The document summarizes the job hazard analysis for painting work at the Sussen Asia Pvt. Ltd. project. It identifies hazards for storage, handling, and application of paints. It also lists hazards for shifting structural materials like beams and channels. Control measures are provided to address fire, falling, hitting, eye injuries, dust, and smell hazards. Personal protective equipment like safety goggles, gloves, masks, and safety shoes are to be provided. The analysis was written by the safety officer, reviewed by the project manager, and attended by the site engineer and safety personnel.
The document summarizes the job hazard analysis for painting work at the Sussen Asia Pvt. Ltd. project. It identifies hazards for storage, handling, and application of paints. It also lists hazards for shifting structural materials like beams and channels. Control measures are provided to address fire, falling, hitting, eye injuries, dust, and smell hazards. Personal protective equipment like safety goggles, gloves, masks, and safety shoes are to be provided. The analysis was written by the safety officer, reviewed by the project manager, and attended by the site engineer and safety personnel.
The document summarizes the job hazard analysis for painting work at the Sussen Asia Pvt. Ltd. project. It identifies hazards for storage, handling, and application of paints. It also lists hazards for shifting structural materials like beams and channels. Control measures are provided to address fire, falling, hitting, eye injuries, dust, and smell hazards. Personal protective equipment like safety goggles, gloves, masks, and safety shoes are to be provided. The analysis was written by the safety officer, reviewed by the project manager, and attended by the site engineer and safety personnel.
SUPERVISOR: Mr. N.Satisha LOCATION: Near Fabrication Yard DATE:
JOB STEP HAZARDS Control Measure ACTION
Break the job into steps. List the hazard or type of harm List the necessary control measures to be Person who will Listing work which may be hazardous. identified with each step followed to eliminate the identified hazards ensure this happens
Storage of paints Fire incident at Paints will be stored
storage area of paints separately away from the source of heat. Keeping paints at site Fire incident due to Smoking, gas cutting, welding smoking gas cutting, etc. will not be allowed nearby welding etc. paints. Mr. N.Satisha Trickling and falling of Only trained workers will be paints. allowed to handle paints. Shifting Of Structural Material Falling Hazards & Hitting All the lifting tools and tackles to be inspected prior to use. (Channel And Beam) Injury. Cut Injury,Triping Hazards Proper pathway for hydra & It will be escorted with a signal man.
Stacking area of Structural
Material will be properly secure & Barricaded.
PPE’S (Helmets , Proper Hand
Gloves, Safety Shoes.) to be used.
Work to be done under skilled
supervision. Buffing Eye Injury, Dust provided necessary PPE’s like allergy , Hand injury. safety goggles, hand gloves ,Nose Mask, Safety Shoes etc Proper Guard for moving parts Painting Eye Injury, Suffocation provided necessary PPE’s like Due to Smell safety goggles, hand gloves ,Nose Mask, Safety Shoes etc Job Hazard Analysis Attendees: Mr.R.Dhake,Mr.Hindole ,Mr.N. Satisha Name Signature Date Written by: Safety Officer RBIPL Mr. Dhake Site Engineer: Mr.Hindole Reviewed by: Project Manager Mr.Vinod Narkhede RBIPL SAPL Officer / Engineer: