Reference: WAT-R001D0.1
Revision: 0.1/Draft
Date: Sunday, 24 September 2017
Project related
+84-24-37606431 T
+84-24-37606432 F
info@vn.rhdhv.com E
royalhaskoningdhv.com W
Document title: Mekong Delta Integrated Climate Resilience and Sustainable Livelihoods Project
Date / initials:
Date / initials:
Classification
Project related
Disclaimer
No part of these specifications/printed matter may be reproduced and/or published by print, photocopy, microfilm or by
any other means, without the prior written permission of HaskoningDHV Nederland B.V.; nor may they be used,
without such permission, for any purposes other than that for which they were produced. HaskoningDHV Nederland
B.V. accepts no responsibility or liability for these specifications/printed matter to any party other than the persons by
whom it was commissioned and as concluded under that Appointment. The integrated QHSE management system of
HaskoningDHV Nederland B.V. has been certified in accordance with ISO 9001:2015, ISO 14001:2015 and OHSAS
18001:2007.
24 September 2017 PISC - TECHNICAL PROPOSAL WAT-R001D0.1
Project related
HaskoningDHV Vietnam
A - Consultant’s Organization
B - Consultant’s Experience
A – Consultant’s Organisation
Backed by expertise and experience of nearly 7,000 colleagues across the world, we work for
public and private clients in more than 130 countries. We understand the local context and
deliver appropriate local solutions.
We focus on delivering added value for our clients while at the same time addressing the
challenges that societies are facing. These include the growing world population and the
consequences for towns and cities; the demand for clean drinking water, water security and
water safety; pressures on traffic and transport; resource availability and demand for energy and
waste issues facing industry.
We aim to minimise our impact on the environment by leading by example in our projects, our
own business operations and by the role we see in “giving back” to society. By showing
leadership in sustainable development and innovation, together with our clients, we are working
to become part of the solution to a more sustainable society now and into the future.
Our head office is in the Netherlands, other principal offices are in the United Kingdom, South
Africa, and India. In addition, solid track records have been established over the years in Asia
with offices in Vietnam, Indonesia, Singapore, China, Philippines, Myanmar and Thailand; and
we have a long standing presence in Africa, Americas and the Middle East.
In this manner, we are able to offer multidisciplinary and integrated engineering and consultancy
services locally, based on experience built globally.
Through our full-time presence in Vietnam, we have a strong and long involvement in a large
number of projects in Vietnam. With our knowledge of state of the art technologies,
methodologies and approaches combined with our long time presence and experience in
Vietnam, Royal HaskoningDHV provides its clients with custom tailored solutions, based on
regional and local expertise, global expertise and international standards.
1.4 VMEC
VINA MEKONG Engineering Consultants J.S. Company (VMEC) is an multi-
disciplinary investigation, design and engineering consultancy; has been granted full
Established in 2003, VMEC has been delivering dynamic, creative, cost effective solutions for
more than three hundred government funded, ODA, and private investment projects.
VMEC has over 30 permanent staffs and over 20 intermittent staffs with continuous training and
upgrading. VMEC always focuses on capacity building of human resources, improving
management system, using high-tech tools and new technologies to fulfil all requirements of our
clients.
Key personnel of VMEC are senior engineers and experienced specialists having over 30-year
experience in engineering consultancy for local and international clients.
1.5 INTEC
International Engineering Consultant Joint Stock Company (INTECT) is a Joint
stock Company operating under the Enterprise Law with key product of
Consultancy Services.
INTEC provides a wide range of consultancy services in various areas such as Water Supply
and Drainage; Environmental Sanitation; Solid Waste Management; Transportation; Irrigation;
Urban Upgrading and Development; Hospital; Climate Change Adaptation and Water Resource
Management.
Despite its only 10 years of operation, INTEC has attracted a team of leading experts in every
field, thanks to its reasonable policy. With its tireless endeavour, INTEC has flourished and
become one of the leading enterprises in Vietnam in providing Consultancy Services in various
fields to various clients from various sources of fund.
INTEC now is fully qualified and capable of providing comprehensive consulting services, from
Master Planning, Construction Survey, Investment and Investment Project Report to Detailed
Design, Construction Supervision and implementation and Environmental and Social Safeguard
Reports for projects of specialized and multiple sectors.
INTEC has been involved in projects implemented throughout Vietnam with various Partners
and Customers from private sector, or State owned enterprises to Partners from international
organizations and international donors.
24 September 2017 ICRSL PROJECT - PIC WATVN1361P001F0.1 3
INTEC has participated in implementing projects funded from different sources from domestic to
foreign investment, ODA fund and funding from international organizations such as the World
Bank (WB); Asian Development Bank (ADB); Japan Bank for International Cooperation (JBIC);
German Development Bank (KfW), Finland (Finnida), Denmark (DANIDA), Hungary (Eximbank),
France (AFDD), South Korea (EDCF) and other donor organizations.
Following its principle - Quality of service is vital for enterprise's survival; INTEC has and will
bring to its Customers and Partners the most qualified, scientific, advanced and efficient
consulting products.
2017 - 2022 Construction Supervision Consultant for Investment Management USD 14,215,705/ USD JV of Royal
Interceptor and Wastewater Treatment Plant – Authority (IMA) for Ho Chi 13,233,907 HaskoningDHV (lead)
Second HCMC environmental sanitation project Minh City Environmental and Dohwa
The consulting services involve construction Sanitation Project
management and daily supervision of two major
components: Vietnam
1. The construction of an 8 km long WB
Interceptor of diameter 3200 mm, using
trenchless technology, in District 2 of Ho
Chi Minh City.
2017-2021 Project Implementation Support Consultant - Bac Giang City‘s Construction USD 1,116,148/ JV of HaskoningDHV
Second Greater Mekong Subregion Towns Project Management Unit USD 1,116,148 Nederland B.V (lead) –
Development Project No.2 HaskoningDHV Việt Nam
The Second Greater Mekong Subregion (GMS) Lao Cai Provincial ODA Subconsultant: Vietvuong
Corridor Towns Development Project for Viet Nam Project Management Unit
will improve urban services in three towns, namely Mong Cai city ‘s GMS 2
Bac Giang (Bac Giang Province), Mong Cai Project Management Unit –
(Quang Ninh Province) and Sa Pa (Lao Cai Quang Ninh province
Province). The project will support economic,
socio-cultural and environmental development in ADB funded
2016-2019 Thua Thien Hue water supply project - HUEWACO USD 1,352, 231/ USD HaskoningDHV
Consulting services for Contract management 1,352, 231 Nederland B.V –
and Construction supervision HaskoningDHV Việt Nam
The scope of consulting services will Vietnam
include contract management and
construction supervision for Phase 1 of ADB
the Project.
Phong Dien Water Supply Area:
Constructing aproximately 155km of
transmission and distribution pipelines D50-
400;
Tu Ha Water Supply Area: Constructing
2016 - 2017 Decision Support Tool Coastal Zone Mekong Netherlands Enterprise US$ 370,000 / US$ Lead partner with
Delta Agency (RVO.nl) 240,000 Deltares
With its main donors Vietnam has set out on a HaskoningDHV Vietnam
development trail to follow the strategy proposed in Vietnam Ltd. and
the ‘Mekong Delta Plan’ in its fertile delta. For the Southern Institute of
coastal and estuary zone in the delta this entails Water Resources
managing the salinization and the mostly eroding Planning
coastline. The strategy proposed for the Mekong
Delta is the adoption of a new aquaculture concept
to adapt land use to the advancing saline water
intrusion instead of fighting it and sticking to the no
longer tenable fresh-water agriculture,
predominantly being rice and fruit. In this context
the structure and position of the coastal flood
defence system is essential for adaptation options
in the near and longer-term future. The presence of
a mangrove belt (as a production source for sea
food and a wave shield for the dyke system) is a
crucial element in decision making for the transition
2015 – Construction Supervision – phase 2 (package Rach Gia City Urban USD 1,132,216 / USD Royal HaskoningDHV
ongoing RG-CS-4.10) under Rach Gia City Urban Upgrading Investment 1,132,216 (lead) in association with
Upgrading project Management Project Unit sub-consultants:
HaskoningDHV Vietnam,
RHDHV represents the Client to implement the Vietnam
Cuu Long Construction
contract management and construction Funded by World Bank
supervision of the following contract packages: Consultant JSC.
Upgrading of drainage culvert system D=400-
600, L=17.500 m and infrastructure for LIAs and
improvement of Road and embankment
Scope of works:
Improvement of LIA includes road system
(Upgrading and improving the existing
degraded alleys to asphalt/concrete
roads), Drainage System (Constructing
reinforced concrete drainage culvert
system ), Water Supply System
Supporting Primary and Secondary
infrastructures: Building and improving the
embankment of Kien river and Hien canal ;
- Upgrade Nguyen Truong To street
2015 – Construction supervision and contract Project Management Unit for USD 1,263,347 / USD Royal HaskoningDHV
ongoing management of Component 2 - Phase 2 (Bun Construction Investment 1,263,347 (lead) in association with
Xang Lake, Sao Canal, Ngong Canal, South of using Official Assistant sub-consultants:
canal and drainage system in Lake Bun Xang Development Fund of Can HaskoningDHV Vietnam,
Basin) Tho City (CTPMU)”
Cuu Long Construction
RHDHV represents the Client to implement the
contract management and construction Vietnam Consultant JSC.
supervision of the following contract packages:
Upgrading of Bun Xang Lake and Canals Funded by World Bank
(Ngong & South canals), in Bun Xang Lake
Basin,
Drainage System in Bun Xang Lake
Drainage Basin including Sewer pipelines
along lake and canal; Wastewater
interceptor along canals; Combined
sewer along alleys in Bun xang drainage
basin. Total: D200-600; L=19.200m
Improvement of Sao Canal
Road & Bridge improvement: Roads and
pathways around the lake, B=15m, Small bridges
along road routes around lake and canal
2013 - Construction supervision, Procurement Binh Phuoc Water Supply & US $ 637,581/ US $ Royal HaskoningDHV
ongoing assistance, contract management and skills Sewerage One Member Co., 637,581 (lead) in association with
transfer for the Dong Xoai Town Drainage and Ltd. Cuu Long JSC
Wastewater, Binh Phuoc province Sub project
Scope of the project includes: Vietnam
Construction of 05 sewage pumping stations
at different locations to water treatment plants; Funded by World Bank
Construction of stormwater drainage culverts
D600÷ D1000 total length is L = 9 km
Construction of interceptor sewer system by
gravity wastewater collection; total length is
Nov 2014 – Project Implementation and Management Project Management Office US$ 2,360,000 / US$ JV partner in a
Sep 2018 Support for Integration System and Weather (PMO) / National Hydro- 340,000 Consortium of Deltares
Forecasting and Early Warning Systems Meteorological Services (lead partner), Center for
Royal HaskoningDHV has provided the following Environmental Fluid
services: Dynamics, Innovative
Phase I – Assessment and development of Vietnam Hydrology Inc. (JV
detailed Design for an Integrated Nationwide partner), RMSI Private
Weather Forecasting and Early Warning System Limited, Bureau of
Phase II – Procurement and technical support Meteorology BOM (sub-
and implementation: Assisting in implementation consultants)
and performance monitoring of activities
throughout the project is inclusive of assistance in
development tender documents, tender evaluation
and contract negotiations, contract performance
monitoring, operational acceptance, assistance in
recruitment of individual technical consultants and
assistance in implementation of activities on
improving the effectiveness of the component 2
and other similar investments
May 2013 – Bihar Urban Development Investment Program Bihar Urban Infrastructure US$ 6.7 Million/ US$ 5.3 Lead partner in a JV of
Ongoing – Project - 1 Program Management Consulting Development Corporation mil. HaskoningDHV
Services. (ADB Loan Number: 2861-IND) Ltd. Consulting Pvt. Ltd.,
HaskoningDHV Nederland B.V. is a Project India, Tata Consulting
Jan 2014 – Consultancy Services for the Hadejia-Jama'are- Federal Government of US$ 2,280,000 Lead partner in a JV of
Jul 2015 Komadugu-Yobe River Basin Nigeria, Federal Ministry of Diyam Consult, Nigeria
HaskoningDHV Nederland B.V. is a lead Water Resources
Consultant responsible for the following activities:
Project management; Nigeria
Preparation of integrated watershed
management plan;
Dam safety assessment of two large dams;
Institutional development plan;
2013 - 2014 Strengthening Disaster Resilience for Coastal World Bank US$ 245,000 / US$ Lead partner with
Communities in the Mekong Delta 180,000 Deltares
The aim of the study to “Strengthen Disaster Vietnam
Resilience for Coastal Communities in the Mekong
Delta” is to propose solutions for improvement of
transport infrastructure for priority districts in the
coastal provinces of the Mekong Delta; to (i) allow
residents a means of escape; (ii) provide access
for emergency services and (iii) improve logistic
facilities for transport of agro-aquacultural
products.
RHDHV prepared a range of GIS maps for the
coastal provinces with socioeconomic-, transport-
and flood data. We furthermore identified the most
vulnerable coastal districts within the coastal
provinces, using the results of interviews with local
authorities and focus group meetings and a multi
criteria analysis based on the GIS data. For these
districts critical transport infrastructure projects
were provided by the local authorities. These
projects were subsequently ranked using a second
multi criteria analysis. A cost benefit analysis
identified if the projects were economically viable.
2012-2015 Technical Assistance and Supervision for Siverek Municipality US$ 451, 185/ US$ 451, HaskoningDHV
Siverek Wastewater Project 185 Nederland B.V , WYG
The purposes of this Contract are as follows: International
To provide Technical Assistance and Turkey WYG Türkiye
Capacity Building to Siverek Municipality / ER-GE Design
Water Utility Department through Engineering Consulting
administrative and financial issues (including
billing / collection)
To assist the Municipality / Water Utility
Department in technical operation and
maintenance of an efficient water and
wastewater department
To provide Capacity Building within specific
Technical Issues to the Municipality / Water
Utility Department
To provide Technical Assistance and
Capacity Building to the Project
Implementation Unit (PIU)
Preparation/revision of the supply tender
dossier for the provision of equipment and
Technical Assistance during tendering,
contracting and successful delivery of the
supply items
Construction Supervision Services for
Wastewater and Stormwater Investments
Works Contract 1: Construction of Wastewater
Treatment Plant: Design Review of WWTP for
120,000 PE, and Construction Supervision of
Stage 1 to 85,000 PE according to FIDIC Yellow
Book
Works Contract 2: Construction of Wastewater and
Stormwater Collectors (over 245 km) and
Aug 2012 - Consultancy for Design review & PMC for Aurangabad Water Utility USD 1,122,214/ USD HaskoningDHV
now “Built, Refurbish, Operate and Maintain the Company Limited (AWUCL) 1,122,214 Nederland B.V. (lead) in
Water Supply System of Aurangabad City, (SPV of SPMN/ESSEL/VA association with
Maharashtra Technology/ National Water & HaskoningDHV
Brief Description of main deliverables: Sewerage Corporation) Consulting Pvt. Ltd.
Water will be lifted through Intake structure from India (Formerly DHV India Pvt.
Jayakwadi Dam, transmitted through 2000 mm. Ltd.)
