Sie sind auf Seite 1von 116

PROYEK PEMBANGUNAN PABRIK NPK

FUSION
CAPACITY 100.000 MTPY

CALCULATION SHEET FOR PIPERACK

O
OWNER : PT PUPUK S
SRIWIDJAJA PALEMBANG
G

CONTRACTOR : PT TIMAS SUPLINDO

PROJECT TITLE : PROYEK PEMBANGUNAN PABRIK NPK FUSION

LOCATION : PALEMBANG, SOUTH SUMATRA, INDONESIA

PROJECT NO : 14-0602/SP038

DOCUMENT NO : NPK-05-A1-CS-401-T

1 15-Dec-14 RE - Issued for Approval AR DS SP


0 5-Dec-14 Issued for Approval AR DS SP
REV. NO DATE DESCRIPTION PREPD CHKD APPD

TS‐ENG‐CAL‐CIV‐14‐001‐0030
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

PAGE
1. GENERAL ………..…………………….……………………………………………………………… 1
1.1 OUTLINE OF STRUCTURE …………………………….…………………………………… 1
1.2 DESIGN PHILOSOPHY …………………………….………………………………………… 1
1.2.1 Unit Measurement …………………………….……………………………………… 1
1.2.2 Computer Software Used …………………………….……………………………… 1
1.3 CODE AND STANDARD …………………………….……………………………………… 1
1.4 REFERENCE DOCUMENT …………………………….……………………………………… 1
1.5 MATERIAL PROPERTIES …………………………….……………………………………… 1
1.5.1 CONCRETE MATERIAL …………………………….………………………………… 1
1.5.2 STEEL MATERIAL …………………………….……………………………………… 1

2. STRUCTURE LAYOUT …………………………….……………………………………………… 2


2.1 PIPERACK 1 AND PIPE STANCHION …………………………….………………………… 2
2.2 PIPERACK 2 …………………………….……………………………………………………… 5

3. DESIGN LOAD …………………………….………………………………………………………… 8


3.1 DEAD LOAD …………………………….……………………………………………………… 8
3.2 PIPE OPERATING LOAD …………………………….……………………………………… 8
3.3 THERMAL FRICTION LOAD …………………………….…………………………………… 9
3.4 WIND LOAD …………………………….……………………………………………………… 11
3.5 SEISMIC LOAD …………………………….…………………………………………………… 13
3.6 LOAD COMBINATION …………………………….…………………………………………… 18

4. ANALYSIS RESULT …………………………….…………………………………………………… 20


4.1 ANALYSIS RESULT FOR PIPERACK 1 AND PIPE STANCHION ……………………… 20
4.2 ANALYSIS RESULT FOR PIPERACK 2 …………………………….……………………… 21

5. DESIGN FOUNDATION …………………………….……………………………………………… 22


5.1 SOIL BEARING CAPACITY …………………………….…………………………………… 22
5.2 CALCULATION OF FOUNDATION …………………………….…………………………… 23

ATTACHMENT - 1 INPUT STAAD PRO


ATTACHMENT - 2 STEEL MEMBER OUTPUT
ATTACHMENT - 3 SUPPORT REACTION
ATTACHMENT - 4 CALCULATION OF FOUNDATION
ATTACHMENT - 5 SOIL REPORT

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 1 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

1. GENERAL

1.1 OUTLINE OF STRUCTURE


Project : NPK Fusion Plant
Client : PT. Pupuk Sriwidjaja
Location : Palembang
Facility : Pipe Rack and Pipe Stanchion

1.2 DESIGN PHILOSOPHY


1.2.1 Unit measurement
Unit measuremen in design shall be in SI system.

1.2.2 Computer software used in design analysis, as follow :


a. Microsoft Excel c. AFES
b. STAAD PRO

1.3 CODE AND STANDARD

This document only covered calculation of pipe rack and pipe stanchion. Upper Structure Calculated by
STAAD Pro, foundation design by AFES. Support reaction take from output STAAD Pro analysis.

ASCE 7-10 Minimum Design Load for Buildings and Others Structures
ASCE 7-05 Ch.6 Requirements Design for Wind Load
AISC 360-10 Spesification for Structural Steel Buildings
ACI 318-08 Building Code Structural Concrete
SNI 1726-2012 Tata cara perencanaan ketahanan gempa untuk struktur bangunan
dan non gedung

1.4 REFERENCE DOCUMENT


NPK-00-A0-GS-402-T Design Specification Civil and Structural
NPK-00-A0-PP-401-T Plant Arrangement Layout
Soil Report Final Report Soil Investigation for NPK Fusion Plant Project
NPK-05-A1-PP-406-T General Layout Pipe Rack

1.5 MATERIAL PROPERTIES


1.5.1 Concrete Material
Compressive concrete strenght Fc = 24.9 MPa
Levelling concrete strength Fcl = 10.375 MPa
Unit weight of reinforcement c = 23.544 kN/m3
Yield strength of reinforcement fyr = 400 MPa
Modulus elasticity of concrete Ec = 23453 MPa

1.5.2 Steel material


ASTM A36 fy = 250 MPa
fu = 400 MPa
Modulus of elasticity E = 200000 MPa
Modulus of shear G = 77200 MPa

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 2 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

2. STRUCTURE LAYOUT
2.1 PIPERACK 1 AND PIPE STANCHION

3D Prespective structure Model

2.30m

2.20m

6.00m
2.30m

2.50m
1.00m

30.00m

Dimension Layout 6
Y 37 8
X 38
Z 35
29 36
25
27 30 26
21 28
22 47
19 50
33 4546
17 20 34
15 18 43
48
16 3941
13
14 5
11 7
9 12
2 10
4

23
24

31
32

1
3
Y
X Node Number
Z

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 3 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

Member WF 400x200x8x13

Member WF 200x100x5.5x8

Member C 100x50x5

Member L 75x75x6

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 4 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

Member L80x80x6

Member C 150x75x6.5

67 6
7168
64 69 40
70 46
51 66 65 41
55
48 53 52 43
5449
27 50
31 59
47
24 29 28 60
35 82
25 79
78
21 26 61
7322
18 23
72 463 80
15 20 19 5 75
74
36
12 17 16
3213
934 14
730 11 10
3 8

38
4439
42
56
4557
58
1
62
2

Member Number

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 5 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

2.2 PIPERACK 2

3D Prespective structure Model

2.90m

2.90m
2.50m

20.00m

1.00m

Dimension Layout

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 6 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

6
8
21
22
19
20
17
18
15 25
16 26
13
14
11
12
9
10
2 5
4 7

23
24

1
3 Node number

Member WF 300x150x6.5x9

Member WF 200x100x5.5x8

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 7 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

Member C 100x50x5

Member L 75x75x6

Member L 80x80x6

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 8 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

27 8
47
29 28
24
46 33
26 25 39
21 34
45
23 22
18
44
20 19 35
15
43
17 16
12
42 3
14 13 38
9 4
41
11 10
5
40
7 6

30
37
31

32

1
36
2
Member Number

3. DESIGN LOAD

3.1 Dead Load


a. Structure Selfweight
Dead Load of structure will be calculated by computer itself (STAAD Pro program) with "Selfweigth Y -1.0".

3.2 Piping Operating Load

Pipe Schedule 40

Pipe Outside Wall Weight of Area Inside Weight full


Safety Factor
Diameter Diameter Thickness Pipe of Pipe Water
Inch (mm) (mm) (kg/m) (mm2) (kg/m)
1 33.4 3.38 2.55 557.4 0.6 1.5
2 60.3 3.91 5.54 2163.1 2.2 1.5
3 88.9 5.49 11.52 4768.6 4.8 1.5
6 168.3 7.11 28.83 18645.9 18.6 1.5

Operating Load for Load for Pipe


Span Span
Pipe Load Piperack stanchion
(kN/m) (m) (kN) (m) (kN)
0.05 2.5 0.125 6 0.3
0.12 2.5 0.3 6 0.72
0.24 2.5 0.6 6 1.44
0.70 2.5 1.75 6 4.2

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 9 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

-4.500 kN
-0.600 kN
-0.300 kN
-0.600 kN
-0.300 kN
-4.500 kN
-0.600 kN
-0.300 kN
-0.600 kN
-0.300 kN
-0.600 kN
kN -1.440 kN
-0.300
-0.600 kN
-0.300 kN -0.720
-0.720kN
kN
-0.600 kN
-0.300 kN -1.440 kN
-0.600 kN
-0.300 kN -0.720
-0.600 kN -0.720kN
kN
-0.300 kN
-0.600 kN
-0.300 kN
-0.600
-0
-0.300 kN
300 kN
-0.600 kN
-0.300 kN
-0.600 kN
-0.300 kN

Input Pipe Operating Load P(O) on Piperack 1 and Pipe Stanchion -1.750
1 750 kN
-1.750 kN
-1.750 kN -0.600 kN
-1.750 kN -0.600 kN -0.300
-0.300kN
kN
-1.750 kN -0.600 kN -0.300
-0.300kN
kN
-1.750 kN -0.600 kN -0.300
-0.300kN
kN
-1.750 kN -0.600 kN -0.300
-0.300kN
kN
-1.750
1 750 kN -0.600 kN -0.300
0-0.300
300 kN
kN
-1.750 kN -0.600 kN -0.300
-0.300kN
kN
-0.600 kN -0.300
-0.300kN
kN
-0.600 kN -0.300
-0.300kN
kN
-0.300
-0.300kN
kN

Input Pipe Operating Load P(O) on Piperack 2

3.3 Thermal Friction Load (TF)

Coeficience friction between steel to stell μ = 0.3


TF = 0.3 X Operating Load

Pipe Load for Load for Pipe


TF TF
Diameter Piperack Stanchion
Inch (kN) (kN) (kN) (kN)
1 0.125 0.0375 0.3 0.09
2 0.3 0.09 0.72 0.216
3 0.6 0.18 1.44 0.432
6 1.75 0.525 4.2 1.26

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 10 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

0.090kN
0.180 kN
0.090kN
0.180 kN
0.090 kN
0.180 kN
0.090kN
0.180 kN
0.090kN
0.180 kN
0.090kN
0.180 kN
0.216
0.432 kN kN
0.216 kN
0.090kN
0.180 kN
0.090 kN
0.180 kN 1.260 kN
0.090kN
0.180 kN 0.216
0.432 kN kN
0.216 kN
0.090kN
0.180 kN
0.090 kN 1.260 kN
0.180 kN
0.090kN
0.180 kN
0.090kN
0.180 kN

Input Thermal Friction Load (TF) on Piperack 1 and Pipe Stainchion

0.090
0.180 kN kN
0.090 kN
0.090
0.180 kN kN
0.525
0.090 kN
kN
0.090
0.180 kN kN
0.525 kN
0.090 kN
0.090
0.180 kN kN
0.525
0.090 kN
kN
0.090
0.180 kN kN
0.525
0.090 kN
kN
0.090
0.180 kN kN
0.525 kN
0.090 kN
0.090
0.180 kN kN
0.525
0.090 kN
kN
0.090
0.180 kN kN
0.525
0.090 kN
kN
0.090
0.180 kN kN
0.525
0.090 kN
kN
0.525 kN

Input Thermal Friction Load (TF) on Piperack2

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 11 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

3.4 WIND LOAD (Wx, Wz)

Wind load calculation refers to ASCE 7-05, American Society of Civil Engineers.
Calculate Wind pressure, F, on each structure surface :

F = qz.G.Cf.Af

Where:
qz = the velocity pressure evaluated at height z (defined in sect. 29-3) of the centroid
of area Af.
G = gust effect factor from ASCE-7-05 Section 26.9
Cf = force coefficient from Fig. 29.5-1 through 29.5-3
Af = projected area normal to the wind except where Cf is specified for the actual
surface area, (m2)

- Risk Category = Category IV


- Basic wind speed V = 37.99 m/s = 85 mile/h
- Important factor = 1.15
- Wind directionality factor Kd = 0.85
- Exposure category = C
- Topographic factor Kzt=(1+K1.K2.K3) 2 = 1.0
Lh = 25 m x= 50 m H/Lh= 0.04 So : K1 = 0.17
H= 1m z= 50 m x/Lh= 2.00 K2 = 0.50
z/Lh= 2.00 K3 = 0.00
- Gust effect factor G = 0.85

- Velocity Pressure Exposure Coefficient, Kz or Kh and Velocity Pressure qz or qh

qz = 0.613 x Kz x Kzt x Kd x V 2 x I (N/m2); V in m/s)

Height above ground level, z qz


Kz
ft m N/m2

15 4.60 0.85 734


20 6.10 0.90 780
25 7.60 0.95 817
30 9.10 0.98 849
40 12.20 1.04 902
50 15.20 1.09 946
60 18.00 1.14 983
70 21.30 1.17 1015
80 24.40 1.21 1044
90 27.40 1.24 1070

Wind load generated automatically by Staad Pro based on this intensity

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 12 of 23                     '

0.065
0.163 kN/m
kN/m
0.062
0.163 kN/mkN/m
0.163 kN/m
0.055
0.156 kN/m
kN/m
0.1470.059
kN/mkN/m
0.156
0.147 kN/m
kN/m

0.055
0.059 kN/m 0.110 kN/m
0.110kN/m
0.110 kN/m
0.147 kN/m
0.147 kN/m
0.110 kN/m
0.110kN/m
0.110 kN/m
0.147 kN/m
0.147 kN/m
0.065
0.163 kN/m
kN/m
0.062
0.163 kN/mkN/m
0.163 kN/m
0.055
0.156 kN/m
kN/m
0.1470.059
kN/mkN/m
0.156
0.147 kN/m
kN/m

0.055
0.059
0.147 kN/m
kN/m
0.147 kN/m

0.147 kN/m
0.147 kN/m

Input Wind Load dir-X (WX) on Pipereck 1 and Pipe Stanchion


0.327 kN/m
0.327 kN/m
0.327 kN/m 0.327 kN/m
0.327 kN/m
0.327 kN/m0.327 kN/m 0.312
0.327 kN/m 0.294 kN/m
kN/m
0.327 kN/m 0.312
0.294 kN/m
kN/m
0.327 kN/m0.327 kN/m
0.327 kN/m0 327 kN/m
0.327
0.327 kN/m 0.294 kN/m
0.327 kN/m 0.294 kN/m 0.055 kN/m
0.327 kN/m0.327 kN/m
0.327 kN/m0.327 kN/m
0.327 kN/m 0.294 kN/m 0.055 kN/m
0.327 kN/m 0.294 kN/m
0.327 kN/m0.327 kN/m
0.327 kN/m0.327 kN/m
0.327
0.327 kN/m
kN/m
0.327 kN/m
0.312
0.294 kN/m
kN/m
0.312
0.294 kN/m
kN/m

0.294 kN/m
0.294 kN/m

0.294 kN/m
0.294 kN/m

Input Wind Load dir-Z (WZ) on Piperack 1 and Pipe Stanchion


0.156 kN/m

0.117 kN/mkN/m
0.062
0.117 kN/m

0.055
0.110 kN/m
kN/m
0.059
0.110 kN/m
kN/m

0.059
0.110 kN/m
kN/m
0.156 kN/m
0.110 kN/m
0.1170.062
kN/mkN/m
0.117 kN/m

0.055 kN/m
Input Wind Load dir-X (WX) on Piperack 2
0.110 kN/m 0.234 kN/m
0.059
0.110 kN/m
kN/m 0.234 kN/m
0.234 kN/m
0.234
0 234 kN/m
0.234 kN/m
0.234 kN/m
0.234 kN/m
0.234 kN/m
0.234 kN/m 0.220 kN/m
0.059 kN/m 0.234 kN/m 0.220 kN/m
0.110 kN/m 0.234 kN/m
0.110 kN/m 0.234 kN/m
0.234 kN/m
0.234 kN/m
0.234 kN/m
0.234 kN/m
0.234 kN/m 0.220 kN/m
0.234 kN/m 0.220 kN/m
0.234 kN/m
0 234 kN/m
0.234

0.220 kN/m
0.220 kN/m

0.220 kN/m Input Wind Load dir-Z (WZ) on Piperack 2


0.220 kN/m

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 13 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

