Beruflich Dokumente
Kultur Dokumente
Location: AF/CA
Proj Duration: 18 HOURS
Date Start: 5/14/2019
Date Finish: 5/14/2019
s
cc
t
WORK SCOPE
our
%W
%A
#h
Work hours 7:00 AM 8:00 AM 9:00 AM 10:00 AM 11:00 AM
2% 0.5 Plan
2 Installation of barricade and safety signages.
Actual
13% 3 Plan
5 Installation of diagonal
Actual
37.50% 9 Plan
6 Installation of columns
6 Installation of columns
Actual
37.50% 9 Plan
6 Installation of H-Beam
Actual
4.17% 1 Plan
6 Painting
Actual
4.17% 1 Plan
7 Housekeeping
Actual
100% 24.0
Total Weighted Accomplishment =
Total Project Accomplishment =
PASAR Representative
Ending Acc
2:00 AM 3:00 AM 4:00 AM 5:00 AM 6:00 AM 7:00 AM
Project: On-Site Overhaul of CF Boiler #2
Location: Smelter
Proj Duration: 25 Working days
Date Start: 1/21/2019
Date Finish: 2/15/2019
Work days 1 2 3 4 5
cc
ays
t
WORK SCOPE
%W
%A
#d
Work days 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb
Actual
Actual
4
Visual inspection of related supports for corroded 8.1% 2 Plan
structural elements(outside WHB)
Actual
Repair/repainting of dilapidated structural
5
element supports for boiler such as buck stay, 12.2% 3 Plan 73% 75% 77% 80% 83%
Repair/repainting of dilapidated structural
5
element supports for boiler such as buck stay,
beams,angular's, purlins, hammering anvilm
plates and supports (outside WHB). Actual
Replacement of noted(as per NDT 20.3% Plan 75% 77% 79% 80%
5
11 recommendation )thinned-out and corroded
boiler tubes.
Actual
Plan
15 Repair of noted leaks after hydro testing
Actual
Plan
16 Commissioning
Actual
100% 24.68
Total Weighted Accomplishment =
Total Project Accomplishment =
8-Feb 9-Feb 10-Feb 11-Feb 12-Feb 13-Feb 14-Feb 15-Feb 16-Feb 17-Feb
90% 100%
95% 100%
Approved by / Date:
PASAR Representative