MS pipe of 27 km. upto the WTP of 192 MLD,
WTP to MBR (12 km), MBR to Service Reservoir
and 1200 km distribution network with individual
house connection and 100% metering.
Assist the Employer (SPV in implementation of the
Project as per Concession Agreement;
Construction supervision, Project
management, Quality Control and Assurance
during the implementation period (starting from
the pre-Takeover till the completion of the
Construction &Rehabilitation period that extends
until the Defect Liability Period); Take all
reasonable steps to extract that high quality
construction and works executed in full compliance
with the Engineering design, technical
specifications and other stipulations of the contract
documents and within the specified time periods;
PMC during Construction & Rehabilitation
period that extends until the Defect Liability
Period; Daily, Weekly reports and MIS Reports
and any other reports required as per concession
May 2011 – Mekong Delta Plan Government of The 2,500,000 Euro Lead partner in a JV of
Dec 2014 Mekong Delta Plan is to contribute to realising and Netherlands/MONRE/MARD (Equivalent US$ Wageningen University
maintaining a prosperous delta, both economically of S.R. Vietnam and Research Centre,
2,750,000)
and socially, in which its population can thrive in a Deltares, Rebel,
vigorous and dynamic economy that is founded on Vietnam Water.NL (all from the
sustainable use of its natural resources, and well Netherlands)
adapted to changes in water resources and
climate. It spells out what uncertainties and
challenges confront the delta from now to 2050,
and from 2050 towards 2100, and presents a clear
long-term vision towards Agro-Business
Industrialisation as a promising future strategy.
Taking into account the existing government
policies and the institutional framework, it is
recognised that the orientation for the agricultural
sector in the delta needs to shift from a focus on
production towards a focus on added value by
improving the product-value chain, involving public-
private partnerships and introducing market-based
mechanisms. The Mekong Delta Plan includes 'no-
regret' and priority measures, as well as measures
that can be deferred towards the longer-term that
Vietnam could adopt to ensure a safe, prosperous
and both economically and environmentally
sustainable and climate proof future for the delta
region.
Mar 2011 - Capacity Development for Metropolitan Asian Development Bank US$ 1,363,000/ US$ HaskoningDHV
Mar 2013 Sanitation Management and Health Project (ADB) 1,363,000 Nederland B.V
July 2011 – Consultancy Services for Project Preparation Kolkata Municipal US$ 842,400/ US$ HaskoningDHV
June 2012 Works under Asian Development Bank’s MFF Corporation (PMU), Kolkata, 842,400 Nederland B.V. (Formerly
for Kolkata Urban Sector Investment India Known as DHV
Programme (Phase-II) ADB Funded, Project Consultants) (Lead
Cost: (USD 570.00 million), Partner)
Brief Description of main deliverables: Project and
aims to improve water supply and sanitation HaskoningDHV
conditions in the city through identification of gaps Consulting Pvt. Ltd.
in the provision of water supply, sewerage and (Formerly DHV India Pvt.
Jun 2010 - Technical Assistance Jerusalem West Waste The Jerusalem Wastewater US$ 865,300/ US$ Sole consultant
May 2015 Water Treatment Plant in Soreq Valley and Purification Enterprise 865,300
The plant currently treats some 85,000 m3 of ltd (JWPE)
municipal wastewater per day and produces Israel
secondary effluent and Class B waste sludge. The
plant is designed for a final treatment capacity of
100,000 m3/d.
Services:
Executing an extended feasibility study
Preliminary design (Process technological, Civil,
Mechanical, Electrical &Control) of the preferred
Feb 2010 - Urban Sanitation Development Program (USDP) Royal Netherlands Embassy USD 16.74 mil/ USD HaskoningDHV
Dec 2014 In order to accelerate the process in planning and 16.74 mil Nederland B.V
investment of the urban sanitation development in (Lead partner) IRC,
Indonesia, the Government of Indonesia (GOI) has Indonesia PEM,
defined a range of targets which have been MLD (Mitra Lingkungan
elaborated in the Road Map to Acceleration of Dutaconsult),
Urban Sanitation Development (PPSP) 2010-2014. Haskoning,
This road map targets 330 cities that have Mott MacDonald
sanitation problems and focus on three goals to be Indonesia (MMI),
achieved by 2014: freedoms from open and Unesco IHE,
careless defecation, at-source reduction of waste Witteveen+Bos
generation by 20% via the 3Rs (reduce, reuse and
recycle) and environmentally-friendly waste
management reduced flooding/water ponding.
The Urban Sanitation Development Program
Dec 2009 – Institutional Strengthening for IWRM in 6 Ci’s Ministry of Public Works US$ 4,000,000/US$ Lead partner in a JV of
Nov 2014 River Basin Territory, Package B, Indonesia 1,600,000 Deltares, Demis,
The Government of Indonesia developed the River Indonesia Euroconsult Mott
Oct 2009 – Feasibility Study, Final Design & Construction Millennium Development US$ 2,000,000/US$ Lead partner in a JV of
Dec 2011 Supervision of Rehabilitation/Extension Works Authority (MiDA) 1,000,000 ABP Consult ltd., Ghana
Jun 2007 – VWRAP: Phu Ninh and Da Ban Irrigation PMUs Phu Ninh and Da Ban US$ 864,110/US$ Lead partner in a JV of
Jun 2011 System Modernization Technical Design 502,110 BRL International, France
HaskoningDHV Nederland B.V. is a lead Vietnam HEC-II Consultants,
Consultant to provide services as following: Vietnam
Preparation of the preliminary design and
detailed engineering design for modernization
of the 7,800 ha (Da Ban) and 18,000 ha (Phu
Ninh) irrigation projects,
Modelling of the main irrigation networks –
existing and improved situation (HEC-RAS);
Update resettlement and land acquisition plan,
including cost estimate;
Assistance in preparing irrigation management
2009 – 2010 Volta River Dam Safety Assessment Volta River Authority US$ 2,553,350/US$ Lead partner in a JV of
HaskoningDHV Nederland B.V. is a lead 1,600,000 Norplan AS (Norway);
Consultant to provide following services: Ghana ABP Consult Ltd.
Project management; (Ghana)
Preparation of Environment Management Plan
(EMP) to avoid or minimize adverse
environmental effects from the existence and
operation of the dams: impact identification,
policy and strategy development, preparation of
an Environmental Action Plan, preparation of
an Occupational Health and Safety Plan;
Preparation of an Emergency Preparedness
Plan (EPP) for both dams covering a potentially
affected area of more than 1000 km². Detailed
maps are prepared using LiDAR techniques
and other photos;
Dam Safety Assessment (DSA), comprising the
following: assessment of adequacy of warning
and other signs with respect to public safety,
preparation of hazard potential classification,
dam break analysis and VRA dam safety
organization;
Training Programme for VRA staff.
Sept 2007 – MRC Flood Management and Mitigation Mekong River Commission $ 2 900 000 / HaskoningDHV
Program - Structural Measures and Flood
24 September 2017 ICRSL PROJECT - PIC WATVN1361P001F0.1 26
Duration Assignment name/& brief description of main Name of Client & Country Approx. Contract value Role on the Assignment
deliverables/outputs of Assignment (in US$ equivalent)/
Amount paid to your
firm
Aug 2009 Proofing (MRC) 1 400 000 US$ Nederland B.V
The project aims at the introduction of Integrated (Lead partner)
Flood Risk Management in the four riparian Vietnam and
countries of the Lower Mekong Basin, i.e. WL | Delft Hydraulics,
Cambodia, Lao PDR, Thailand and Vietnam and
Unesco-IHE, Regional
the preparation of projects of structural works for
flood risk reduction (reservoirs, diking schemes, Consultants
river improvements and diversions). The focus of
the project is on transboundary planning and
project development.
The immediate objectives of the project are
formulated as follows:
1. to reduce the vulnerability of people living in
the Lower Mekong Basin (Thailand, Lao PDR,
Cambodia and Vietnam) to the negative
impacts of floods; and
2. establish sustainable flood risk management
capacity in the Mekong River Commission and
line agencies in the riparian countries.
Feb 2006 - Project Management Consultant for Greater Bangalore Water Supply and US$ 460,000/ US$ HaskoningDHV
Dec 2006 Bangalore Sewerage Component and Road Sewerage Board,Bangalore, 460,000 Consulting Pvt. Ltd.
(Design) Restoration Work. (World Bank Funded) Project Karnataka, India (Formerly DHV India Pvt.
Dec 2009 Cost: (INR 938.87 Crore) – india Ltd.); (Lead Partner)
(Construction Brief Description of main deliverables: and
Supervision) Topographical Survey of around 2000km road Shah Technical
networks and engineering investigations; Review of Consultants Pvt. Ltd.
previous reports; Assessment of population,
sewage generation and zoning of areas;
Rehabilitation of existing sewerage system and
design of proposed sewerage system (around
2000 km preliminary sewers and 150 km
2005 -Jun Greater Bangalore Water Supply Project – Greater Bangalore Water USD 241,250/ USD HaskoningDHV
2011 Project Management Consultancy Supply Project Management 241,250 Nederland B.V (JV
Project Management services for the Unit partner) with
improvement of the water supply in greater India Meinhardt Singapore
Bangalore, India (Pvt) Ltd (Lead)
The project area covered under this project Funded by World Bank And sub-consultant: DHV
comprises of eight urban local bodies situated India Pvt. Ltd.
within the Bangalore Metropolitan Area (BMA). Out
of the total 594 sq. km planned are of CDP, about
240 sq. km is covered by these ULB’s. The present
population in the above 8 ULB’s is about 1.2 million
and the projected in the next 15 years is about 2.7
million. At present, about 6% of the area is
provided with piped water supply system. The
existing water supply is managed only through
bore wells and sewerage through cess pools. The
main objective of the project is to strengthen the
basic services and provide 24 hr. safe drinking
water in the selected municipalities,
Jul 2005 – Jul Mekong Transport Infrastructure Development PMU1, PMU-W, MOT, World US$ 904,000/US$ Lead partner in a JV of
2007 Project - Preparation of the feasibility study and Bank 350,000 Louis Berger Group, Inc.
preliminary design (USA), China Engineering
HaskoningDHV Nederland B.V. is a lead Vietnam Consultants, Inc.
Consultant to provide following services: (Taiwan)
Review and assessment of the existing
conditions of the inland waterway
infrastructures;
Bathymetric surveys, traffic count, bridges
May 2004 – Rehabilitation of Irrigation and Drainage Rural Restructuring Agency US$ 9,600,000/US$ Lead partner in a JV of
Nov 2007 Infrastructure Component of Rural Enterprise of the Republic of Uzbekistan 929,700 consultancy contracts
Support Project with 37 national
Royal HaskoningDHV was responsible for the Uzbekistan consultants
execution of the complete project. An initial
detailed inventory of the existing irrigation and
drainage infrastructure in 4 districts was made and
the findings presented in the form of a defects
report. This was submitted and approved by the
relevant local authorities and formed the basis for
six feasibility studies. These studies included for
Aug 2003 – Central Region Water Resources Sector Project Asian Development Bank / US$ 1,400,000/ US$ Lead partner in a JV of
Aug 2004 HaskoningDHV Nederland B.V. is a lead MARD 1,020,000 Delft Hydraulics, The
Consultant to provide following services: Netherlands
overall project management; Vietnam HEC-1, Vietnam (sub-
water resources planning; con)
screening of potential sub-projects for inclusion HEC-2, Vietnam (sub-
in the sector project; con)
support to the counterpart in the preparation of
full Feasibility Studies for up to six initial sub-
projects in the sector project;
technical, engineering, review of proposed and
retained sub-projects;
economic analysis; and
social impact assessment and resettlement and
compensation assessment.
preparation of overall project for sector
investment: potential projects, pilot studies,
guidelines + methodologies, reforms,
implementation plans, training, etc.
Mar 2002 – Vietnam Water Resources Assistance Project Central Project Office (CPO), US$ 850,000/ US$ Lead partner in a JV of
Dec 2003 (VWRAP) MARD 250,000 Nippon Koei Ltd. (leading
HaskoningDHV Nederland B.V. guided the firm), Japan
technical elaboration of the modernisation and Vietnam HEC-1
rehabilitation of the irrigation infrastructure, HEC-2
including reservoir dams, and prepared the
Financial Management Plans for the respective
Irrigation Management Companies.
preparation of concept documents for
Feb 1997 – Gari Irrigation Scheme Petroleum (Special) Trust US$ 4,800,000/ US$ Lead partner in a JV
Jun 2001 HaskoningDHV Nederland B.V. is a lead Fund 1,950,000
Consultant to provide following services:
the updating of the 1983 Feasibility Study and Nigeria
Detailed Design for the 2,000 ha Gari Irrigation
Scheme and the head works, including the Gari
and Marke dam;
carrying out geo-technical investigations of the
Gari and Marke dam;
review of safety and stability of the dam and
detailed design of remedial works;
Apr 1999 – Water Boards Project Ministry of Water Resources US$ 4,100,000/US$ Lead partner in a JV of
Apr 2005 The Water Boards Project (WBP) has been and Irrigation 2,500,000 IWACO (The
formulated to study the possibilities for participatory Netherlands)
water management at secondary canal level in Egypt EAP (Egypt)
support of the formulation of new laws and NSCE (Egypt)
amendments to existing legislation.
HaskoningDHV Nederland B.V. is a lead
The Terms of Reference describe the project in enough detail and clarity for us to have adequate
understanding of the scope of the project and the services required from the Project Implementation
Support Consultant. The ToR is clear and precise in describing the different responsibilities and duties of
the Consultant.
Nevertheless, based on our experience with other similar projects and after careful study of the Terms of
Reference (ToR) and other relevant documents, we would like to make the comments and suggestions as
described below. Please note that our observations on the ToR as provided here should be regarded as
starting points in an open discussion with the Client, should we be invited for contract negotiations.
The proposal is based on the information contained in the TOR. Should there be a change in the
scope of work to what is provided in the TOR - as a result of the currently evolving project process
- then this would be clarified and resolved at the time of contract negotiations for the consulting
services.
As mentioned in TECH-2, we have recently been involved in the Mekong Delta Plan (MDP, 2013)
on which the concept and approach for this Mekong Delta Integrated Climate Resilience and
Sustainable Livelihoods Project is based. We also assisted World Bank and MARD to review a
number of the investment subprojects under the Components 2, 3 and 4 of this project. This is
considered a valuable asset for our Consortium and is certainly giving us a head start once
selected for the provision of the consulting services for this project.
From our experiences and the lessons learned in the previous projects in the Mekong Delta, we
fully underline the current Project objectives. The objectives would be achieved through the
provision of capital investments (especially in water management infrastructures), technical
assistance (related to agricultural and aquaculture livelihoods) and capacity building for farmers in
selected Mekong Delta provinces and government institutions at national and sub-national levels
The deliverables mentioned in chapter 6 (Outputs of the Consultant Service) only mention the
main deliverables of the Consultant. Besides the main deliverables, the Consultant will have to
prepare “other reports as requested by CPMU / MARD and WB. We have carefully studied and
analysed the ToR and have identified a number of other reports and products that we believe will
be of benefit to the CPMU and the PMUs. We suggest to further discuss these other reports and
products during the inception phase to align expectations. We further note that support towards
any other reports that are requested by the CPMU / MARD and the WB are part of the services.