3.5 Seismic Load (E)

Seismic load this structure is calculated based on SNI 1726-2012 and "Peta Hazard Gempa
Indonesia 2011" Ministry of Public Work.
Location : Palembang
Latitude : -2.97270894229815
Longitude : 104.809367716661

SMS= Fa.SS (ASCE 7-10 (11.4-1))


SM1= Fv.S1 (ASCE 7-10 (11.4-2))
SDS= 2/3.SMS (ASCE 7-10 (11.4-3))
SD1= 2/3.SM1 (ASCE 7-10 (11.4-4))
0.2.SD1
T0 =
SDS
SD1
TS =
SDS
Sa = (ASCE 7-10 (11.4-5))

if T > Ts, SD1


Sa =
T

Variable Soil Type (E)

PGA (g) 0.145


SS (g) 0.259
S1 (g) 0.162
CRS 0.929
CR1 0.945 (Take from http://puskim.pu.go.id/Aplikasi/desain_spektra_indonesia_2011/)
FPGA 2.142
Fa 2.471
Fv 3.313
PSA (g) 0.31
SMS (g) 0.640
SM1 (g) 0.537
SDS (g) 0.427
SD1 (g) 0.358
T0 (second) 0.168
TS (second) 0.839

V = Cs . W

SDS . I
Cs =
R

Cs min = 0.044 SDS .I

Cs Max = SD1 . I
T.R

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 14 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

3.5.1 Seismic Load Piperack 1


I = Importance factor = 1.25
R = Earthquake reduction factor
for conveyor = 8.00
T = Elastic fundamental period of vibration
0.75
T = Ct x (hn) = 0.31
Ct = Numerical coefficient = 0.072 Steel moment resisting frames
hn = The height of structure (m) = 7
Cs = 0.067 (strong axis - direction)
Csmax = 0.179
Csmin = 0.023
Cs = 0.067 Design
Wt = Structure selfweight and dead load

Distribution Horizontal Seismic Operating Condition


Seismic Load Due to Operating condition
(Selfweight + Dead Load + Pipe Operating + Thermal Friction + 0.25 Live Load)
Wt = 63.09 kN
Vx = Cs*Wt = 4.21 kN Vz = Cs*Wt = 4.21
Wi x Hi Wi x Hi 100% 100% `
Node Wi (kN) Hi (m)
( kN m )  Wi x Hi FX ( kN ) FZ ( kN )
EL + 7.000
2 14.428 7 101.0 0.2287 0.96 0.96
4 17.115 7 119.8 0.2713 1.14 1.14
6 14.428 7 101.0 0.2287 0.96 0.96
8 17.115 7 119.8 0.2713 1.14 1.14
Total 63.1 441.6

Distribution Vertical Seismic Operating Condition


Seismic Load Due to Operating condition
(Selfweight + Dead Load + Pipe Operating + Thermal Friction + 0.25 Live Load)
Wt = 63.09 kN
Vy = Cs*Wt = 4.21 kN
T= 0.31 second
k= 1.00
Wi x Hik Wi x Hik 100%
Node Wi (kg) Hi (m)
( kN m )  Wi x Hik FY ( kN )
EL + 7.000
2 14.428 7 101.0 0.2287 0.96
4 17.115 7 119.8 0.2713 1.14
6 14.428 7 101.0 0.2287 0.96
8 17.115 7 119.8 0.2713 1.14
Total 63.1 441.6

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 15 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

0.970 kN
1.150 kN

0.980 kN

0.980 kN

0.970 kN
1.150 kN

Y
X
Z
Input Seismic Load dir-X (VX) on Piperack 1 and Pipe Stanchion
0.970
1.150 kN
kN

0.980 kN

0.980 kN

0.970
1.150 kN
kN

Y
X
Z Input Seismic Load dir-Z (VZ) on Piperack 1 and Pipe Stanchion
-0.970 kNkN
-1.150

-0.980 kN

-0.980 kN

-0.970 kNkN
-1.150

Y
X
Z Input Seismic Load dir-Y (VY) on Piperack 1 and Pipe Stanchion

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 16 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

3.5.2 Seismic Load Piperack 2


I = Importance factor = 1.25
R = Earthquake reduction factor
for conveyor = 8.00
T = Elastic fundamental period of vibration
0.75
T = Ct x (hn) = 0.28
Ct = Numerical coefficient = 0.072 Steel moment resisting frames
hn = The height of structure (m) = 6
Cs = 0.067 (strong axis - direction)
Csmax = 0.179
Csmin = 0.023
Cs = 0.067 Design
Wt = Structure selfweight and dead load

Distribution Horizontal Seismic Operating Condition


Seismic Load Due to Operating condition
(Selfweight + Dead Load + Pipe Operating + Thermal Friction + 0.25 Live Load)
Wt = 48.10 kN
Vx = Cs*Wt = 3.21 kN Vz = Cs*Wt = 3.21
Wi x Hi Wi x Hi 100% 100% `
Node Wi (kN) Hi (m)
( kN m )  Wi x Hi FX ( kN ) FZ ( kN )
EL + 6.000
2 11.87 6 71.2 0.2468 0.79 0.79
4 12.178 6 73.1 0.2532 0.81 0.81
6 11.87 6 71.2 0.2468 0.79 0.79
8 12.178 6 73.1 0.2532 0.81 0.81
Total 48.1 288.6

Distribution Vertical Seismic Operating Condition


Seismic Load Due to Operating condition
(Selfweight + Dead Load + Pipe Operating + Thermal Friction + 0.25 Live Load)
Wt = 48.10 kN
Vy = Cs*Wt = 3.21 kN
T= 0.28 second
k= 1.00
Wi x Hik Wi x Hik 100%
Node Wi (kg) Hi (m)
( kN m )  Wi x Hik FY ( kN )
EL + 6.000
2 11.87 6 71.2 0.2468 0.79
4 12.178 6 73.1 0.2532 0.81
6 11.87 6 71.2 0.2468 0.79
8 12.178 6 73.1 0.2532 0.81
Total 48.1 288.6

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 17 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

0.800 kN
0.820 kN

0.800 kN
0.820 kN

0.800
0 800 kN
0.820 kN
Input Seismic Load dir-X (VX) on Piperack 2

0.800 kN
0.820 kN

-0.800 kN
-0.820 kN
Input Seismic Load dir-Z (VZ) on Piperack 2

-0.800 kN
-0.820 kN

Input Seismic Load dir-Y (VY) on Piperack 2

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 18 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

3.6 Loading Combination

Factored Load Combination


Combination Loads for Concrete structure and Steel Structure

LOAD COMB 111 1.4 (D + P(O) + TF)
LOAD COMB 112 1.2 (D + P(O) + TF)+ 1.6 L
LOAD COMB 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L
LOAD COMB 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L
LOAD COMB 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L
LOAD COMB 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L
LOAD COMB 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L
LOAD COMB 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L
LOAD COMB 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L
LOAD COMB 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L
LOAD COMB 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L
LOAD COMB 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L
LOAD COMB 123 0.9 (D + P(O) + TF)+ 1.6 WX
LOAD COMB 124 0.9 (D + P(O) + TF)+ 1.6 WZ
LOAD COMB 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ
LOAD COMB 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ
LOAD COMB 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ
LOAD COMB 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ
LOAD COMB 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX
LOAD COMB 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX
LOAD COMB 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX
LOAD COMB 132 0.9 (D + P(O) + TF)+ 1.0 VY  ‐ 1.0 VZ ‐ 0.3 VX

Unfactored Load Combination


Combination Loads for Stability Foundation and Deflection

LOAD COMB 211 (D + P(O) + TF)
LOAD COMB 212 (D + P(O) + TF)+ L
LOAD COMB 213 (D + P(O) + TF)+ WX
LOAD COMB 214 (D + P(O) + TF)+ WZ
LOAD COMB 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ
LOAD COMB 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ
LOAD COMB 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ
LOAD COMB 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ
LOAD COMB 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX
LOAD COMB 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX
LOAD COMB 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX
LOAD COMB 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX
LOAD COMB 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L
LOAD COMB 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L
LOAD COMB 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 L
LOAD COMB 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 L

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 19 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

LOAD COMB 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 L
LOAD COMB 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75 L
LOAD COMB 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 L
LOAD COMB 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 L
LOAD COMB 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 L
LOAD COMB 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75 L
LOAD COMB 233 0.6 (D + P(O) + TF)+ WX
LOAD COMB 234 0.6 (D + P(O) + TF)+ WZ
LOAD COMB 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ
LOAD COMB 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ
LOAD COMB 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ
LOAD COMB 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ
LOAD COMB 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX
LOAD COMB 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX
LOAD COMB 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX
LOAD COMB 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX

Notes :
D = Dead Load
L = Live Load
WX = Wind Load Dir-X
WZ = Wind Load Dir-Z
VX = Horizontal Seismic Load Dir-X
VY = Vertical Seismic Load Dir-Y
VZ = Horizontal Seismic Load Dir-Z
P(O) = Pipe Operating Load
TF = Thermal Friction Load

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 20 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

4. ANALYSIS RESULT

4.1 Analysis Result for Piperack 1 and Pipe Stanchion


Steel Member Output

Steel member already analyzed by Staad Pro


Resume result ratio member

Member No. Profile LC Max Ratio Check


11 C100X50X5 114 0.068 ok < 1
74 C150X75X6.5 115 0.146 ok < 1
3 H200X100X5.5 113 0.013 ok < 1
21 H400X200X8 114 0.459 ok < 1
30 L75X75X6 114 0.198 ok < 1
62 L80X80X6 114 0.943 ok < 1

Max Deflection Check on Piperack 1 and Pipe Stanchion

Allowable displacement = H / 240


Beam length = 30000 mm
Deflection allowable = 125.00 mm
Section displacement for beam Node. 20 L/C : 219
Vertical Deflection
Y-trans = 65.18 mm < 125.00 mm OK..!

Column Displacement Check

Di
joint-i
H / D ≥ 200, so :
D2
joint-2
● Hi / Di ≥ 200
D1
joint-1 ● H2 / D2 ≥ 200
Hi

● H1 / D1 ≥ 200
H2

H1

Maximum permissible displacement of column for Piperack 1 : H/ 200


Check maximum deflection for steel column ( node ) :
Column height = 6800 mm Node: 4 L/C : 213
Deflection allowable = 34.00 mm
Displacement at node from STAAD output :
X-trans = 11.807 mm
Z-trans = 0.005 mm Displ. = 11.81 mm < 34.00 mm OK..!

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 21 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

4.2 Analysis Result for Piperack 2


Steel Member Output

Steel member already analyzed by Staad Pro


Resume result ratio member

Member No. Profile LC Max Ratio Check


11 C100X50X5 111 0.162 ok < 1
7 H200X100X5.5 111 0.042 ok < 1
28 H300X150X6.5 111 0.558 ok < 1
40 L75X75X6 114 0.092 ok < 1
37 L80X80X6 114 0.68 ok < 1

Max Deflection Check on Piperack 1 and Pipe Stanchion

Allowable displacement = H / 240


Beam length = 20000 mm
Deflection allowable = 83.33 mm
Section displacement for beam Node. 16 L/C : 219
Vertical Deflection
Y-trans = 48.45 mm < 83.33 mm OK..!

Column Displacement Check

Di
joint-i
H / D ≥ 200, so :
D2
joint-2
● Hi / Di ≥ 200
D1
joint-1 ● H2 / D2 ≥ 200
Hi

● H1 / D1 ≥ 200
H2

H1

Maximum permissible displacement of column for Piperack 2 : H/ 200


Check maximum deflection for steel column ( node ) :
Column height = 5800 mm Node: 4 L/C : 213
Deflection allowable = 29.00 mm
Displacement at node from STAAD output :
X-trans = 25.865 mm
Z-trans = 0.022 mm Displ. = 25.87 mm < 29.00 mm OK..!

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 22 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

5. DESIGN FOUNDATION

5.1 Soil Bearing Capacity

Soil bearing capacity calculated based on laboratory test table soil Bore Hole 3 (B-3)

Use Terzaghi formula

qult = C.Nc + ɣb.Nq.Df + 0,5.ɣb.B.Nɣ

Where :
2 2
C = Soil Cohesion = 0.27 kg/cm = 2.7 ton/m
3
ɣb = Specific Grafity of Soil = 1.62 t/m
Df = Depth of Foundation = 2m
B = Width of Foundation = 1m = 1m
φ = Shear Internal Degree = 1.7 o
Nc, Nq, Nɣ = Terzaghi factor based on Shear Internal Degree

φ  Nc Nq Nɣ Nc' Nq' Nɣ'


0 5.7 1.0 0.0 5.7 1.0 0.0
5 7.3 1.6 0.5 6.7 1.4 0.2
10 9.6 2.7 1.2 8.0 1.9 0.5
15 12.9 4.4 2.5 9.7 2.7 0.9
20 17.7 7.4 5.0 11.8 3.9 1.7
25 25.1 12.7 9.7 14,8 5.6 3.2
30 37.2 22.5 11.8 19.0 8.3 5.7

for φ = 1.7o use linier interpolation

Nc = 6.244 Nc' = 6.04


Nq = 1.204 Nq' = 1.136
Nɣ = 0.17 Nɣ' = 0.068

qult = C.Nc + ɣb.Nq.Df + 0,5.ɣb.B.Nɣ


2
qult = 20.9 ton/m

qult = C.Nc' + ɣb.Nq'.Df + 0,5.ɣb.B.Nɣ'


2
qult = 20.04 ton/m

2
Use qult minimum = 20.04 ton/m

qult 20.04
qa = = = 6.68 ton/m2
SF 3

TS‐ENG‐CAL‐CIV‐14‐001‐0030
Page 23 of 23                     '
PROJECT NO : 14-0602/SP038 REV
DOC NO : NPK-05-A1-CS-401-T 1
CALCULATION SHEET FOR PIPERACK
DATE PREPD CHKD APPD
15-Dec-14 AR DS SP

5.2 Calculation of Foundation

Calculation of foundation will be provide by AFES. For Further detail calculation please see attachment 3

3D Modeling foundation layout Piperack 1 and Pipe Stanchion

3D Modeling foundation layout Piperack 2

For further output support reaction please see Attachment - 3

TS‐ENG‐CAL‐CIV‐14‐001‐0030
ATTACHMENT - 1
INPUT STAAD PRO
Input Staad Pro Piperack 1 and Pipe Stanchion Input Staad Pro Piperack 1 and Pipe Stanchion

