Sie sind auf Seite 1von 4

Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT

K.O
H.K

R.

DATA SHEET
NE
OW
ITS
OF
FOR CONSTRUCTION

FOR
NT
DESCRIPTION

NSE
CO
EN

MOTOR OPERATED VALVES ITT


WR
E
TH

(BUTTERFLY) T
OU
TH
WI
NT
ME
CU
DO
S
THI
JO/EWO
10-00450

OM
FR
D
NE
Sep-22-10

TAI
DATE

OB
BE
ALL
SH
NO.
REV

FOR CONSTRUCTION
00

T
PAR
DISCIPLINE IN
ENGINEER OR
H. Kasajima L
FUL
Sep-22-10
DATE: IN
PROJECT ON
ENGINEER CTI
T. Hatoya DU
RO
Sep-22-10
DATE:
REP
NO
CERTIFIED CO.
K. Ogawa AM
AR
Sep-22-10
DATE: UDI
SA
CONSTRUCTION
AGENCY
OF
Y
ERT
OP
DATE: PR
OPERATIONS E
SOL
E

DATE: JGC JOB NO. 0-5000 TH


ARE
CONTROL NUMBER

N
VERIFICATION

REI
JGC DOC NO. S-410-136G-301 HE
EDSD

ED
AIN

PCWBS B000
NT
DATE:

CO
BY:

N
TIO
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

JGC CORPORATION
MA
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

OR
INF
(DCC) NO. _____________________

E
TH
D
AN
ING

DATA SHEET DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AW
REVISION

DR
MOTOR OPERATED VALVES (BUTTERFLY)
DAT 1
S

Q41 L RE-854837 THI


RO, UTILITIES & PONDS OF
00
11
MANIFA SAUDI ARABIA JO / EWO: 10-00450-0002

418006870.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

CONTENTS
ENGG CERT

K.O
H.K

1 GENERAL NOTES.............................................................................................. 3

2 ABBREVIATION LIST......................................................................................... 3 R.
NE
OW
ITS
OF
3 DATA SHEET....................................................................................................... 4
FOR CONSTRUCTION

NT
DESCRIPTION

NSE
CO
EN
ITT
WR
E
TH
T
OU
TH
WI
NT
ME
CU
DO
S
THI
JO/EWO
10-00450

OM
FR
D
NE
Sep-22-10

TAI
DATE

OB
BE
ALL
SH
NO.
REV

00

T
PAR
DISCIPLINE IN
ENGINEER OR
H. Kasajima L
FUL
Sep-22-10
DATE: IN
PROJECT ON
ENGINEER CTI
T. Hatoya DU
RO
Sep-22-10
DATE:
REP
NO
CERTIFIED CO.
K. Ogawa AM
AR
Sep-22-10
DATE: UDI
SA
CONSTRUCTION
AGENCY
OF
Y
ERT
OP
DATE: PR
OPERATIONS E
SOL
E
TH
DATE: ARE
CONTROL NUMBER

N
VERIFICATION

REI
HE
EDSD

ED
AIN
NT
DATE:

CO
BY:

N
TIO
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

MA
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

OR
INF
(DCC) NO. _____________________

E
TH
D
AN
ING

DATA SHEET DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AW
REVISION

DR
MOTOR OPERATED VALVES (BUTTERFLY)
DAT 2
S

Q41 L RE-854837 THI


RO, UTILITIES & PONDS OF
00
11
MANIFA SAUDI ARABIA JO / EWO: 10-00450-0002

418006870.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

ENGG CERT

1 GENERAL NOTES
K.O
H.K

 General requirements shall be in accordance with Requisition R-216G-


301C “Requisition for Motor Operated Valves (Butterfly)”.
 Instrument/ Electrical requirements shall be in accordance with S-410- R.
NE
136J-301 “Instrument Specification Sheet for Electric Motor Operated OW
ITS
Valve Actuators (Butterfly)”. OF
FOR CONSTRUCTION

NT
DESCRIPTION

NSE
CO
EN
ITT
WR
2 ABBREVIATION LIST E
TH
T
OU
Abbreviation Description TH
WI

CL Class
NT
ME

FF Flat Face
CU
DO
S
INS. Insulation THI
JO/EWO
10-00450

OM
MAT’L Material FR
D
NPS Nominal Pipe Size NE
Sep-22-10

TAI
DATE

OPER. Operating
OB
BE

P&ID Piping and Instrumentation Diagram


ALL
SH
NO.
REV

00

T
PP Personnel Protection PAR
DISCIPLINE IN
ENGINEER
H. Kasajima
PRESS. Pressure OR
L

DATE:
Sep-22-10 QTY Quantity FUL
IN
PROJECT
STD Standard
ON
ENGINEER CTI
T. Hatoya DU
TEMP.Temperature RO
Sep-22-10
DATE:
REP

CERTIFIED THICK. Thickness NO


CO.
K. Ogawa
TSO Tight Shut Off AM
AR
Sep-22-10
DATE: UDI
SA
CONSTRUCTION
AGENCY
OF
Y
ERT
OP
DATE: PR
OPERATIONS E
SOL
E
TH
DATE: ARE
CONTROL NUMBER

N
VERIFICATION

REI
HE
EDSD

ED
AIN
NT
DATE:

CO
BY:

N
TIO
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

MA
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

OR
INF
(DCC) NO. _____________________

E
TH
D
AN
ING

DATA SHEET DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AW
REVISION

DR
MOTOR OPERATED VALVES (BUTTERFLY)
DAT 3
S

Q41 L RE-854837 THI


RO, UTILITIES & PONDS OF
00
11
MANIFA SAUDI ARABIA JO / EWO: 10-00450-0002

418006870.doc
Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY

ENGG CERT

3 DATA SHEET
K.O
H.K

Refer to the next sheets.

R.
NE
OW
ITS
OF
FOR CONSTRUCTION

NT
DESCRIPTION

NSE
CO
EN
ITT
WR
E
TH
T
OU
TH
WI
NT
ME
CU
DO
S
THI
JO/EWO
10-00450

OM
FR
D
NE
Sep-22-10

TAI
DATE

OB
BE
ALL
SH
NO.
REV

00

T
PAR
DISCIPLINE IN
ENGINEER OR
H. Kasajima L
FUL
Sep-22-10
DATE: IN
PROJECT ON
ENGINEER CTI
T. Hatoya DU
RO
Sep-22-10
DATE:
REP
NO
CERTIFIED CO.
K. Ogawa AM
AR
Sep-22-10
DATE: UDI
SA
CONSTRUCTION
AGENCY
OF
Y
ERT
OP
DATE: PR
OPERATIONS E
SOL
E
TH
DATE: ARE
CONTROL NUMBER

N
VERIFICATION

REI
HE
EDSD

ED
AIN
NT
DATE:

CO
BY:

N
TIO
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

MA
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

OR
INF
(DCC) NO. _____________________

E
TH
D
AN
ING

DATA SHEET DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AW
REVISION

DR
MOTOR OPERATED VALVES (BUTTERFLY)
DAT 4
S

Q41 L RE-854837 THI


RO, UTILITIES & PONDS OF
00
11
MANIFA SAUDI ARABIA JO / EWO: 10-00450-0002

418006870.doc

Das könnte Ihnen auch gefallen