Beruflich Dokumente
Kultur Dokumente
E XPOLINK .
...., ? 20
MATERIAL SUBMITTAL
ROUTE 2020 CONSULTANCY SERVICES STAGE 4 · DESIGN AND BUILD
0 New Submittal
• Re-Submittal
ENCLOSURES: □ Drawings
□ Job Reference
□ Norms I Standards
■ Certificate of Quality
■ Test Certificate
□ B.O.Q. Pages
□ Method Statement
□ Sample
□ Guarantee Certificate
□ FSC Certificate (if applicable)
□ Sample Photo
COMMENTS:
SONO of the material by the Engineer shall not relieve the Contractor from his obligations under the Contract nor shall it constitute a change to the Contract's Documents .
~------
for I ENGR. AMIN AHMED AMIN
F-IC-2031 REV 11
CB-003-PRD The attached Scope of Certification bearing the same Certificate No. forms an integral part of this Certificate.
This Certificate is an electronic document, subject to the Terms and Conditions of the Product Certification System and shall not be reproduced except in full.
~ :=::::i.ii,.,,a:=J..,..a
DUBAI MUNICIPAUTY
GOVERNMENT OF DUBAI
Product
S/N Brand Name Product Details
Description
Durosan Interior Matt
Jollyfix
Easycoat Magnum
Water Based Paint for Exterior
Easycoat Fenotex
Application only
Exterior Walls
Easycoat Profile Decor
of Mineral
2 Easycoat Heavytex with Marble chips
Substrate
VOC (GBRS limit is max.40 g/I)
Easycoat Heavytex without Marble chips
(Category 3)
Heavy metals: Cadmium and
Jotun Block Filler
Chromium VI
Texo Compound
Page 1 of 6 F-IC-2032 R6
P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE
~ :=::::i.ii,.,,a:=J..,..a
DUBAI MUNICIPAUTY
GOVERNMENT OF DUBA I
Jotashield Decor HB
Exterior Woodshield Varnish Exterior Gloss VOC (GBRS limit is max.700 g/I)
3 Minimal Build Woodshield Varnish Exterior Matt Heavy metals: Cadmium and
Page 2 of 6 F-IC-2032 R6
P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE
~ :=::::i.ii,.,,a:=J..,..a
DUBAI MUNICIPAUTY
GOVERNMENT OF DUBAI
Page 3 of 6 F-IC-2032 R6
P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE
~ :=::::i.ii,.,,a:=J..,..a
DUBAI MUNICIPAUTY
GOVERNMENT OF DUBAI
Jotafloor Sealer
Page 4 of 6 F-IC-2032 R6
P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE
~ :=::::i.ii,.,,a:=J..,..a
DUBAI MUNICIPAUTY
GOVERNMENT OF DUBA I
PenguardTexo
Penguard Topcoat
Penguard Special
Penguard HSP
Penguard Express Zp
Penguard HSP Zp
Barrier 80
Barrier ZEP
Resist 78
Durathane
Penguard WF
Tankguard 412
Hardtop AX
Hardtop XP
Hardtop Flexi
Hardtop CA
Hardtop XPL
Hardtop HB
Hardtop Eco
Jotamastic 87
Jotamastic 80
Jotamastic Smartpack
Page 5 of 6 F-IC-2032 R6
P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE
~ :=::::i.ii,.,,a:=J..,..a
DUBAI MUNICIPAUTY
GOVERNMENT OF DUBAI
NOTE1: This document forms part of the Certificate of Product Conformity bearing
the same certificate number.
NOTE2: The above product shall bear the DCL Conformity Mark.
NOTE 3: For colors/Types not covered by the Scope, SRI and LRV shall be tested and classified based on the
application of the product in the construction site to ensure that it meets the requirements of the DM-
GBRS.