STAAD SPACE STAAD SPACE
START JOB INFORMATION START JOB INFORMATION
ENGINEER DATE 24‐Nov‐14 74 75 78 TO 80 82 TABLE ST C150X75X6.5
END JOB INFORMATION CONSTANTS
INPUT WIDTH 79 BETA 90 MEMB 74 78
UNIT METER KN MATERIAL STEEL ALL
JOINT COORDINATES DEFINE WIND LOAD
1 0 0 0; 2 0 6.8 0; 3 0 0 1; 4 0 6.8 1; 5 30 0 0; 6 30 6.8 0; 7 30 0 1; TYPE 1
8 30 6.8 1; 9 2.5 6.8 0; 10 2.5 6.8 1; 11 5 6.8 0; 12 5 6.8 1; 13 7.5 6.8 0; INT 0.734 0.78 0.817 0.849 0.902 0.946 0.983 1.015 1.044 1.07 HEIG  4.6  6.1 ‐
14 7.5 6.8 1; 15 10 6.8 0; 16 10 6.8 1; 17 12.5 6.8 0; 18 12.5 6.8 1;  7.6  9.1  12.2  15.2  18  21.3  24.4  27.4
19 15 6.8 0; 20 15 6.8 1; 21 17.5 6.8 0; 22 17.5 6.8 1; 23 0 4.5 0; 24 0 4.5 1; EXP 1 JOINT 1 TO 26 31 TO 34 39 41 43 45 TO 47
25 30 4.5 0; 26 30 4.5 1; 27 20 6.8 0; 28 20 6.8 1; 29 22.5 6.8 0; LOAD 1 DEAD LOAD (D)
30 22.5 6.8 1; 31 0 2.3 0; 32 0 2.3 1; 33 30 2.3 0; 34 30 2.3 1; 35 25 6.8 0; SELFWEIGHT Y ‐1 LIST 1 TO 32 34 TO 36 38 TO 75 78 79
36 25 6.8 1; 37 27.5 6.8 0; 38 27.5 6.8 1; 39 33 0 0.5; 41 33 0.3 1; LOAD 2 LIVE LOAD (L)
43 33 0.3 0; 45 39 0 0.5; 46 39 0.3 1; 47 39 0.3 0; 48 33 0.3 0.5; LOAD 3 WIND LOAD (WX)
50 39 0.3 0.5; WIND LOAD X 1 TYPE 1 XR 0 0 YR 0 6.8 ZR 0 1 OPEN
MEMBER INCIDENCES WIND LOAD X 1 TYPE 1 XR 30 30 YR 0 6.8 ZR 0 1 OPEN
1 1 31; 2 3 32; 3 2 4; 4 5 33; 5 7 34; 6 6 8; 7 2 9; 8 4 10; 9 9 11; 10 10 12; WIND LOAD X 1 TYPE 1 XR 33 33 YR 0 0.3 ZR 0 1 OPEN
11 9 10; 12 11 13; 13 12 14; 14 11 12; 15 13 15; 16 14 16; 17 13 14; 18 15 17; WIND LOAD X 1 TYPE 1 XR 39 39 YR 0 0.3 ZR 0 1 OPEN
19 16 18; 20 15 16; 21 17 19; 22 18 20; 23 17 18; 24 19 21; 25 20 22; 26 19 20; LOAD 4 WIND LOAD (WZ)
27 21 27; 28 22 28; 29 21 22; 30 2 10; 31 27 22; 32 11 14; 34 9 12; 35 21 20; WIND LOAD Z 1 TYPE 1 XR 0 30 YR 0 6.8 ZR 0 0 OPEN
36 13 16; 38 23 2; 39 24 4; 40 25 6; 41 26 8; 42 23 24; 43 25 26; 44 2 24; WIND LOAD Z 1 TYPE 1 XR 0 30 YR 0 6.8 ZR 1 1 OPEN
45 24 31; 46 6 26; 47 26 33; 48 27 29; 49 28 30; 50 27 28; 51 29 35; 52 30 36; WIND LOAD Z 1 TYPE 1 XR 30 39 YR 0 0.5 ZR 0.5 0.5 OPEN
53 29 30; 54 29 28; 55 35 30; 56 31 23; 57 32 24; 58 31 32; 59 33 25; 60 34 26; LOAD 5 SEISMIC LOAD (VX)
61 33 34; 62 31 3; 63 33 7; 64 35 37; 65 36 38; 66 35 36; 67 37 6; 68 38 8; JOINT LOAD
69 37 38; 70 37 36; 71 6 38; 72 15 18; 73 17 20; 74 39 48; 75 41 48; 78 45 50; *100% X‐Dir
79 46 50; 80 48 43; 82 50 47; *EL + 7.000
SUPPORTS 2 FX 0.97
1 3 5 7 PINNED 4 FX 1.15
39 45 FIXED 6 FX 0.97
MEMBER RELEASE 8 FX 1.15
3 6 11 14 17 20 23 26 29 42 43 50 53 58 61 66 69 START MY MZ 48 50 FX 0.98
3 6 11 14 17 20 23 26 29 42 43 50 53 58 61 66 69 END MY MZ LOAD 6 SEISMIC LOAD (VZ)
MEMBER TRUSS  JOINT LOAD
30 TO 32 34 TO 36 44 TO 47 54 55 62 63 70 TO 73 *100% Z‐Dir
DEFINE MATERIAL START *EL + 7.000
ISOTROPIC STEEL 2 FZ 0.97
E 2.05e+008 4 FZ 1.15
POISSON 0.3 6 FZ 0.97
DENSITY 76.8195 8 FZ 1.15
ALPHA 1.2e‐005 48 50 FZ 0.98
DAMP 0.03 LOAD 7 SEISMIC LOAD (VY)
END DEFINE MATERIAL JOINT LOAD
MEMBER PROPERTY JAPANESE *100% Y‐Dir
11 14 17 20 23 26 29 50 53 66 69 TABLE ST C100X50X5 *EL + 7.000
3 6 TABLE ST H200X100X5.5 2 FY ‐0.97
30 TO 32 34 TO 36 42 43 54 55 58 61 70 TO 73 TABLE ST L75X75X6 4 FY ‐1.15
7 TO 10 12 13 15 16 18 19 21 22 24 25 27 28 48 49 51 52 64 65 67 ‐ 6 FY ‐0.97
68 TABLE ST H400X200X8 8 FY ‐1.15
1 2 4 5 38 TO 41 56 57 59 60 TABLE ST H400X200X8 48 50 FY ‐0.98
44 TO 47 62 63 TABLE ST L80X80X6 LOAD 8 PIPING OPERATING P(O)
Input Staad Pro Piperack 1 and Pipe Stanchion Input Staad Pro Piperack 1 and Pipe Stanchion

STAAD SPACE STAAD SPACE
START JOB INFORMATION START JOB INFORMATION
MEMBER LOAD 1 0.9 8 0.9 9 0.9 3 1.6 
3 6 11 14 17 20 23 26 29 50 53 66 69 CON GY ‐0.3 0.6 LOAD COMB 124 0.9 (D + P(O) + TF)+ 1.6 WZ
3 6 11 14 17 20 23 26 29 50 53 66 69 CON GY ‐0.6 0.8 1 0.9 8 0.9 9 0.9 4 1.6 
75 79 CON GY ‐0.72 0.2 LOAD COMB 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ
75 79 CON GY ‐4.5 0.4 1 0.9 8 0.9 9 0.9 7 1.0 5 1.0 6 0.3 
82 CON GY ‐0.72 0.1 LOAD COMB 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ
80 CON GY ‐0.72 0.1 1 0.9 8 0.9 9 0.9 7 1.0 5 1.0 6 ‐0.3 
82 CON GY ‐1.44 0.3 LOAD COMB 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ
80 CON GY ‐1.44 0.3 1 0.9 8 0.9 9 0.9 7 1.0 5 ‐1.0 6 0.3 
LOAD 9 THERMAL LOAD (TF) LOAD COMB 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ
MEMBER LOAD 1 0.9 8 0.9 9 0.9 7 1.0 5 ‐1.0 6 ‐0.3 
3 6 11 14 17 20 23 26 29 50 53 66 69 CON GX 0.09 0.6 LOAD COMB 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX
3 6 11 14 17 20 23 26 29 50 53 66 69 CON GX 0.18 0.8 1 0.9 8 0.9 9 0.9 7 1.0 6 1.0 5 0.3 
75 79 CON GX 0.216 0.2 LOAD COMB 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX
75 79 CON GX 1.26 0.4 1 0.9 8 0.9 9 0.9 7 1.0 6 1.0 5 ‐0.3 
82 CON GX 0.216 0.1 LOAD COMB 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX
80 CON GX 0.216 0.1 1 0.9 8 0.9 9 0.9 7 1.0 6 ‐1.0 5 0.3 
82 CON GX 0.432 0.3 LOAD COMB 132 0.9 (D + P(O) + TF)+ 1.0 VY  ‐ 1.0 VZ ‐ 0.3 VX
80 CON GX 0.432 0.3 1 0.9 8 0.9 9 0.9 7 1.0 6 ‐1.0 5 ‐0.3 
******************** ********************
**LOAD COMBINATION** *UNFACTORED LOAD COMBINATION*
******************** ********************
*FACTORED LOAD COMBINATION* LOAD COMB 211 (D + P(O) + TF)
******************** 1 1.0 8 1.0 9 1.0 
LOAD COMB 111 1.4 (D + P(O) + TF) LOAD COMB 212 (D + P(O) + TF)+ L
1 1.4 8 1.4 9 1.4  1 1.0 8 1.0 9 1.0 2 1.0 
LOAD COMB 112 1.2 (D + P(O) + TF)+ 1.6 L LOAD COMB 213 (D + P(O) + TF)+ WX
1 1.2 8 1.2 9 1.2 2 1.6  1 1.0 8 1.0 9 1.0 3 1.0 
LOAD COMB 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L LOAD COMB 214 (D + P(O) + TF)+ WZ
1 1.2 8 1.2 9 1.2 3 1.6 2 1.0  1 1.0 8 1.0 9 1.0 4 1.0 
LOAD COMB 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L LOAD COMB 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ
1 1.2 8 1.2 9 1.2 4 1.6 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 5 0.7 6 0.21 
LOAD COMB 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L LOAD COMB 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ
1 1.2 8 1.2 9 1.2 7 1.0 5 1.0 6 0.3 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 5 0.7 6 ‐0.21 
LOAD COMB 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L LOAD COMB 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ
1 1.2 8 1.2 9 1.2 7 1.0 5 1.0 6 ‐0.3 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 5 ‐0.7 6 0.21 
LOAD COMB 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L LOAD COMB 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ
1 1.2 8 1.2 9 1.2 7 1.0 5 ‐1.0 6 0.3 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 5 ‐0.7 6 ‐0.21 
LOAD COMB 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L LOAD COMB 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 5 ‐1.0 6 ‐0.3 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 6 0.7 5 0.21 
LOAD COMB 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L LOAD COMB 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 6 1.0 5 0.3 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 6 0.7 5 ‐0.21 
LOAD COMB 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L LOAD COMB 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 6 1.0 5 ‐0.3 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 6 ‐0.7 5 0.21 
LOAD COMB 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L LOAD COMB 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 6 ‐1.0 5 0.3 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 6 ‐0.7 5 ‐0.21 
LOAD COMB 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L LOAD COMB 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L
1 1.2 8 1.2 9 1.2 7 1.0 6 ‐1.0 5 ‐0.3 2 1.0  1 1.0 8 1.0 9 1.0 3 0.75 2 0.75 
LOAD COMB 123 0.9 (D + P(O) + TF)+ 1.6 WX LOAD COMB 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L
Input Staad Pro Piperack 1 and Pipe Stanchion Input Staad Pro Piperack 1 and Pipe Stanchion

STAAD SPACE STAAD SPACE
START JOB INFORMATION START JOB INFORMATION
1 1.0 8 1.0 9 1.0 4 0.75 2 0.75  KZ 2 MEMB 1 2 4 5 38 TO 41 56 57 59 60
LOAD COMB 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 L LOAD LIST 111 TO 132
1 1.0 8 1.0 9 1.0 7 0.525 5 0.525 6 0.1575 2 0.75  CHECK CODE ALL
LOAD COMB 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 L STEEL MEMBER TAKE OFF LIST 1 TO 32 34 TO 36 38 TO 75 78 TO 80 82
1 1.0 8 1.0 9 1.0 7 0.525 5 0.525 6 ‐0.1575 2 0.75  PARAMETER 2
LOAD COMB 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 L CODE AISC UNIFIED
1 1.0 8 1.0 9 1.0 7 0.525 5 ‐0.525 6 0.1575 2 0.75  DJ1 2 MEMB 7 9 12 15 18 21 24 27 48 51 64 67
LOAD COMB 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75 L DJ2 6 MEMB 7 9 12 15 18 21 24 27 48 51 64 67
1 1.0 8 1.0 9 1.0 7 0.525 5 ‐0.525 6 ‐0.1575 2 0.75  DJ1 4 MEMB 8 10 13 16 19 22 25 28 49 52 65 68
LOAD COMB 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 L DJ2 8 MEMB 8 10 13 16 19 22 25 28 49 52 65 68
1 1.0 8 1.0 9 1.0 7 0.525 6 0.525 5 0.1575 2 0.75  CAN 0 MEMB 7 TO 10 12 13 15 16 18 19 21 22 24 25 27 28 48 49 51 52 64 65 67 68
LOAD COMB 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 L DFF 240 MEMB 7 TO 10 12 13 15 16 18 19 21 22 24 25 27 28 48 49 51 52 64 65 ‐
1 1.0 8 1.0 9 1.0 7 0.525 6 0.525 5 ‐0.1575 2 0.75  67 68
LOAD COMB 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 L DJ1 1 MEMB 1 38 56
1 1.0 8 1.0 9 1.0 7 0.525 6 ‐0.525 5 0.1575 2 0.75  DJ1 2 MEMB 1 38 56
LOAD COMB 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75 L DJ2 3 MEMB 2 39 57
1 1.0 8 1.0 9 1.0 7 0.525 6 ‐0.525 5 ‐0.1575 2 0.75  DJ1 4 MEMB 2 39 57
LOAD COMB 233 0.6 (D + P(O) + TF)+ WX DJ2 5 MEMB 4 40 59
1 0.6 8 0.6 9 0.6 3 1.0  DJ1 6 MEMB 4 40 59
LOAD COMB 234 0.6 (D + P(O) + TF)+ WZ DJ2 7 MEMB 5 41 60
1 0.6 8 0.6 9 0.64 1 DJ1 8 MEMB 5 41 60
LOAD COMB 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ CAN 1 MEMB 1 2 4 5 38 TO 41 56 57 59 60
1 0.6 8 0.6 9 0.6 7 0.7 5 0.7 6 0.21  DFF 200 MEMB 1 2 4 5 38 TO 41 56 57 59 60
LOAD COMB 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ LOAD LIST 211 TO 242
1 0.6 8 0.6 9 0.6 7 0.7 5 0.7 6 ‐0.21  FINISH
LOAD COMB 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ
1 0.6 8 0.6 9 0.6 7 0.7 5 ‐0.7 6 0.21 
LOAD COMB 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ
1 0.6 8 0.6 9 0.6 7 0.7 5 ‐0.7 6 ‐0.21 
LOAD COMB 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 0.7 5 0.21 
LOAD COMB 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 0.7 5 ‐0.21 
LOAD COMB 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 ‐0.7 5 0.21 
LOAD COMB 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 ‐0.7 5 ‐0.21 
******* FOR SEISMIC ******
LOAD COMB 1000 (D + P(O) + TF)+ 0.25 L
1 1.0 8 1.0 9 1.0 2 0.25 
PERFORM ANALYSIS
PARAMETER 1
CODE AISC UNIFIED
METHOD LRFD
FYLD 250000 ALL
FU 410000 ALL
RATIO 1 ALL
LZ 30 MEMB 7 TO 10 12 13 15 16 18 19 21 22 24 25 27 28 48 49 51 52 64 65 67 68
KY 2 MEMB 1 2 4 5 38 TO 41 56 57 59 60
Input Staad Pro Piperack 2 Input Staad Pro Piperack 2

