1. PURPOSE OF TEST 试 1
2. SYSTEM SPECIFICATION 系 1
3. TEST CODE 试 2
4. TEST CONDITION 试 3
5. TEST ITEM 测 3
9. ACCEPTANCE CRITERIA 验 5
10. APPENDIX 附 6
Cooling Towers Performance Test Procedure of INDIA TALWANDI Power Plant
印度塔尔万迪电厂冷却塔性能试验方案
第1页共7页
Cooling Towers Performance Test Procedure of INDIA TALWANDI Power Plant
印度塔尔万迪电厂冷却塔性能试验方案
2.4 Condenser 凝
Double back pressure, double shells, single flow, surface cooling type condenser
will be adopt in this project. We will use rigid support at the bottom and elastic
connection between top and low pressure cylinder exhaust outlet. Condenser tube
bundle will adopt stainless steel TP304. Tube plate will adopt complex material
(Q235B+TP304). Water chamber will be painted anticorrosive dope and adopt cathodic
protection. The oxygen content at outlet is less than 30μg/l.
凝
汽
器
采
用
双
背
压
、
双
壳
体
、
单
第2页共7页
Cooling Towers Performance Test Procedure of INDIA TALWANDI Power Plant
印度塔尔万迪电厂冷却塔性能试验方案
流
程
、
表
面
冷
却
式
。
底
部
采
用
刚
性
支
撑
,
上
部
与
低
压
缸
排
汽口之间的连接采用弹性连接(弹性膨胀节)。凝汽器传热管管束采用不锈钢材料,管板采用
Q235B+TP304
复 30μg/l.
Turbine-generator unit VWO operation, circulating water temperature rise is
8.9℃,clean coefficient is 0.9,under the conditions above, condenser average back
pressure will reach to 10.2kPa(a), cooling water in pipe velocity <2.19m/s.
凝 VWO 工
8.9℃ ,清洁系数 0.9 的条件下,凝汽器平均背压达到10.2kPa(a) ,冷却水管内流速<
2.19m/s 。
第3页共7页
Cooling Towers Performance Test Procedure of INDIA TALWANDI Power Plant
印度塔尔万迪电厂冷却塔性能试验方案
第4页共7页
Cooling Towers Performance Test Procedure of INDIA TALWANDI Power Plant
印度塔尔万迪电厂冷却塔性能试验方案
出 2个
6.5 CCW flow: FSCS10C1-00C ultrasonic flowmeter of 1.0 precision grade,
manufactured by Fuji, Japan. 冷 1.0 级
FSCS10C1-00C 型
6.6 Outlet air temperature of cooling tower: standard platinum resistance, 2m above the
water channel of each cooling tower.
出 2米 20个
6.7 Wind speed inside cooling tower:Semiconductor anemometer, 2m above the water
channel of each cooling tower.
塔 2米
6.8 Table 1 is the measuring point list. 试 附表 10.1 。
分 数 , 值 的
算 均
平 。
7.10 After the test, the principal gathers all of the datas and checks them, if they are
normal, they are in effect..
试 结 负
验
试 据 本
,
常
正 次 有 效
为
NOTES 式 :
Ω - Cooling Number 冷
Cw - Specific Heat of water (kJ/kg ∙℃) 水 比 (kJ/kg ∙℃) ;
i″1, i″2, i″m - Saturated air enthalpy at water inlet, outlet and average temperatures
(kJ/kg) 分 为 , 出 饱 焓 (kJ/kg) ;
i1, i2, im - Enthalpy of air inlet, outlet and the average value of them(kJ/kg)
分 为 和 值 (kJ/kg) 。
8.2
Valuation of CT cooling capacity: 塔 价
评 :
h = Dtt Dt
d
NOTES 式 :
按 测 算 实
实 差 (℃ ) ;
measured condition 按 测 算 差 (℃ ) 。
10 APPENDIX 附件
10.1 The performance test measuring points list of TALWANDI
印
Table 10.1 The performance test measuring points list of TALWANDI
表 10.1 印
N POINT NO. INSTRUMENT PERIODIC(min/time)
o. 测 名 数 仪 记 ( /
次
1. Generator power 1 power collector 功 表 1
发
2. CCW flow 冷 2 ultrasonic flowmeter 10
超
3. Speed and direction of 1 propeller anemometer 10
wind 大 大
4. Atmospheric dry-bulb 1 Assmann ventilated 10
temperature psychrometer
大 阿
5. Atmospheric pressure 1 Pressure meter 10
大 大
6. Inlet water temperature of 2- standard platinum 1
tower进 4 resistance 标
7. 1
Outlet water temperature 2- standard platinum
of tower 出 4 resistance 标
8. 1
Outlet air temperature of 20- standard platinum
tower出 24 resistance 标
9. 20
Wind speed inside cooling 20- Semiconductor
第7页共7页
Cooling Towers Performance Test Procedure of INDIA TALWANDI Power Plant
印度塔尔万迪电厂冷却塔性能试验方案
towers 塔 24 anemometer
半
TIME( every 20
No. DATE Wind speed inside cooling
minutes )
序 日 towers 塔
时 隔 20分 )
1
2
3
4
第8页共7页
Cooling Towers Performance Test Procedure of INDIA TALWANDI Power Plant
印度塔尔万迪电厂冷却塔性能试验方案
10.3 Auto recording Table of test 试
Table 10.4. Auto recording table( same as Turbine HeatRate test )自
Outlet air
Inlet water Outlet water
TIME Generator temperatu
No. temperature of temperature
DATE ( every 1 power re of
序 tower of tower
minute ) 发 tower
进 出
出
1
2
3
4
5
第9页共7页