SRI Class 1 (> 78) - "Can be Used in 75 -100% of surface to be coated - Sloped or Flat Roof'
SRI Class 2 (29<78) - "Can be Used in 75 -100% of surface to be coated - Sloped Roof'
SRI Class 3 ( < 29 or untested) - "Can be Used in 0 - 25% of surface to be coated - Sloped or Flat Roof
provided the remaining area is Class 1 or 2"
Page 6 of 6 F-IC-2032 R6
P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE
r1•9 U fJ}l-•!._•;._.;.,..._.Olil
WIMPEY LABORATORIES
-
._;-.•L..tQiJ-•..
TEST REPORT FOR PHYSICAL PROPERTIES AND CHEMICAL RESISTANCE OF JOTAFLOOR PU UNIVERSAL
ASTM C 957
Results of analysis:
liA
~ U•U
OHSAS 18-001 REGISTERED
6!\~7~18-al;JGI?
; ; ~1 4=:>~l..::.,l__,Lo':il
.. ~ 1 4=:>~l..::.,l__,Lo':il •
• '-E-.J • H'l"YV'\:..,.,.,_- • +'\V\ i 'l"Y · iV\A : ~L.. •
TEL : +971 4 3204717 • FAX: +971 4 3204718 • P.O.BOX: 123279 • DUBAI • U NITED A RAB EM IRATES
~.>:'1.
+ '\V \ i'l"Y· iV \ V : c , ~
REPORT OF TESTS
1.0 Introduction
Further to the test work instructions received from Mis. Jotun Paints, Dubai, dated
16.11.2011, Jotafloor PU Uni versa I has been tested for the following by Al Futtaim
Exova
2.0 Pull Off Strength
Test Method : The test was carried out in general accordance with ASTM D 4541
2002 using a portable adhesion tester.
The test sample was prepared by applying the supplied sample on the surface of a host
concrete block and test specimens were cured at a temperature of23±2°C.
The test procedure involved fixing a circular dolly over the test area using a two
component adhesive. A pm1ial depth circumferential cut was made over the test area.
After the adhesive had cured sufficiently, the test was performed at an ambient temp of
23°C±2 using a po11able adhesion tester until failure occurred.
'~
r?r1l O __ A_U_
M_A_R~F~A~RO~O~K-
alf of Al Futtaim Exova (L.L.C constiucllon & consume, Products Manage,
7
Tested b : SSK, Date tested: I 0.12.2012
This report shall only be reproduced in full. Approval of the testing laboratory is required for partial reproduction.
Samples will be reta ined for a period ofone month only, unless otherwise requested.
The test results relate only to U1e samples tested.
O t
)i( '~
LI.I ~
th
Date: 5 January 2011
External Fire Exposure Roof Test
Page 1
Document Reference: 199956
Testing
Advising
Assuring
Registered Office: Exova (UK) Ltd, Lochend Industrial Estate, Newbridge , Midlothian EH28 8PL United Kingdom Reg No SC 70429
This report in issued in accordance with our terms and conditions, a copy of which is available on request
I0249
BS476:Part3:2004 Exova
Warringtonfire
Executive Summary
Objective To determine the fire performance of the following product when tested in
accordance with BS 476: Part 3: 2004
Test Sponsor Jotun UAE Limited (LLC). PO Box 3671, Behind National Taxi, AL Quoz Industrial
Area, Dubai, United Arab Emirates
Test Results In Accordance With The Designations Defined In BS 476: Part 3: 2004 The
Test Specimens Are In Category "EXT.F.AA".
Date of Test: 20th December 201 O
Signatories
Authorised
C. Dean* Report Issued: 5th January 2011
Operations Manager
This version of the report has been produced from a .pdf format electronic file that has been provided
by Exova Warringtonfire to the sponsor of the report and must only be reproduced in ful l. Extracts or
abridgements of reports must not be published without permission of Exova Warringtonfire.