Training and capacity building are an important part of the services. In order to emphasise this
and to best design (annual) training plans and ensure knowledge transfer, it might be considered
including a training expert as an additional part time expert in the PISC team. The training expert
can support the other staff members in ensuring knowledge transfer in their work, designing
training programs that connect with the target group and support in execution of these programs.
We hope to further discuss this suggestion during the start-up of the project.
As indicated in the ToR the project duration will be from December 2017 to December 2018. We
assume that this includes 61 months. Our technical proposal (work planning and manning
schedule) and financial proposal are prepared based on a 61 month period. We would like to hold
discussion with client during the contract negotiation.
In addition to the observations with regard to the ToR presented above, we would like to propose the
following amendments to the draft Contract and discuss them during the negotiations.
We therefore propose to include the standard World Bank clause and complete the standard clause as
below to limit the liability of the Consultant.
Duration of Liability
The draft contract does not appear to define the duration of the liability. We therefore propose to add the
following Clause to the Special Conditions.
The Consultant’s liability is limited to a period of two years after the Consultant has completed the
Services or the Contract has terminated, whichever comes sooner.
We would therefore appreciate your consideration to add the following to the Special Conditions as sub-
clause 37.2:
Notwithstanding the provision in clause 37.1 of this Agreement, if after the date of this Contract
there is any change in the Applicable Law which affects Consultant's costs or his progress,
Consultant is entitled to require a modification or variation of the Agreement, including any
modification or variation of the scope of the Services, reflecting the effect of passing or changing
of such laws or regulations.
4. Nationality and Qualifications of Arbitrators. The sole arbitrator or the third arbitrator
appointed pursuant to paragraphs 1(a) through 1(c) above shall be an internationally
recognized legal or technical expert with extensive experience in relation to the matter in
dispute and shall not be a national of the Consultant's home country [If the Consultant
consists of more than one entity, add: or of the home country of any of their members or
Parties] or of the Government's country. For the purposes of this Clause, "home country
means any of:
(a) the country of incorporation of the Consultant [If the Consultant consists of more
than one entity, add: or of any of their members or Parties]; or
(b) the country in which the Consultant's [or any of their members' or Parties'] principal
place of business is located; or
(c) the country of nationality of a majority of the Consultant's [or of any members' or
Parties '] shareholders; or
(d) the country of nationality of the Sub-consultants concerned, where the dispute
involves a subcontract.
The ToR is clear on the counterpart organisations and the facilities that are provided to the consultant.
Relations between the consultant and counterparts are noted in the Project Detailed Outline (PDO) and
project Operational manual (POM). No information is given about the counterpart staff but that is not
expected at this stage. We have the following comments:
Data and information to be provided by the Client: we assume that all data will be collected
through the CPO/CPMU and will be made available to the Consultant, free of charge.
Site access permission: If and where necessary CPO/CPMU will assist in arranging the site
access permission for the Consultants
Office space: We propose that our project office will be located in Can Tho, preferably in same
building as the CPO Branch Office in Can Tho, to ensure the close cooperation and coordination
with the Client and the counterpart staff.
HaskoningDHV Vietnam Office in HCMC: If and when necessary the Consultant will make use of
its own office in HCMC for the purpose of the project implementation.
The Consultant proposes to set up a field office in Can Tho, to effectively facilitate the intensive
field work in the stakeholders as well as close coordination with related provincial authorities and
technical agencies: People’s Committee, DARDs, ICMB10 and PPMUs and their consultants and
contractors. We will need support from CPO/CPMU to get approval for setting up this field office in
a timely manner from the beginning of the project and recruit field coordinator to provide
administrative and coordination support to the Consultant.
Communication with CPO/CPMU: Official communication between the Consultant and
CPO/CPMU will be between representative(s) of CPO/CPMU and the Team Leader of the
Consultant and his authorized person (normally the Deputy Team Leader). We also expect that
staff is assigned to cooperate with the Consultant, availability for discussions, availability of
reports and data, letters of introduction to other agencies, or provincial authorities, timely
approvals of reports and invoices.
Workshops and training: a number of stakeholder and coordination workshops and training will
have to be conducted under this assignment. We do expect that from early stage of the
assignment the Consultant will work with CPO/CPMU to discuss how to organize the workshops
and training program, time schedule and where to organize.
Table of Contents
1 Introduction 1
1.1 Project Context 1
1.2 Our experience leads to understanding 2
1.3 This section – Tech 4 2
3 Work plan 30
3.1 General 30
3.2 Planning and deliverables 30
3.3 Data management 32
3.4 Risk management 32
3.5 QSHE Management System 34
Table of Tables
Table 2-1: Initial suggestions for training programs 23
Table 3-1: Abbreviation of staff used in table below 30
24 September 2017 PISC - TECHNICAL PROPOSAL WAT-R001D0.1 1
Project related
Table 3-2: Deliverables to be produced as part of the services, planning of delivery and staff involved.
Deliverables that are mentioned in chapter 6 of the ToR are indicated with an ‘x’ in the last column. 31
Table of Figures
1 Introduction
Component 2: Managing floods in Upper Delta. This component is to i) protect and enhance
positive effects of floods through flood control measures (flood retention) and increase rural
incomes and protect high-value assets by introducing flood control measures in rural areas and
alternative models in agriculture and fisheries; ii) provide livelihood support to farmers so that they
can have alternative crop during flood season, including aquaculture; iii) construct and upgrade
infrastructure to protect high-value assets such as urban areas and orchards; and iv) support
efficient water use in agriculture during dry season. In view of mitigating impacts from strong
floods in the Upper Delta, 3 sub-projects are proposed under this Component to enhance flood
discharge capacity.
Component 3: Adapting to Salinity Transitions in the Estuary. This component aims to address the
challenges related to salinity intrusion, coastal erosion, sustainable aquaculture and improved
livelihoods for communities living in the coastal areas. This will potentially consist of: i)
construction of coastal defences consisting of combinations of compacted earth embankments
and coastal mangrove belts; ii) modification of water and agricultural infrastructure along the
coastal zone to allow flexibility for sustainable aquaculture activities and adapt to changing salinity
levels; iii) support to farmers to transition to more sustainable brackish water activities such as
mangrove-shrimp, rice-shrimp and other aquaculture activities; and iv) supporting climate smart
agriculture by facilitating water use efficiency in the dry season. Four sub-projects are proposed
under this Component to face challenges from the sea, including severe salinity intrusion.
Component 4: Protecting Coastal Areas in Delta Peninsula. This component aims to address the
challenges related to coastal erosion, groundwater management, sustainable aquaculture and
improved livelihoods for communities living in the coastal and river mouth areas. This will
potentially consist of: i) construction/rehabilitation of coastal defences consisting of combinations
of compacted earth embankments and coastal mangrove belts; ii) modification of water control
infrastructure along the coastal zone to allow flexibility for sustainable aquaculture activities; iii)
control of groundwater abstraction for agricultural/aquaculture and development of freshwater
supplies for domestic use; iv) support to farmers to practice more sustainable brackish water
activities such as mangrove-shrimp and other aquaculture activities; and v) supporting climate
smart agriculture by facilitating water use efficiency. This Component includes 3 proposed sub-
projects.
24 September 2017 PISC - TECHNICAL PROPOSAL WAT-R001D0.1 1
Project related
Component 5: Project Implementation and Management Support. This component will be split into
project management support and capacity building for MARD, MONRE and MPI. This component
is expected to provide incremental running costs and consulting and advisory services for overall
project management, financial management, procurement, safeguards and monitoring and
evaluation.
The project is implemented in three basic ecological sub-zones in Mekong Delta which is covering 8
selected provinces: Floodplains (An Giang, Dong Thap), estuaries (Ben Tre, Tra Vinh, Soc Trang) and
peninsula (Ca Mau, Kien Giang).
The use of Livelihood Transformation Models (LTMs) which play an important role in this project is one of
the key recommendations that followed from these projects. It is important to see the developments in the
Mekong Delta not as alone-standing but of part of the system. Local stakeholders are an important part of
this system and as the delta changes, they have to adapt as well. The changes however also offer
chances, and supporting them to transform their livelihood offers them the opportunity to benefit from this.
Next to the MDP we have been involved in several other projects in the Mekong Delta and for the WB in
Vietnam as shown in Tech-2. This gives us a very strong understanding of the institutional, environmental
and social context in which this project takes place. This understanding can strongly benefit the
implementation of the ICRSL project.
We have a longstanding involvement in the Mekong Một, hai, ba: "Vì đồng bằng sông Cửu Long!" The Prime
Delta which started with the preparation of the Minister of Vietnam, Mr. Nguyen Xuan Phuc and former
Mekong Delta Master Plan (funded by UNDP) in director of the WB in Hanoi Victora Kwakwa cheer on the
1993 and we look forward to continuing our support Mekong Delta during the Mekong Delta Forum 2016.
the further sustainable development of the region
under that now familiar slogan: “Một, hai, ba: "Vì đồng bằng sông Cửu Long!”.
The scope of work of the consultant will comprise the following (from the ToR):
Study available project documents and work with the CPMU to agree on, and to submit, a
tentative detailed work plan for the entire service;
Support CPMU and PMUs in all aspects of project implementation, including preparing a work
plan every year, establishing and updating a procurement plan, carrying out the related
procurement and contract management activities and reporting as required by relevant authorities
and donor;
Support CPMU / PMUs in working with the donor and relevant authorities in preparation of next-
phase sub-projects;
Support CPMU in monitoring, managing
construction progress and quality;
Support CPMU / PMUs in piloting livelihood
transformation models in subprojects;
Support CPMU in implementing subprojects
HP l-5: Enhancing forecasts for
management and operation of irrigation/
hydraulic works;
In cooperation with the project monitoring
safeguard consultant, update and prepare
the progress of safeguard policies in
required reports;
Support CPMU / PMUs in organizing
training courses, workshops and capacity
building activities.
1. Mobilization / Start-up
2. General Project Management Support
3. Preparation of next-phase subprojects
4. Support implementation of construction
works
5. Support implementation of livelihood
transformation models and non-structural
activities Figure 2-1: Overview of activities of the PISC
6. Support Implementation of Sub-project 1-5
7. Training / Workshops
8. Procurement and Contract Management
9. Financial Management
These nine tasks can roughly be divided in three groups as shown in Figure 2-1. There are project
management and general activities which are unrelated to specific subprojects. These tasks are focused
on making sure that the project runs smoothly and that checks and balances on project procedures are
upheld. Secondly, there are the activities which are directly related to implementation of the subprojects.
Strong coordination and cooperation with other actors involved is of the essence in these tasks. Finally,
there is the capacity building component which runs throughout the project. We consider it essential to
ensure that all our projects are carried out within a ‘learning-on-the-job’ environment so that the
sustainable management of these projects is ensured also after the consultant is gone.
The following sections will provide our approach and methodology for these 9 different activities and the
different activities that need to be carried out as part of the tasks.
Per task the expected deliverables are indicated, these deliverables will also be repeated in chapter 0.
2.2.1 Mobilization
All three partners for the execution of these activities, Royal HaskoningDHV (RHDHV), Vina Mekong
Engineering Consultants J.S. Company (VMEC) and International Engineering Consultant Joint Stock
Company (INTEC) are based in Vietnam.
Upon award of this project our staff will quickly be mobilised. It is noted that consultant will be based in
Can Tho. This means that arrangements for the project office and residence of staff in Can Tho will have
to be made. Thanks to our longstanding experience with working in the Mekong Delta we have a good
network in Can Tho and will be able to efficiently arrange the required facilities. We aim to set-up a project
office close to the MARD office to facilitate close cooperation. Furthermore, INTEC has an existing office
in Can Tho which can be used as appropriate during the start of mobilisation. Because of the existing
facilities in Can Tho, HCMC and Hanoi already available to the partners we expect that the mobilisation
activities can be carried out parallel to the other activities during mobilization and start-up. This means that
our staff will be immediately operation and will be able to focus all their attention to the commencement of
the services without any delay.
The agenda of the kick-off meetings will be set at the start of the projects, but topics that at least need to
be discussed are:
Introduction of staff;
Expectations of the project and the cooperation;
Expected challenges and risks during project execution that need to be managed;
Opportunities to reach impact above expectations.
24 September 2017 PISC - TECHNICAL PROPOSAL WAT-R001D0.1 4
Project related
Financing Agreement;
Project Appraisal Document (PAD);
Project Operation Manual (POM);
Progress reports
Project Feasibility Study report
We will review these documents to the ToR and our understanding of the tasks in the project and will note
any deviations between the documents and gaps in information where these documents need to be
updated. These notes will be discussed with the CPMU and incorporated in the inception report.
We expect that a series of Annexes will be required to complete the Inception Report. These will cover,
amongst others:
Confirmed ToR of PISC;
Records of kick-off meetings
ToRs for individual experts of PISC Team
At the kick-off meeting the above table of contents will be discussed with the CPMU and adaptations will
be made based on their requirements. The draft inception report will be discussed with the CPMU and
needs to be approved.
2.2.5 Deliverables
Estimated delivery date* Deliverable
10 January, 2018 Assessment of project documents
10 January, 2018 Records of Kick-off meetings
20 January, 2018 Inception report
*Estimated delivery date dependent on commencement date of the services
We will support the CPMU in updating the overall project implementation plan and ensure that it meets
both Vietnam governmental and WB regulations. This includes at least:
Check consistency of overall plan with subproject plans
Consistency of time-frame with respect to formal Vietnamese and WB procedures
Feasibility of the planning in relation to progress indicators
Planning risk register and propose control measures
Verify that the plan is based on plan-do-check-act
A report on the update of the implementation plan is delivered 2 months after the start of the project.
th
completed by July the 15 every year. The overall project annual work plan is then sent to WB for review,
submitted to the MPI for appraisal and to the relevant Ministries for approval.
The annual plans must be consistent with the overall implementation plan and will form the basis of
evaluation and monitoring activities. We will support the CPMU in drafting these plans. In this process the
communication with PPMUs and project owners is essential, and we need to make sure that the reports
send to the CPMU are already in line with Vietnam government and WB regulations.
In general terms we believe that long- Figure 2-2: Adaptive management cycle (Source: CDFW, 2017)
running projects with a large scope such
as this project benefit from an adaptive management approach such as shown in Figure 2-2. The key if
adaptive management is that monitoring and evaluation is an important tool to adapt the problem
definition, goals or actions that are part of the project based on the results found. Within this project we will
have to deal with several phases of the adaptive management cycle. For the subprojects which are being
prepared for construction the planning phase has already largely been concluded and these are moving
into the ‘do’ phase. For the remaining subprojects the feasibility studies need to be conducted and these
are still on the boundary of the do and the planning phase. During the implementation of the subprojects
the evaluation and response phase becomes important. The adaptive management cycle shows the steps
that are part of all the phases. It also shows that we should not be afraid to be criterial of the results of the
actions that are part of the project and that we should be willing to adapt what is going wrong.
The monitoring of project results according to the indicators set and the evaluation of the outcomes forms
an essential part of this approach.
