NATIONAL IRANIAN TANKER COMPANY

SHIP: M.T.IRAN ASTARA DATE: APR.2007

BRAKE RENDERING TEST RECORD & DATA FOR MOORING


WINCHES

F 1 = Line pull

L1

Bolted
Bracket

REQUIRED JACK
FORCE =
F1 (L1/ L2)

Jack with
Gauge

WINCH
FOUNDATION

L2

THE FORMULA ABOVE GIVES THE FORCE REQUIRED OF THE JACK TO INDICATE THE
BRAKE HOLDING CAPACITY WITH ONE LAYER ON THE DRUM. TO CALCULATE THE
BRAKE HOLDING CAPACITY AT PERIPHERY OF THE DRUM (GIVEN BY F2 BELOW) THE
FOLLOWING FORMULA WILL HOLD GOOD:
F1 x L1 = F2 x L2
DATA FOR M.T.IRAN SANANDAJ:
1. F1 = 41.1 TONNES (WINCHES SET TO RENDER AT THIS LOAD)
2. L1 = 291 mm
3. L2 = NATI
690 mmDFONAL IRANIAN
FOR WINCHES W1 AND TANKER COMPANY
W2 (fwd headline winches)
4. L2 = 575 mm FOR
SHIP: MT IRAN (ABADANALL OTHER WINCHES (M1,M2,M3,M4,M5 & M6)
DATE:30/12/00
THERE FORE
PLACE: KHARK ISLAND
JACK FORCE (F2) = (F1 X LI) / L2
= (41.1 Tonnes X 291 mm) /575mm
= 20.8 Tonnes (for M1,M2,M3,M4,M5 & M6)
= 293 kgf/cm2 =298.6 bar

JACK FORCE (F2) = (F1 X LI) / L2


= (41.1 Tonnes X 291 mm) / 690 mm
= 17.33 Tonnes (for W1 & W2) = 244kgf/cm2 = 239 bar
BREAKE
JACK pressure ACTUAL JACK
WINCH DISTANCE ADJUSTED TO
DATE SUPPOSED TO pressure
NUMBER (L2) RENDER AT
BE (F2) READIING
(F1)
1
APR.2007 575 mm 41.1 Tonnes 298.60 bar 298.68 bar

APR.2007 2 575 mm 41.1 Tonnes 298.60 bar 298.68 bar

APR.2007 3 575 mm 41.1 Tonnes 298.60 bar 298.70 bar

APR.2007 4 690 mm 41.1 Tonnes 239.00 bar 239.80 bar


APR.2007 5 690 mm 41.1 Tonnes 239.00 bar 239.80 bar
APR.2007 6 575 mm 41.1 Tonnes 298.60 bar 298.70 bar

APR.2007 7 575 mm 41.1 Tonnes 298.60 bar 298.70 bar

APR.2007 8 575 mm 41.1 Tonnes 298.60 bar 298.58 bar

APR.2007 9 575 mm 41.1 Tonnes 298.60 bar 298.65 bar

APR.2007 10 575 mm 41.1 Tonnes 298.60 bar 298.68 bar

APR.2007 11 575 mm 41.1 Tonnes 298.60 bar 298.66 bar

APR.2007 12 575 mm 41.1 Tonnes 298.60 bar 298.68 bar

APR.2007 13 575 mm 41.1 Tonnes 298.60 bar 298.65 bar

APR.2007 14 575 mm 41.1 Tonnes 298.60 bar 298.65 bar

NATIONAL IRANIAN TANKER COMPANY


SHIP: M.T.IRAN ASTARA DATE: APR.2007

BRAKE RENDERING TEST RECORD & DATA FOR MOORING


WINCHES

M.A.Karimi.k Capt.A.R.SAMADI