A 220VAC 1 set Rp 107.143 Rp 107.143
a.1.8 Flexibel PVC 1/2 inch clipsal 4 M Rp 35.714 Rp 142.857
a.1.9 Accessories (clem, connector, etc) 1 Lot Rp 250.000 Rp 250.000
a.1.10 Consumable (cable ties, insulationl, etc) 1 Lot Rp 300.000 Rp 300.000
Total A Rp 8.554.714
B. LABOUR COST
B.1 Install Lighting at basement of Slitter area
b.1.1 Pulling Cable NYM 3c X 2.5sq 100 M Rp 9.500 Rp 950.000
b.1.2 Install Conduit PVC 1/2 inch clipsal 20 ea Rp 35.000 Rp 700.000
b.1.3 Install Fload light 30W 30W Osram 4 set Rp 150.000 Rp 600.000
b.1.4 Install Concent-T-Dos 15A 220VAC 1 lot Rp 125.000 Rp 125.000
b.1.5 Install Switch Box 2 set Rp 125.000 Rp 250.000
b.1.6 Installation accessories (Sock, clem, etc) 1 ea Rp 250.000 Rp 250.000
Total Rp 5.125.000