2.3.5 Reporting
The following progress reports are foreseen to be produced as part of this task:
Report on staffing and monthly costs;
Quarterly report on implementation progress, disbursement and procurement;
Semi-annual and annual implementation reports, including implementation of safeguard measures
Mid-term evaluation report
Final report
The reporting regime is described in the POM and will be upheld during the assignment. We will support
the CPMU in preparing a planning for the delivery of these reports and assuring that contributions from
other actors are received timely. Reports of other activities are mentioned separately in the relevant
sections.
MIS are often set-up as open source systems to which all actors with the right credentials have access
and can manage the files. These are accessed through online browsers, an example of which is shown in
Figure 2-3. Such systems do need to be aligned with digital safety procedures that are in place when
dealing with governmental data. We will discuss what the best solution is for data management in this
project and propose a MIS in the inception report. The MIS will be set-up for use in the months thereafter.
Staff that will have to work with the MIS will be trained in its use.
2.3.7 Deliverables
Estimated delivery date* Deliverable
20 February, 2018 Report on update of the overall project implementation plan
20 March, 2018 MIS set-up and start of staff training
15 July, annually Annual implementation plan
Monthly Report on staffing and monthly costs;
Quarterly Report on implementation progress, disbursement and procurement;
Semi-annual and annual implementation reports, including
Semi-annually
implementation of safeguard measures
20 June, 2020 Mid-term evaluation report
20 December, 2023 Final report
*Estimated delivery date dependent on commencement date of the services
Figure 2-4 shows the location of the subprojects that will be prepared under this task and that will be
executed under task 4. Our staff are familiar with all project locations.
Figure 2-4: Location of the 10 subprojects under component 2, 3 and 4 of the MD- ICRSL project (Source MDF - World Bank)
along the coastal area belonging 2 districts: Hoa Binh, Dong Hai and Bac Lieu city.
We will use the strategy as proposed in the Mekong Delta Plan (2013) and the follow-up as confirmed in
the Mekong Delta Forums (2015, 2016 and the recent 2017) as framework for the projects. This implies
problem description that go beyond the specific need for a certaing infrastructural asset:
We will build on the general strategy of the Mekong Delta Plan
We will specify the more regional strategies of Upper Delta, Peninsula and Coastal Zone as
partially described for the review of World Bank projects in 2015/2016 (Integrated Sustainable
Livelihoods)
The problem discussion and project approach assume not only related infrastructural problems,
but the whole value chain of regional produce
The problem description needs to be viewed in the context of future development scenarios. How will the
circumstances change and what impact will they have on the perceived problem. Based on a common
understanding of these topics we will support the CPMU and PMUs in working with donor and relevant
authorities to define objectives and contents of these subprojects. We foresee that several workshops,
expert sessions and stakeholder consultants will be required to include all stakeholders.
After the content and objectives of the FS are decided upon we will provide guidance to the project owners
in setting up the FS. The FS need to be executed in accordance with the requirements set for them by the
WB and the Vietnamese government. Our team will develop an understanding of these requirements.
Finally, we will review the FS based on our understanding of the objectives of the projects and the
technical attainability of the solution suggested.
There is a strong linkage between the development of the FS and the development of Livelihood
Transformation Models (LTM) as described in paragraph 2.6. Our team will make sure that these two
activities are aligned and strengthen each other.
2.4.3 Deliverables
Estimated delivery date* Deliverable
September, 2018 Objectives and content of subprojects
March, 2019 Reviews of Feasibility Studies (development is supported by PISC)
*Estimated delivery date dependent on commencement date of the services
Project. The objective of the Dutch team was to advise on how to integrate the vision of a "prosperous and
sustainable Mekong Delta" into the projects. RHDHV was the main contributor to this Technical
Assistance Team and hence has in depth knowledge of the four proposed subprojects in An Giang, Kiên
Giang, Bến Tre and Trà Vinh. The subprojects are described in the Project Appraisal Document (PAD),
here we highlight the issues we consider to be of importance.
From an overall delta perspective it has been recommended that in the Upper Delta flood retention area
be maintained. Reverting high-dyke areas to low-dyke area would be ideal. The MDP recommends a
positive incentive be formulated to have farmers willing to work in a system with August dykes and thus
avoid the decrease of retention area.
Project objective as
ideally formulated
Green
August-dyke area with
two rice crops per year
Pink
High-dyke areas with
three rice crops per
year
Figure 2-6: Present situation An Phú (left) and Ideal future situation with completely-controlled flooding (right). Source: RHDHV &
WUR, 2016
The subproject in An Phu, An Giang Province covers an area of 22,640 ha consisting of two zones (4a
and 4b). Zone 4a is characterized as a two-rice crop area of 15,800 ha and Zone 4b is a three-rice crop
area of 6,228 ha. The subproject investments in Zone 4a include a combination of 61 km reinforced low
embankments (August dikes, which are overtopped during the seasonal flooding); 15 sluice gates to
reduce maintenance costs from overflow damages; and development of flood-based production models
(rice combined with floating vegetables and/or fish breeding) targeting an area of 1,500 ha and 2,500
households. For Zone 4b, the activities include the development of production models to support the
24 September 2017 PISC - TECHNICAL PROPOSAL WAT-R001D0.1 13
Project related
transition from three-rice crop to two-rice crop plus an alternative crop, targeting 1,200 households. By
avoiding the two-rice crop areas to be changed into three-rice crop areas and showcasing the profitability
of changing from three-rice crop to rice plus aquaculture or cash crops, the investments will help protect
and/or reclaim the benefits of controlled flooding. At the same time, the subproject’s activities will
contribute to increasing yields through improved flood-based production models and protecting high-value
assets.
The investments for Zone 1 include additional mangrove planting targeting an area of 250 ha and eco
mangrove-shrimp farming certification targeting an area of 1,000 ha and 300 households. The investments
for Zone 2 include a combination of structural (five sluice gates and culverts, dredging 28.7 km of canals)
and non-structural measures (mangrove-shrimp pilot models targeting an area of 2,500 ha and 2,500
households). Improvements will allow for better water resource management (control of salinity level,
improvement of water quality), which will contribute to increased productivity and salinity adaptation. The
investments for Zone 3 include the rice-prawn pilot models targeting an area of 180 ha and 150
households, and six community action plans
Figure 2-7: Zoning in the project area in Bến Tre. Source RHDHV & WUR, 2016
Trà Vinh Province and its Mang Títh irrigation system (around the year 2000) are strongly and typically
affected by the impacts of climate change that characterise its coastal water management regime and its
options for a sustainable management in the future. The province and its agricultural sector are strongly
affected by the dual, re-enforcing, impacts of salinity intrusion and fresh water shortages in the dry
season. The current land use patterns and dynamics are already strongly governed by increasing salinity
intrusion and declining fresh water supplies. Three, in fact four distinctive agricultural water use zones are
now discernible in Trà Vinh, with moving boundaries:
zone 1 outside the sea dyke,
sea and mangroves
zone 2 permanent brackish-
saline coastal zone;
zone 3A (lower) intermittent
fresh-brackish transition zone;
zone 3B (higher) fresh-water
zone, also further upstream.
The investment for Zone 3 includes the construction of three sluice gates (Tan Dinh, Bong Bot, and Vung
Liem). These structural investments will complete the system that protects freshwater area for valuable
horticulture to avoid high economic losses. The system being completed is also expected to allow for
better water resource management (control of salinity level, improvement of water quality) which
contribute to increased productivity and salinity adaptation in Zones 2 and 3.
The introduction of a brackish-water aquaculture requires a transition of larger tracts of land. Since rice-
shrimp and brackish aquaculture do not mingle, the only option is to work in larger blocks. One may
distinguish the following transition phases:
Transition of individual blocks. In the proposal there are some blocks indicated as pilot areas that
represent the first blocks that will be converted. These blocks need to be isolated from those that still
practise rice-shrimp. This is preferably done by the use of temporary dams. Within these blocks the
water infrastructure has to be optimised towards the use of aquaculture ponds.
Transition of the entire zone up to the Chong My canal based on the experiences of the first block.
Transition of the next zone. It may be difficult to maintain rice-shrimp in the entire area. So in future
also the zone adjacent to the Chong My canal may need to be converted to brackish water
aquaculture.
Rebuilding the water infrastructure needs to be preceded by setting up farmers cooperatives on the scale
of individual blocks. An alternative first step may be a conversion to a mangrove shrimp system. This does
not require large scale conversion to a cascading system and may be proposed as on pilot/option close to
the coast.
The subproject in An Minh-An Bien District, Kien Giang Province covers an area of 60,800 ha and also
follows a three-zoned coastal management approach. Zone 1 is a mangrove belt of 6,669 ha, Zone 2
combines a saline production zone and a brackish-water zone of 54,131 ha, and Zone 3 is the saltwater
intrusion zone. The investments for Zone 1 include a combination of structural (10 km of coastal wave
breakers) and nonstructural measures (mangrove planting along the coastline targeting an area of 250
ha). The investments for Zone 2 include a combination of structural measures (nine sluice gates) costing
and nonstructural measures (biosecure aquaculture, eco-shrimp, and rice-shrimp pilot models targeting an
area of 7,500 ha and 6,500 households). The investments will contribute to enhanced coastal protection
for the area and support transition saline-brackish production models as an appropriate alternative for
rain-fed rice and extensive shrimp farming outside the wet season, through a tide-based system of canal
cascades with separate water intake and outflow.
The activities of the CPMU in which we will assist are the following:
Review construction execution schedules for the entire subproject;
Monitor the progress of construction works and ensure that these remain on schedule;
Provide guidance on quality management measures.
Upon the start of the project working agreements will be made with PMUs responsible for the
implementation of the subprojects regarding reporting and submission of data to the CPMU. These
working agreements need to be in line with MARD and WB guidelines as detailed in the Project
Operational Manual (POM). The agreements need to ensure:
Timely delivery of reports and information meeting all the MARD and WB criteria;
CPMU to be fully informed of status of all project components, in order to inform the client in a
timely manner regarding any issues relating to project progress, with appropriate proposals for
resolving any problems, including the role of the CPMU in facilitating the PMUs in implementing
solutions;
It is critical that all project components comply with the World Bank’s Environmental Safeguarding
criteria and all relevant legal requirements in relation to health, safety and welfare and insurance.
The PISC team will ensure they develop a full understanding of these requirements from the
project outset so that they can flag issues are appropriate. However, final responsibility of
monitoring of project safeguard compliance lies with the Independent Monitoring Consultant.
Furthermore, our team will develop an internal working guideline on quality control as part of the inception
report. Our team includes staff with detailed expert knowledge about procurement and project planning,
irrigation, hydraulic works and other sectors related to the construction works.
2.5.3 Deliverables
Estimated delivery date* Deliverable
20 January, 2018 Working agreements with PMUs regarding construction of subprojects
20 January, 2018 Internal quality control guidelines (part of the inception report)
As required (expected 3 monthly as part Schedule progress reports, quality control reports
In the Technical Review Dutch Team on alignment with Mekong Delta Plan Framework our experts
already provided some guidance to different livelihood models that can be implemented in the Mekong
Delta, and an example of this is shown in Textbox 2-1.
Such livelihood models are a first step towards Livelihood Transformation Models (LTM). However, more
detail is needed on how communities are going to move from their current means of existence towards a
new approach. Finding the right incentives and ensuring that LTMs are in line with the interest of local
stakeholders is essential in this.
LTM need to be tailor made per region and need to connect that changes the results from the
implementation of the subprojects. Involvement of local stakeholders in the design and implementation of
LTMs is equally important. Implementation LTMs with the support of communities at a small scale and
expanding towards a larger scale once a LTM proofs to be successful seems the best way to ensure that
they achieve the output that is hoped for.
Textbox 2-1: Parallel brackish water cascades for aquaculture (RHDHV & WUR, 2016)
It is a sequence of ponds, carnivore, herbivore and shrimps or a sequence of carnivore and a poly-
culture of shrimp and herbivore fish.
The intake point has an ensured acceptable salinity level and a limited risk of pollution and disease.
So it is situated at the coast (constant salinity), sufficiently far from other discharge points or
potential sources of pollution.
The discharge point is preferably situated in a location that can handle pollution, especially higher
levels of nutrients. This can be an area with sufficient flushing (coastal area with currents and
waves), flushing (river discharge) or mangroves (uptake capacity by plants and by sedimentation).
The cascades are ideally situated in the form of parallel tracts. These can be parallel regarding the
whole cascade, or as far as the shrimp ponds are concerned. Other than in circulating systems,
running parallel better limits the risks of diseases.
Figure 2-10: Example of a parallel cascade system for sustainable brackish aquaculture
So the simplest systems take water from the sea and discharge water to the sea. It can also take water from
the sea and discharge into the river. A third option is a cascading system in the form of a circulation system
in which the (internal) discharge point may consists of a sufficiently large mangrove patch from where the
water is fed back into the system or an internal set of ponds with the capacity to filter and purify the water
(see below). This latter option may be attractive where it is difficult to guarantee salinity and quality of the
intake point, where tidal amplitude is too small so pumps are already needed, or if there is a strong
preference, for example by a farmer or cooperative to establish an isolated system. A circulating cascade is
also a preferred option in the case of high suspended solid concentrations.
A key item that needs to be included in the implementation plans is the indicators by which the quality and
success of the LTM implementation will be monitored. Based on these indicators we will support the
CPMU in setting up a monitoring network by which the progress and success of the LTMs can be
monitored. The provision of data and reports that need to be collected to ensure effective monitoring will
be discussed with the PMUs.
As mentioned in section 2.6.1 the involvement of local stakeholders is essential for the success of the
LTMs. We will support the Provincial PMUs is establishing agriculture cooperatives that will support the
process. In this task it is important to communicate clearly with the farmers involved on the benefits of
their involvement and make sure that they feel a sense of ownership towards the project. Furthermore, we
will support in setting up capacity building programs for local stakeholders such as farmers, village leaders
and government officials that will help them to support the project at field level.
Finally, when a LTM proves to be successful by both scoring high on the impact indicators and having the
support of the local stakeholders we will help the CPMU and PMU in findings ways to upscale the model.
2.6.3 Deliverables
Estimated delivery date* Deliverable
20 February 2018 LTM Implementation plans (development is supported by PISC)
Local capacity building and agricultural cooperatives development plan
20 March 2018
(development is supported by PISC)
Every six months LTM implementation progress reports
*Estimated delivery date dependent on commencement date of the services
The subproject will develop a ‘Real-Time Operation System for Hydraulic Infrastructure in the Mekong
Delta’. This consists of (a) updating the hydraulic, agricultural, and monitoring databases; (b) upgrading
existing delta water resource models; (c) simulating different flood and drought scenarios to develop
operational protocols; and (d) enhancing the sharing of information, communication, and warning systems.
Forecast information serves the management and operation of works in the flood season (long-term
forecasting in early flood season, forecasting the flood peak period, and forecasting flood withdrawal).
Also, it supports the management and operation of works in low-flow season (long-term forecasting in
early low-flow season, forecasting lowest flow period, and forecasting less severe salinity period, end of
salinity intrusion)
The envisioned tool in this sense bears resemblance to Decision Support Systems (DSS). We see several
projects related to DSS being implemented in Vietnam and the Mekong Delta especially, such as the
“Technical Assistance to Upgrade the Decision Support System and Support Water Resources Planning
Studies for Sesan and Srepok River Basin” that will be implemented under the WB funded Mekong
Integrated Water Management Project. We consider it important that such ICT based projects are aligned,
and that a proliferation of data-management systems which are not able to communicate with each other
is prevented. Other projects in which DSS tools have been or will be developed are:
Subproject 4 (under the Component 1 of MD-ICRSL) on Mekong Delta Database Center: the
subproject will be implemented by MONRE to build the integrated database related to water
resources and environment for analyzing, asssessing and informing decision makers about
sustainable development in context of climate change.