I
Document No.: 199956 Page No.: 2 of 10
Author: K. Hughes Issue Date: 5th January 2011
Client: Jotun UAE Limited (LLC) Issue No:
0249
BS476:Part3:2004 Exova
Warringtonflre
TABLE 1 ................................................................................................................................................. 8
I
Document No.: 199956 Page No.: 3 of 10
th
Author: K, Hughes Issue Date: 5 January 2011
Client Jotun UAE Limited (LLC) Issue No.:
0249
85476:Part3:2004 Exova
Warringtonfire
Test Details
Purpose of test To determine the performance of specimens of a roof construction when they
are subjected to the conditions of the test specified in BS 476: Part 3: 2004,
"British Standard Specification for Fire Tests on Building Materials and
Structures - External Fire Exposure Roof Tests".
The test was performed in accordance with the test procedures specified in BS
476: Part 3: 2004 and this report should be read in conjunction with that British
Standard.
Scope of test The tests are designed to enable measurement of:
Roofs are graded according to the angle at which they are tested, the time for
which they resist penetration by fire and the distance of superficial spread of
flame on their external surface.
The test specimens are tested at an angle of 45° to the horizontal (sloping
position) unless the roof construction is used at an angle of less than 10° to the
horizontal, in which case the specimens are tested horizontally (flat position).
Fire test study Certain aspects of some fire test specifications are open to different
group/EGOLF interpretations. The Fire Test Study Group and EGOLF have identified a
number of such areas and have agreed Resolutions which define common
agreement of interpretations between fire test laboratories which are members
of the Groups. Where such Resolutions are applicable to this test they have
been followed .
Instruction to test The test was conducted on the 20 th December 201 O at the request of Jotun
UAE Limited (LLC) the sponsor of the test.
Provision of test The specimens were supplied by the sponsor of the test. Exova
specimens Warringtonfire was not involved in any selection or sampling procedure.
Conditioning of The specimens were received on the 14th December 2010. Prior to testing the
specimens specimens were conditioned to equilibrium in an atmosphere having a
temperature of 23 ±2°C and a relative humidity of 45 to 55%.
I
Document No .. 199956 Page No.: 4 of 10
th
Author: K Hughes Issue Date: 5 January 2011
Client: Jotun UAE Limited (LLC) Issue No .:
0249
BS476:Part3:2004 Exova
Warringtonflre
I
Document No.: 199956 Page No.: 5 of 10
th
Author: K. Hughes Issue Date: 5 January 2011
Client: Jotun UAE Limited (LLC) Issue No:
0249
BS476: Part 3: 2004 Exova
Warrlngtonfire
Note 1: The sponsor of the test has confirmed that no flame retardant additives were utilised
in the production of the component.
I
Document No.. 199956 Page No,: 6 of 10
th
Author: K. Hughes Issue Date: 5 January 2011
Client: Jotun UAE Limited (LLC) Issue No.:
0249
85476:Part3: 2004 Exova
Warrlngtonftre
Test Results
Results The test results relate only to the behaviour of the test specimens of the
construction under the particular conditions of test, they are not intended to be
the sole criterion for assessing the potential fire hazard of the construction in
use.
The test results relate only to the specimens of the roof construction which
were tested . Small differences in the composition or thickness of the
construction may significantly affect the results of the test and may therefore
invalidate the test results . Care should be taken to ensure that any
construction which is supplied or used is fully represented by the specimens
which were tested.
The results of the tests on each of the specimens are given in Table 1.
Validity The specification and interpretation of fire test methods are the subject of
ongoing development and refinement. Changes in associated legislation may
also occur. For these reasons it is recommended that the relevance of test
reports over five years old should be considered by the user. The laboratory
that issued the report will be able to offer, on behalf of the legal owner, a review
of the procedures adopted for a particular test to ensure that they are
consistent with current practices, and if required may endorse the test report.
This report may only be reproduced in full. Extracts or abridgements shall not
be published without permission of Exova Warringtonfire.
