Date Submitted Date Rejected Date Resubmitted Date Approved
Original
Status (Original/Alternative)
STONE FINISHES
- June 6, 2018 - 2 Alternative Sample's are submitted to SPI for Approval
- June 18, 2018 - Need to Resubmit and need actual photos of Slab prior for
Approval
- June 20, 2018 - As per Discussion with SPI, BTR Designer will going to do
Waiting for Supplier's the final approval for this Sample
Photo per BTR - July 5, 2018 - Per SPI (Maam Joy), Ms. Carla will be on Wednesday, dated
2weeks process in office
20 mm Marble (King Spent) PR: Aug 02, 2018 ESLC-CIIDI-SRF-0001 June 20, 2018 Comment to Apply, July 11, 2018, and she will going to talk with re. on the sample submitted to
PHILIPPINE GRANITE / + Alternative
1 ST-01 / ST-02 for Toilet Vanity Counter and AWAITING FOR ESLC-CIIDI-SRF- June 13, 2018 June 18, 2018 Aug 15, 2018 "Dark Veins for stone to discussed with the characteristic of the stones. By that they, they make the
45-60 days leadtime upon Material
Common Areas APPROVAL 0001REV1 Aug 18, 2018 be minimize" See decision, wether the sample submitted is approved or Not.
SOUTH PACIFIC payment
Remarks for SPI - June 20, 2018 - Sample resubmitted
Comments - Aug 15, 2018 - Original sample resubmitted
- Aug 18, 2018 - 2 much bigger samples ST-1 to be resubmitted in addition to
the one submitted on Aug 15, 2018
- Aug 31, 2018 - CIID to give a bigger sample, but suggest to order by batch
base on BTR's comments "Veins not too dark"
TILES FINISHES
FEATURE WALL 4" x 12" - August 31, 2018 - Per SPI Classique to Submit Alternative, Procurement
Alternative For Outsourcing c/o
TL-4 (Substrate : Wood) - (TO BE SUBMITTED) ESLC-CIIDI-SRF-0006 commit to give the alternative sample by Next week (Before September 5,
Material Procurement Team
for Wall 2018)
Option 1
Option 2
Option 3
Date Submitted Date Rejected Date Resubmitted Date Approved
Original
Status (Original/Alternative)
- June 13, 2018 - Conchu promise to give the sample by Thursday dated June 14,
2018
HERRINGBONE FINISH TO MATCH
Alternative - June 18 , 2018 - nd Submission, Sample Submitted to SPI for approval
WD-2 WD-1 ESLC-CIIDI-SRF-0013 June 18, 2018
Material - Jue 20, 2018 - Maam Joy of Spi, will going to communicate with the Designer for
(VENEER: OAK)
Final Specs for the said Finishes.
- Aug 31, 2018 - Waiting for new design from BTR.
- June 13, 2018 - 2 alternative Sample's are submitted to SPI for Approval
VINYL FLOORING TO MATCH - June 18, 2018 - Alternative to is ok but need to look for another Vinyl Tile
ORIGINAL SAMPLE which is less Dark Veins.
FOR SEATING AREA Alternative 1: Kent Floors 2weeks process in office PR: Aug 10, 2018 Alternative - June 20, 2018 - Procurement to outsource
7 VF-2 ESLC-CIIDI-SRF-0015 June 13, 2018 June 18, 2018 August 18, 2018 August 31, 2018 R X
Alternative 2: Floor Center +30-45 Days Leadtime On-Process Material - Maam Joy of SPI will Select on the Finishes on Selection
Option1: 6110 book (Merino) and Classique to Match.
Option2: Sedona Oak 4789 -August 18, 2018 - 2 alternatives submitted waiting for approval
- AUg 30, 2018 - MAterial Approved By BTR
GLASS AND ACCESSORIES (SHOWER ENCLOSURE)
METAL FINISHES
CS-6105NSV
CYCLONES SATIN NICKEL SILVER
If on stock- 15 days
304 STAINLESS STEEL
fabrication & cutting.