Subproject 6 (under the Component 1 of MD-ICRSL) on Mekong Delta Comprehensive
Infrastructure Development System for Climate Change Adaptation and Socio-economic
Development. Under this subproject MPI will develop the Decision Support Framework (DSF) to
support the analysis and assesssment of the proposed development scenarios and investment
program (with priority, “no-regret” and “low-regret” measures).
Decision Support Tool (DST) for the Mekong Delta Coastal Protection Measures: this project is
completed in July 2017 by Dutch Consortium led by HaskoningDHV to develop DST for the Ca
Mau and Kien Giang Provinces.
Hoi An Flood Early Warning System (funded by ADB). This project will implement one of the most
urgent non-structural measures which is the installation and upgrading of a comprehensive flood
forecasting and warning system (FFWS) for Vu Gia-Thu Bon river system, combined with a
Decision Support System (DSS). The FFWS that has been identified as an urgent need in the Vu
Gia - Thu Bon basin aims at improving the procedures for flood warning and timely evacuation,
while the DSS will enable the analysis of both structural and non-structural measures regarding
flood management, and the study of water shortage problems and/or salinity intrusion during dry
periods.
The Consortium consisting of HaskoningDHV, Deltares (lead) and Safege (French) is selected to
execute this project which is expected to commence the service in October 2017.
Based on this implementation plan we will support CPMU in preparing TORs for data collection, surveys
and establish specialized database informing forecasts. Based on the responses to these TORs we will
help the CPMU to select a forecasting tool that is able to process data that becomes available from
equipment and monitoring station in the Mekong Delta and can be aligned with other initiatives in this field.
The PDO shows that the forecasting tool needs to be able to interact with several models:
Hydraulic model MIKE 11;
Water quality model MIKE11;
Model on tidal prediction and saline line prediction (MIKE21/TELEMAC);
SCADA;
Meteorological, hydrological models;
Models on forecasting of production and water demand.
Our staff has extensive experience with all these models and will be able to provide detailed advice on
how to deal with such requirements. Finally, we will support the CPMU during sub-project implementation,
including the related procurement and contract management activities as outlined in section 0.
Textbox 2-2: Model knowledge RHDHV
The direct and indirect economic and social impact of flooding is huge. Climate change and specifically sea
level rise further enhance flood risk in deltas. We focus on the planning, modelling and design of solutions to
reduce flood risk for public and private clients in delta areas. Royal HaskoningDHV has a very strong and long
track record in flood risk reduction delivered by ICT applications such as hydrodynamic and morphological
modelling studies with SOBEK, MIKE11 and MIKE21 software of DHI, WAQUA 2D flow model and Delft3D
software of Deltares, Matlab, SCADA and GIS geoprocessing. Especially in Vietnam we have a hydraulic
modelling group, consisting of experienced hydrodynamic modellers who undertake a wide range of hydraulic
modelling projects from local Vietnam-based assignments through to major international multi-disciplinary river
basin, port and coastal engineering projects. They are familiar with numerical modelling of flow phenomena
and related processes in rivers, coastal areas and seas (e.g. waves, currents, sediment transport and
morphology), and have strong knowledge on MIKE software packages.
We have been involved in numerous large coastal and river flooding projects at all continents of the world.
Recent projects have been executed in the United Kingdom, the Netherlands, New Orleans, Trinidad,
Colombia, Mozambique, Azerbaijan, Thailand, Australia and Vietnam. We have delivered the full chain from
initial ideas to project implementation for public and private clients through sketch and feasibility studies,
conceptual and detailed designs and also supervision of projects. The returns on these investments of our
clients have become clear during extreme events in the years after implementation of these projects. We will
make this knowledge available in the development of the forecasting tool.
2.7.3 Deliverables
Estimated delivery date Deliverable
As required Subproject 1-5 implementation plan (development is supported by PISC)
As required Selection and implementation of forecasting tool
*Estimated delivery date dependent on commencement date of the services
This training plan will be updated annually, based on insights on capacity building needs that have been
developed in the previous year. The training program at least includes a part on training in WB
procedures, specifically in procurement, contract management and financial management. The training
plan will furthermore at least assess the following points:
Knowledge gaps and learning objectives identified;
Suggested training programs;
Suggested staff for training programs;
Timing and location of execution
Cost estimates
Based on the annually updated training plans we will support the preparation of Terms of References and
keep track of the activities performed, including the number of participants and the learning objectives
realised. The perceived effectiveness of training programs will be evaluated and outcomes will be sued to
shape the update of the training plan for the next year.
The table below provides some initial ideas about the types and content of training that can be delivered.
This table will be reviewed and amended during the development of the training plan. Participants of the
training sessions will also be decided at this point.
Table 2-1: Initial suggestions for training programs
Training topic Content
The training is based on the WB’s project management procedures and covers a
Overall WB project comprehensive introduction of the procedures as well as some specific aspects such as design,
management construction, procurement, and financial management. Through this training it will be achieved
participants will have a full understanding of the requirements of WB’s project management
The contents are mainly: i) preparation of supervision monthly report and its use; ii) preparation
of quarterly progress report for each component; and iii) preparation of total project progress
Project progress reports. When carrying out the training, full preparation will be made so all participants can be
control actively involved. It is proposed that at first intensive training will be in the form of a seminar
and workshop and should be conducted with subsequent guidance to be offered during
preparation and use of the reports.
Claim and variation Contents of the training will mainly include: i) establishment of claim/variation procedure and
procedure implementation with special emphasis placed on the type and characteristics of the contract,
the coordination of nationally adopted documents, and WB contract; ii) the emphasis and
principle of review for claim and variation; iii) valuation basis for claim/variation; and iv) format
of variation order.
Contents of training: i) measurement basis, principle and method with special attention should
Measurement, loan be paid to the relationship between technical specification, notes to BOQs, and that between
disbursement pro- special conditions and general conditions; ii) format of monthly statement. It is required that
cedures, financial following this training the resident engineers should fully know how to use and IAs should
management and understand. iii) WB’s disbursement policies, guidelines, practices, and procedures. The four
payment pillars of an efficient disbursement operation are: a) funds flow structure; b) disbursement
arrangements; c) staff capacity and systems, and d) internal controls.
Training on project procurement will be conducted according to the project progress. To meet
Project the requirements of the WB’s project management, trainings will be conducted on civil works
procurement and goods procurement respectively so that the participants will be very familiar with the
requirements of project procurement.
Technical According to the requirements of WB’s management, we will adopt typical examples in the
specifications of training and work out crucial points of the method for the preparation of technical specifications
bidding documents of bidding documents and Bill of Quantities on the basis of final design documents approved by
and BOQs relevant units.
Project Contents of training include: differences between monitoring and evaluation; logical framework
performance as basis for evaluation; evaluation design models (experimental, quasi-experimental, case
monitoring and studies); statistical concepts; random and non-random sampling; stratification and different
evaluation sample selection methods; data evaluation; presenting results.
Figure 2-12: Graphical design of the Mekong Delta Plan (front page) by RHDHV
2.8.5 Deliverables
Estimated delivery date* Deliverable
20 February, 2018 Overall training plan
Annually Annual updated training plan
As required Training material
*Estimated delivery date dependent on commencement date of the services
In order to be able to monitor and manage the project effectively, it is important maintain a realistic and
up-to-date procurement plan and the Consultant will support the CPMU and different PMUs to review the
procurement plans. The Procurement Plan for the first 18 months has been prepared and agreed during
the project preparation and we will review this plan at the start of the services based on the available
information and the progress achieved prior to the start of the PISC services. The Procurement Plan will
thereafter be reviewed and updated on an annual basis or if required in case of major developments the
Procurement Plan can be updated at intermediate periods. After updating the Procurement Plan we will
assists the PMUs to obtain the World Bank’s no-objection.
2.9.2 Procurement
The Procurement Plan will be the basis for the overall management of procurement activities. The
management of procurement activities will cover the following aspects for which we will provide assistance
and support PMUs to:
Procurement will follow World Bank guidelines and the relevant provisions in the Financing Agreement
except when contracts (goods, works or services) are 100% financed from the domestic funds. In these
cases procurement procedures following the national Procurement Law and relevant Decrees will be
adopted. Compliance with World Bank and National procedures is key to prevent any undue delays. Not
all parties and organisations might be fully familiar with the procedures that have to be applied. It is
essential to ensure that all parties involved have sufficient knowledge and an understanding of the
procedures. Ensuring compliance with these rules and procedures must be viewed as a key consideration
and we therefore plan to address this at the earlier stage of the project
The World Bank standard bidding documents and requests for proposal will be used for all packages that
are (partially) financed from World Bank funds and therefore most of the components will be standard that
will not require input from the PISC. Besides contractual issues such as the Special Conditions of
Contract, the support and assistance of the PISC will focus on technical documents for the procurement of
works and goods and Terms of References for services. This will cover:
Goods packages: review of technical specification of goods to ensure that appropriate bids can be
prepared by potential suppliers.
Works packages: the review of works packages will be more extensive and will cover detailed
design, quantities, technical specifications, and cost estimates;
Service packages: review of the Terms of Reference for the services which will focus on
consistency and completeness of the ToR.
Another important aspect will be the review of cost estimates. The cost estimate of each package will be
reviewed on the basis of the current price, following the stipulations on norms, prices and relevant
guidance documents for preparation of construction cost estimate in Vietnam; and complying with the
Regulations on Official Development Assistance (ODA) management issued together with the Decree No.
131/2006/ND-CP dated 9 November 2006 of the Government of Vietnam.
The support for the procurement process will cover the complete procurement cycle from planning, the
preparation of bidding documents and requests for proposals, support during the bidding process, the
evaluation of bids and proposals until the award and finalisation of the contract. During this process it is
important to monitor progress and therefore we will advise the PMUs to establish a tracking system for the
review of the bidding documents and to follow up on milestones of the procurement process with special
emphasis in the bidding process. This system aims to monitor and manage the overall process of the
bidding document, milestones and approvals.
We will also assist the PMUs and the CPU to prepare project progress report as requested by WB and
assist on review of disbursements. The Consultant will assist the PCU/PMUs with the administration of
contract performance, in both construction progress and quality control aspects.
Based on our experience, we will assist the PMUs with progress and quality control. We suggest
establishing a management system that includes:
regular meeting among the PCU/PMUs, Contractors, Supervision Company and the Consultant
Team;
specific reporting on issues of project progress and engineering quality;
regular site visits to inspect progress and quality;
a communication plan which clearly identifies a designated person in charge for the PMUs and
other parties like the Design Consultants, Construction Company, and Supervision Company;
An important part of contract management is the supervision on site for which supervising consultants will
be engaged. Nevertheless, we suggest that the PMUs together with the PISC will carry-out joint site visits
from time to time on a regular basis. This will enable the PMUs to review progress on site and discuss and
resolve issues.
The Consultant will participate in monthly and quarterly meetings to discuss with the PCU/PMUs, or
personnel from design consultants, construction Supervision Companies, and contractors on the progress
of each contract package and other issues to be addressed so as to facilitate the problems solving and
project implementation, including preparation of minutes for each meeting.
Payment processes are also essential to maintain construction progress. The importance of the payment
process will be explained to all parties involved and the responsibilities of each party will be defined. In
addition, we will review payment certificates with an emphasis on:
whether the payment complies with contract documents;
for lump sum items, whether the payment percentage is appropriate in relation to progress;
for advance payment, whether the repayment is in accordance with specifications.
2.9.4 Deliverables
Estimated delivery date Deliverable
20 March, 2018 Updated project procurement manual
Input towards report on implementation progress, disbursement and
Quarterly
procurement (part of quarterly report)
Annually Updated Procurement Plan
*Estimated delivery date dependent on commencement date of the services
The update of the financial management and disbursement chapter will go hand in hand with the
development of a financial management system. We consider it important to have a properly working
financial management system to monitor project finances. When such as system is set up properly at the
start of the project, it will save a lot of time during monitoring and the production of financial reports.
Based on our experience on WB financed projects, a monthly statement template will be proposed which
will be easy to understand and use for the cost control for related parties (ie, Contractors, Resident
Engineers and the PMUs). The template will clearly show disbursement of advance payment, repayment
of advance payment, payment out of BOQ, payment of claim/variation, advance payment for materials to
be incorporated into permanent works and retention money.
During the update of the financial management manual and the set-up of the financial management
system we will pay close attention towards the requirements of the World Bank and the Vietnamese
Government. If any conflicts between these requirements are noted they will be flagged immediately and
discussed with the client and WB as appropriate.
Prior to the development of such reports we will discuss the template and auditing procedures with the
independent auditing consultant to guarantee a smooth auditing procedure.
Our staff will timely flag any issues that arise with the finances of the project. We will also ensure that they
are fully knowledgeable of the World Banks and the Vietnamese Government’s rules and regulations on
fraud and corruption. We will clearly set-out the procedure for reporting expected issues in this respect to
them.
2.10.3 Deliverables
Estimated delivery date Deliverable
20 March, 2018 Updated financial management and disbursement manual
20 March, 2018 Financial management system operational
Semi-annual and annual Semi-annual and annual financial report
*Estimated delivery date dependent on commencement date of the services
3 Work plan
3.1 General
Much of the approach followed in the work plan is already described in the previous chapter. The project is
divided in three general work-packages:
Al three of these work-packages has strong interrelations with the others. Overall project management
activities are focussed on keeping track of -and steering where required- the progress that is made with
tasks that are part of the subproject preparation and implementation activities. Capacity building activities
need to be an integrated part of all this to ensure long term sustainability of the project.
Tech-5 provides a detailed work schedule which shows that there are a number of support-tasks which
require continuous input from the PISC, such as general project management, monitoring of
implementation progress and support in financial management and procurement. Execution of such
ongoing tasks will be based on three pillars:
Clear communication: Regular meetings with the CPMU to discuss progress of the activities and
identify where support is needed and how the PISC can best provide this;
Cooperation: The CPMU and PISC have a joined responsibility for the execution of the tasks. We
aim to build a setting in which the CPMU and PISC are complementary to each other. We feel that
personal connections are important in this respect. That is why at the start of the project we will
pay attention to introductory activities and aim to create connections between staffs of both
parties.
On-the-job training: As part of the cooperation we will involve CPMU staff in our supporting
activities where possible and allow to them to understand the tools and procedures used.
The coding in
Table 3-2 below corresponds with the coding in Tech-5 and 6. Some deliverables are not coded (N/A)
because they are not at the same level as the other deliverables, but are included as important
milestones.
Table 3-1: Abbreviation of staff used in table below
Abbreviation Position
AE Agriculture expert
FE Forestry expert
Table 3-2: Deliverables to be produced as part of the services, planning of delivery and staff involved. Deliverables that are
mentioned in chapter 6 of the ToR are indicated with an ‘x’ in the last column.