STAAD SPACE STAAD SPACE
START JOB INFORMATION START JOB INFORMATION
ENGINEER DATE 04‐Dec‐14 LOAD 3 WIND LOAD (WX)
END JOB INFORMATION WIND LOAD X 1 TYPE 1 XR 0 0 YR 0 5.8 ZR 0 1 OPEN
INPUT WIDTH 79 WIND LOAD X 1 TYPE 1 XR 20 20 YR 0 5.8 ZR 0 1 OPEN
UNIT METER KN LOAD 4 WIND LOAD (WZ)
JOINT COORDINATES WIND LOAD Z 1 TYPE 1 XR 0 20 YR 0 5.8 ZR 0 0 OPEN
1 0 0 0; 2 0 5.8 0; 3 0 0 1; 4 0 5.8 1; 5 20 0 0; 6 20 5.8 0; 7 20 0 1; WIND LOAD Z 1 TYPE 1 XR 0 20 YR 0 5.8 ZR 1 1 OPEN
8 20 5.8 1; 9 2.5 5.8 0; 10 2.5 5.8 1; 11 5 5.8 0; 12 5 5.8 1; 13 7.5 5.8 0; LOAD 5 SEISMIC LOAD (VX)
14 7.5 5.8 1; 15 10 5.8 0; 16 10 5.8 1; 17 12.5 5.8 0; 18 12.5 5.8 1; JOINT LOAD
19 15 5.8 0; 20 15 5.8 1; 21 17.5 5.8 0; 22 17.5 5.8 1; 23 0 2.9 0; 24 0 2.9 1; *100% X‐Dir
25 20 2.9 0; 26 20 2.9 1; *EL + 6.000
MEMBER INCIDENCES 2 FX 0.8
1 1 23; 2 3 24; 3 5 25; 4 7 26; 5 2 9; 6 4 10; 7 2 4; 8 6 8; 9 9 11; 10 10 12; 4 FX 0.82
11 9 10; 12 11 13; 13 12 14; 14 11 12; 15 13 15; 16 14 16; 17 13 14; 18 15 17; 6 FX 0.8
19 16 18; 20 15 16; 21 17 19; 22 18 20; 23 17 18; 24 19 21; 25 20 22; 26 19 20; 8 FX 0.82
27 21 6; 28 22 8; 29 21 22; 30 23 2; 31 24 4; 32 23 24; 33 25 6; 34 26 8; LOAD 6 SEISMIC LOAD (VZ)
35 25 26; 36 1 24; 37 24 2; 38 5 26; 39 26 6; 40 2 10; 41 9 12; 42 11 14; JOINT LOAD
43 13 16; 44 16 17; 45 18 19; 46 20 21; 47 22 6; *100% Z‐Dir
SUPPORTS *EL + 6.000
1 3 5 7 PINNED 2 FZ 0.8
MEMBER RELEASE 4 FZ 0.82
7 8 11 14 17 20 23 26 29 START MY MZ 6 FZ 0.8
7 8 11 14 17 20 23 26 29 END MY MZ 8 FZ 0.82
MEMBER TRUSS  LOAD 7 SEISMIC LOAD (VY)
32 35 TO 47 JOINT LOAD
DEFINE MATERIAL START *100% Y‐Dir
ISOTROPIC STEEL *EL + 6.000
E 2.05e+008 2 FY ‐0.8
POISSON 0.3 4 FY ‐0.82
DENSITY 76.8195 6 FY ‐0.8
ALPHA 1.2e‐005 8 FY ‐0.82
DAMP 0.03 LOAD 8 PIPING OPERATING P(O)
END DEFINE MATERIAL MEMBER LOAD
MEMBER PROPERTY JAPANESE 7 8 11 14 17 20 23 26 29 CON GY ‐0.6 0.2
1 TO 4 30 31 33 34 TABLE ST H300X150X6.5 7 8 11 14 17 20 23 26 29 CON GY ‐0.3 0.4
5 6 9 10 12 13 15 16 18 19 21 22 24 25 27 28 TABLE ST H300X150X6.5 7 8 11 14 17 20 23 26 29 CON GY ‐1.75 0.6
7 8 TABLE ST H200X100X5.5 7 8 11 14 17 20 23 26 29 CON GY ‐0.3 0.8
11 14 17 20 23 26 29 TABLE ST C100X50X5 LOAD 9 THERMAL LOAD (TF)
32 35 40 TO 47 TABLE ST L75X75X6 MEMBER LOAD
36 TO 39 TABLE ST L80X80X6 7 8 11 14 17 20 23 26 29 CON GX 0.18 0.2
CONSTANTS 7 8 11 14 17 20 23 26 29 CON GX 0.09 0.4
MATERIAL STEEL ALL 7 8 11 14 17 20 23 26 29 CON GX 0.525 0.6
DEFINE WIND LOAD 7 8 11 14 17 20 23 26 29 CON GX 0.09 0.8
TYPE 1 ********************
INT 0.734 0.78 0.817 0.849 0.902 0.946 0.983 1.015 1.044 1.07 HEIG  4.6  6.1 ‐ **LOAD COMBINATION**
 7.6  9.1  12.2  15.2  18  21.3  24.4  27.4 ********************
EXP 1 JOINT 1 TO 26 *FACTORED LOAD COMBINATION*
LOAD 1 DEAD LOAD (D) ********************
SELFWEIGHT Y ‐1 LIST 1 TO 47 LOAD COMB 111 1.4 (D + P(O) + TF)
LOAD 2 LIVE LOAD (L) 1 1.4 8 1.4 9 1.4 
Input Staad Pro Piperack 2 Input Staad Pro Piperack 2

STAAD SPACE STAAD SPACE
START JOB INFORMATION START JOB INFORMATION
LOAD COMB 112 1.2 (D + P(O) + TF)+ 1.6 L LOAD COMB 213 (D + P(O) + TF)+ WX
1 1.2 8 1.2 9 1.2 2 1.6  1 1.0 8 1.0 9 1.0 3 1.0 
LOAD COMB 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L LOAD COMB 214 (D + P(O) + TF)+ WZ
1 1.2 8 1.2 9 1.2 3 1.6 2 1.0  1 1.0 8 1.0 9 1.0 4 1.0 
LOAD COMB 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L LOAD COMB 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ
1 1.2 8 1.2 9 1.2 4 1.6 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 5 0.7 6 0.21 
LOAD COMB 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L LOAD COMB 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ
1 1.2 8 1.2 9 1.2 7 1.0 5 1.0 6 0.3 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 5 0.7 6 ‐0.21 
LOAD COMB 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L LOAD COMB 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ
1 1.2 8 1.2 9 1.2 7 1.0 5 1.0 6 ‐0.3 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 5 ‐0.7 6 0.21 
LOAD COMB 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L LOAD COMB 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ
1 1.2 8 1.2 9 1.2 7 1.0 5 ‐1.0 6 0.3 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 5 ‐0.7 6 ‐0.21 
LOAD COMB 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L LOAD COMB 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 5 ‐1.0 6 ‐0.3 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 6 0.7 5 0.21 
LOAD COMB 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L LOAD COMB 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 6 1.0 5 0.3 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 6 0.7 5 ‐0.21 
LOAD COMB 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L LOAD COMB 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 6 1.0 5 ‐0.3 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 6 ‐0.7 5 0.21 
LOAD COMB 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L LOAD COMB 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX
1 1.2 8 1.2 9 1.2 7 1.0 6 ‐1.0 5 0.3 2 1.0  1 1.0 8 1.0 9 1.0 7 0.7 6 ‐0.7 5 ‐0.21 
LOAD COMB 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L LOAD COMB 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L
1 1.2 8 1.2 9 1.2 7 1.0 6 ‐1.0 5 ‐0.3 2 1.0  1 1.0 8 1.0 9 1.0 3 0.75 2 0.75 
LOAD COMB 123 0.9 (D + P(O) + TF)+ 1.6 WX LOAD COMB 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L
1 0.9 8 0.9 9 0.9 3 1.6  1 1.0 8 1.0 9 1.0 4 0.75 2 0.75 
LOAD COMB 124 0.9 (D + P(O) + TF)+ 1.6 WZ LOAD COMB 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 L
1 0.9 8 0.9 9 0.9 4 1.6  1 1.0 8 1.0 9 1.0 7 0.525 5 0.525 6 0.1575 2 0.75 
LOAD COMB 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ LOAD COMB 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 L
1 0.9 8 0.9 9 0.9 7 1.0 5 1.0 6 0.3  1 1.0 8 1.0 9 1.0 7 0.525 5 0.525 6 ‐0.1575 2 0.75 
LOAD COMB 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ LOAD COMB 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 L
1 0.9 8 0.9 9 0.9 7 1.0 5 1.0 6 ‐0.3  1 1.0 8 1.0 9 1.0 7 0.525 5 ‐0.525 6 0.1575 2 0.75 
LOAD COMB 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ LOAD COMB 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75 L
1 0.9 8 0.9 9 0.9 7 1.0 5 ‐1.0 6 0.3  1 1.0 8 1.0 9 1.0 7 0.525 5 ‐0.525 6 ‐0.1575 2 0.75 
LOAD COMB 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ LOAD COMB 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 L
1 0.9 8 0.9 9 0.9 7 1.0 5 ‐1.0 6 ‐0.3  1 1.0 8 1.0 9 1.0 7 0.525 6 0.525 5 0.1575 2 0.75 
LOAD COMB 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX LOAD COMB 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 L
1 0.9 8 0.9 9 0.9 7 1.0 6 1.0 5 0.3  1 1.0 8 1.0 9 1.0 7 0.525 6 0.525 5 ‐0.1575 2 0.75 
LOAD COMB 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX LOAD COMB 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 L
1 0.9 8 0.9 9 0.9 7 1.0 6 1.0 5 ‐0.3  1 1.0 8 1.0 9 1.0 7 0.525 6 ‐0.525 5 0.1575 2 0.75 
LOAD COMB 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX LOAD COMB 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75 L
1 0.9 8 0.9 9 0.9 7 1.0 6 ‐1.0 5 0.3  1 1.0 8 1.0 9 1.0 7 0.525 6 ‐0.525 5 ‐0.1575 2 0.75 
LOAD COMB 132 0.9 (D + P(O) + TF)+ 1.0 VY  ‐ 1.0 VZ ‐ 0.3 VX LOAD COMB 233 0.6 (D + P(O) + TF)+ WX
1 0.9 8 0.9 9 0.9 7 1.0 6 ‐1.0 5 ‐0.3  1 0.6 8 0.6 9 0.6 3 1.0 
******************** LOAD COMB 234 0.6 (D + P(O) + TF)+ WZ
*UNFACTORED LOAD COMBINATION* 1 0.6 8 0.6 9 0.64 1
******************** LOAD COMB 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ
LOAD COMB 211 (D + P(O) + TF) 1 0.6 8 0.6 9 0.6 7 0.7 5 0.7 6 0.21 
1 1.0 8 1.0 9 1.0  LOAD COMB 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ
LOAD COMB 212 (D + P(O) + TF)+ L 1 0.6 8 0.6 9 0.6 7 0.7 5 0.7 6 ‐0.21 
1 1.0 8 1.0 9 1.0 2 1.0  LOAD COMB 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ
Input Staad Pro Piperack 2

STAAD SPACE
START JOB INFORMATION
1 0.6 8 0.6 9 0.6 7 0.7 5 ‐0.7 6 0.21 
LOAD COMB 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ
1 0.6 8 0.6 9 0.6 7 0.7 5 ‐0.7 6 ‐0.21 
LOAD COMB 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 0.7 5 0.21 
LOAD COMB 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 0.7 5 ‐0.21 
LOAD COMB 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 ‐0.7 5 0.21 
LOAD COMB 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX
1 0.6 8 0.6 9 0.6 7 0.7 6 ‐0.7 5 ‐0.21 
******* FOR SEISMIC ******
LOAD COMB 1000 (D + P(O) + TF)+ 0.25 L
1 1.0 8 1.0 9 1.0 2 0.25 
PERFORM ANALYSIS
PARAMETER 1
CODE AISC UNIFIED
METHOD LRFD
FYLD 250000 ALL
FU 410000 ALL
RATIO 1 ALL
LZ 20 MEMB 5 6 9 10 12 13 15 16 18 19 21 22 24 25 27 28
KY 2 MEMB 1 TO 4 30 31 33 34
KZ 2 MEMB 1 TO 4 30 31 33 34
LOAD LIST 111 TO 132
CHECK CODE ALL
STEEL MEMBER TAKE OFF LIST 1 TO 35
PARAMETER 2
CODE AISC UNIFIED
DJ1 2 MEMB 5 9 12 15 18 21 24 27
DJ2 6 MEMB 5 9 12 15 18 21 24 27
DJ1 4 MEMB 6 10 13 16 19 22 25 28
DJ2 8 MEMB 6 10 13 16 19 22 25 28
CAN 0 MEMB 5 6 9 10 12 13 15 16 18 19 21 22 24 25 27 28
DFF 240 MEMB 5 6 9 10 12 13 15 16 18 19 21 22 24 25 27 28
DJ1 1 MEMB 1 30
DJ1 2 MEMB 1 30
DJ2 3 MEMB 2 31
DJ1 4 MEMB 2 31
DJ2 5 MEMB 3 33
DJ1 6 MEMB 3 33
DJ2 7 MEMB 4 34
DJ1 8 MEMB 4 34
CAN 1 MEMB 1 TO 4 30 31 33 34
DFF 200 MEMB 1 TO 4 30 31 33 34
LOAD LIST 211 TO 242
FINISH
ATTACHMENT - 2
STEEL MEMBER OUTPUT
Steel Member Output Piperack 1 and Pipe Stanchion
Member
Member Name Ratio Clause LC
Number
1 H400X200X8 0.1 Clause H1/2 114
2 H400X200X8 0.133 Clause H1/2 114
3 H200X100X5.5 0.013 Clause H1/2 113
4 H400X200X8 0.117 Clause H1/2 114
5 H400X200X8 0.15 Clause H1/2 114
6 H200X100X5.5 0.013 Clause H1/2 113
7 H400X200X8 0.24 Clause H1/2 114
8 H400X200X8 0.288 Clause H1/2 111
9 H400X200X8 0.18 Clause E 114
10 H400X200X8 0.135 Clause H1/2 117
11 C100X50X5 0.068 Clause H1/2 114
12 H400X200X8 0.309 Clause H1/2 114
13 H400X200X8 0.12 Clause H1/2 111
14 C100X50X5 0.062 Clause H1/2 114
15 H400X200X8 0.391 Clause H1/2 114
16 H400X200X8 0.189 Clause H1/2 111
17 C100X50X5 0.055 Clause H1/2 114
18 H400X200X8 0.44 Clause H1/2 114
19 H400X200X8 0.228 Clause H1/2 111
20 C100X50X5 0.049 Clause H1/2 114
21 H400X200X8 0.459 Clause H1/2 114
22 H400X200X8 0.24 Clause H1/2 111
23 C100X50X5 0.043 Clause H1/2 114
24 H400X200X8 0.457 Clause H1/2 114
25 H400X200X8 0.24 Clause H1/2 111
26 C100X50X5 0.043 Clause H1/2 111
27 H400X200X8 0.433 Clause H1/2 114
28 H400X200X8 0.219 Clause H1/2 111
29 C100X50X5 0.043 Clause H1/2 111
30 L75X75X6 0.198 Clause D2 114
31 L75X75X6 0.053 Clause D2 124
32 L75X75X6 0.125 Clause D2 114
34 L75X75X6 0.16 Clause D2 114
35 L75X75X6 0.017 Clause D2 124
36 L75X75X6 0.089 Clause D2 114
38 H400X200X8 0.222 Clause H1/2 111
39 H400X200X8 0.278 Clause H1/2 111
40 H400X200X8 0.279 Clause H1/2 111
41 H400X200X8 0.336 Clause H1/2 111
42 L75X75X6 0.011 Clause H1/2 114
43 L75X75X6 0.011 Clause H1/2 114
44 L80X80X6 0.727 Clause E 114
45 L80X80X6 0.218 Clause D2 124
46 L80X80X6 0.725 Clause E 114
47 L80X80X6 0.217 Clause D2 124
48 H400X200X8 0.379 Clause H1/2 114
49 H400X200X8 0.171 Clause H1/2 111
50 C100X50X5 0.049 Clause H1/2 114
51 H400X200X8 0.289 Clause H1/2 114
52 H400X200X8 0.093 Clause H1/2 111
53 C100X50X5 0.055 Clause H1/2 114
Steel Member Output Piperack 1 and Pipe Stanchion
Member
Member Name Ratio Clause LC
Number
54 L75X75X6 0.089 Clause D2 124
55 L75X75X6 0.124 Clause D2 124
56 H400X200X8 0.152 Clause H1/2 111
57 H400X200X8 0.2 Clause H1/2 114
58 L75X75X6 0.012 Clause H1/2 114
59 H400X200X8 0.19 Clause H1/2 111
60 H400X200X8 0.233 Clause H1/2 114
61 L75X75X6 0.012 Clause H1/2 114
62 L80X80X6 0.943 Clause E 114
63 L80X80X6 0.94 Clause E 114
64 H400X200X8 0.211 Clause H1/2 114
65 H400X200X8 0.183 Clause H1/2 111
66 C100X50X5 0.061 Clause H1/2 114
67 H400X200X8 0.292 Clause H1/2 114
68 H400X200X8 0.348 Clause H1/2 111
69 C100X50X5 0.068 Clause H1/2 114
70 L75X75X6 0.159 Clause D2 124
71 L75X75X6 0.197 Clause D2 124
72 L75X75X6 0.054 Clause D2 114
73 L75X75X6 0.018 Clause D2 124
74 C150X75X6.5 0.146 Clause H1/2 115
78 C150X75X6.5 0.146 Clause H1/2 115
75 C150X75X6.5 0.064 Clause H1/2 111
79 C150X75X6.5 0.064 Clause H1/2 111
80 C150X75X6.5 0.049 Clause H1/2 111
82 C150X75X6.5 0.049 Clause H1/2 111
Steel Member Output Piperack 2
Member
Member Name Ratio Clause LC
Number
1 H350X175X7 0.092 Clause H1/2  118
2 H350X175X7 0.161 Clause E     114
3 H350X175X7 0.183 Clause H1/2  111
4 H350X175X7 0.234 Clause H1/2  114
5 H300X150X6.5 0.243 Clause H1/2  117
6 H300X150X6.5 0.262 Clause H1/2  117
7 H200X100X5.5 0.042 Clause H1/2  111
8 H200X100X5.5 0.042 Clause H1/2  111
9 H300X150X6.5 0.208 Clause H1/2  114
10 H300X150X6.5 0.185 Clause H1/2  111
11 C100X50X5 0.162 Clause H1/2  111
12 H300X150X6.5 0.29 Clause H1/2  114
13 H300X150X6.5 0.273 Clause H1/2  111
14 C100X50X5 0.162 Clause H1/2  111
15 H300X150X6.5 0.303 Clause H1/2  114
16 H300X150X6.5 0.282 Clause H1/2  111
17 C100X50X5 0.162 Clause H1/2  111
18 H300X150X6.5 0.295 Clause H1/2  114
19 H300X150X6.5 0.282 Clause H1/2  111
20 C100X50X5 0.162 Clause H1/2  111
21 H300X150X6.5 0.229 Clause H1/2  114
22 H300X150X6.5 0.203 Clause H1/2  111
23 C100X50X5 0.162 Clause H1/2  111
24 H300X150X6.5 0.249 Clause H1/2  114
25 H300X150X6.5 0.235 Clause H1/2  113
26 C100X50X5 0.162 Clause H1/2  111
27 H300X150X6.5 0.536 Clause H1/2  111
28 H300X150X6.5 0.558 Clause H1/2  111
29 C100X50X5 0.162 Clause H1/2  111
30 H350X175X7 0.161 Clause H1/2  118
31 H350X175X7 0.172 Clause H1/2  117
32 L75X75X6 0.009 Clause E     124
33 H350X175X7 0.34 Clause H1/2  111
34 H350X175X7 0.355 Clause H1/2  111
35 L75X75X6 0.009 Clause E     124
36 L80X80X6 0.167 Clause D2    114
37 L80X80X6 0.68 Clause E     114
38 L80X80X6 0.166 Clause D2    124
39 L80X80X6 0.68 Clause E     114
40 L75X75X6 0.092 Clause D2    114
41 L75X75X6 0.063 Clause D2    114
42 L75X75X6 0.039 Clause D2    114
43 L75X75X6 0.013 Clause D2    124
44 L75X75X6 0.012 Clause D2    124
45 L75X75X6 0.038 Clause D2    124
46 L75X75X6 0.063 Clause D2    124
47 L75X75X6 0.092 Clause D2    124
ATTACHMENT - 3
SUPPORT REACTION
Output Support reaction 
Piperack 1 and Pipe Stanchion

