Mir Sadat Ali

Name : Mir Sadat Ali, C.Eng (India)


Name of Firm : Nhance Consulting Engineers Pvt. Ltd.
Job Title : Senior Electrical Engineer
Profession : Electrical Engineer

ACADEMIC QUALIFICATIONS

Academic Degree Year of award Name and Location of Institution

B.Tech in Electrical &


2006 Jawaharlal Nehru Technological University
Electronics Engineering

PROFESSIONAL EXPERIENCE: 13 Years

1. SENIOR ELECTRICAL ENGINEER AT NHANCE CONSULTING ENGINEERING,


HYD
Oct 2017 - PRESENT

 Managing Electrical installations in residential, commercial and industrial


buildings.

 Ensuring specifications and standards in construction and maintenance of the


buildings, keeping in view international best practices.
 Supervision of Electrical Works in Manipur Sarva Siksha Abhiyan Project.Cost
650 Crores

2. PRINCIPAL ENGINEER AT KBR-AMCDE, AL-KHOBAR, SAUDI ARABIA


Sep2008- Aug 2017
 Preparation of electrical drawings such as single line diagrams, panel schedules,
electrical equipment layouts, lighting, power & grounding layouts, cable routing
& cable tray routing layouts, hazardous area classification drawings etc. in
compliance with international standards, such as IEEE/ANSI, NEC, NFPA,
IEC, API, UL, NEMA along with Saudi Aramco procedures, standards &
specifications for Saudi Aramco facilities; Sabic/Hadeed standards for Sabic
and Affiliate.

 Preparation of electrical calculations such as lighting illumination, cable sizing,


battery sizing, disconnecting device sizing, protective device sizing etc. by
using Microsoft excel & engineering software’s in accordance with
international standards.

 Selection & sizing of electrical equipment’s viz. Transformer, Switchgears,


Controlgears (MCC’s), Switchracks, Switchboards, Panel boards, UPS & DC
systems.

 Selection & sizing of low voltage & medium voltage cables. Cable tray sizing
& type selection, tray routing for particular service and applications.
Mir Sadat Ali

 Preparation of cable/conduit schedules, panel schedules, load lists, datasheets,


specifications, RFQs, material take-off (MTO), cut over plans, scope of works,
study reports.

 Preparation of power system studies by performing load flow, motor starting,


short circuit, ground grid, harmonic, relay coordination, arc flash & transient
stability studies by using ETAP PowerStation software.

 Review of quotations & preparing technical bid evaluations, technical


clarificaitons for electrical equipments. Upon selection of successful bidder,
review of NMR 601, 602 & 603 documents for electrical equipments.

 Preparation of Weekly progress reports and attending weekly meetings with


clients and internal review meetings.

 Preparation of M.Hrs Estimate for new projects and M.Hrs forecast for ongoing
projects.

 Conducting site-visits & preparation of site-visit reports.


 BI:10-00484)-Upgrade Potable Water System at 46 no’s SAOO GOSP’s.
Prepared the proposal drawings, cable and conduit schedules, calculations,
MTO, ER estimate & SOW for installing new 4 no’s 7.5HP drinking water
pump motors by taking power supply from existing MCC’s in
generator/switchgear room. Also provide lighting and local control station for
each motor at all 46 no’s sites in Southern Area Oil Operations Gas Oil
Separation Plant’s.- Project Cost 400 Crores

 Eight (8) floor Residential & Commercial building for AYTB at Jubail,
Prepared the IFC drawings, cable and conduit schedules, panel schedules,
calculations, MTO & SOW for constructing new 2 no’s 8 floors building (1 no.
Residential & 1 no. Commercial) at AYTB, Jubail.-Project Cost 350 Crores

 Rehabilitate Al-Mua’jjiz Terminal (AMT) at Yanbu.


Prepared the electrical assessment reports for all the existing electrical
equipment’s such as emergency diesel generators, power & distribution
transformers, switchgears (13.8KV, 4.16KV & 480V), MCC’s (4.16KV, 480V),
existing 15KV, 5KV feeder cables, cathodic protection system etc.
Also, prepared the proposal drawings, datasheets, cable and conduit schedules,
calculations, MTO, ER Estimate & SOW for new 110/13.8KV GIS substation,
new 10 no’s buildings and electrical driven firewater pumps, jockey pumps,
foam pumps, oily water sump pumps and slope tank pump motors- Project Cost
335 Crores

3. MATERIAL PLANNING ENGINEER AT WESCOSA, DAMMAM, SAUDI ARABIA


Feb 2008- July 2008
 Assigned as Material planning engineer for power and distribution transformers.

 To ensure materials are available in stock for the production of transformers of


different type, rating and voltage levels on weekly, monthly and yearly schedule
using JD Edwards’s software.

4. SITE ENGINEER AT NASEER ELECTRICAL PVT LTD,HYDERABAD, INDIA


Mir Sadat Ali

July2006- Jan 2008


 Responsible for the installation of lighting system, power distribution system,
Telephone, Intercom and Audio Visual system in accordance with engineering
drawings for (2 Basements+Ground+5 floors) TCS building- Project Cost 340
Crores

 Monitor all electrical material submittals and manual verification of relevant


procedures, project specification and standards.