Tech-6 Estimated In
Deliverable name PISC Staff involved
code delivery date ToR
Task 1: Mobilization and start-up
N/A 10 January, 2018 Assessment of project documents TL, CTL, PPE
N/A 10 January, 2018 Records of Kick-off meetings TL, CTL
D-1 20 January, 2018 Inception report All project staff x
Task 2: General Project Management Support
D-2 20 February, 2018 Report on update of the overall project implementation plan TL, PPE, FNE x
D-3 20 March, 2018 MIS set-up and start of staff training TL, TS1, 2 & 3
D-4 15 July, annually Annual implementation plan All project staff
D-5 Monthly Report on staffing and monthly costs; TL, CTL, PPE, FNE x
Report on implementation progress, disbursement and
D-6 Quarterly All project staff x
procurement;
Semi-annual and annual implementation reports, including TL, CTL, IHE, AE, FE,
D-7 Semi-annually x
implementation of safeguard measures AQE, TS1, 2, 3
D-8 20 June, 2020 Mid-term evaluation report All project staff x
20 December, TL, CTL, IHE, AE, FE,
D-9 Final report x
2023 AQE, TS1, 2, 3
Task 3: Preparation of next-phase subprojects
TL, CTL, IHE, AE, FE,
N/A September, 20181 Objectives and content of subprojects
AQE, TS1, 2, 3
TL, CTL, IHE, AE, FE,
D-10 March, 20191 Reviews of Feasibility Studies
AQE, TS1, 2, 3
Task 4: Support implementation of construction works
Working agreements with PMUs regarding construction of TL, CTL, IHE, AE, FE,
N/A 20 January, 2018
subprojects AQE, TS1, 2, 3
TL, CTL, IHE, AE, FE,
N/A 20 January, 2018 Internal quality control guidelines (part of the inception report)
AQE, TS1, 2, 3
Schedule progress reports, quality control reports (part of CTL, IHE, AE, FE, AQE,
D-11 Quarterly
quarterly report) TS1, 2, 3
Task 5: Support implementation of livelihood transformation models and non-structural activities
TL, IHE, AE, FE, AQE,
D-12 20 February 2018 LTM Implementation plans
TS1, 2, 3
D-13 20 March 2018 Local capacity building and agricultural cooperatives CTL, IHE, AE, FE, AQE,
1
Delivery date is based on estimation and will be adapted when detailed project planning and progress requirements have been
developed in the inception phase.
24 September 2017 PISC - TECHNICAL PROPOSAL WAT-R001D0.1 31
Project related
Tech-6 Estimated In
Deliverable name PISC Staff involved
code delivery date ToR
development plan TS1, 2, 3
TL, IHE, AE, FE, AQE,
D-14 Every six months LTM implementation progress reports x
TS1, 2, 3
Task 6: Support Implementation of subproject 1-5
TL, CTL, IHE, AE, FE,
D-15 20 February 20181 Subproject 1-5 implementation plan
AQE, TS1, 2, 3
TL, CTL, IHE, AE, FE,
D-16 December 20181 Selection and implementation of forecasting tool
AQE, TS1, 2, 3
Task 7: Training / Workshops
TL, CTL, IHE, AE, FE,
D-17 20 February, 2018 Overall training plan x
AQE, PPE, FNE
20 February, TL, CTL, IHE, AE, FE,
D-18 Annual updated training plan
annually AQE, PPE, FNE
N/A As required Training material All project staff
Task 8: Procurement and Contract Management
D-19 20 March, 2018 Updated project procurement manual TL, PPE
Input towards report on implementation progress, disbursement
D-20 Quarterly TL, CTL, PPE
and procurement;
D-21 Annually Updated Procurement Plan TL, PPE
Task 9: Financial Management
D-22 20 March, 2018 Updated financial management and disbursement manual TL, FNE
N/A 20 March, 2018 Financial management system operational TL, FNE
Semi-annual and
D-23 Semi-annual and annual financial report TL, CTL FNE
annual
The approach towards setting up a Management Information System (MIS) which will process data is
described in section 2.3.6. Simultaneous to setting up this MIS we will develop data provision forms and
formats which will be used to gather data from PMUs and other actors. This will ensure that data received
is consistent from all providers and includes the information required for synthesizing the data into overall
project reports.
1. Risk Register: A Risk Register will be developed and will be set up and maintained throughout the
project as a database of all risks associated with all subprojects and the overarching programme.
It will include an assessment of the likelihood and severity of the risks and the planned responses
for risk reduction and mitigation.
2. Risk Identification and Ranking: The risks need to be identified and their severity assessed in a
way that is consistent across all parts of the project. The planned responses need to have a
consistent system for assessing and prioritising actions. While special risk studies will be required
in various areas, such as construction, environment and social, these must be carried out and
consolidated within a coherent framework.
3. The risks (or risk events) will be examined in terms of their likelihood of occurrence in the duration
of the project, and the severity of the impacts. The second of these requires some measure or
ranking which is as objective as possible. Severity of impact is best seen in relation to the degree
to which the objectives of the stakeholders may be compromised. While engineering, financial,
environmental, social impacts need to be monitored separately, for reporting purposes each can
be related back to a common scale of severity.
4. Risk Response Plans: For risks which are deemed to be critical in the Risk Register, a Risk
Management Plan will be developed identifying the responsibilities of all parties in the event of the
risk being realised. The plan will include the mobilisation of materials and resources and for
communications within the project team, with the Client, Government agencies and emergency
services, general public and the media, as appropriate.
5. Contractor's Risk Management: We would expect the contractors for each subproject to develop
their own Risk Management systems. We would carry out joint assessments with the contractors
and agree responsibilities for managing risk in risk response plans, in accordance with the terms
of their Contracts. However, the CPMU has a broader range of interests than the contractors, so
as PISC we will prepare an independent risk review of the project for the CPMU and provide
regular updates as a key part of the quarterly project reports.
6. Updating and Reporting: The Risk Register and Risk Response Plans will be regularly updated
and monitored throughout the project, to meet the changing project status and changing external
circumstances. Any significant variances from the programme, performance of the Contractor or
financial status of the project, and any external events not originally anticipated will be subject to
risk assessment with recommendations for an appropriate response.
The Project Appraisal Document already takes note of the following substantial risks for the programme:
Sector strategies and policy risks: the climate-related policy issues in the Mekong Delta are
complex as they cover a range of sectors.
Technical design risks: the main technical challenge is the farmer livelihood transitions that are
enabled by the infrastructure
Institutional capacity risk: adopting a cross-sectoral and regional approach within the relatively
rigid administrative systems in Vietnam will be a challenge
Fiduciary risks: decentralization in the project design, which requires greater capacity and
accountability
Some other risks are identified as moderate. We would like to amend this risk assessment with at least
one other risk:
Delays - Establishment of Approval and Payment Procedures: Experience has shown us that one
of the most common causes of contract delays results from delay of payments to the contractors,
which adversely affects their cash flow and consequently the construction progress. The methods
of measurement and payment of the works are specified in the tender and contract documents
and the general procedures for payments are specified in the general conditions. However, time
periods for payment procedures and formats of statements and certificates can be customised to
suit project requirements. We will analyse the documents and the breakdown of the programme of
the Works of the contractors and will recommend appropriate procedures and programmes for
applications, submissions, certifications and payments. It is important that all parties are aware of
their role and responsibilities related to timely processing of payments. We will take a proactive
approach in whatever measures prove desirable, to assist the various parties and to facilitate
smooth processing of payments, which will minimise the risk of disruption of physical progress.
These and other risks will be included in the risk register and managed through the approach described
above.
It is understood that the Ministry of Agriculture and Rural Development (MARD) will act as executing
agency for the coordination of the entire ICRSL project. A Project Steering Committee will provide
guidance to the implementation of the project and the Central Project management Unit (CPMU) will be
responsible for the overall project management.
At local level the Provincial People's Committees (PPC) will assign their DARD as Subproject owner and
Provincial Project Management Units (PPMU) will be formed. The Irrigation Construction Management
Board No. 10 will be project owner of Subproject 1 in Component 2, Subproject 6 in Component 3 and will
hence also have a Project Management Unit (PMU).
The detailed responsibilities and tasks of the different actors are described in the Project Operation
Manual (POM) which will be an important reference document for those involved in project management.
The Project Implementation Support Consultant (PISC) will mostly interact with the CPMU and the
different PMUs. As part of the responsibilities of the PISC it is however expected that the PISC also needs
to discuss the status of the project with the other actors and involve them in decision making when
appropriate. The PISC will thus support the CPMU and PMU’’s with the implementation of the project and
its subprojects, according to schedule, while project outputs are achieved in accordance with requirements
of the donor and regulations of Vietnam Government.
For this project, RHDHV Vietnam is in the lead and will be supported by our office in the Netherlands. Both
VMEC and INTEC will act as sub consultants to RHDHV. The staff selected for the PISC team will work
as a single team with no differences between the staff members from the different companies. All team
members will report to the team leader and backstopping is also arranged by our delegated Project
Director from the Vietnam office, with support from the HaskoningDHV the Netherlands.
Figure 4-2: Organisational set-up of Mekong Delta Integrated Climate Resilience and Sustainable Livelihoods Project, Component 2, 3, 4 and sub-project 5 of Component
Figure 4-3 shows the organisation of personnel and their division over the three work groups. The division
is an indication of the work group in which most of their work will take place. In practice, all team members
are likely to work on all work packages and offer support where required.
The work group which executes the ICRSL project management and general tasks is formed by the Team
Leader and senior expert in water management Henry Clark. Henry has extensive experience with project
management support projects for international financing institutes, including experience in Vietnam. Henry
will be supported by Truong Tuan Duy, who has worked extensively on the Mekong Delta Plan and the
resulting projects.
Project management
Project Director
Team Leader: Henry Clark
Co-team Leader: Truong Tuan Duy
Project management support staff
Work group: Subproject preparation and Work group: Capacity building tasks
implementation tasks
Team Leader: Henry Clark
Team Leader: Henry Clark Co-team Leader: Truong Tuan Duy
Co-team Leader: Truong Tuan Duy All other project staff
Irrigation/Hydraulic work expert: Tran Ba Tu
Agriculture expert: Tran Viet Dung
Forestry expert: Nguyen Chi Thanh
Aquaculture expert: Kim Van Van
Technical support staff: Nguyen Thi Hanh Tien,
Tran Thanh Duc, Truong Van Hai Van
All staff members will report to the Team Leader who will also facilitate communication and cooperation
between the team members. We consider it important that team members are up-to-date with each other’s
activities and able to support each other when required.
Our team composition consists of a good mixture of senior and medior experts. The key team members
are very experienced people who will be able to provide optimal support to the CPMU and PMU based on
their extensive experience. The staff members of the different consortium parties are selected solely
based on their suitability for the positions, resulting in the strongest team that these companies together
are able to form for this project. We are confident that this team can provide the support in the
implementation of the ICRSL project that is required.
Expert's input (in person/month) per each Deliverable (listed in Tech-5) Total time input*
N Name
Position D-1 D-2 D-3 D-4 D-5 D-6 D-7 D-8 D-9 D-10 D-11 D-12 D-13 D-14 D-15 D-16 D-17 D-18 D-19 D-20 D-21 D-22 D-23 Home Field Total
Key experts
Senior expert in water Home 0.5 0.5 0.5 0.5 1 3
K-1 Henry Clark 33
management - Team Field 2 2 1 2 2 2 1.5 1.5 2.5 1 1 1 0.5 0.5 1 1.5 1 2 1 1 2 30
Irrigation expert - Co- Home 1 1 2 4
K-2 Truong Tuan Duy 61
team leader Field 2 2 5 12 6 6 2 4 1 2 2 3 3 2 2 2 1 57
Home 1.25 1 2 4.25
K-3 Tran Ba Tu Hydraulic work expert 45.25
Field 1 2 2 2 3 3 3 4 3 2 8 7 0.5 0.5 41
Home 0.5 0.75 1 1 1 4.25
K-4 Tran Viet Dung Agriculture expert 45.25
Field 1 2 2 3.5 2.5 3 5 4 5 4 4 2 2 0.5 0.5 41
Home 0.5 0.75 1 1 1 4.25
K-5 Nguyen Chi Thanh Forestry expert 45.25
Field 1 2 2 3.5 2.5 3 5 4 5 4 4 2 2 0.5 0.5 41
Home 0.5 0.75 1 1 1 4.25
K-6 Kim Van Van Aquaculture expert 45.25
Field 1 2 2 3.5 2.5 3 5 4 5 4 4 2 2 0.5 0.5 41
Subtotal: 24 251 275
Non-Key experts
Procurement and planning Home 0.5 0.5 2 1 4
NK-1 Pham Van Thang 44
expert Field 2 1 1.5 2 1 1.5 3 3 4 14 7 40
Home 0.5 0.5 2 3
NK-2 Pham Thi Thu Hien Financial expert 33
Field 2 1 1 1.5 1 1.5 3 3 4 12 30
Technical Supporting staff Home 2 2 4
NK-3 Nguyen Thi Hanh Tien 61
1 (aquaculture) Field 2 1 4 4 5 5 6 6 4 8 4 6 1 1 57
Technical Supporting staff Home 2 2 4
NK-4 Truong Van Hai Van 61
2 (agriculture) Field 2 1 4 4 5 5 6 6 4 8 4 6 1 1 57
Technical Supporting staff Home 2 2 4
NK-5 Tran Thanh Duc 61
3 (irrigation) Field 2 1 4 4 5 5 6 6 4 8 4 6 1 1 57
Subtotal: 19 241 260
Total: 43 492 535
* "Home" time input is seen as time spend at the expert's home office, whereas "Field" time is seen as time spend at the project office in Can Tho or in the area of project implentation
List of deliverables
D-1 Final inception report
D-2 Report on update of the overall project implementation plan
D-3 Management Information System operational and start of staff training
D-4 Annual implementation plan
D-5 Reports on staffing and monthly costs
D-6 Quarterly report on implementation progress, disbursement and procurement
D-7 Semi-annual and annual implementation reports
D-8 Mid-term evaluation report (English and Vietnamese)
D-9 Final report
D-10 Reviews of Feasibility Studies
D-11 Schedule progress reports, quality control reports (part of quarterly reports)
D-12 LTM Implementation plans
D-13 Local capacity building and agricultural cooperatives development plan
D-14 LTM implementation progress reports (part of semi-annual progress report)
D-15 Subproject 1-5 implementation plan
D-16 Selection and implementation of forecasting tool (supported by PIC)
D-17 Overall training plan
D-18 Annual updated training plan
D-19 Updated project procurement manual
D-20 Procurement and contract mangement progress report (part of quarterly report)
D-21 Updated procurement plan (annually)
D-22 Updated financial management and disbursement manual
D-23 Semi-annual and annual financial report
Project related
KEY EXPERTS
Education:
1971: B.Sc Degree in Civil Engineering at Sunderland Polytechnic, UK. General civil engineering
subjects including hydraulics, hydrology and construction management.
1973: M.Sc in Engineering Mechanics specializing in computational methods for river flow modelling,
embankment design and sediment transport.
packages for repairs to main barrage gates, installation of 25km of concrete/masonry/piling for
canal lining to primary and secondary canals, and upgrading of the drainage system. Season-
long system shutdowns needed while the work was carried out.