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
1 111 1.4 (D + P(O) + TF) 9.284 22.634 0.065 0 0 0
1 112 1.2 (D + P(O) + TF)+ 1.6 L 7.958 19.401 0.055 0 0 0
1 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L 5.764 18.871 0.054 0 0 0
1 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L 7.912 ‐109.941 ‐0.309 0 0 0
1 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L 6.898 15.525 0.062 0 0 0
1 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L 6.898 24.175 0.052 0 0 0
1 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L 9.018 16.567 0.065 0 0 0
1 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L 9.018 25.217 0.055 0 0 0
1 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L 7.64 5.799 0.074 0 0 0
1 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L 8.276 6.111 0.075 0 0 0
1 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L 7.64 34.631 0.042 0 0 0
1 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L 8.276 34.943 0.043 0 0 0
1 123 0.9 (D + P(O) + TF)+ 1.6 WX 3.775 14.021 0.04 0 0 0
1 124 0.9 (D + P(O) + TF)+ 1.6 WZ 5.922 ‐114.791 ‐0.323 0 0 0
1 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ 4.908 10.675 0.048 0 0 0
1 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ 4.908 19.324 0.039 0 0 0
1 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ 7.028 11.717 0.051 0 0 0
1 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ 7.028 20.367 0.041 0 0 0
1 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX 5.65 0.948 0.06 0 0 0
1 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX 6.286 1.261 0.061 0 0 0
1 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX 5.65 29.78 0.028 0 0 0
1 132 0.9 (D + P(O) + TF)+ 1.0 VY  ‐ 1.0 VZ ‐ 0.3 VX 6.286 30.093 0.029 0 0 0
1 211 (D + P(O) + TF) 6.632 16.167 0.046 0 0 0
1 212 (D + P(O) + TF)+ L 6.632 16.167 0.046 0 0 0
1 213 (D + P(O) + TF)+ WX 5.261 15.836 0.045 0 0 0
1 214 (D + P(O) + TF)+ WZ 6.603 ‐64.671 ‐0.181 0 0 0
1 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ 5.89 13.454 0.051 0 0 0
1 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ 5.89 19.509 0.044 0 0 0
1 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ 7.373 14.184 0.053 0 0 0
1 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ 7.373 20.239 0.046 0 0 0
1 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX 6.409 6.646 0.059 0 0 0
1 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX 6.854 6.865 0.06 0 0 0
Output Support reaction 
Piperack 1 and Pipe Stanchion

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
1 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX 6.409 26.828 0.037 0 0 0
1 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX 6.854 27.047 0.037 0 0 0
1 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L 5.603 15.919 0.045 0 0 0
1 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L 6.61 ‐44.461 ‐0.125 0 0 0
1 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 6.075 14.133 0.05 0 0 0
1 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 6.075 18.674 0.045 0 0 0
1 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 7.188 14.68 0.051 0 0 0
1 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75  7.188 19.221 0.046 0 0 0
1 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 6.465 9.026 0.056 0 0 0
1 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 6.798 9.19 0.056 0 0 0
1 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 6.465 24.163 0.039 0 0 0
1 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75  6.798 24.327 0.04 0 0 0
1 233 0.6 (D + P(O) + TF)+ WX 2.608 9.369 0.027 0 0 0
1 234 0.6 (D + P(O) + TF)+ WZ 3.944 9.677 0.028 0 0 0
1 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ 3.237 6.987 0.032 0 0 0
1 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ 3.237 13.042 0.026 0 0 0
1 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ 4.721 7.717 0.034 0 0 0
1 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ 4.721 13.772 0.027 0 0 0
1 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX 3.756 0.179 0.041 0 0 0
1 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX 4.202 0.398 0.041 0 0 0
1 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX 3.756 20.361 0.018 0 0 0
1 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX 4.202 20.58 0.019 0 0 0
3 111 1.4 (D + P(O) + TF) 11.636 26.976 ‐0.103 0 0 0
3 112 1.2 (D + P(O) + TF)+ 1.6 L 9.974 23.122 ‐0.088 0 0 0
3 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L 7.738 22.573 ‐0.085 0 0 0
3 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L 10.009 152.464 ‐21.962 0 0 0
3 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L 8.913 28.157 ‐0.737 0 0 0
3 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L 8.913 19.508 0.545 0 0 0
3 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L 11.034 29.037 ‐0.727 0 0 0
3 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L 11.034 20.387 0.554 0 0 0
3 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L 9.656 38.556 ‐2.229 0 0 0
3 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L 10.292 38.82 ‐2.226 0 0 0
Output Support reaction 
Piperack 1 and Pipe Stanchion

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
3 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L 9.656 9.724 2.043 0 0 0
3 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L 10.292 9.988 2.046 0 0 0
3 123 0.9 (D + P(O) + TF)+ 1.6 WX 5.244 16.792 ‐0.063 0 0 0
3 124 0.9 (D + P(O) + TF)+ 1.6 WZ 7.516 146.683 ‐21.94 0 0 0
3 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ 6.42 22.377 ‐0.715 0 0 0
3 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ 6.42 13.727 0.567 0 0 0
3 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ 8.54 23.256 ‐0.705 0 0 0
3 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ 8.54 14.607 0.576 0 0 0
3 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX 7.162 32.776 ‐2.207 0 0 0
3 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX 7.798 33.04 ‐2.204 0 0 0
3 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX 7.162 3.944 2.065 0 0 0
3 132 0.9 (D + P(O) + TF)+ 1.0 VY  ‐ 1.0 VZ ‐ 0.3 VX 7.798 4.208 2.068 0 0 0
3 211 (D + P(O) + TF) 8.311 19.268 ‐0.073 0 0 0
3 212 (D + P(O) + TF)+ L 8.311 19.268 ‐0.073 0 0 0
3 213 (D + P(O) + TF)+ WX 6.914 18.925 ‐0.072 0 0 0
3 214 (D + P(O) + TF)+ WZ 8.334 100.107 ‐13.745 0 0 0
3 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ 7.569 22.793 ‐0.527 0 0 0
3 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ 7.569 16.738 0.37 0 0 0
3 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ 9.053 23.409 ‐0.521 0 0 0
3 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ 9.053 17.354 0.376 0 0 0
3 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX 8.089 30.072 ‐1.572 0 0 0
3 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX 8.534 30.257 ‐1.57 0 0 0
3 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX 8.089 9.89 1.419 0 0 0
3 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX 8.534 10.075 1.421 0 0 0
3 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L 7.263 19.011 ‐0.072 0 0 0
3 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L 8.328 79.897 ‐10.327 0 0 0
3 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 7.755 21.912 ‐0.414 0 0 0
3 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 7.755 17.371 0.259 0 0 0
3 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 8.868 22.374 ‐0.409 0 0 0
3 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75  8.868 17.833 0.264 0 0 0
3 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 8.144 27.371 ‐1.197 0 0 0
3 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 8.478 27.51 ‐1.196 0 0 0
Output Support reaction 
Piperack 1 and Pipe Stanchion

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
3 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 8.144 12.235 1.046 0 0 0
3 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75  8.478 12.373 1.047 0 0 0
3 233 0.6 (D + P(O) + TF)+ WX 3.589 11.218 ‐0.042 0 0 0
3 234 0.6 (D + P(O) + TF)+ WZ 4.952 11.553 ‐0.045 0 0 0
3 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ 4.245 15.086 ‐0.498 0 0 0
3 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ 4.245 9.031 0.399 0 0 0
3 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ 5.729 15.701 ‐0.491 0 0 0
3 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ 5.729 9.647 0.406 0 0 0
3 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX 4.764 22.365 ‐1.542 0 0 0
3 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX 5.209 22.55 ‐1.54 0 0 0
3 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX 4.764 2.183 1.448 0 0 0
3 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX 5.209 2.367 1.45 0 0 0
5 111 1.4 (D + P(O) + TF) ‐11.741 24.268 0.067 0 0 0
5 112 1.2 (D + P(O) + TF)+ 1.6 L ‐10.064 20.801 0.057 0 0 0
5 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L ‐12.257 21.331 0.059 0 0 0
5 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L ‐10.017 ‐108.541 ‐0.307 0 0 0
5 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L ‐11.123 17.967 0.067 0 0 0
5 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L ‐11.123 26.617 0.057 0 0 0
5 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L ‐9.004 16.925 0.064 0 0 0
5 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L ‐9.004 25.574 0.054 0 0 0
5 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L ‐10.381 7.511 0.077 0 0 0
5 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L ‐9.746 7.199 0.076 0 0 0
5 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L ‐10.381 36.343 0.045 0 0 0
5 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L ‐9.746 36.031 0.044 0 0 0
5 123 0.9 (D + P(O) + TF)+ 1.6 WX ‐9.741 16.131 0.045 0 0 0
5 124 0.9 (D + P(O) + TF)+ 1.6 WZ ‐7.501 ‐113.741 ‐0.321 0 0 0
5 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ ‐8.608 12.767 0.052 0 0 0
5 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ ‐8.608 21.417 0.043 0 0 0
5 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ ‐6.488 11.725 0.05 0 0 0
5 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ ‐6.488 20.374 0.04 0 0 0
5 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX ‐7.866 2.311 0.063 0 0 0
5 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX ‐7.23 1.998 0.062 0 0 0
Output Support reaction 
Piperack 1 and Pipe Stanchion

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
5 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX ‐7.866 31.143 0.03 0 0 0
5 132 0.9 (D + P(O) + TF)+ 1.0 VY  ‐ 1.0 VZ ‐ 0.3 VX ‐7.23 30.83 0.03 0 0 0
5 211 (D + P(O) + TF) ‐8.386 17.334 0.048 0 0 0
5 212 (D + P(O) + TF)+ L ‐8.386 17.334 0.048 0 0 0
5 213 (D + P(O) + TF)+ WX ‐9.757 17.665 0.049 0 0 0
5 214 (D + P(O) + TF)+ WZ ‐8.357 ‐63.504 ‐0.18 0 0 0
5 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ ‐9.128 15.351 0.054 0 0 0
5 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ ‐9.128 21.405 0.048 0 0 0
5 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ ‐7.644 14.621 0.053 0 0 0
5 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ ‐7.644 20.676 0.046 0 0 0
5 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX ‐8.609 8.031 0.062 0 0 0
5 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX ‐8.164 7.812 0.061 0 0 0
5 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX ‐8.609 28.214 0.039 0 0 0
5 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX ‐8.164 27.995 0.039 0 0 0
5 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L ‐9.414 17.583 0.049 0 0 0
5 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L ‐8.365 ‐43.295 ‐0.123 0 0 0
5 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 ‐8.943 15.846 0.053 0 0 0
5 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 ‐8.943 20.388 0.048 0 0 0
5 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 ‐7.83 15.299 0.051 0 0 0
5 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75  ‐7.83 19.84 0.046 0 0 0
5 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 ‐8.553 10.357 0.058 0 0 0
5 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 ‐8.219 10.193 0.058 0 0 0
5 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 ‐8.553 25.494 0.041 0 0 0
5 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75  ‐8.219 25.33 0.041 0 0 0
5 233 0.6 (D + P(O) + TF)+ WX ‐6.403 10.732 0.03 0 0 0
5 234 0.6 (D + P(O) + TF)+ WZ ‐5.067 10.424 0.029 0 0 0
5 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ ‐5.774 8.417 0.035 0 0 0
5 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ ‐5.774 14.472 0.028 0 0 0
5 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ ‐4.29 7.687 0.033 0 0 0
5 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ ‐4.29 13.742 0.027 0 0 0
5 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX ‐5.254 1.098 0.042 0 0 0
5 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX ‐4.809 0.879 0.042 0 0 0
Output Support reaction 
Piperack 1 and Pipe Stanchion