I
Document No.: 199956 Page No.: 7 of 10
th
Author: K. Hughes Issue Date: 5 January 2011
Client: Jotun UAE Limited (LLC) Issue No .:
0249
BS476:Part3:2004 Exova
Warrlngtonfire
Table 1
I
Document No.. 199956 Page No.: 8 of 10
th
Author: K. Hughes Issue Date: 5 January 2011
Client: Jotun UAE Limited (LLC) Issue No.:
0249
BS476:Part3:2004 Exova
Worringtonfire
Classification Of Specimens
4 Classification
Roof systems shall be designated by the letters EXT.F or EXT.S to indicate whether the test results
apply to a flat (horizontal) or an inclined roof system, respectively
Roof systems subject to conditions of external fire shall be classified according to both the
time of penetration and the distance of spread of flame along their external surface.
Each category designation shall consist of two letters, e.g. AA, AC, BB, these being
determined as specified in 4.22 and 4.23
A. Those specimens that have not been penetrated within one hour
B. Those specimens that are penetrated in not less than 30 min.
C. Those specimens that are penetrated in less than 30 min.
D. Those specimens that are penetrated in the preliminary flame test
Attention shall be drawn to dripping from the underside of the specimen, any mechanical
failure, and any development of holes, by adding a suffix "X" to the designation to denote
that one or more of these took place during the test.
EXAMPLE 1 EXT.F.AA is a flat roofing system with one hour fire penetration resistance
on which there was no spread of flame.
EXAMPLE 2 EXT.S.CCX is an inclined roofing system with less than 30 min fire
penetration resistance, on which the spread of flame exceeded 533mm and further
deterioration took place.
I
Document No : 199956 Page No.: 9 of 10
th
Author: K Hughes Issue Date: 5 January 2011
Client: Jotun UAE Limited (LLC) Issue No :
0249
85476: Part 3: 2004 Exova
Warringtonfire
Revision History
I
Document No.. 199956 Page No.: 10 of 10
th
Author: K. Hughes Issue Date: 5 January 2011
Client: Jotun UAE Limited (LLC) Issue No:
0249
TEST REPORT
REACTION TO FIRE TEST
TEST SPONSOR:
Jotun UAE Ltd. LLC
P.O. Box: 3671, Al Quoz Industrial Area
Dubai, United Arab Emirates
T: +971 4 339 5000, F: +9714 338 0666
Website: www.jotun.com
TESTED MATERIAL/ASSEMBLY:
Jotafloor PU Coating System applied over fibre cement board substrate
TEST STANDARD:
ASTM E84-16: Standard Test Method for Surface Burning Characteristics of Building
Materials
·,.
Copyright© This document shall not be reproduced except in full without written approval of Tho mas Bell-Wright International Consultants
111111
THOMAS BELL-WRIGHT
INTERNATIONAL CONSULTANTS Test Reference No.: QL022-3
◄◄ l9
II SIi'\(,
'...I, 1 1 I
xo ,\n,0011
Memberships
Members of European Group of Organization for Fire Testing, Inspection and Certification
www.egolf. org.uk
Member of International Trade Council
www.thetradecouncil.com
Member of Association for Specialist Fire Protection
www.asfp.org.uk
Member of Centre for Window and Cladding Technology
www.cwct.co.uk
~
CENTRE FOR
~ ~.._ INTERNATIONAL
TRADE
WINDOW!
COUNCIL CLADDING
T E C H N O L O G Y
41fP
W'lll'W,Dlf p ,o,tg,Ufil
The work which is the subject of this report falls wholly or partly under the accreditations of ISO 17025
U KAS and ISO 17025 GAC.
,,•.,,.
