3 Boiler room How many people operate in boiler room / control room? 28-Feb-19 2 person 4-Mar-19 close
Yes, will use jumbo bag
How the ashes in jumbo bag will be transferred? Will there be (under ACS), approx
4 Boiler room 28-Feb-19 4-Mar-19 close
handling equipment or using labor? 100m3/day (biomass) if
coal 500 kg/day
Will the flooring also be using concrete floor with Liquid floor Floor hardener (powder 5
5 Boiler room & Coal Storage 28-Feb-19 4-Mar-19 close
hardener polish as in the Utility building? kg/m2)
Mechanical
Does the boiler room need to provide with domestic water tap point
6 Domestic water tap points 28-Feb-19 2 titik 4-Mar-19 close
for cleaning or for hand basin?
Does the boiler room need to provide with floor drain or can be
7 Floor drain 28-Feb-19 yes 4-Mar-19 close
provided gutter and grill?
consultant to find
8 Biomass Boiler Please send us the MSDS for the biomass and coal for the boiler. 28-Feb-19 coal 4-Mar-19
out
Structure
what is maximum operating load of this equipment (in red cloud)?
11 Operating equipment load 28-Feb-19 ACS, 16 Ton per each 4-Mar-19 close
No.
REQUEST FOR INFORMATION
Client : The Craft Heinz Company Date :
Project : Plant Relocation-Bid Package & Const Project no. : TA1885
To : Contractor's site representative Your Ref. :
Query / Subject:
1.
2.
3.
4.
5.
6.
Signature:
Name:
Response / Comment:
1.
2.
3.
4.
5.
6.
Signature:
Name:
Site Representative
PM-11 Rev: 02
Copy to ¨ CM (RHDHV)
¨ Client to be issued after RHDHV's
¨ PM (RHDHV) representative's decision
PM-11 Rev: 02