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
5 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX ‐5.254 21.28 0.02 0 0 0
5 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX ‐4.809 21.061 0.019 0 0 0
7 111 1.4 (D + P(O) + TF) ‐14.093 27.57 ‐0.029 0 0 0
7 112 1.2 (D + P(O) + TF)+ 1.6 L ‐12.08 23.632 ‐0.025 0 0 0
7 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L ‐14.316 24.181 ‐0.028 0 0 0
7 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L ‐12.116 152.973 ‐21.898 0 0 0
7 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L ‐13.14 29.546 ‐0.664 0 0 0
7 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L ‐13.14 20.897 0.618 0 0 0
7 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L ‐11.02 28.667 ‐0.673 0 0 0
7 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L ‐11.02 20.017 0.608 0 0 0
7 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L ‐12.398 39.33 ‐2.162 0 0 0
7 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L ‐11.762 39.066 ‐2.165 0 0 0
7 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L ‐12.398 10.498 2.11 0 0 0
7 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L ‐11.762 10.234 2.107 0 0 0
7 123 0.9 (D + P(O) + TF)+ 1.6 WX ‐11.296 18.273 ‐0.022 0 0 0
7 124 0.9 (D + P(O) + TF)+ 1.6 WZ ‐9.096 147.065 ‐21.892 0 0 0
7 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ ‐10.12 23.638 ‐0.658 0 0 0
7 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ ‐10.12 14.989 0.624 0 0 0
7 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ ‐8 22.759 ‐0.667 0 0 0
7 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ ‐8 14.109 0.614 0 0 0
7 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX ‐9.378 33.422 ‐2.156 0 0 0
7 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX ‐8.742 33.158 ‐2.159 0 0 0
7 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX ‐9.378 4.59 2.116 0 0 0
7 132 0.9 (D + P(O) + TF)+ 1.0 VY  ‐ 1.0 VZ ‐ 0.3 VX ‐8.742 4.326 2.113 0 0 0
7 211 (D + P(O) + TF) ‐10.067 19.693 ‐0.021 0 0 0
7 212 (D + P(O) + TF)+ L ‐10.067 19.693 ‐0.021 0 0 0
7 213 (D + P(O) + TF)+ WX ‐11.464 20.036 ‐0.022 0 0 0
7 214 (D + P(O) + TF)+ WZ ‐10.089 100.532 ‐13.692 0 0 0
7 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ ‐10.809 23.833 ‐0.468 0 0 0
7 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ ‐10.809 17.779 0.429 0 0 0
7 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ ‐9.325 23.218 ‐0.475 0 0 0
7 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ ‐9.325 17.163 0.423 0 0 0
Output Support reaction 
Piperack 1 and Pipe Stanchion

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
7 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX ‐10.289 30.682 ‐1.517 0 0 0
7 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX ‐9.844 30.497 ‐1.519 0 0 0
7 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX ‐10.289 10.499 1.474 0 0 0
7 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX ‐9.844 10.315 1.472 0 0 0
7 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L ‐11.115 19.951 ‐0.022 0 0 0
7 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L ‐10.083 80.322 ‐10.274 0 0 0
7 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 ‐10.623 22.798 ‐0.356 0 0 0
7 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 ‐10.623 18.257 0.317 0 0 0
7 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 ‐9.51 22.336 ‐0.361 0 0 0
7 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75  ‐9.51 17.795 0.312 0 0 0
7 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 ‐10.234 27.935 ‐1.143 0 0 0
7 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 ‐9.9 27.796 ‐1.144 0 0 0
7 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 ‐10.234 12.798 1.1 0 0 0
7 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75  ‐9.9 12.659 1.098 0 0 0
7 233 0.6 (D + P(O) + TF)+ WX ‐7.437 12.159 ‐0.014 0 0 0
7 234 0.6 (D + P(O) + TF)+ WZ ‐6.075 11.824 ‐0.011 0 0 0
7 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ ‐6.782 15.956 ‐0.46 0 0 0
7 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ ‐6.782 9.901 0.437 0 0 0
7 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ ‐5.298 15.34 ‐0.466 0 0 0
7 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ ‐5.298 9.286 0.431 0 0 0
7 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX ‐6.263 22.804 ‐1.509 0 0 0
7 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX ‐5.817 22.62 ‐1.511 0 0 0
7 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX ‐6.263 2.622 1.482 0 0 0
7 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX ‐5.817 2.437 1.48 0 0 0
39 111 1.4 (D + P(O) + TF) ‐2.974 10.536 0 ‐0.259 ‐0.055 0.892
39 112 1.2 (D + P(O) + TF)+ 1.6 L ‐2.549 9.031 0 ‐0.222 ‐0.048 0.765
39 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L ‐2.778 9.031 0 ‐0.222 ‐0.048 0.825
39 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L ‐2.549 9.031 ‐0.026 ‐0.226 ‐0.048 0.765
39 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L ‐3.529 10.011 ‐0.294 ‐0.31 ‐0.048 1.059
39 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L ‐3.529 10.011 0.294 ‐0.134 ‐0.048 1.059
39 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L ‐1.569 10.011 ‐0.294 ‐0.31 ‐0.048 0.471
39 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L ‐1.569 10.011 0.294 ‐0.134 ‐0.048 0.471
Output Support reaction 
Piperack 1 and Pipe Stanchion

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
39 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L ‐2.843 10.011 ‐0.98 ‐0.516 ‐0.048 0.853
39 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L ‐2.255 10.011 ‐0.98 ‐0.516 ‐0.048 0.676
39 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L ‐2.843 10.011 0.98 0.072 ‐0.048 0.853
39 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L ‐2.255 10.011 0.98 0.072 ‐0.048 0.676
39 123 0.9 (D + P(O) + TF)+ 1.6 WX ‐2.141 6.773 0 ‐0.166 ‐0.036 0.634
39 124 0.9 (D + P(O) + TF)+ 1.6 WZ ‐1.912 6.773 ‐0.026 ‐0.17 ‐0.036 0.573
39 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ ‐2.892 7.753 ‐0.294 ‐0.254 ‐0.036 0.867
39 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ ‐2.892 7.753 0.294 ‐0.078 ‐0.036 0.867
39 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ ‐0.932 7.753 ‐0.294 ‐0.254 ‐0.036 0.279
39 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ ‐0.932 7.753 0.294 ‐0.078 ‐0.036 0.279
39 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX ‐2.206 7.753 ‐0.98 ‐0.46 ‐0.036 0.662
39 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX ‐1.618 7.753 ‐0.98 ‐0.46 ‐0.036 0.485
39 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX ‐2.206 7.753 0.98 0.128 ‐0.036 0.662
39 132 0.9 (D + P(O) + TF)+ 1.0 VY  ‐ 1.0 VZ ‐ 0.3 VX ‐1.618 7.753 0.98 0.128 ‐0.036 0.485
39 211 (D + P(O) + TF) ‐2.124 7.526 0 ‐0.185 ‐0.04 0.637
39 212 (D + P(O) + TF)+ L ‐2.124 7.526 0 ‐0.185 ‐0.04 0.637
39 213 (D + P(O) + TF)+ WX ‐2.267 7.526 0 ‐0.185 ‐0.04 0.675
39 214 (D + P(O) + TF)+ WZ ‐2.124 7.526 ‐0.017 ‐0.187 ‐0.04 0.637
39 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ ‐2.81 8.212 ‐0.206 ‐0.247 ‐0.04 0.843
39 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ ‐2.81 8.212 0.206 ‐0.123 ‐0.04 0.843
39 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ ‐1.438 8.212 ‐0.206 ‐0.247 ‐0.04 0.431
39 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ ‐1.438 8.212 0.206 ‐0.123 ‐0.04 0.431
39 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX ‐2.33 8.212 ‐0.686 ‐0.391 ‐0.04 0.699
39 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX ‐1.918 8.212 ‐0.686 ‐0.391 ‐0.04 0.575
39 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX ‐2.33 8.212 0.686 0.021 ‐0.04 0.699
39 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX ‐1.918 8.212 0.686 0.021 ‐0.04 0.575
39 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L ‐2.231 7.526 0 ‐0.185 ‐0.04 0.666
39 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L ‐2.124 7.526 ‐0.012 ‐0.187 ‐0.04 0.637
39 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 ‐2.639 8.04 ‐0.154 ‐0.231 ‐0.04 0.792
39 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 ‐2.639 8.04 0.154 ‐0.138 ‐0.04 0.792
39 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 ‐1.61 8.04 ‐0.154 ‐0.231 ‐0.04 0.483
39 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75  ‐1.61 8.04 0.154 ‐0.138 ‐0.04 0.483
Output Support reaction 
Piperack 1 and Pipe Stanchion

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
39 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 ‐2.278 8.04 ‐0.515 ‐0.339 ‐0.04 0.684
39 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 ‐1.97 8.04 ‐0.515 ‐0.339 ‐0.04 0.591
39 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 ‐2.278 8.04 0.515 ‐0.03 ‐0.04 0.684
39 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75  ‐1.97 8.04 0.515 ‐0.03 ‐0.04 0.591
39 233 0.6 (D + P(O) + TF)+ WX ‐1.418 4.515 0 ‐0.111 ‐0.024 0.42
39 234 0.6 (D + P(O) + TF)+ WZ ‐1.359 4.515 0 ‐0.111 ‐0.025 0.408
39 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ ‐1.96 5.201 ‐0.206 ‐0.173 ‐0.024 0.588
39 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ ‐1.96 5.201 0.206 ‐0.049 ‐0.024 0.588
39 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ ‐0.588 5.201 ‐0.206 ‐0.173 ‐0.024 0.177
39 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ ‐0.588 5.201 0.206 ‐0.049 ‐0.024 0.177
39 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX ‐1.48 5.201 ‐0.686 ‐0.317 ‐0.024 0.444
39 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX ‐1.069 5.201 ‐0.686 ‐0.317 ‐0.024 0.321
39 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX ‐1.48 5.201 0.686 0.095 ‐0.024 0.444
39 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX ‐1.069 5.201 0.686 0.095 ‐0.024 0.321
45 111 1.4 (D + P(O) + TF) ‐2.974 10.536 0 ‐0.259 ‐0.055 0.892
45 112 1.2 (D + P(O) + TF)+ 1.6 L ‐2.549 9.031 0 ‐0.222 ‐0.048 0.765
45 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L ‐2.778 9.031 0 ‐0.222 ‐0.048 0.825
45 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L ‐2.549 9.031 ‐0.026 ‐0.226 ‐0.048 0.765
45 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L ‐3.529 10.011 ‐0.294 ‐0.31 ‐0.048 1.059
45 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L ‐3.529 10.011 0.294 ‐0.134 ‐0.048 1.059
45 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L ‐1.569 10.011 ‐0.294 ‐0.31 ‐0.048 0.471
45 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L ‐1.569 10.011 0.294 ‐0.134 ‐0.048 0.471
45 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L ‐2.843 10.011 ‐0.98 ‐0.516 ‐0.048 0.853
45 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L ‐2.255 10.011 ‐0.98 ‐0.516 ‐0.048 0.676
45 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L ‐2.843 10.011 0.98 0.072 ‐0.048 0.853
45 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L ‐2.255 10.011 0.98 0.072 ‐0.048 0.676
45 123 0.9 (D + P(O) + TF)+ 1.6 WX ‐2.141 6.773 0 ‐0.166 ‐0.036 0.634
45 124 0.9 (D + P(O) + TF)+ 1.6 WZ ‐1.912 6.773 ‐0.026 ‐0.17 ‐0.036 0.573
45 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ ‐2.892 7.753 ‐0.294 ‐0.254 ‐0.036 0.867
45 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ ‐2.892 7.753 0.294 ‐0.078 ‐0.036 0.867
45 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ ‐0.932 7.753 ‐0.294 ‐0.254 ‐0.036 0.279
45 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ ‐0.932 7.753 0.294 ‐0.078 ‐0.036 0.279
Output Support reaction 
Piperack 1 and Pipe Stanchion

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
45 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX ‐2.206 7.753 ‐0.98 ‐0.46 ‐0.036 0.662
45 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX ‐1.618 7.753 ‐0.98 ‐0.46 ‐0.036 0.485
45 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX ‐2.206 7.753 0.98 0.128 ‐0.036 0.662
45 132 0.9 (D + P(O) + TF)+ 1.0 VY  ‐ 1.0 VZ ‐ 0.3 VX ‐1.618 7.753 0.98 0.128 ‐0.036 0.485
45 211 (D + P(O) + TF) ‐2.124 7.526 0 ‐0.185 ‐0.04 0.637
45 212 (D + P(O) + TF)+ L ‐2.124 7.526 0 ‐0.185 ‐0.04 0.637
45 213 (D + P(O) + TF)+ WX ‐2.267 7.526 0 ‐0.185 ‐0.04 0.675
45 214 (D + P(O) + TF)+ WZ ‐2.124 7.526 ‐0.017 ‐0.187 ‐0.04 0.637
45 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ ‐2.81 8.212 ‐0.206 ‐0.247 ‐0.04 0.843
45 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ ‐2.81 8.212 0.206 ‐0.123 ‐0.04 0.843
45 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ ‐1.438 8.212 ‐0.206 ‐0.247 ‐0.04 0.431
45 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ ‐1.438 8.212 0.206 ‐0.123 ‐0.04 0.431
45 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX ‐2.33 8.212 ‐0.686 ‐0.391 ‐0.04 0.699
45 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX ‐1.918 8.212 ‐0.686 ‐0.391 ‐0.04 0.575
45 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX ‐2.33 8.212 0.686 0.021 ‐0.04 0.699
45 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX ‐1.918 8.212 0.686 0.021 ‐0.04 0.575
45 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L ‐2.231 7.526 0 ‐0.185 ‐0.04 0.666
45 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L ‐2.124 7.526 ‐0.012 ‐0.187 ‐0.04 0.637
45 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 ‐2.639 8.04 ‐0.154 ‐0.231 ‐0.04 0.792
45 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 ‐2.639 8.04 0.154 ‐0.138 ‐0.04 0.792
45 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 ‐1.61 8.04 ‐0.154 ‐0.231 ‐0.04 0.483
45 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75  ‐1.61 8.04 0.154 ‐0.138 ‐0.04 0.483
45 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 ‐2.278 8.04 ‐0.515 ‐0.339 ‐0.04 0.684
45 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 ‐1.97 8.04 ‐0.515 ‐0.339 ‐0.04 0.591
45 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 ‐2.278 8.04 0.515 ‐0.03 ‐0.04 0.684
45 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75  ‐1.97 8.04 0.515 ‐0.03 ‐0.04 0.591
45 233 0.6 (D + P(O) + TF)+ WX ‐1.418 4.515 0 ‐0.111 ‐0.024 0.42
45 234 0.6 (D + P(O) + TF)+ WZ ‐1.359 4.515 0 ‐0.111 ‐0.025 0.408
45 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ ‐1.96 5.201 ‐0.206 ‐0.173 ‐0.024 0.588
45 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ ‐1.96 5.201 0.206 ‐0.049 ‐0.024 0.588
45 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ ‐0.588 5.201 ‐0.206 ‐0.173 ‐0.024 0.177
45 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ ‐0.588 5.201 0.206 ‐0.049 ‐0.024 0.177
Output Support reaction 
Piperack 1 and Pipe Stanchion

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
45 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX ‐1.48 5.201 ‐0.686 ‐0.317 ‐0.024 0.444
45 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX ‐1.069 5.201 ‐0.686 ‐0.317 ‐0.024 0.321
45 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX ‐1.48 5.201 0.686 0.095 ‐0.024 0.444
45 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX ‐1.069 5.201 0.686 0.095 ‐0.024 0.321
Output Support reaction 
Piperack 2

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
1 111 1.4 (D + P(O) + TF) 3.709 16.446 0.006 0 0 0
1 112 1.2 (D + P(O) + TF)+ 1.6 L 3.179 14.096 0.005 0 0 0
1 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L 1.674 13.612 0.003 0 0 0
1 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L 3.168 ‐41.462 ‐11.243 0 0 0
1 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L 2.369 11.602 ‐0.483 0 0 0
1 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L 2.369 17.239 0.492 0 0 0
1 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L 3.989 12.553 ‐0.48 0 0 0
1 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L 3.989 18.191 0.495 0 0 0
1 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L 2.936 5.358 ‐1.62 0 0 0
1 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L 3.422 5.643 ‐1.619 0 0 0
1 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L 2.936 24.15 1.63 0 0 0
1 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L 3.422 24.435 1.631 0 0 0
1 123 0.9 (D + P(O) + TF)+ 1.6 WX 0.879 10.088 0.002 0 0 0
1 124 0.9 (D + P(O) + TF)+ 1.6 WZ 2.373 ‐44.986 ‐11.244 0 0 0
1 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ 1.575 8.078 ‐0.485 0 0 0
1 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ 1.575 13.715 0.49 0 0 0
1 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ 3.195 9.029 ‐0.482 0 0 0
1 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ 3.195 14.667 0.493 0 0 0
1 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX 2.142 1.834 ‐1.621 0 0 0
1 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX 2.628 2.119 ‐1.62 0 0 0
1 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX 2.142 20.626 1.629 0 0 0
1 132 0.9 (D + P(O) + TF)+ 1.0 VY  ‐ 1.0 VZ ‐ 0.3 VX 2.628 20.911 1.63 0 0 0
1 211 (D + P(O) + TF) 2.65 11.747 0.004 0 0 0
1 212 (D + P(O) + TF)+ L 2.65 11.747 0.004 0 0 0
1 213 (D + P(O) + TF)+ WX 1.709 11.444 0.003 0 0 0
1 214 (D + P(O) + TF)+ WZ 2.642 ‐22.977 ‐7.026 0 0 0
1 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ 2.083 10.001 ‐0.338 0 0 0
1 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ 2.083 13.947 0.345 0 0 0
1 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ 3.217 10.667 ‐0.336 0 0 0
1 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ 3.217 14.613 0.347 0 0 0
1 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX 2.479 5.63 ‐1.133 0 0 0
1 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX 2.82 5.83 ‐1.133 0 0 0
Output Support reaction 
Piperack 2