111111
THOMAS BELL-WRIGHT
INTERNATIONAL CONSULTANTS Test Reference No.: QL022-3
Table of Contents
2. SPONSOR ...... .. ... ... ................ .. .... ... ....... .............. ... ...... .. .... .... ..... .... ............. ... .. ... ... .. ... ..... ..... ....... ........ ... 4
3. TESTING LABORATORY .. .............................. ......... ... ... .. .............. .. .... .... .... ... .. ....... ................................... 4
4. DATE OF TEST ................ ........... .. ......... ...... .......... ... ... ............ .. .... ..... ... ........... .. ... .................................... 4
5. SPECIMEN DESCRIPTION .. .................. ..... ................................................................... ...... ... ........ ..... ..... .. 5
6. METHOD OF TEST .. .. ..... ........ .. ..... .. .. .......... ...... ... ............. ....................... ....... ... ........................ .. ........ ..... 6
6.1. Placing oftest specimen ... ............ ... ........ ... ..... .. ...... ......................................................... ......... ... .. 6
7. OBSERVATION ................................... ...................... ...... ..... ..... ... ..... .... .... ... .... ......... .......... .......... ......... ... 7
8. SUMMARY OF RESULTS ...... .... ...... ....... ..... ....... .... ............. ....... ... .. .. .... ... ... ... ...... .................................. .... . 7
9. CLASSIFICATIONS ....... ..... ... .................. ......... ....... ..... .... ... ................ ..................... ,... .. ... .. ........ ........... .... 8
11. APPENDIX 1- GRAPHS ..... ...................... .. ....................... .... ............. ....... ....... ............. ... ........... .... .... .. 10
14144Zii•M
111111
THOMAS BELL-WRIGHT
INTERNATIONAL CONSULTANTS Test Reference No.: QL022-3
1. INTRODUCTION
Determination of the flame spread index and the smoke developed index of Jotafloor PU Coating System
applied over fibre cement board substrate as per ASTM E84; Standard Test Method for Surface Burning
Characteristics of Building Materials.
2. SPONSOR
Name: Jotun UAE Ltd. LLC
Address : P.O. Box: 3671, Al Quoz Industrial Area
Dubai, United Arab Emirates
T: +971 4 339 5000
F: +9714 338 0666
Website: www.jotun.com
3. TESTING LABORATORY
Name: Thomas Bell-Wright International Consultants (TBWIC)
Address : Corner of 46 th and 47 th Streets,
Jebel Ali Industrial Area 1
Dubai, United Arab Emirates
T: +971 4 821 5777
F: +9714 333 2693
Website: www.bell-wright.com
4. DATE OF TEST
Sample received: 27-Feb-17
Test date: 22-Mar-17
liiAIJiiM
111111
THOMAS BELL-WRIGHT
INTERNATIONAL CONSULTANTS Test Reference No.: QL022-3
5. SPECIMEN DESCRIPTION
The description of the specimen given below has been prepared from information provided by the Sponsor.
Product Tested Coating System applied over fibre cement board substrate
Product Name Jotafloor PU Coating System
Manufacturer Jotun UAE Ltd . LLC
Overall Coating Thickness 240 microns
Fire side Exposed coated surface
Product Description
Product Name PU Coating
Product Reference Jotafloor PU Top Coat HS
gj' Manufacturer Jotun Paints
"'Cl
'iii Colour Reference Note 1
...
QI
Number of Coats 2 Coats x 70 microns
~
..... Application rate per coat 13 m 2/litre
ra
0
u Application method Roller Application
a.
0 Curing process per coat 7 days curing
I-
Thickness 140 microns
Specific gravity 1.39
Product Name Epoxy
Product Reference Jotafloor SF Primer
Manufacturer Jotun Paints
Product Details Colour Reference Note 1
...
QI Number of Coats 1 x 100 Microns
E
·;::
CL
Application rate per coat 10 m 2/litre
Application method Roller Application
Curing process per coat 1 day curing
Thickness 100 microns
Specific gravity 1.1
Product Name Fibre Cement Board
Manufacturer Outsourced
Colour Reference Grey
QI
.....
........ra Thickness 12mm
Ill
.0
:::,
Density Note 1
VI
Dimensions per panel 2440 x 605mm (Ix w) (measured)
No. of panel 3
Total dimension 7320 x 605mm (Ix w) (measured)
Three (3) sections of Jotafloor PU Coating System applied over fibre
cement board substrate were butt jointed end-to-end. The test
Specimen placement
specimen was placed directly to the tunnel ledges with the exposed
coated surface towards the flame source.
