SCHOOL PLACEMENT SCHEME OF WORK (2018-2019)

Student ID No. G00334835

List of Topics: Foundation, Floors, Walls,


Subject: MTW
Table Project
Pupil Year Group: 5th No. of Pupils: 18
No. of Lessons: 40 Length Of Lessons: 40 mins + 80 mins
Date: 26th Nov 2018 – 15th February 2019 Time of Lesson

PREVIOUS LEARNING
KNOWLEDGE SKILLS
 Use hand tools
 Planning permission
 Operate classroom power tools e.g.
 Site Layout
bandsaw, lathe, cordless
 Site safety
 Sketching tools
 Hand tools
 Remove a number of simple and
 Power tools complex joints

AIMS LEARNING OUTCOMES (LOs) ASSESSMENT


The aims of this scheme are to… Each aim has one or more Each LO has a corresponding
corresponding LO. Assessment
At the end of this scheme students
will be able to…
1. Complete the table 1. Competently complete a 1. Demonstration
project dovetail joint 2. Peer assessment
2. Accurately clamp up, 3. Worksheet
maintaining squareness
3. Use research techniques to
add a design to the table
1. Identify 3 different types of
foundations
1. Exit Cards
2. Introduce the students to 2. Construct a section detail of
2. Worksheets
the topic of foundations each foundation
3. Class discussion
3. List advantages and
disadvantages of each
1. Identify 3 different types of
floors
1. Traffic Lights
3. Introduce the topic of 2. Construct a section detail of
2. Exam questions
floors each floor type
3. Debate
3. List advantages and
disadvantages of each
1. Outline the key details and
dimensions of a concrete wall
1. Kahoot Quiz
2. Outline the key details and
4. Introduce the topic of 2. Questioning
dimensions of a timber frame
walls techniques
wall
3. Drawing exercise
3. Construct a section detail of
both wall types

LITERACY NUMERACY ORACY GRAPHICACY


STRATEGIES STRATEGIES STRATEGIES STRATEGIES
- Word wall to display - Measuring - Student - Posters
new words - Converting Presentations - Visualizer
- Get students to say measurements from - Group Work - Videos
and spell new or cm to mm - Promote correct - Images
challenging words - Addition and grammar - Animated
- Ensure correct subtraction of - Answering PowerPoints
spelling of key words numbers questions aloud - Models
- Label power tools - Make students figure - Class discussions
out certain
measurements in
drawings

DIFFERENTIATION STRATEGIES
This section must reflect your actual class group… change the headings to suit your group.
- Use gender neutral projects
- Ensure boys and girls conduct demonstrations
equally
Gender Inclusion - When conducting groupwork, arrange groups to
contain a mix of both girls and boys
- Use inclusive language/ Avoid use of words such as
‘lads’
- Pair weaker students with stronger students
- Have a mix of high and lower order exercises
prepared
Mixed Ability Teaching Strategies
- Simplify exercises for weaker students
- Promote Peer Assisted Learning
- Provide extra support to weaker students
LESSON/ TEACHING ASSESSMENT
WEEK CURRICULUM/ SYLLABUS CONTENT
TOPIC STRATEGIES STRATEGIES
- Functions of foundations - Wordwall (L) (O) - Questioning
- Different types of foundation - PowerPoint (G) Techniques (O)
 Strip Foundation - Video (G) - Exit Cards
 Raft Foundation - Think Pair Share (O) - Discussion (O)
 Pile Foundation
1 Foundation
- Detail section of strip foundation
- Advantages and disadvantages of
strip foundation

- Detail section of raft foundation - Wordwall (L)(O) - Demonstration (O)


- Advantages and disadvantages of raft
- PowerPoint (G) (G)
foundation
- Construction process of raft -Working Drawings (L) - Observation
Foundations/ foundation
2 (N) - Peer Assessment (L)
Practice Joint - Practice dovetail joint
- Model (G) (O)
- Video (G)

- Detail section of raft foundation - Wordwall (L) (O) - Discussion (O)


- Advantages and disadvantages of raft
Foundations/ foundation - Board Drawings (G) - Traffic Lights
3
Practice Joint - Construction process of raft - Groupwork (L) (O) - Kahoot Quiz (G)
foundation
- Video (G)
- Complete practice dovetail joint
- Wordwall (L) (O) - Homework (L) (N)
- Functions of floors
- Different types of floors - Video (G)
 Slab and Screen
- PowerPoint (G) - Tweet (L) (O)
 Suspended Timber
Floors/ Table  Solid floating concrete floor -Working Drawings (L) - Demonstration (O)
4 - Detail section of slab and screed
Project (N) (G)
- Marking out mortise and tenon
joints for table - Model (G)
- Begin cutting mortise and tenon - Board Drawings (G)
joints
- Detail section of Solid Floating - Wordwall (L) (O) - Exit Cards