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
1 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX 2.479 18.784 1.142 0 0 0
1 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX 2.82 18.984 1.142 0 0 0
1 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L 1.944 11.52 0.003 0 0 0
1 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L 2.644 ‐14.296 ‐5.268 0 0 0
1 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 2.224 10.437 ‐0.252 0 0 0
1 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 2.224 13.397 0.26 0 0 0
1 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 3.075 10.937 ‐0.251 0 0 0
1 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75  3.075 13.896 0.261 0 0 0
1 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 2.522 7.159 ‐0.849 0 0 0
1 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 2.777 7.309 ‐0.849 0 0 0
1 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 2.522 17.025 0.857 0 0 0
1 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75  2.777 17.175 0.858 0 0 0
1 233 0.6 (D + P(O) + TF)+ WX 0.649 6.746 0.002 0 0 0
1 234 0.6 (D + P(O) + TF)+ WZ 1.51 7 0.002 0 0 0
1 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ 1.023 5.302 ‐0.339 0 0 0
1 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ 1.023 9.248 0.343 0 0 0
1 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ 2.157 5.968 ‐0.337 0 0 0
1 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ 2.157 9.914 0.345 0 0 0
1 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX 1.42 0.931 ‐1.135 0 0 0
1 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX 1.76 1.131 ‐1.134 0 0 0
1 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX 1.42 14.085 1.14 0 0 0
1 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX 1.76 14.285 1.141 0 0 0
3 111 1.4 (D + P(O) + TF) 4.092 17.259 ‐0.016 0 0 0
3 112 1.2 (D + P(O) + TF)+ 1.6 L 3.507 14.794 ‐0.014 0 0 0
3 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L 2.021 14.33 ‐0.013 0 0 0
3 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L 3.515 70.352 ‐0.394 0 0 0
3 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L 2.697 17.969 ‐0.012 0 0 0
3 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L 2.697 12.331 ‐0.016 0 0 0
3 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L 4.317 18.897 ‐0.013 0 0 0
3 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L 4.317 13.259 ‐0.017 0 0 0
3 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L 3.264 24.871 ‐0.009 0 0 0
3 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L 3.75 25.149 ‐0.01 0 0 0
Output Support reaction 
Piperack 2

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
3 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L 3.264 6.079 ‐0.019 0 0 0
3 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L 3.75 6.357 ‐0.02 0 0 0
3 123 0.9 (D + P(O) + TF)+ 1.6 WX 1.144 10.631 ‐0.01 0 0 0
3 124 0.9 (D + P(O) + TF)+ 1.6 WZ 2.638 66.653 ‐0.39 0 0 0
3 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ 1.82 14.27 ‐0.009 0 0 0
3 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ 1.82 8.633 ‐0.012 0 0 0
3 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ 3.44 15.198 ‐0.01 0 0 0
3 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ 3.44 9.561 ‐0.013 0 0 0
3 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX 2.387 21.172 ‐0.006 0 0 0
3 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX 2.873 21.451 ‐0.006 0 0 0
3 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX 2.387 2.38 ‐0.016 0 0 0
3 132 0.9 (D + P(O) + TF)+ 1.0 VY  ‐ 1.0 VZ ‐ 0.3 VX 2.873 2.659 ‐0.016 0 0 0
3 211 (D + P(O) + TF) 2.923 12.328 ‐0.011 0 0 0
3 212 (D + P(O) + TF)+ L 2.923 12.328 ‐0.011 0 0 0
3 213 (D + P(O) + TF)+ WX 1.994 12.038 ‐0.011 0 0 0
3 214 (D + P(O) + TF)+ WZ 2.927 47.052 ‐0.249 0 0 0
3 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ 2.356 14.55 ‐0.011 0 0 0
3 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ 2.356 10.604 ‐0.013 0 0 0
3 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ 3.49 15.2 ‐0.011 0 0 0
3 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ 3.49 11.254 ‐0.013 0 0 0
3 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX 2.752 19.382 ‐0.008 0 0 0
3 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX 3.093 19.577 ‐0.008 0 0 0
3 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX 2.752 6.227 ‐0.015 0 0 0
3 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX 3.093 6.422 ‐0.016 0 0 0
3 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L 2.226 12.111 ‐0.011 0 0 0
3 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L 2.926 38.371 ‐0.19 0 0 0
3 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 2.497 13.995 ‐0.011 0 0 0
3 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 2.497 11.035 ‐0.012 0 0 0
3 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 3.348 14.482 ‐0.011 0 0 0
3 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75  3.348 11.522 ‐0.013 0 0 0
3 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 2.795 17.618 ‐0.009 0 0 0
3 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 3.05 17.765 ‐0.009 0 0 0
Output Support reaction 
Piperack 2

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
3 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 2.795 7.753 ‐0.014 0 0 0
3 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75  3.05 7.899 ‐0.015 0 0 0
3 233 0.6 (D + P(O) + TF)+ WX 0.825 7.107 ‐0.006 0 0 0
3 234 0.6 (D + P(O) + TF)+ WZ 1.674 7.352 ‐0.007 0 0 0
3 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ 1.187 9.619 ‐0.006 0 0 0
3 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ 1.187 5.673 ‐0.008 0 0 0
3 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ 2.321 10.269 ‐0.007 0 0 0
3 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ 2.321 6.323 ‐0.009 0 0 0
3 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX 1.583 14.451 ‐0.004 0 0 0
3 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX 1.924 14.646 ‐0.004 0 0 0
3 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX 1.583 1.296 ‐0.011 0 0 0
3 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX 1.924 1.491 ‐0.011 0 0 0
5 111 1.4 (D + P(O) + TF) ‐9.285 19.8 0.03 0 0 0
5 112 1.2 (D + P(O) + TF)+ 1.6 L ‐7.959 16.972 0.026 0 0 0
5 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L ‐9.464 17.455 0.027 0 0 0
5 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L ‐7.947 ‐38.586 ‐11.222 0 0 0
5 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L ‐8.769 15.428 ‐0.46 0 0 0
5 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L ‐8.769 21.066 0.515 0 0 0
5 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L ‐7.149 14.477 ‐0.463 0 0 0
5 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L ‐7.149 20.115 0.512 0 0 0
5 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L ‐8.202 8.518 ‐1.598 0 0 0
5 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L ‐7.716 8.233 ‐1.599 0 0 0
5 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L ‐8.202 27.31 1.652 0 0 0
5 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L ‐7.716 27.025 1.651 0 0 0
5 123 0.9 (D + P(O) + TF)+ 1.6 WX ‐7.474 13.213 0.02 0 0 0
5 124 0.9 (D + P(O) + TF)+ 1.6 WZ ‐5.958 ‐42.829 ‐11.229 0 0 0
5 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ ‐6.779 11.185 ‐0.466 0 0 0
5 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ ‐6.779 16.823 0.509 0 0 0
5 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ ‐5.159 10.234 ‐0.469 0 0 0
5 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ ‐5.159 15.872 0.506 0 0 0
5 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX ‐6.212 4.275 ‐1.605 0 0 0
5 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX ‐5.726 3.99 ‐1.606 0 0 0
Output Support reaction 
Piperack 2

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
5 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX ‐6.212 23.067 1.646 0 0 0
5 132 0.9 (D + P(O) + TF)+ 1.0 VY  ‐ 1.0 VZ ‐ 0.3 VX ‐5.726 22.782 1.645 0 0 0
5 211 (D + P(O) + TF) ‐6.632 14.143 0.021 0 0 0
5 212 (D + P(O) + TF)+ L ‐6.632 14.143 0.021 0 0 0
5 213 (D + P(O) + TF)+ WX ‐7.573 14.445 0.022 0 0 0
5 214 (D + P(O) + TF)+ WZ ‐6.625 ‐20.581 ‐7.009 0 0 0
5 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ ‐7.199 13.063 ‐0.318 0 0 0
5 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ ‐7.199 17.009 0.364 0 0 0
5 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ ‐6.065 12.397 ‐0.32 0 0 0
5 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ ‐6.065 16.343 0.362 0 0 0
5 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX ‐6.802 8.226 ‐1.115 0 0 0
5 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX ‐6.462 8.026 ‐1.116 0 0 0
5 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX ‐6.802 21.38 1.16 0 0 0
5 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX ‐6.462 21.18 1.159 0 0 0
5 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L ‐7.338 14.37 0.022 0 0 0
5 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L ‐6.627 ‐11.9 ‐5.251 0 0 0
5 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 ‐7.057 13.333 ‐0.233 0 0 0
5 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 ‐7.057 16.293 0.279 0 0 0
5 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 ‐6.207 12.833 ‐0.235 0 0 0
5 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75  ‐6.207 15.793 0.277 0 0 0
5 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 ‐6.76 9.705 ‐0.831 0 0 0
5 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 ‐6.505 9.555 ‐0.832 0 0 0
5 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 ‐6.76 19.571 0.875 0 0 0
5 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75  ‐6.505 19.421 0.875 0 0 0
5 233 0.6 (D + P(O) + TF)+ WX ‐4.92 8.788 0.014 0 0 0
5 234 0.6 (D + P(O) + TF)+ WZ ‐4.059 8.534 0.013 0 0 0
5 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ ‐4.546 7.406 ‐0.327 0 0 0
5 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ ‐4.546 11.352 0.356 0 0 0
5 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ ‐3.412 6.74 ‐0.329 0 0 0
5 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ ‐3.412 10.686 0.354 0 0 0
5 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX ‐4.149 2.568 ‐1.124 0 0 0
5 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX ‐3.809 2.369 ‐1.125 0 0 0
Output Support reaction 
Piperack 2

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
5 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX ‐4.149 15.723 1.151 0 0 0
5 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX ‐3.809 15.523 1.151 0 0 0
7 111 1.4 (D + P(O) + TF) ‐9.667 20.372 ‐0.019 0 0 0
7 112 1.2 (D + P(O) + TF)+ 1.6 L ‐8.286 17.462 ‐0.017 0 0 0
7 113 1.2 (D + P(O) + TF)+ 1.6 WX + 1.0 L ‐9.772 17.926 ‐0.017 0 0 0
7 114 1.2 (D + P(O) + TF)+ 1.6 WZ + 1.0 L ‐8.294 73.02 ‐0.397 0 0 0
7 115 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ + 1.0 L ‐9.096 21.565 ‐0.016 0 0 0
7 116 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ + 1.0 L ‐9.096 15.927 ‐0.02 0 0 0
7 117 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ + 1.0 L ‐7.476 20.637 ‐0.015 0 0 0
7 118 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ + 1.0 L ‐7.476 14.999 ‐0.019 0 0 0
7 119 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX + 1.0 L ‐8.529 27.817 ‐0.013 0 0 0
7 120 1.2 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX + 1.0 L ‐8.043 27.539 ‐0.012 0 0 0
7 121 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX + 1.0 L ‐8.529 9.025 ‐0.023 0 0 0
7 122 1.2 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ ‐ 0.3 VX + 1.0 L ‐8.043 8.747 ‐0.022 0 0 0
7 123 0.9 (D + P(O) + TF)+ 1.6 WX ‐7.701 13.56 ‐0.013 0 0 0
7 124 0.9 (D + P(O) + TF)+ 1.6 WZ ‐6.222 68.654 ‐0.393 0 0 0
7 125 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX + 0.3 VZ ‐7.024 17.199 ‐0.012 0 0 0
7 126 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VX ‐ 0.3 VZ ‐7.024 11.562 ‐0.015 0 0 0
7 127 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX + 0.3 VZ ‐5.404 16.271 ‐0.011 0 0 0
7 128 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VX ‐ 0.3 VZ ‐5.404 10.634 ‐0.014 0 0 0
7 129 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ + 0.3 VX ‐6.457 23.452 ‐0.008 0 0 0
7 130 0.9 (D + P(O) + TF)+ 1.0 VY + 1.0 VZ ‐ 0.3 VX ‐5.971 23.173 ‐0.008 0 0 0
7 131 0.9 (D + P(O) + TF)+ 1.0 VY ‐ 1.0 VZ + 0.3 VX ‐6.457 4.66 ‐0.019 0 0 0
7 132 0.9 (D + P(O) + TF)+ 1.0 VY  ‐ 1.0 VZ ‐ 0.3 VX ‐5.971 4.381 ‐0.018 0 0 0
7 211 (D + P(O) + TF) ‐6.905 14.552 ‐0.014 0 0 0
7 212 (D + P(O) + TF)+ L ‐6.905 14.552 ‐0.014 0 0 0
7 213 (D + P(O) + TF)+ WX ‐7.834 14.842 ‐0.014 0 0 0
7 214 (D + P(O) + TF)+ WZ ‐6.91 49.275 ‐0.251 0 0 0
7 215 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ ‐7.472 17.424 ‐0.014 0 0 0
7 216 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ ‐7.472 13.477 ‐0.016 0 0 0
7 217 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ ‐6.338 16.774 ‐0.013 0 0 0
7 218 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ ‐6.338 12.828 ‐0.015 0 0 0
Output Support reaction 
Piperack 2

Horizontal Vertical Horizontal Moment


Node L/C
Fx kN Fy kN Fz kN Mx kNm My kNm Mz kNm
7 219 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX ‐7.075 21.8 ‐0.011 0 0 0
7 220 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX ‐6.735 21.605 ‐0.011 0 0 0
7 221 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX ‐7.075 8.646 ‐0.018 0 0 0
7 222 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX ‐6.735 8.451 ‐0.018 0 0 0
7 223 (D + P(O) + TF)+ 0.75 WX + 0.75 L ‐7.602 14.769 ‐0.014 0 0 0
7 224 (D + P(O) + TF)+ 0.75 WZ + 0.75 L ‐6.909 40.594 ‐0.192 0 0 0
7 225 (D + P(O) + TF)+ 0.525 VY + 0.525 VX + 0.1575 VZ + 0.75 ‐7.33 16.706 ‐0.014 0 0 0
7 226 (D + P(O) + TF)+ 0.525 VY + 0.525 VX ‐ 0.1575 VZ + 0.75 ‐7.33 13.746 ‐0.015 0 0 0
7 227 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX + 0.1575 VZ + 0.75 ‐6.48 16.218 ‐0.013 0 0 0
7 228 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VX ‐ 0.1575 VZ + 0.75  ‐6.48 13.259 ‐0.015 0 0 0
7 229 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ + 0.1575 VX + 0.75 ‐7.032 19.988 ‐0.012 0 0 0
7 230 (D + P(O) + TF)+ 0.525 VY + 0.525 VZ ‐ 0.1575 VX + 0.75 ‐6.777 19.842 ‐0.012 0 0 0
7 231 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ + 0.1575 VX + 0.75 ‐7.032 10.122 ‐0.017 0 0 0
7 232 (D + P(O) + TF)+ 0.525 VY ‐ 0.525 VZ ‐ 0.1575 VX + 0.75  ‐6.777 9.976 ‐0.017 0 0 0
7 233 0.6 (D + P(O) + TF)+ WX ‐5.072 9.021 ‐0.009 0 0 0
7 234 0.6 (D + P(O) + TF)+ WZ ‐4.223 8.776 ‐0.008 0 0 0
7 235 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX + 0.21 VZ ‐4.71 11.603 ‐0.008 0 0 0
7 236 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VX ‐ 0.21 VZ ‐4.71 7.657 ‐0.01 0 0 0
7 237 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX + 0.21 VZ ‐3.576 10.953 ‐0.007 0 0 0
7 238 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VX ‐ 0.21 VZ ‐3.576 7.007 ‐0.01 0 0 0
7 239 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ + 0.21 VX ‐4.313 15.98 ‐0.005 0 0 0
7 240 0.6 (D + P(O) + TF)+ 0.7 VY + 0.7 VZ ‐ 0.21 VX ‐3.973 15.785 ‐0.005 0 0 0
7 241 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ + 0.21 VX ‐4.313 2.825 ‐0.013 0 0 0
7 242 0.6 (D + P(O) + TF)+ 0.7 VY ‐ 0.7 VZ ‐ 0.21 VX ‐3.973 2.63 ‐0.012 0 0 0
ATTACHMENT - 4
CALCULATION OF FOUNDATION
12/15/2014