Note 1 - The Sponsor cannot provide the information.
1¥i44iii•M
111111
THOMAS BELL-WRIGHT
INTERNATIONAL CONSULTANTS Test Reference No.: QL022-3
The test specimen was submitted by the client and TBWIC has not been involved in the selection and
configuration of the specimen.
6. METHOD OF TEST
Several sections of cement board butt jointed end-to-end with overall dimensions of 7350 x 600mm (I
x w), were placed at the back of the sample to protect the furnace lid assembly.
Flame spread and density of the smoke are measured and recorded while the results are computed
against the standard calibration materials (cement board and red oak flooring).
6.3. Conditioning
After delivery on 27-Feb-17, the specimen was stored in room temperature for 23 days prior to the test
ranging from 20.2 to 25.8°C and 45 to 55% relative humidity.
IIMiiiiiM
111111
THOMAS BELL-WRIGHT
INTERNATIONAL CONSULTANTS Test Reference No.: QL022-3
7. OBSERVATION
Test Data and Observation
Observations
8. SUMMARY OF RESULTS
The test specimen has been evaluated in accordance with ASTM E84; Standard Test Method for Surface
Burning Characteristics of Building Materials.
14i41Zili■
111111
THOMAS BELL-WRIGHT
INTERNATIONAL CONSULTANTS Test Reference No.: QL022-3
9. CLASSIFICATIONS
The following information is designed to help put these test results into context. Flame Spread Index and
Smoke Developed Index results from an ASTM E84 test are often used by regulatory agencies to approve
materials for various applications. For example, the International Building Code 2015, Section 803.1.1
requires that:
Interior wall and ceiling finish materials shall be classified in accordance with ASTM E84 or UL 723-lOth Ed.
2008. Such interior finish materials shall be grouped in the following classes in accordance with their flame
spread and smoke-developed indexes.
Note that the above example is the IBC requirement for interior wall and ceiling finishes only; your
application may be different.
1414¥11•■
111111
THOMAS BELL-WRIGHT
INTERNATIONAL CONSULTANTS Test Reference No.: QL022-3
10. LIMITATIONS
Testing of materials that melt, drip, or delaminate to such a degree that the continuity of the flame front
is destroyed, results in low flame spread indices that do not relate directly to indices obtained by the testing
materials that remain in place
Thomas Bell-Wright International Consultants recommend that the relevance of test reports should be
considered after a period of five years.
This test report is respectfully submitted by: Thomas Bell-Wright International Consultants
m o arungao ~ agoso
ing & Inspection Engineer Fire Testing Support Engineer
of Fire Compliance
1414ffii•M
THOMAS BELL-WRIGHT
INTERNATIONAL CONSULTANTS Test Reference No.: QL022-3
20
18
16
t 14
.!!!
::;;- 12
ro
~ 10
a.
~ 8
E
ro 6
u:::
4
2
0
0 1 2 3 4 5 6 7 8 9 10
Time (min)
100
90
80
C
0 70
·.;::::;
...a.0 60
Ill
..c 50
...
ct
..c: 40
bl)
:.:i
30
~
20
10
0
0 1 2 3 4 5 6 7 8 9 10
Time (min)
;;;;;;.11+1
111111
THOMAS BELL-WRIGHT
INTERNATIONAL CONSULTANTS Test Reference No.: QL022-3
Photo 1: Specimen before the test Photo 2: Specimen before the test
(Non-fire side) (Fire side)
Photo 3: Specimen after the test Photo 4: Specimen after the test
(located near the fire end) (located near the exhaust end)
IAMllll•i
- -
Al Futtaim Ex ova LLC T: +971 (0)4 885 1001
Dubai lnvestments Park F: +971 (0)4 885 4004
-a.! h 6 II IJig sl
~~
Ill
P.O. Box 349 24, Dubai E: dubai.lab@exova.com
United Arab Emirates W: www.exova.com :.-4► Al-fidtaim Exova
REPORT OF TESTS
Test ed for Jotun Paints, Post. Box No. 3671, Dubai, U.A.E
1.0 Introduction
Further to the test work instructions received from M/s. Jotun U.A.E Ltd (L.L.C), dated
17.05.2012, a representative from Al Futtaim Exm/a L.L.C visited their factory in Al
Quoz. The purpose of the visit was to witness the following test on their paint sample.
