REQUEST FOR INFORMATION


Client : PT Heinz ABC Indonesia Project n : TA1885
Project : Indonesia Footprint From : RHDHV
To : KH

NO SUBJECT QUESTION DATE ANSWERED DATE STATUS

8 Specific FM global requirement

9 Site investigation docs (Soil report and topo survey)

15 Specific GMP guidelines

Page 1 TA-1885 - Request for Information_170912


Tel.
Fax.
Email

REQUEST FOR INFORMATION


Client : PT Heinz ABC Indonesia Project no. : TA1885
Project : Indonesia Footprint From : RHDHV
Plant : Karawang To : Heinz ABC Indonesia

NO SUBJECT QUESTION DATE ANSWERED DATE STATUS


Architecture
is the existing boiler still operate? Does the boiler currently using
1 Boiler room 28-Feb-19 2 person 4-Mar-19 close
coal as well?
2 Control Room will control room facilitate with air condition system? 28-Feb-19 AC 4-Mar-19 close

3 Boiler room How many people operate in boiler room / control room? 28-Feb-19 2 person 4-Mar-19 close
Yes, will use jumbo bag
How the ashes in jumbo bag will be transferred? Will there be (under ACS), approx
4 Boiler room 28-Feb-19 4-Mar-19 close
handling equipment or using labor? 100m3/day (biomass) if
coal 500 kg/day
Will the flooring also be using concrete floor with Liquid floor Floor hardener (powder 5
5 Boiler room & Coal Storage 28-Feb-19 4-Mar-19 close
hardener polish as in the Utility building? kg/m2)

Mechanical
Does the boiler room need to provide with domestic water tap point
6 Domestic water tap points 28-Feb-19 2 titik 4-Mar-19 close
for cleaning or for hand basin?
Does the boiler room need to provide with floor drain or can be
7 Floor drain 28-Feb-19 yes 4-Mar-19 close
provided gutter and grill?
consultant to find
8 Biomass Boiler Please send us the MSDS for the biomass and coal for the boiler. 28-Feb-19 coal 4-Mar-19
out

still open, wait


further
boiler feed tank 10m3, drawing/dimension
Please share technical spesification of each equipment such us
9 Request 28-Feb-19 Basuki will send the 4-Mar-19 information.
capacity of boiler feed tank, demin plant capacity etc
drawing of BFT Meanwhile use
Load as per
information

need compress air (4 titik,


instrumen, pneumatic valve
3 ; piping layout and
still open, wait
Does the boiler area need special utilities like compressed air, RO consumption will inform
10 Request 28-Feb-19 4-Mar-19 further info from
water, etc soon), steam 6" (start from
Basuki.
boiler outlet flange), suplai
ke softener 4 bar ( kualitas
RAW)

Structure
what is maximum operating load of this equipment (in red cloud)?

11 Operating equipment load 28-Feb-19 ACS, 16 Ton per each 4-Mar-19 close

Page 2 TA-1885 - Request for Information_170912


Tel.
Fax.
Email

REQUEST FOR INFORMATION


Client : PT Heinz ABC Indonesia Project no. : TA1885
Project : Indonesia Footprint From : RHDHV
Plant : Karawang To : Heinz ABC Indonesia

NO SUBJECT QUESTION DATE ANSWERED DATE STATUS


Maintain Top Roof level as
With new angle of Roof, The Top Roof Boiler must fixed as original
12 Height of building per drawing from Boiler 4-Mar-19 close
drawing from Basuki (adjust column height)
vendor (Basuki)

Page 3 TA-1885 - Request for Information_170912


Royal HaskoningDHV
Jl. R.A. Kartini #26 (Outer Ring Road) Cilandak - Jakarta
12430
+62 21 750 4605 Tel.
+62 21 750 4610 Fax.
info@id.rhdhv.com Email

No.
REQUEST FOR INFORMATION
Client : The Craft Heinz Company Date :
Project : Plant Relocation-Bid Package & Const Project no. : TA1885
To : Contractor's site representative Your Ref. :

SFrom : RHDHV's representative, Main office

Query / Subject:
1.
2.
3.
4.
5.
6.

Signature:
Name:

To the Contractor: Date:

Response / Comment:
1.
2.
3.
4.
5.
6.

Signature:
Name:

Site Representative

Original to ¨ RHDHV's representative (to be returned to contractor)

PM-11 Rev: 02
Copy to ¨ CM (RHDHV)
¨ Client to be issued after RHDHV's
¨ PM (RHDHV) representative's decision

PM-11 Rev: 02