• Bajo Irrigation Project (4,000ha rehab/upgrade and extension, South Sulawesi): 4 packages for
construction of new concrete weir (120m long, 4m high), masonry lining to existing canals
Positions held: Co-Team Leader (covering 3 Provinces, based in Makassar) for consultant team
advising Provincial PU staff
Activities performed:
(i) General management support to Provincial PU with contract document preparation, tendering
procedures, tender evaluation, checking contractor’s work plans, measurement of quantities
and approval for payments, budget plans, monitoring progress.
(ii) Assistance to Provincial PU with financial management, and disbursement activities
(iii) Assistance to PU with preparation of contract documents and tendering of various construction
packages.
(iv) Preparation and submission of Consultant’s Inception Report.
(v) Assistance with farmer guidance for improvements in agricultural production, diversification of
crops.
(vi) Assist Provincial PU with planning for operation and maintenance of the systems including
innovative water saving measures.
(vii) Assist DGWRD and Provincial PU in preparations for follow-on work including project
identification, feasibility studies and detailed designs.
(viii) Assistance to Provincial PU and contractors in creative planning for co-operative cropping
season disruption using accelerated construction methods and innovative methods and
materials.
(ix) Assistance to Provincial PU in organizing farmers into Farmer Groups to increase their
participation in managing the schemes after construction.
(x) Assisted PU staff in organizing agricultural demonstration plots to give guidance to famers in
best practice agricultural techniques and in on-farm water management.
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes
myself, my qualifications, and my experience, and I am available to undertake the assignment in
case of an award. I understand that any misstatement or misrepresentation described herein may
lead to my disqualification or dismissal by the Client, and/or sanctions by the Bank.
19/09/2017
Henry A Clark
19/09/2017
Education:
1981: B.Sc Degree in Civil Engineering at Water Resources University, Hanoi, S.R. Vietnam.
Specialisation in Design of Hydraulic works.
Publications: Truong Tuan Duy, Frits J.H.Dirks, Ger de Lange, Ho Long Phi, Ruben Dahm, Land
subsidence: the flooding threat in coastal cities from within, A case study in Ho Chi Minh City,
th
paper for International Association for Hydro-environment Engineering and Research (IAHR) 36
World Congress at The Hague, The Netherlands, on 28 June to 3 July 2015.
Language Skills (indicate only languages in which you can work): Vietnamese, English
Extra works (May to July 2010): including (i) assisting in preparation of PAM (Project Administration
Manual), (ii) preparation of the bid documents for turnkey contract of Co Ngua Pumping Station, and
(iii) involved in preparation of the RFP of QCBS package of detailed design of WRU New Campus.
Name of Assignment or project: Re-hydrating the Earth Project Vietnam.
Year: June 2007 to September 2008
Location: Ninh Thuan Province, Vietnam
Client: Partners for Water (The Netherlands)
Main project features: Implementation of the sustainable and small scale water retention techniques
for re-hydrating the earth by construction of the trenching system and 2 dams. Project components:
detailed design and construction of designed works; socio-economic studies and assessment, EIA and
social analysis.
Position held: Irrigation Engineer
Activities performed: assisted project leaders in contract negotiations, and directly involved and
assisted Team Leader to coordinate all activities of the project implementation: data collection,
baseline survey, site visits, stakeholder discussions and meetings, detailed design of trenches and
dams, supervision of construction works, and project monitoring and measuring.
Name of Assignment or project: WB-Funded Northern Delta Transport Development Project.
Year: July 2007 to April 2008 (part-time work)
Location: Hanoi and Northern Delta’s Provinces.
Client: PMU-Waterways / Vietnam Inland Water Administration / Ministry of Transport (MOT)
Main project features: Preparation of feasibility study and preliminary engineering design for the WB
Loan Project to develop the transport system (mainly waterways and roads) in the Northern Delta
Vietnam; The study includes the RAP, EIA, social impact assessment, institutional aspects.
Position held: Civil Engineer /Transport Expert
Activities performed: assisted project leaders in contract negotiations, and directly involved and
assisted Team Leader to coordinate all activities of the project implementation: data collection, site
visits, discussions and meetings, preparation of inception reports, interpreter for the workshops.
Name of Assignment or project: WB-funded Mekong Transport Infrastructure Development Project.
Year: December 2005 to June 2006 (2 manmonths, various short assignments)
Location: HCMC & Mekong Delta Vietnam.
Client: Highway # 1 Rehabilitation Project Management Units (PMU1) / Ministry of Transport (MOT)
Main project features: Preparation of feasibility study and preliminary engineering design for the WB
Loan Project to develop the transport system (mainly roads and inland waterways) in the Mekong
Delta; The study includes the RAP, EIA, social impact assessment, institutional aspects.
Position held: Civil Engineer/Transport Expert
Activities performed: involved in formulation of the river/canal bank protection measures;
improvement measures for bridges lifting and construction along the waterways; translation of
project reports and interpreter for the stakeholders workshops.
Name of Assignment or project: ADB Appraisal Mission of the Central Region Water Resources
Project.
Year: October 2005 (3 weeks)
Location: Hanoi and Hue City
Client: Asian Development Bank, in Manila, The Philippines.
Main project features: Appraisal Mission for ADB Loan Project to finance for six subprojects that will
Assistant to Project Director of Feasibility Study for the Secondary Canal Development Project for
three represented areas in the Mekong Delta. The main objective of the study is to determine optimal
plan for integrated development of the O Mon-Xa No, Ba The-Tri Ton and Bac Dong areas in the
Mekong Delta. The study components include: improvement of the irrigation and drainage system,
flood control, optimal land-use plan, rural infrastructure development plan, institutional arrangements,
EIA study and economic/financial analysis
Certification:
07/09/2017
Education:
Degrees Awarded Institution Dates of Obtainment
B.E., Civil Engineer (Water The Polytechnic University of Ho Chi 1979
Resources) Minh City, Vietnam
Master of Science, Engineering Galway University, Ireland 1991
Hydrology
Language Skills:
Speaking Reading Writing
Vietnamese Mother Tongue Mother Tongue Mother Tongue
English Excellent Excellent Excellent
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my
qualifications, and my experience, and I am available, as and when necessary, to undertake the assignment
in case of an award. I understand that any misstatement or misrepresentation described herein may lead to
my disqualification or dismissal by the Client, and/or sanctions by the Bank.
st
Name of Expert Date: August 31 , 2017
TRAN BA TU
th
Name of authorized Date: September 24 , 2017
Representative of the Consultant
N i*i
5 oe
>. o
=
"b
!
iI .!
U)
:2'
U tr t,
CC,
(:i
E-*
a
//4 in,{'{A*'{
' 1
tt){tt oroo,,rdnr/ tl,, I ny7 ro, */'
?
'l /'
" *,t{L
'Yv)/tSie ./ ,r
O!:
U! Jcierce
I
/,
{i;fru /g ?3 r'tt U"r t,erti{t,
a/ €o11"oo (1
A
,/$r
rli'tl
,3,"{'&-
U 0'?o€
"/il" Vo*tt'ttrcttt 'K
V"//"g, "t "/ rAr'?,/rrr:rer u' ty
'??ng,,tf,,o,,
BAN DICII
Nam 1993 - Trudng Dpi hgc Yalway, m$t trong nhirng co s0 cira truong Dai hoc
Tai Hydrology
(da ky)
Vi6n chirc dao tqcr
*!
f.,i
t
J
-.rt
ti
;i,
! mAxmaxsMINH
i
:: \<6)
z, :$: !n3:
ti o: 6t:
a :: \9i
)
.. \: )64
(.)
00 .-:: ,CE
d:
a.
:: E9! o:
€:
,,O vx :
:: ui: bo
Ui: E: > r=: >:
::
jl-: Or:'O: c:
scB.\\
:F: 1A: :
9p ri s:
a:
<o.,=i
h, ^t, .6:
z ial A:
Q' b0
.*.c-l :
:
'<CE:
(r: ,<()
- <o:
c): -AI:
.cE\,
F
F : Lr:
..: E'xc i
d5,
.cB ]L
F: ;e: xo\:
zD. c0:
!
bo:
:50
:c !1.(o !
:61:
\<C) :
F:
.ai.jl:
^
^: E* o:
.< (): F:
9+((): h0:
X 0.: -c .d
a O: zo n,: f,oo
ttr
t-:
A:
:
U,
oo i
.si
,o c): F: oo
V; ca
O
g
BD
.!l 6t: U: x ra
\((u
o
i: F.
€ I
o Q.I:
.<61
:
id
(J:
-cJ
C'
--.
:
:
l>d t
r:li: F
a I
O. '+'
-?. 5*6 : ..
bo oo: z tr,600 ":.i
<('). <o ()
AD
(\l:
o E() x!. &=, bo
.d
JZ
.-6lO
9v
.n oo: x>, <e)
t
al: C)
r5 o,i
\(o
O orq a
<oU
.H
FA F
Project related
Education:
1998: M.Sc in Agricultural Systems, Faculty of Agriculture, Chiang Mai University, Thailand
1991: B.Sc in Agricultural Economics, Hanoi Agricultural University, Viet Nam
Language Skills (indicate only languages in which you can work): Vietnamese, English
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes
myself, my qualifications, and my experience, and I am available, as and when necessary, to
undertake the assignment in case of an award. I understand that any misstatement or
misrepresentation described herein may lead to my disqualification or dismissal by the Client,
and/or sanctions by the Bank.
07/09/2017
Education:
2007: PhD of Wetland Classification
2002: MSc. of Natural and Protected Conservation in the Mekong Delta, Vietnam
1970: BSc. of Forestry, Hanoi Forestry University
Forest inventory, planning and management, Los Banos University, the Philippines, August-
October, 1988.
Limnology, Uppsala University, Sweden, August-November, 1993.
Skills in diplomatic negotiation and chairing of inter-governmental meetings, Maastricht
University, Netherlands, November, 1999.
Study tour on experiences in managing an international river for the Mekong delta in Vietnam,
Australia, April, 2001.
Study tours on Payment for Ecosystem Servives (PES), USA, March-April 2010 and
September 2012.
Language Skills (indicate only languages in which you can work): Vietnamese and English
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes
myself, my qualifications, and my experience, and I am available, as and when necessary, to
undertake the assignment in case of an award. I understand that any misstatement or
misrepresentation described herein may lead to my disqualification or dismissal by the Client,
and/or sanctions by the Bank.
07/09/2017
Education:
- PhD of Aquatic Animal Veterinary in January, 2014.
- MSc. (Aquatic Veterinary Study) in Institute of Aquaculture, University of Stirling, Scotland, UK, 1999.
- BSc. (Veterinary) Hanoi Agriculture University No. 1, 1994
Other training
- Basic training course in fish and shellfish diseases diagnosis. Bangkok, Thailand, August, 1996.
- Life History Workshop from 27 to 31 August 2001 in AIT, Thailand.
- AARM/SRS Training on Basic Facilitation & Data Gathering Skills from 9-14 December 2001 was
held at DOF, Phnom Penh, Cambodia.
- MSc Advanced Module Livelihoods and Aquatic Resource Management held at the Institute of
Aquaculture, University of Stirling from 6-20 January 2003.
- Principles of Health Management in Aquaculture (AquaHealth Online) from 2 June - 24 October 2003
in Tigbauan, Iloilo, Philippines.
- Diploma on Epidemiology and Statistics under FIBOZOPA project at RIA1 from 27th September to
9th October, 2004.
- Methodology course for studies on freshwater snails in Vietnam with emphasis on intermediate hosts
of fishborn zoonotic trematodes from 4-11th May, 2005.
- Isolation and identification of Metacecariae in fresh water fish from Vietnam from 30th May – 3rd
June, 2005.
07/09/2017
NON-KEY EXPERTS
Education:
- 1998: Diploma of Water Supply and Sanitary Engineer, University of Ha Noi Civil Engineering
- 2002: Certificate on construction contract management – Asia Institute of Technology Center in
Viet Nam
- 2010: Certificate on Procurement – Procurement training JSC.,
- 2012: Certificate on design of water supply and drainage works
- 2014: Certificate on supervision of water supply and drainage works
- 2010: Construction cost pricing certificate
Employment record relevant to the assignment:
Languages:
Detailed Task assigned Work Undertaken that Best Illustrates Capability to Handle the
Tasks Assigned
Name of assignment: Project for Construction of Water Supply System for Rural Districts Gia Loc and
Tu Ky, Hai Duong Province, Vietnam
Year: 2012 to 2014 Location: Hai Duong Province, Vietnam
Client: HADUWASUCO
Main project features: The project is defined as the development, construction and operation of a
drinking water supply system with a capacity of 20,000 m3/day consisting of: Raw water intake, which
will be rehabilitated; An existing water treatment plant (WTP) with a capacity of 10,200m3/day, which
will be upgraded and expanded to 20,000m3/day in 2013;10km transmission pipelines DN 400, 30 km
distribution pipelines, 20-30 km services pipelines,
Positions held: Project Manager/ Procurement Specialist
Activities performed:
- Preparation of procurement plan and packaging schedule;
- Preparation of general parts of all bid documents;
- Prepare procedures and guidelines for evaluation of contractor’s bids;Set up the design
organization and manage the whole team;
- Take main responsibility for preparing basic design; procurement plan, bidding document
- Overall control of project deliverables
- Client management and overall project control on time, budget and delivery;
- Set up QA and QC procedures to ensure the quality of preparation work;
Name of assignment or project: Construction of Clean Water Supply System for rural areas in the
North Mo Cay and South Mo Cay, Ben Tre province
Year: 2011 To present
Location: Ben Tre, Vietnam Client: BEWACO
Main project features: This project aims at the distribution of the additionally produced water and
includes a booster pumping station (capacity 10,000m3/day) and a distribution network (including
piping with various dimensions ranging from D60 to D250 with a total length of about 150 km).The
system is based on river basin regional water supply.
Positions held: Project Manager/ Procurement Specialist
Activities performed:
- Preparation of procurement plan and packaging schedule;
- Preparation of general parts of all bid documents;
- Prepare procedures and guidelines for evaluation of contractor’s bids;Set up the design
organization and manage the whole team;
- Take main responsibility for preparing basic design; procurement plan, bidding document
- Overall control of project deliverables
- Client management and overall project control on time, budget and delivery;
Set up QA and QC procedures to ensure the quality of preparation work;
Name of assignment or project: Phu My wastewater collection and treatment system Ba Ria Vung
Tau (ORIO financed)
Year: 12/2010 To: present
Location: Ba Ria Vung Tau, Viet Nam
Main project features: the development and implementation of a collection network of domestic
wastewater and 2 wastewater treatment plants with a total capacity of 30,000 m3/day
(including such works as geo-topographic surveying work, designing, prepare procurement plan,
prepare bidding document, etc)
Positions held: Project Manager/ Procurement Specialist
Activities performed:
Data collection of population, hydrological, water quality, preparation of model for hydrological
calculation;
Environmental impact assessment;
Supervision of geological and topographical investigation;
Socio-economic survey, community consultation; preparation of resettlement action plan for
households affected by the project;
Preparation bidding document & Bids evaluation.