Instrument QUV
Type of Lamp UV-A Lamp (340nm)
Total exposure 8000 hrs
Gloss retention 70%
Cabinet temperature 60°C
Condensation cycle In a 12hrs cycle (8hrs is UV at 60° C and 4hrs condensation)
Initial gloss reading 83 @ 60° angles. The After g ass reading 61 @ 60° angles. No
surface of the coated panel is white in change in original appearance. No indication
appearance and of glossy finish. Surface of any deterioration like chalking or
im pe rfections were observed. discolo ration observed.
Document/Reports No.
~~
MGC·N0001 -CIV-V8R·SYW-RC5-000399
~
----- -
Route 2020 Consultancy Services
MATERIAL COMPLIANCE TABLE
-
Revision:
PARSDNS;~Y~trA
Submission Date:
-
EXPOLINK.
•
.
''l[f\, ,..,.
-
Ref Specification/Rev
R2020 -PSJV-FORM-0156 Rev. 0 1 - MATERIAL COMPLIANCE TABLE (MCT) Template, 07-0ct-201 7 Page 2 of 2
Jotun Protects Property
To,
M/s. EMCON CONTRACTING LLC,
Dubai, U.A.E
With respect to the above project and subject above, we hereby submit our reply to the
comments received from the Engineers & The Client.
4. (B) Jotun Roles & Responsibilities during the inspection of coatings works
1. Jotun will monitor periodically the surface preparation for the coating works related
to the Viaduct/Piers.
2. Jotun will monitor the details of the moisture content in the surface taken by the
applicator and advise accordingly.
3. Jotun will periodically moni~or the WFT's taken by the applicator QC during
application of the topcoats.
4. Jotun will carry out the Pull off test (Adhesion test) & DFT's after minimum 14 days of
curing of the Final topcoat. Reports of the same shall be sent accordingly.
5. Jotun has the authority to STOP coating activities during any adverse weather
conditions.
6. Jotun will monitor periodically the Safety measurements at site related to coating
works only, and inform the HSE responsible at site for any issues & changes if
required.
7. Jotun representative shall monitor periodically the storage of paints at site.
Best~ , s,
~ enon
Sales Manager- Projects Jotun lJ.A.E. Ltcl. (L.L.C.)
JOTUN UAE Ltd P.O.Box 3671, Dubai
United Arn!:> Emirates
Dubai.
To,
M/s. EMCON CONTRACTING LLC,
Dubai, U.A.E
With respect to the above project and subject above, we hereby submit our reply to the
comments received from the Engineers & The Client.
22. General
3- Paint supplier certifications shall not be issued specifically for the project from the
supplier once the paint has been accepted by the Engineer. if not obtained, the PQQ shall
have a status of rejected.
(B) Submitted approved applicator letter (on page 4 of 62) with Manufacturer's note "This
letter will be valid only if our Technical Service, Mr. Justin Fernandez is informed by fax on
04-338066 before starting works to enable us to check and supervise the coating" .
► Noted. The information of the start of the work shall be provided by the applicator
for better coordination and communication at site during the coating application.
Best Regards,
_; ~:.non
·><' Sales Manager- Projects
JOTUN UAE Ltd
lo·,un U..D.. I::. Ltd. (!... I... G.\
l-;_c::.::10Y. 367·!, f:lfll:-::d
\J!'d·:·r:~~ /-\r;·:~:i [n1i:·c.t:::~~
Dubai.