WNCTC SETTING A
0 1
Odd: 1, 3, 5, 7, 9, 11 √3
Even: 2, 4, 6, 8, 10, 12 1.5
However, we have found through experimentation that the correction factor is actually 1
WnCTC equals 12 using our test connections.
Follow these steps to test the Differential Slope settings using the Post-Test Calculation
method from the previous “3-Phase Differential Slope Testing” Section:
1. Determine how you will monitor pickup and set the relay accordingly, if required.
(Pickup indication by LED, output contact, front panel display, etc. See previous
publications of The Relay Testing Handbook for details.)
2. Apply a restraint current into the first test phase of Winding-2. The pickup indication
should be on.
3. Apply an equal, but opposite current in W1 using the Tap ratios to determine what the
current magnitude should be. For example:
TAP1 × A1
W1
= W2 ×
TAP2 × A2
2.41 × 1
W1= 5 ×
4.61 × 1.732
W1= 5 × 0.302
W1 = 1.510
4. The pickup indication should now be off. Raise the Winding-1 current until the relay
operates. Record the value on your test sheet. (Remember that you can also use the
pulse or jog method to minimize the amount of current applied to the relay. Review the
Instantaneous Overcurrent (50-element) pickup procedure in previous publications of
The Relay Testing Handbook for details.)
116
Chapter 2: Percent Differential (87) Element Testing
5. Calculate the IRT, IOP, and Slope using the formulas in the Post-Test Calculation section
of the “3-Phase Differential Slope Testing” in this document. Use a 1.732 correction
factor for windings with odd W_CTC settings and use the IRT calculation to determine
if the test was O87P, Slope-1, or Slope-2. Raise the W2 current and repeat 2-5 until all
elements of the differential protection have been tested.
¾
( ) (
IRT= IAW2 / ( TAP2 × A2 ) + IAW1 / ( TAP1 × A1) / 2 )
IOP= IAW1/ ( TAP1 × A1) - IAW2/ ( TAP2 × A2 )
¾
¾ EXPECTED=IF(IRT<(O87P × 100 / SLP1),O87P,IF(IRT<3,SLP1,SLP2))
8. Repeat the pickup test for all windings that are part of the differential scheme. If more
than two windings are used, change all connections and references to W2 to the next
winding under test. (W2 becomes W3 for W1 to W3 tests)