Name of assignment or project: Second Provincial Towns Water Supply and Sanitation, ADB Loan
No: 1514-VIE (SF), Package B, Vietnam
Year: 1998 – 2001
Location: Ministry of Construction, and Water Supply Companies
Client:
Main project features: The scope of project is preparation of Detailed design, bid document and
Construction supervision for rehabilitation and expansion of water supply and sanitation systems of four
provincial towns and cities, Dong Hoi, Dong Ha, Quy Nhon and Ben Tre. Total capacity of 4 systems
3
122000 m /day, total project cost US $ 53.5 Mill. Coffey MPW Ltd. Australia
Positions held: Water supply and Drainage Engineer/ Procurement Specialist
Activities performed:
- Review basic design
- Prepare detail design
- Preparation bidding document & Bids evaluation.
Name of assignment or project: The project for upgrading water supply and sanitation system in
Buon Ma Thuot city, Dak Lak province
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes
myself, my qualifications, and my experience, and I am available to undertake the assignment in case
of an award. I understand that any misstatement or misrepresentation described herein may lead to my
disqualification or dismissal by the Client, and/or sanctions by the Bank.
10. Name of Assignment/Project: Project for Constructions of Hau River Water Treatment Plant in
12. Name of Assignment/Project: Phu My wastewater collection and treatment system Ba Ria Vung
Tau (ORIO financed)
Year: 2010 - present
Location: Ba Ria Vung Tau, Vietnam
Client: BUSADCO
Main project features: the development and implementation of a collection network of domestic
wastewater and 2 wastewater treatment plants with a total capacity of 30,000 m3/day.
Position held: Accounting/Financial Management Specialist
Activities performed: The main activities include:
Consult and support the PMU in financial management; financial and accounting management for
project; Setup and practice the financial and accounting management system of project; Guide PMUs to
practice the procedures and regulations for financial and accounting, reporting and auditing for the
project; Plan, review current budgeting, vouchers, accounting and financial reporting of project; Prepare
and update financial record, reports of project in accordance with requirements of Donor and the
Government Agencies; Prepare VAT and PIT tax reports to submit to tax Agency and Tax Exemption for
International Consultant, claim project VAT, PIT liquidation annually for project staffs; Review procurement
procedures of projects; Prepare supporting document to process fund withdrawal in accordance with CA
and UNOPs procedures; Coordinate with Internal and External audit.
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself,
my qualifications, and my experience, and I am available, as and when necessary, to undertake the
assignment in case of an award. I understand that any misstatement or misrepresentation described
herein may lead to my disqualification or dismissal by the Client, and/or sanctions by the Bank.
Education:
- Doctor of Applied Biological sciences, Faculty of Bioscience Engineering, Aquatic Ecology
research group. Ghent University, Belgium, February 2017
- MSc.of Aquaculture, Faculty of Bioscience Engineering - Department of Animal Production
Ghent University, Belgium, 2009
- Engineer of Aquaculture, Hanoi Agriculture University, 2004
Other training
Subject of course Country Organized by Duration of Year
studies
Doctoral training program: Belgium Ghent University 2011-2017
project management,
communication, leadership,
conflict handling…
Supervisor for the thesis: Monitoring the Nguyen Thi Phuong Tuoi – K51 2010
exploitation of aquatic resources in Son La Bachelor of Aquaculture at Hanoi
hydropower reservoir in Phu Yen District- Agriculture University
Son La province
Publications
A1- peer reviewed journal, Science Citation Index
Thi Hanh Tien Nguyen, Pieter Boets, Koen Lock, Marie Anne Eurie Forio, Wout Van
Echelpoel, Jana Van Butsel, Juan Antonio Dueñas Utreras, Gert Everaert, Luis Elvin
Dominguez Granda, Thu Huong Thi Hoang, Peter L.M. Goethals. 2017. Use of Threshold
Indicator Taxa ANalysis (TITAN) to detect macroinvertebrate community responses to
environmental gradients in the Portoviejo River (Ecuador). International Journal of Limnology
53: 203-219.
Marie Anne Eurie Forio, Ans Mouton, Koen Lock, Pieter Boets, Nguyen Thi Hanh Tien, Minar
Naomi Damanik Ambarita, Peace Liz Sasha Musonge, Luis Dominguez-Granda, Peter L. M.
Goethals. 2017. Fuzzy modelling to identify key drivers of ecological water quality to support
decision and policy making. Environmental Science and Policy 68:58- 68.
Thi Hanh Tien Nguyen, Gert Everaert, Pieter Boets, Elina Bennetsen, Thu Huong Thi Hoang, Peter
L.M. Goethals, Martin Volk. 2017. Impact of hydropower dams on river ecosystems: A review from
modeller’s perspective. Water (under review
Minar Naomi Damanik-Ambarita, Gert Everaert, Marie Anne Eurie Forio, Thi Hanh Tien Nguyen,
Koen Lock, Peace Liz Sasha Musonge, Natalija Suhareva, Luis Dominguez- Granda, Elina
Bennetsen, Pieter Boets, Peter L. M. Goethals. (2016). Generalized Linear Models to Identify
Key Hydromorphological and Chemical Variables Determining the Occurrence of
Macroinvertebrates in the Guayas River Basin (Ecuador). Water 8:297.
Minar Naomi Damanik-Ambarita, Koen Lock, Pieter Boets, Gert Everaert, Thi Hanh Tien Nguyen,
Marie Anne Eurie Forio, Peace Liz Sasha Musonge, Natalija Suhareva, Elina Bennetsen, Dries
Landuyt, Luis Dominguez-Granda, Peter L.M. Goethals. (2016). Ecological water quality analysis of
the Guayas river basin (Ecuador) based on macroinvertebrates indices. Limnologica - Ecology and
Management of Inland Waters 57:27-59
Tien Hanh Thi Nguyen, Pieter Boets, Koen Lock, ,Marie Ane Eurie Forio, Peace Sasha, Luis Elvin
Dominguez-Granda,Thu Huong Thi Hoang, Gert Everaert, Peter L.M. Goethals. (2015). Habitat
suitability of the invasive water hyacinth and its relation to water quality and macroinvertebrate
07/09/2017
The holder of this degree can use the title of Doctor and of Doctor of Philosophy (PhD). This degree corresponds to level 8 of the Flemish Qualifications Structure, as laid down in the Decree of 30 April 2009 concerning the
Qualifications Structure, and to level 8 of the European Qualifications Framework for Lifelong Learning.
The diploma is given in accordance with the Higher Education Code dated 11 October 2013, ratified by the Decree dated 20 December 2013.
ref. 00707955/D0089382
The diploma and the diploma supplement are one and indivisible.
Check the authenticity on http://attestering.UGent.be with code f377f-87020-035fe-59762
Thi Hanh Tien Nguyen TRANSCRIPT OF RECORDS
04/10/1982, Ha Bac (Vietnam) - Student number 00707955 ACADEMIC YEAR 2016-2017
First semester exam period
Doctoral Training Programme Ghent University Disclosure 10/02/2017
MARKS OBTAINED IN ACADEMIC YEAR 2011 - 2012 To obtain further information on your
results or your study progress you may
either contact the lecturers or their
crdts course units Percentile code grade assistants for feedback or visit your
faculty’s Monitoring Service.
2 A002780 Advanced Academic English: Conference Skills - Presentation Skills in - C111 12/20
INTERNAL APPEAL
English In case of factual doubts, internal appeal
5 I001542 Environmental Impact Assessment: Integrated Project 28(21)51 C111 14/20 can be filed against these examination
decisions or against refusal to enroll with
2 X000172 Personal Effectiveness - PASS - the Internal Appeals Commission.
The appeal has to be filed by means of a
0 X000002 Progress Report signed and dated petition that is sent to
the Rector of Ghent University
2 X000014 Project management - PASS - (Sint-Pietersnieuwstraat 25, 9000 Gent)
by registered post, on penalty of non-
admissibility of the appeal.
At the same time, you have to send an
electronic version of your petition by e-
MARKS OBTAINED IN ACADEMIC YEAR 2012 - 2013 mail to ombuds@ugent.be by way of
information. The appeal has to be filed
crdts course units Percentile code grade within the peremptory time limit of seven
calendar days, starting on the calendar
2 X000187 Communication Skills basics + Conflict Handling - PASS - day after the examination results
announcement. (More information: article
0 Hydropower and the environment - PASS - 100 of the Education and Examination
Code, www.ugent.be/oer)
2 X000198 Leadership Foundation Course - PASS -
CODES
0 X000002 Progress Report C = Credit certificate awarded
_XX_: academic year (e.g. 09 meaning
0 X000001 Publication and/or Conference Contributions academic year 2009-2010)
_ _ _X: exam take(1/2)
PASS = Pass
FAIL = Fail
MARKS OBTAINED IN ACADEMIC YEAR 2013 - 2014 ZIEK = Absent because of illness
AFWE = Absent
BDRG = Fraud
crdts course units Percentile code grade ONBK = Local grade unknown
VRST = Exemption
0 Policies and Practices for Natural Resource Management - PASS - STOP = Terminated enrolment
0 Introduction to R - PASS -
0 X000002 Progress Report
0 X000001 Publication and/or Conference Contributions
0 X000585 Summer School 'Zeg 't eens'-'Let's Talk Science' 2016 - PASS -
Position Title and No. NK4, Technical Supporting staff (AGRICULTURE EXPERT)
Name of Expert: TRUONG VAN HAI VAN
Date of Birth: 28/03/1951
Country of Citizenship/Residence Vietnam
Education:
Degrees Awarded Institution Dates of Obtainment
M.Sc. Plant Protection - University Nong Lam University, Ho Chi Minh City 1994 – 1997
of Agriculture and Forestry
Language Skills:
Speaking Reading Writing
Vietnamese Mother Tongue Mother Tongue Mother Tongue
English Excellent Excellent Excellent
Expert’s contact information: (e-mail: truongvanhaivan@gmail.com, phone: (84-06503) 746 720 / 0903-
817198)
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my
qualifications, and my experience, and I am available, as and when necessary, to undertake the assignment
in case of an award. I understand that any misstatement or misrepresentation described herein may lead to
my disqualification or dismissal by the Client, and/or sanctions by the Bank.
st
Name of Expert Date: August 31 , 2017
Education:
2009: MSc Degree in Hydro-Informatics and Water Management, EuroAquae from 5 universities in
Europe
2006: BSc Degree in Water Resources Engineering at University of Technology in Ho Chi Minh City,
Vietnam
Language Skills (indicate only languages in which you can work): Vietnamese, English
- Support the Name of Assignment or project: Flood hazard assessment for Jotun Paints
Irrigation Expert Factory in Hiep Phuoc Industrial Park
- Day to day Year: June 2017 – July 2017
support Location: Ho Chi Minh City, Vietnam
CPMU/PPMU in Client: Jotun Paints Vietnam
technical issues Main project features: Jotun Vietnam factory in Hiep Phuoc IP is located at the
downstream section of the Dong Nai and Saigon Rivers in Ho Chi Minh City
- Collect data for (HCMC) where there is a rapid level of urbanisation. The project site is on a
quarterly, Annual low lying area on the south of Ho Chi Minh City. This area is planned for urban
reports and other and construction development, and therefore the land filling to raise the
reports ground level is being implemented in this area. The project area is subject to
the flooding caused by heavy rainfall, high discharges of the Saigon and Dong
- Assist in
Nai Rivers, flooding from Mekong Delta and high tides or a combination of
training/worksop
these factors.
s
Jotun Vietnam has requested HaskoningDHV Vietnam to undertake a quick
From 1995 to now, the water treatment plant has been operated very well and the treated water quality
is better than the other water treatment plants in Metro Manila. Now, problems of the plant
encountered comprise process optimization and equipment improvement. For the former, during the
typhoon season, from July to September every year, the value of turbidity in raw water was much
higher than the design basis (350 NTU); while the peak value reached nearly 2,000 NTU, which
resulted in the bad clarified water quality due to the short sludge settling time. For the latter, a large
number of equipment is getting close to end of the life time and updating replacement as necessary.
In order to get a satisfied treated water quality during the typhoon season, the treated water has to be
decreased in 70% of the full capacity. One of the critical issues was the existing sludge extraction
system, which was not enough to receive so much sludge produced from the Pulsators. As LP-2
serves for about 3.2 million people in Metro Manila, the water treatment capacity and water quality are
two key points to keep the water delivery system running.
Position held: Hydraulic Engineer/Project Coordinator
Activities performed: Data collection and processing; assess current conditions of the plant; site analysis
and survey; coordinate engineering design activities of the team; writing the report.
Name of Assignment or project: Technical Review of the Existing Feasibility Studies and Developing
a Roadmap for Non-Structural Investments, Ho Chi Minh City Flood Risk Management Project
Year: October 2014 to August 2015
Location: HCMC, Vietnam
Client: The World Bank
Main project features: The project is part of the World Bank’s long term engagement to support the city
to reduce the overall flooding situation in HCMC through institutional development and structural
investments. Given the extensive needs of the city, a phased approach, combining institutional and
investment measures, is being proposed for integrated flood risk management.
Position held: Hydraulic Engineer
Activities performed: Technical reviewing and coordination activities of the project; data collection and
site visits; translation of project outputs.
Name of Assignment or project: Mekong Delta Transport Infrastructure Development Project,
Independent Implementation Audit
Year: July 2010 to October 2014
Location: Mekong Delta, Vietnam
Client: World Bank and PMU-W
Main project features: The overall objective of the Mekong Delta Transport Infrastructure Development
Project (MDTIDP) is to support sustainable economic growth and include development in the Mekong
Delta Region by increasing the efficiency of transport infrastructure in the Delta in an integrated and safe
manner by means of multi-modal transport.
The scope of the Integrated Project Implementation Audit Services (IPIA) is to conduct semi-annual
reviews of the status of all project elements and bring together progress under one report to be presented
prior to each World Bank supervision mission. Specifically the IPIA will check that works are being carried
out to agreed designs and specifications and are of good technical quality; that Bank’s environmental and
social safeguard plans and policies are being adhered to, and; to identify difficulties arising or anticipated
during project implementation, analyse causes and propose solutions.
Position held: Environmental Specialist
Activities performed: Carry out the semi-annual implementation auditing on performances of the
contractors, supervision consultants and provincial PMUs on the issue of environmental and health and
safety and report to the World Bank in order to improve the quality of civil works of packages by tackling
bottle-necks and proposing solutions.
Name of Assignment or project: HCMCES-II. Ensuring Disaster and Climate Resilience for
Investments in the Wastewater and Drainage Sector in Ho Chi Minh City
Year: November 2013 - March 2014
Location: Ho Chi Minh City, Vietnam
Client: World Bank
Main project features: HCMCES-II is including the three components: Wastewater interceptor (8km) to
transfer the wastewater and drainage from the network of the Nhieu Loc – Thi Nghe basin and
wastewater from a separate network in District 2 to a WWTP; Wastewater Treatment Plant, with a
capacity of 480,000 m3/day and Investment support and institutional development, including the update
of the MCMC sewerage master plan. Since the project areas are prone to flooding it is important to know
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes
myself, my qualifications, and my experience, and I am available, as and when necessary, to
undertake the assignment in case of an award. I understand that any misstatement or
misrepresentation described herein may lead to my disqualification or dismissal by the Client,
and/or sanctions by the Bank.
07/09/2017