Sie sind auf Seite 1von 35

Master L

S.No Doc No.

1 77-QE30-F-005

3
4

5 77-QE14-F-016

7 76-QE30-F-007

8 77-QE30-F-002

9 77-QE30-F-009

10

11

12 76-QE30-F-006
13 77-QE30-F-008

14

15

16 77-QE30-F-010

17 76-ZP00-F-001

18 75-ZP00-F-001

19

20 77-QE30-F-001

21 77-QE30-F-003
22 77-QE30-F-006

23 77-QB14-F-001

24 77-QB14-F-002

25 77-QE30-F-013

26

27

28

29

30
31 77-QE30-F-015

32

33

34

35 77-QB14-F-004

36 77-QB14-F-005

37 77-QE30-F-011

38 77-QE30-F-004

39 77-QB14-F-002
40 77-QB14-F-001

41 77-QB14-F-006

42 77-QB14-F-003

43 76-QB14-F-001

44 77-QB14-F-007

45 77-QE30-F-017

46 76-QE30-F-008
SALINE WATER CONVERSIO
Strategic Reservoirs At Makkah

Master List of Method of Statements (MOS

Title

Concrete Works

Road Works

Installation of doors and windows


Roof Works

Method Statement of Roof Water Proofing

Erection of Precast Elements

Grouting of Steel Column Base Plates

Block Masonry & Plastering

Concrete Repairs

Painting Works

Land Scaping

False Ceiling works


Bitumen membrane application

Ceramic & granite Tiles

Steel Structure Erection Works

Backfilling

Topographic Survey for Taif

Topographic Survey for Makkah

Scaffolding

Drilling and Blasting for M&T

damp proofing.
termite control

soil resistivity test.

Geophysical Survey.

Ring Beam Foundation

Station Shafts

Piping trench works & Manholes installation

Station Lighting, Fence Lighting, lighting pole installation


& equipment installation

Storm water and drainage system

Sewage water system & Septic Tank


Open channel works

MOS for Slope Protection with (Rip-Rap and Reinforced


or Concrete Slabs )

Epoxy coating

Fencing works

Plate load test

Method of Statement of Plate load Test (SAFCO)

Select Fill Material Test

Earthwork

Method Statement for Geophysical Survey


Method Statement for Soil Resistivity Test

Method Statement for Settlement Monitoring

Borehole refilling

Method statement: excavation of highly weathered rock


and backfilling of the top 1 m of final grade with cement
treated fill, TK-01 AND TK-02 location ,taif project.

Method of Statement for Cyclopean Concrete Works

Method Statement for HDPE Liner Installation

Method of Statement for Zone load test


RSION CORPORATION
kah Phase-II & Taif Phase-I

(MOS)

Date
Type Rev Disc. Status
Planned

MOS C Civil A

MOS Civil 28-May-19

MOS Civil 21-May-19


MOS Civil 30 May 19

MOS A Civil B

MOS Civil 20-May-19

MOS A Civil C

MOS A Civil B

MOS B Civil B

MOS Civil 21-May-19

MOS Civil 4-Aug-19

MOS A Civil B
MOS B Civil A

MOS Civil 15-May-19

MOS Civil 31-May-19

MOS A Civil C

MOS E Civil A

MOS D Civil A

MOS Civil 30-Jun-19

MOS A Civil B

MOS A Civil B
MOS A Civil B

MOS C Civil B

MOS C Civil A

MOS A Civil B

MOS Civil 15-Jun-19

MOS Civil 15-Jun-19

MOS Civil 15-Jun-19

MOS Civil 15-Jun-19

MOS Civil 15-Jun-19


MOS A Civil C

MOS Civil 01-Jul-19

MOS Civil 25-Apr-19

MOS Civil 30-Jun-19

MOS C Civil B

MOS A Civil C

MOS A Civil B

MOS C Civil A

MOS C Civil A
MOS C Civil B

MOS A Civil B

MOS C Civil A

MOS A Civil B

MOS B Civil A

MOS A Civil C

MOS A Civil B
Date : 03/April/19

Date

Submitted Approved

11-Oct-18 24-Oct-18
19-Feb-19 12-Mar-19

16-Mar-19 18-Mar-19

12 May 18 14-May-18

17-Oct-18 24-Oct-18

16-Mar-19 25-Mar-19
14-Aug-18 16-Aug-18

20-Sep-18 27-Sep-18

2-Jul-18 5-Jul-18

30-Jun-18 5-Jul-18

1-Jan-18 17-Jan-18

12-May-18 16-May-18
12-May-18 16-May-18

22-Dec-18 2-Jan-19

9-Aug-18 16-Aug-18

10-Mar-19 14-Mar-19
19-Feb-19 13-Mar-19

5-Nov-18 17-Nov-18

17-Dec-18 2-Jan-19

31-Oct-18 22-Nov-18

28-Aug-18 4-Sep-18

9-Aug-18 16-Aug-18
22-Dec-18 2-Jan-19

9-Feb-19 19-Feb-19

5-Mar-19 14-Mar-19

6-Mar-19 17-Mar-19

17-Mar-19 24-Mar-19

16-Mar-19 24-Mar-19

17-Mar-19 25-Mar-19
Notes

Das könnte Ihnen auch gefallen