Which of the following principles of project management defines and controls the
functions that are to be included in the system?
A (n) ____ is one that can be measured or estimated in terms of dollars and that accrue
to the organization.
breakeven point
tangible benefit
intangible benefit
https://amigo.amityonline.com/courses/2056/quizzes/3267/take 1/15
4/21/2019 Quiz: section C - Multiple Choice Questions
cost/benefit analysis
A(n) ____ is a good tool for monitoring the progress of a project as it moves along.
context diagram
Gantt chart
The ____ is a sequence of tasks that cannot be delayed without causing the project to be
completed late.
payback period
milestone
critical path
float
https://amigo.amityonline.com/courses/2056/quizzes/3267/take 2/15
4/21/2019 Quiz: section C - Multiple Choice Questions
lost customers
lost productivity
Projects initiated through strategic planning are sometimes described as ____ projects
critical
weighted
prototype
top-down
https://amigo.amityonline.com/courses/2056/quizzes/3267/take 3/15
4/21/2019 Quiz: section C - Multiple Choice Questions
"A ____ combines three components: the problem description, the business benefits, and
the system capabilities."
proof-of-concept prototype
context diagram
"A ____ describes the purpose of the new system, the potential start and completion
dates, and the key stakeholders and sponsors of the new system."
project charter
cost/benefit analysis
project schedule
"____ are normally described in terms of the influences that can change the financial
statements, either by decreasing costs or increasing revenues."
Business benefits
Intangible benefits
https://amigo.amityonline.com/courses/2056/quizzes/3267/take 4/15
4/21/2019 Quiz: section C - Multiple Choice Questions
Scope documents
"During the planning phase of the system development life cycle (SDLC), the ____ helps
to define the scope of the problem."
context diagram
There are two general approaches for building a ____: (1) by deliverable and (2) by a
sequential timeline.
context diagram
The objective of ____ is to calculate a percentage return so that the costs and benefits
are exactly equal over the specified time period.
cost/benefit analysis
https://amigo.amityonline.com/courses/2056/quizzes/3267/take 5/15
4/21/2019 Quiz: section C - Multiple Choice Questions
cost/benefit analysis
What is the structured approach called for developing software and information systems?
https://amigo.amityonline.com/courses/2056/quizzes/3267/take 6/15
4/21/2019 Quiz: section C - Multiple Choice Questions
Systems methodology
Software design
Prototyping
Spiral Model
Waterfall Model
Prototyping Model
Which of the following best describes the capability of software to satisfy business
requirements?
https://amigo.amityonline.com/courses/2056/quizzes/3267/take 7/15
4/21/2019 Quiz: section C - Multiple Choice Questions
Both a and b
Compatibility.
Functionality.
Scalability.
Reliability
Technical
Usability
Performance
Technical
Usability
Performance
Reliability
____ requirements are most often documented in graphical and textual models.
https://amigo.amityonline.com/courses/2056/quizzes/3267/take 8/15
4/21/2019 Quiz: section C - Multiple Choice Questions
Technical
Functional
Nonfunctional
Security
GUI
tool
model
technique
An inter-task dependency in which two tasks must finish at the same time is referred to
as.
Start-to-start (SS)
Start-to-finish (SF)
Finish-to-finish (FF)
https://amigo.amityonline.com/courses/2056/quizzes/3267/take 9/15
4/21/2019 Quiz: section C - Multiple Choice Questions
"Which of the following is the estimated amount of time required to complete a task,
based on a weighted average of pessimistic, optimistic, and expected duration?"
Minimal duration
Earliest completion.
"Your company has an emergency and needs contracted work done as soon as possible.
Under these circumstances, which of the following would be the helpful to add to the
contract?"
Incentives
https://amigo.amityonline.com/courses/2056/quizzes/3267/take 10/15
4/21/2019 Quiz: section C - Multiple Choice Questions
The type of prototype used during the analysis phase is the ____ prototype.
evolving
discovery
interface
functioning
design a prototype
https://amigo.amityonline.com/courses/2056/quizzes/3267/take 11/15
4/21/2019 Quiz: section C - Multiple Choice Questions
Organizing.
Directing.
Controlling.
Withdrawing.
Which of the following represents the estimated value of the work actually accomplished?
https://amigo.amityonline.com/courses/2056/quizzes/3267/take 12/15
4/21/2019 Quiz: section C - Multiple Choice Questions
"You are a project manager who was just assigned to take over a project from another
project manager who is leaving the company. The previous project manager tells you that
the project is on schedule, but only because he has constantly pushed the team to
perform. What is the FIRST thing you should do as the new project manager?"
The customer requests a change to the project that would increase the project risk.
Which of the following should you do before all the others?
Include the expected monetary value of the risk in the new cost estimate.
https://amigo.amityonline.com/courses/2056/quizzes/3267/take 13/15
4/21/2019 Quiz: section C - Multiple Choice Questions
The document that is proof of upper management s commitment to the project and gives
the authority to manage the project to the project manager is called:
"A ____ model shows what the system is supposed to do in great detail, without
committing to any one technology."
logical
vertical
physical
horizontal
____ requirements are based on the procedures and rules that the organization uses to
run its business.
System
https://amigo.amityonline.com/courses/2056/quizzes/3267/take 14/15
4/21/2019 Quiz: section C - Multiple Choice Questions
Functional
Physical
Logical
https://amigo.amityonline.com/courses/2056/quizzes/3267/take 15/15