THK: AT LEAST 1.2 MM Original: Cobelco
12 MT-2 AWAITING FOR PR August 02, 2018 August 03, 2018 (BACK TO ORIGINAL) X
Alternative: DSP
If indent 45-60 Days + 15
(ROSE GOLD; FINISH: VIBRATION;
days cutting(laser cut)
ALTERNATIVE)
LOCATION: CORRIDOR
Status Material Approved (Alternative)
X - Approved ,
R - Reject and Resubmit
P.R. Date/
ACTUAL PHOTO'S General Submittal Form
# Material Code Material Description Supplier Lead Time Estimated Delivery Material Remarks REMARKS
SUBMITTED Number
Option 1
Option 2
Option 3
Date Submitted Date Rejected Date Resubmitted Date Approved
Original
Status (Original/Alternative)
30-45 days Production Need JO from Site, NOTE: ALL MT-2 FINISH WILL BE SUPERCEDED TO MT-3
Leadtime And Conchu to make - C/O PROCUREMENT (NEED SAMPLE)
TUBULAR (ASSORTED SIZES) TO Alternative 1: Hui Jin Xin
plus 7 days delivery PR for Materials prior
MATCH MT-1 BRASS FINISH Hardware Manufactory
seafreight from China to for Fabrication. Alternative - June 20, 2018 - For Submission to SPI
13 MT-3 (China) ESLC-CIIDI-SRF-0026 June 20, 2018 June 20, 2018
Manila, Note: Conchu to Material - Sample Approved by SPI
(BK-011 SAND BLASTED BLACK Alternative 2: To be Finish
7-10 days BOC upon provide
TITANIUM; ALTERNATIVE) by Conchu Fabri
Payment, Template/Pattern for - August 31, 2018 - Alternative 2 Sample Submitted but need to submit before
2-3 days from BOC to site GL-2 it will be approved by SPI.
SPECIAL FINISHES
- Inchem, c/o Sir Benie, Promise to give the sample on June 14, 2018
Original: Paintech Building
- July 05, 2018 - Approved with Comment, Need to Submit sample with applied
Materials Groups
SPECIAL PAINT TO MATCH August 31, 2018 - comment with actual Profile.
Alternative 1: Conchu 2weeks process in office Alternative
19 SP-2 ORIGINAL SAMPLE AWAITING FOR PR ESLC-CIIDI-SRF-0031 July 03, 2018 August 18, 2018 Alternative 3 Approved R R R X - July 19, 2018 - Sample submitted to Maam Joy, subject for Terence review
Alternative 2: Levirnicci +30DAYS LOCAL Material
(ALTERNATIVE) by SPI -Aug 18, 2018 - sample submitted for approval
Alternative 3: Olympus
- Aug 31, 2018 - Alternative #3 Approved by SPI Base color approved. "Sheen
Sparko
and application subject for approval actual on site"
- July 05, 2018 - Still need to wait for new booklet of HPL/Laminates from the
August 31, 2018 -
supplier, per supplier they will give the new booklet by tomorrow, dated July 06,
ALUMINUM TUBE WITH PRINTED Hui Jin Xin Hardware AWAITING FOR WD- Alternative Profile Approve by SPI
22 AL-1 ESLC-CIIDI-SRF-0035 June 20, 2018 X 2018 per my conversation (thru Mobile).
DESIGN TO MATCH WD-1 Manufactory (China) 1 APPROVAL Material but need to match Finish
-Still need to be clarified to Ms. Joy/SPI
of WD-1
- August 31, 2018 - Profile approved by SPI but Finish need to match WD-1.
Status Material Approved (Alternative)
X - Approved ,
R - Reject and Resubmit
P.R. Date/
ACTUAL PHOTO'S General Submittal Form
# Material Code Material Description Supplier Lead Time Estimated Delivery Material Remarks REMARKS
SUBMITTED Number
Option 1
Option 2
Option 3
Date Submitted Date Rejected Date Resubmitted Date Approved
Original
Status (Original/Alternative)
Option 1
Option 2
Option 3
Option 4
Code SUBMITTED Number (Original/Alternative Date Rejected
Status Submitted Resubmitted Approved
)
STONE FINISHES
20 mm Marble
for Counter Top Finish @ Private CHONG HING
2weeks process in office + PR: July 25, 2018 Alternative - June 22, 2018 - Material Submitted to SPI
1 ST-01A Lounge MARBLE CO.,LTD ESLC-CIIDI-SRF-0002 June 22, 2018 July 05, 2018
Lead Time: 30-45 days upon On-Process Material - July 05, 2018 - Material Submitted Approved by SPI.
(Hongkong)
(NERO MARQUINA) payment
METAL FINISHES
Option 1
Option 2
Option 3
Option 4
(Original/Alternative)
Drywall Studs
Dimension: 35mm x 76mm x 3.0
1 - Alternative Material June 22, 2018 June 29, 2018
meters, Thickness = 0.50mm ESLC-CIIDI-SRF-0037
Brand: JEA-Maxx Light Steel Frames
Drywall Tracks
Dimension: 35mm x 76mm x 3.0
2 - Alternative Material June 22, 2018 June 29, 2018
meters, Thickness = 0.50mm ESLC-CIIDI-SRF-0038
Brand: JEA-Maxx Light Steel Frames
Wall Angle
Dimension: 25mm x 25mm x 2.4
4 - Alternative Material June 22, 2018 June 29, 2018
meters, Thickness = 0.40mm ESLC-CIIDI-SRF-0040
Brand: JEA-Maxx Light Steel Frames
5 CARRYING CHANNEL 0.8 mm Thick June 13, 2018 June 29, 2018
GYPSUM BOARD
Status Material Approved (Alternative)
Option 1
Option 2
Option 3
Option 4
(Original/Alternative)