TEST PLAN

Project Name :……………………

Abstract
This document provides an overview of the project and the product test strategy, a list of
testing deliverables and plan for development

Private & Confidential


Name Project Test Plan

VERSION HISTORY
Version Write by Revision Approved Approval Outline
# Date By Date
1.0 Krishna Rungta 2018/12/12 Peter 2018/12/24 Test Plan create

Page 2 of 9
Private & Confidential
Name Project Test Plan

TABLE OF CONTENTS
INTRODUCTION ..................................................................................................................... 4
1 TEST STRATEGY ................................................................................................................. 4
1.1 Test Type ................................................................................................................... 5
1.2 Scope of Testing ........................................................................................................ 4
1.2.1 Feature to be tested ............................................................................................ 4
1.2.2 Feature not to be tested ...................................................................................... 5
1.3 Risk and Issues ........................................................................................................... 5
1.4 Test Logistics.............................................................................................................. 6
1.4.1 Who will test? ...................................................................................................... 6
1.4.2 When will test occur? .......................................................................................... 6
2 TEST OBJECTIVE ................................................................................................................ 6
3 TEST CRITERIA ................................................................................................................... 6
3.1 Suspension Criteria .................................................................................................... 6
3.2 Exit Criteria ................................................................................................................ 6
4 RESOURCE PLANNING ....................................................................................................... 6
4.1 System Resource ....................................................................................................... 6
4.2 Human Resource ....................................................................................................... 7
5 TEST ENVIRONMENT ......................................................................................................... 7
6 SCHEDULE & ESTIMATION ................................................................................................. 8
6.1 All project task and estimation ................................................................................. 8
6.2 Schedule to complete these tasks ............................................................................. 9
7 TEST DELIVERABLES ........................................................................................................... 9

7.1 Before testing phase ................................................................................................. 9


7.2 During the testing ...................................................................................................... 9
7.3 After the testing cycles is over .................................................................................. 9

Page 3 of 9
Private & Confidential
Name Project Test Plan

INTRODUCTION
Berisi pembahasan tentang ruang lingkup pengujian, pendekatan pengujian yang digunakan,
sumber daya yang diperlukan dan jadwal pelaksanaan seluruh aktifitas pengujian

The plan identify the items to be tested, the features to be tested, the types of testing to be
performed, the personnel responsible for testing, the resources and schedule required to
complete testing, and the risks associated with the plan.
1 TEST STRATEGY
1.1 Scope of Testing
1.1.1 Feature to be tested
Berisi semua fitur aplikasi yang ada didalam dokumen spesifikasi kebutuhan (SRS) yang
merepresentasikan kebutuhan fungsional

Fitur Peran Deskripsi

1.1.1.1 TABEL REQUIREMENT TRACEABILITY MATRIX

MODUL NAME TEST SCENARIO TEST CASE TEST DATA


Guru99 Banking Testing Project

1.1.2 Feature not to be tested


Daftar fitur- fitur yang tidak diuji karena tidak termasuk dalam SRS. Namun diisi dengan jenis
testing
Jenis
Quality Factor Testi
Deskripsi ng

Missal

1.2 Test Type


Berisi jenis – jenis pengujian yang akan dilakukan terhadap perangkat lunak .
A. Functional Testing
1. Unit Testing : meliputi modul / function apa saja. Dengan menggunakan pendekatan testing
jenis apa
2. Integration Testing : meliputi beberapa bagian. Menggunakan pendekatan integration testing
jenis top-down/ bottom up, big bang dsb
3. dsb

B. Non Functional Testing


Sesuai dengan penjelasan sub bab 1.1.2

1.3 Risk and Issues

Risk Trigger Response Plan


Team member lack the required skills for Plan training course to sk
website testing.
1.4 Test Logistics
1.4.1 Who will test?
Berisi penjelasan siapa yang akan melakukan pengujian, apakah internal anggota tim
pengembang, atau eksternal tester, atau outsourcing?

1.4.2 When will test occur?


Berisi penjelasan pada kondisi apa eksekusi pengujian mulai dilakukan oleh SW tester
misal
- Software is available for testing

2 TEST OBJECTIVE
Berisi penjelasan tujuan pelaksanaan pengujian. Pada umumnya diberi kata –
kata seperti berikut
1. Untuk memverifikasi…
2. Untuk memvalidasi…
3. Untuk menjamin…..
4. dsb

3 TEST CRITERIA
3.1 Suspension Criteria
Berisi penjelasan kondisi - kondisi yang menyebabkan proses pengujian akan dihentikan
untuk sementara waktu, dan kapan akan dilanjutkan kembali

3.2 Exit Criteria


Berisi penjelasan kriteria – kriteria yang menyatakan bahwa fase pengujian dinyatakan
berhasil dan dapat dihentikan

4 RESOURCE PLANNING
4.1 System Resource
No. Resources Descriptions
1. Server Need a Database server which install MySQL server
Web server which install Apache Server
4.2 Human Resource
No. Peran Pekerjaan
1. Test Manager Mengelola seluruh pelaksanaan pengujian
Memberikan arahan pelaksanaan proyek

5 TEST ENVIRONMENT
Gambarkan lingkungan dan kebutuhan perangkat untuk melakukan
oengujian
6 SCHEDULE & ESTIMATION
6.1 Berisi estimasi waktu yang dibutuhkan untuk menyelesaikan proyek pengujian,
berbasiskan pada pembagian kerja / Task

Task Person in Charge Estimate effort


Derive Test Case
and test data Test Designer

Tester

Reportwriter

Total

6.2 Schedule to complete these tasks (gunakan GANTT CHART)

7 TEST DELIVERABLES
Tuliskan nama-nama dokumen yang dihasilkan dan diserahkan setelah pelaksanaan
pengujian selesai
7.1 Sebelum fase Testing
.
7.2 Selama fase Testing

7.3 Setelah fase Testing selesai