LAMPIRAN 10 - Form WO

LIK Formulir Kerja Penugasan Alih Daya No. Formulir

Nama Instalasi :PLTMG MAUMERE 40 MW


Nama Inspektor Alih daya :INDRA ATMAJA
Tanggal Inspeksi :1 Oktober 2018 s/d 30 Oktober 2018

Penyelesaian (%)
No Tipe Inspeksi Penugasan/Pekerjaan Harian Keterangan / Evidence
Inspektor Verifikasi
PLTMG MAUMERE 40
1 Commisioning Trip to Jakarta 100% 100%
MW
PLTMG MAUMERE 40
2 Commisioning Kantor PLN Pusertif 100% 100%
MW
PLTMG MAUMERE 40
3 Commisioning Kantor PLN Pusertif 100% 100%
MW
PLTMG MAUMERE 40
4 Commisioning Kantor PLN Pusertif 100% 100%
MW
PLTMG MAUMERE 40
5 Commisioning Kantor PLN Pusertif 100% 100%
MW
PLTMG MAUMERE 40
6 Commisioning Libur 100% 100%
MW
PLTMG MAUMERE 40
7 Commisioning Libur 100% 100%
MW
PLTMG MAUMERE 40
8 Commisioning Kantor PLN Pusertif 100% 100%
MW

PLTMG MAUMERE 40
9 Commisioning
Trip to Maumere, Kalibrasi thermometer GT#2 oil trafo dan Winding 100%
HV LV 100%
MW
Kalibrasi trafo GT#1 oil trafo, winding HV dan
LV, diesel pump FF, meeting koordinasi PLTMG MAUMERE 40
10 Commisioning 100% 100%
Backfeeding MW

PLTMG MAUMERE 40
11 Commisioning Individual test CB MV 11kV, Energize 100% 100%
MW
backfeeding GT#1

Energize backfeeding GT#2, function test inergen PLTMG MAUMERE 40


12 Commisioning 100% 100%
gas, selesai backfeeding GT#1 MW

PLTMG MAUMERE 40
13 Commisioning lanjut dan selesai energize backfeeeding GT#2 100% 100%
MW
PLTMG MAUMERE 40
14 Commisioning funtion test BSDG 100% 100%
MW

PLTMG MAUMERE 40
15 Commisioning Minimum voltage CB MV 11kV 100% 100%
MW

PLTMG MAUMERE 40
16 Commisioning CT LV( burden test, knee point, ratio dan polarity) 100% 100%
MW
PLTMG MAUMERE 40
17 Commisioning 100% 100%
CT LV cable room (CT Alt 1,2,3,4 dan UAT 1&2 MW

Insulation Resistance BSDG, winding resistance PLTMG MAUMERE 40


18 Commisioning 100% 100%
BSDG MW

review report CB MV dan report review main PLTMG MAUMERE 40


19 Commisioning 100% 100%
busbar 11kV, NSPB 1&2, foam system MW
PLTMG MAUMERE 40
20 Commisioning libur 100% 100%
MW
PLTMG MAUMERE 40
21 Commisioning libur 100% 100%
MW
PLTMG MAUMERE 40
22 Commisioning review report 100% 100%
MW
PLTMG MAUMERE 40
23 Commisioning review report 100% 100%
MW
PLTMG MAUMERE 40
24 Commisioning HV test power cable UAT 1&2 100% 100%
MW
PLTMG MAUMERE 40
25 Commisioning review report, function test UPs dan DC system 11 100% 100%
MW
PLTMG MAUMERE 40
26 Commisioning 100% 100%
function test DC system MW
PLTMG MAUMERE 40
27 Commisioning funcrion test ACDP dan ERP 1&2 100% 100%
MW
PLTMG MAUMERE 40
28 Commisioning 100% 100%
libur MW
PLTMG MAUMERE 40
29 Commisioning review report 100% 100%
MW

insulation resistance UAT (proyocol MAN), PLTMG MAUMERE 40


30 Commisioning 100% 100%
review report MW
PLTMG MAUMERE 40
31 Commisioning insulation resistancr ES 11kV 100% 100%
MW

Total Penyelesaian Pekerjaan (Harian) 100% 100%

Catatan:

Pemberi Penugasan, Inspector,

OKTAVIANUS ENGGAR BS INDRA ATMAJA

Lampiran 10 - Form WO hal. 1/3

LIK No. Formulir


Formulir Kerja Penugasan Bulanan Alih Daya

Nama Instalasi :PLTMG MAUMERE 40 MW & PLTMG BIMA 50 MW


Nama Inspektor Alih daya :INDRA ATMAJA

Bulan Inspeksi :01 Oktober 2018 s/d 30 Oktober 2018

No Tanggal Keterangan / Evidence


Penilaian Harian (%)
No Tanggal Keterangan / Evidence
Penilaian Harian (%)
1 01 Oktober 2018 100% Trip to jakarta
2 02 Oktober 2018 100%
3 03 Oktober 2018 100%
4 04 Oktober 2018 100%
5 05 Oktober 2018 100%
6 06 Oktober 2018 100%
7 07 Oktober 2018 100%
8 08 Oktober 2018 100%
9 09 Oktober 2018 100% Trip to Maumere
10 10 Oktober 2018 100%
11 11 Oktober 2018 100%
12 12 Oktober 2018 100%
13 13 Oktober 2018 100%
14 14 Oktober 2018 100%
15 15 Oktober 2018 100%
16 16 Oktober 2018 100%
17 17 Oktober 2018 100%
18 18 Oktober 2018 100%
19 19 Oktober 2018 100%
20 20 Oktober 2018 100%
21 21 Oktober 2018 100%
22 22 Oktober 2018 100%
23 23 Oktober 2018 100%
24 24 Oktober 2018 100%
25 25 Oktober 2018 100%
26 26 Oktober 2018 100%
27 27 Oktober 2018 100%
28 28 Oktober 2018 100%
29 29 Oktober 2018 100%
30 30 Oktober 2018 100%
31 31 Oktober 2018 100%

Total Penyelesaian Pekerjaan (Bulanan)


100%

Catatan:

Pemberi Penugasan, Inspector,

OKTAVIANUS ENGGAR BS INDRA ATMAJA

Lampiran 10 - Form WO hal. 2/3