Project Na. : NPK Fusion Plan


Calculation Sheet
FOUNDATION CALCULATION SHEET of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 1

FOUNDATION LISTS
One-Stop Solution for Foundation Group Name No. Description No. Description
F1 1 F1
F2 2 F2
F3 3 F3 4 F4

TITLE DESCRIPTION
PROJECT/JOB NO. 14-0602
PROJECT/JOB NAME NPK Fusion Plan
CLIENT NAME PT. Pupuk Sriwidjaja
SITE NAME Palembang
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME Piperack 1 12-12-14 span 30m + pipe stanchion 6m b
LOAD COMBINATION GROUP NAME
REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D

Copyright (c) GSE&C. All RightsReserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 2 Foundation Client : PT. Pupuk Sriwidj... Page 3

CONTENTS 1. GENERAL
1.1 CODE & STANDARD
1. GENERAL Items Description
Design Code American Concrete Institute (ACI 318) [Metric]
1.1 CODE & STANDARD
Horizontal Force for Wind UNIFORM BUILDING CODE (UBC-1997)
1.2 MATERIALS & UNIT WEIGHT
Horizontal Force for Seismic UNIFORM BUILDING CODE [UBC-1997]
1.3 SUBSOIL CONDITION & SAFETY FACTORS Unit System Input : MKS, Output : MKS, Calculation Unit : IMPERIAL
1.4 LOAD COMBINATION
1.2 MATERIALS & UNIT WEIGHT
2. DRAWING Items Value
2.1 LOCATION PLAN Concrete (fck : compressive strength) 250.000 kgf/cm2
Lean Concrete (Lfck : compressive strength) 0.000 kgf/cm2
2.2 DETAIL SKETCH
Reinforcement (D10 ~ D16 , yield strength) 4000.000 kgf/cm2
Reinforcement (D19 ~ , yield strength) 4000.000 kgf/cm2
3. FOUNDATION DATA
Rs (Soil unit weight) 1.800 ton/m3
3.1 FOOTING DATA Rc (Concrete unit weight) 2.400 ton/m3
3.2 PIER DATA Es (Steel Modulus of Elasticity) 2.000 106 kgf/cm2

3.3 SECTION DATA Ec (Concrete Modulus of Elasticity) 239154.000 kgf/cm2

3.4 LOAD CASE - Soil Capacity


3.5 LOAD COMBINATION Items Value
Soil Name Unit-01
4. CHECK OF STABILITY Footing List F1, F2, F3, F4

4.1 CHECK OF SLIDING Qa (Soil Bearing Capacity) 6.68 tonf/m2


Buoyancy Not Consider
4.2 CHECK OF OVERTURNING MOMENT
WL (Water Label from the EL = 0) 0 mm
4.3 CHECK OF CONTACT PRESSURE FD (Frost Depth from the EL = 0) 0 mm
Internal Friction Angle 0
5. DESIGN OF FOOTING Passive Soil Pressure Not Consider

5.1 DESIGN MOMENT AND SHEAR FORCE Cu (Undrained cohesion) Clay , 0 tonf/m2

5.2 REQUIRED REINFORCEMENT


1.3 SUBSOIL CONDITION & SAFETY FACTORS
5.3 ONE WAY SHEAR FORCE
Items Description
5.4 TWO WAY SHEAR FORCE Allowable Increase of Soil (Wind) 33.33 %
Allowable Increase of Soil (Seismic) 33.33 %
Allowable Increase of Soil (Test) 20 %
Safety factor against overturning for OVM1(FO1) 1.5
Safety factor against overturning for OVM2(FO2) 1.5
Safety factor against overturning for OVM3(FO3) 2
Safety factor against sliding for the SL1(FS1) 2

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 4 Foundation Client : PT. Pupuk Sriwidj... Page 5

Safety factor against sliding for the SL2(FS2) 2 234 .6 SW + .6 DL + 1.0 Wind Load (wz) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
Friction factor () 0.5 .6 SW + .6 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
235
Thermal Load (tf)
.6 SW + .6 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
1.4 LOAD COMBINATION 236
Thermal Load (tf)
1.4.1 Group - F1 .6 SW + .6 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
237
Footing List = F1 Thermal Load (tf)

Comb . ID Load Combination for stability .6 SW + .6 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
238
Thermal Load (tf)
211 1.0 SW + 1.0 DL + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
.6 SW + .6 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
212 1.0 SW + 1.0 DL + 1.0 Live Load (l) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 239
Thermal Load (tf)
213 1.0 SW + 1.0 DL + 1.0 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) .6 SW + .6 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
240
214 1.0 SW + 1.0 DL + 1.0 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
215 241
1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
216 242
1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + Comb . ID Load Combination for Reinforcement
217
1.0 Thermal Load (tf) 111 1.4 SW + 1.0 DL + 1.4 Piping Operating P(o) + 1.4 Thermal Load (tf)
1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 112 1.2 SW + 1.2 DL + 1.6 Live Load (l) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
218
1.0 Thermal Load (tf)
113 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wx) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) +
219 114 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wz) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
220 115
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)

1.0 SW + 1.0 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
221 116
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)

1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
222 117
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)

223 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
118
Piping Operating P(o) + 1.2 Thermal Load (tf)
224 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 119
225 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 120
226 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 121
227 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 122
228 Piping Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
123 .9 SW + .9 DL + 1.6 Wind Load (wx) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
229 124 .9 SW + .9 DL + 1.6 Wind Load (wz) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
230 125
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
231 126
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
232 127
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)

233 .6 SW + .6 DL + 1.0 Wind Load (wx) + .6 Piping Operating P(o) + .6 Thermal Load (tf) .9 SW + .9 DL + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
128
Thermal Load (tf)

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 6 Foundation Client : PT. Pupuk Sriwidj... Page 7

.9 SW + .9 DL + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
129 232
Thermal Load (tf) Piping Operating P(o) + 1.0 Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 233 .6 SW + .6 DL + 1.0 Wind Load (wx) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
130
Thermal Load (tf)
234 .6 SW + .6 DL + 1.0 Wind Load (wz) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
.9 SW + .9 DL + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
131 .6 SW + .6 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
Thermal Load (tf) 235
Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
132 .6 SW + .6 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
Thermal Load (tf) 236
Thermal Load (tf)
1.4.2 Group - F2 .6 SW + .6 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
237
Footing List = F2 Thermal Load (tf)

Comb . ID Load Combination for stability .6 SW + .6 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
238
Thermal Load (tf)
211 1.0 SW + 1.0 DL + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
.6 SW + .6 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
212 1.0 SW + 1.0 DL + 1.0 Live Load (l) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 239
Thermal Load (tf)
213 1.0 SW + 1.0 DL + 1.0 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) .6 SW + .6 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
240
214 1.0 SW + 1.0 DL + 1.0 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
215 241
1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
216 242
1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + Comb . ID Load Combination for Reinforcement
217
1.0 Thermal Load (tf) 111 1.4 SW + 1.0 DL + 1.4 Piping Operating P(o) + 1.4 Thermal Load (tf)
1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 112 1.2 SW + 1.2 DL + 1.6 Live Load (l) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
218
1.0 Thermal Load (tf)
113 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wx) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) +
219 114 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wz) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
220 115
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)

1.0 SW + 1.0 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
221 116
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)

1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
222 117
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)

223 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
118
Piping Operating P(o) + 1.2 Thermal Load (tf)
224 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 119
225 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 120
226 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 121
227 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 122
228 Piping Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
123 .9 SW + .9 DL + 1.6 Wind Load (wx) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
229 124 .9 SW + .9 DL + 1.6 Wind Load (wz) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
230 125
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
231 126
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 8 Foundation Client : PT. Pupuk Sriwidj... Page 9

.9 SW + .9 DL + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
127 230
Thermal Load (tf) Piping Operating P(o) + 1.0 Thermal Load (tf)
.9 SW + .9 DL + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
128 231
Thermal Load (tf) Piping Operating P(o) + 1.0 Thermal Load (tf)
.9 SW + .9 DL + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
129 232
Thermal Load (tf) Piping Operating P(o) + 1.0 Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 233 .6 SW + .6 DL + 1.0 Wind Load (wx) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
130
Thermal Load (tf)
234 .6 SW + .6 DL + 1.0 Wind Load (wz) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
.9 SW + .9 DL + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
131 .6 SW + .6 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
Thermal Load (tf) 235
Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
132 .6 SW + .6 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
Thermal Load (tf) 236
Thermal Load (tf)
1.4.3 Group - F3 .6 SW + .6 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
237
Footing List = F3, F4 Thermal Load (tf)

Comb . ID Load Combination for stability .6 SW + .6 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
238
Thermal Load (tf)
211 1.0 SW + 1.0 DL + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
.6 SW + .6 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
212 1.0 SW + 1.0 DL + 1.0 Live Load (l) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 239
Thermal Load (tf)
213 1.0 SW + 1.0 DL + 1.0 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) .6 SW + .6 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
240
214 1.0 SW + 1.0 DL + 1.0 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
215 241
1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
216 242
1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + Comb . ID Load Combination for Reinforcement
217
1.0 Thermal Load (tf) 111 1.4 SW + 1.0 DL + 1.4 Piping Operating P(o) + 1.4 Thermal Load (tf)
1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 112 1.2 SW + 1.2 DL + 1.6 Live Load (l) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
218
1.0 Thermal Load (tf)
113 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wx) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) +
219 114 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wz) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
220 115
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)

1.0 SW + 1.0 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
221 116
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)

1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
222 117
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)

223 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
118
Piping Operating P(o) + 1.2 Thermal Load (tf)
224 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 119
225 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 120
226 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 121
227 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 122
228 Piping Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
123 .9 SW + .9 DL + 1.6 Wind Load (wx) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
229 124 .9 SW + .9 DL + 1.6 Wind Load (wz) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 10 Foundation Client : PT. Pupuk Sriwidj... Page 11

125
.9 SW + .9 DL + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
Thermal Load (tf)
2. DRAWING
.9 SW + .9 DL + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 2.1 LOCATION PLAN
126
Thermal Load (tf)
2.2 DETAIL SKETCH
.9 SW + .9 DL + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
127
Thermal Load (tf)
.9 SW + .9 DL + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
128
Thermal Load (tf)
.9 SW + .9 DL + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
129
Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
130
Thermal Load (tf)
.9 SW + .9 DL + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
131
Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
132
Thermal Load (tf)

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 Page 12

REFERENCE DWGS
NO. DWG NO. DWG TITLE

NOTES
* OUTPUT UNIT : mm

A01 A02 A03 A04

30000 6000
3000

01 1 5
39
F3 45
F4
3 7
F1 F2 NPK Fusion Plan PROJECT

FOUNDATION LOCATION PLAN


Piperack 1 12-12-14 span 30m + pipe
stanchion6m b
SQUAD CHECK

Y PROCESS PIPING VESSELS STRUCT. ELEC. INST.

Z X SCALE JOB NO. MICROFILM NO.

AS SHOWN 14-0602

Copyright (c) GS E&C. All Rights Reserved

12/15/2014 Page 13

2.2 DETAIL SKETCH

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


12/15/2014 Page 14

REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING

2000
1000x2

1500
NOTES
* OUTPUT UNIT : mm

CL FOOTING
4000
1000
3
NPK Fusion Plan PROJECT

1500
FOUNDATION DETAIL FOR
F1

FOUNDATION PLAN
SQUAD CHECK

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN 14-0602

Copyright (c) GS E&C. All Rights Reserved

12/15/2014 Page 15

REFERENCE DWGS
NO. DWG NO. DWG TITLE

CL FOOTING

TOP BOTTOM
50
TYP.

NOTES
* OUTPUT UNIT : mm
D19@200
D19@200

NPK Fusion Plan PROJECT

FOUNDATION DETAIL FOR


F1
D19@200
D19@200

REINFORCEMENT PLAN
SQUAD CHECK

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN 14-0602

Copyright (c) GS E&C. All Rights Reserved


12/15/2014 Page 16

1600
1

400
3

LEAN CONC. 50 THK

ELEVATION S1 - X

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved

12/15/2014F1 Item No. Page 17

1 3
550 550
50 212.5 212.5 50 212.5 212.5
TYP. 125 TYP. 125

500
125
500
125

D16 D16
187.5 187.5
187.5 187.5

8-D19 8-D19
75 PR.
75 PR.

30 GR.
30 GR.

50
50

50
50

D19 D19
1800
1800

D16
D16

@200
@200

100
100

Copyright (c) GS E&C. All Rights Reserved


12/15/2014 Page 18

2.2 DETAIL SKETCH

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved

12/15/2014 Page 19

REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING

2000
1000x2
1500

NOTES
* OUTPUT UNIT : mm

5
CL FOOTING
4000
1000

7
NPK Fusion Plan PROJECT
1500

FOUNDATION DETAIL FOR


F2

FOUNDATION PLAN
SQUAD CHECK

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN 14-0602

Copyright (c) GS E&C. All Rights Reserved


12/15/2014 Page 20

REFERENCE DWGS
NO. DWG NO. DWG TITLE

CL FOOTING

TOP BOTTOM

50
TYP.
NOTES
* OUTPUT UNIT : mm

D19@200
D19@200
NPK Fusion Plan PROJECT

FOUNDATION DETAIL FOR


F2
D19@200
D19@200

REINFORCEMENT PLAN
SQUAD CHECK

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN 14-0602

Copyright (c) GS E&C. All Rights Reserved

12/15/2014 Page 21

7
1600

5
400

LEAN CONC. 50 THK

ELEVATION S1 - X

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


12/15/2014F2 Item No. Page 22

5 7
550 550
50 212.5 212.5 50 212.5 212.5
TYP. 125 TYP. 125

500
125
500
125
D16 D16

187.5 187.5
187.5 187.5
8-D19 8-D19

75 PR.
75 PR.

30 GR.
30 GR.

50
50

50
50
D19 D19

1800
1800

D16
D16

@200
@200

100
100

Copyright (c) GS E&C. All Rights Reserved

12/15/2014 Page 23

2.2 DETAIL SKETCH

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


Page 24

INST.

MICROFILM NO.
12/15/2014

FOUNDATION DETAIL FOR


NPK Fusion Plan PROJECT
DWG TITLE

1X4-M12 ANC. BOLTS (TYPE TYPE L)

ELEC.
Project Na. : NPK Fusion Plan
REFERENCE DWGS

Calculation Sheet

PROCESS PIPING VESSELS STRUCT.


of Project No. : 14-0602

NOTES
Foundation

F3 ~ F4
Client : PT. Pupuk Sriwidj... Page 25

14-0602
* OUTPUT UNIT : mm

JOB NO.
3. FOUNDATION DATA
* ANCHOR BOLT
DWG NO.

3.1 FOOTING DATA

AS SHOWN
Unit : mmFt. Name F1

SCALE
Ft. Type MAT
NO.

SQUAD CHECK

2000 Area 8.000 m2

DRWNCHKDAPPDAPPDAPPD
Ft. Thickness 400.00 mm
Ft. Volume 3.200 m3
TYP. D19@200 Ft. Weight 7.680 tonf
50
Soil Height 1600.00 mm
Soil Volume 11.920 m3

D16
TYP.
Soil Weight 21.456 tonf
D19@200
FOOTING REINF. PLAN
BOTTOM

50
1

4000
CL FOOTING

DESCRIPTION
137.5 Buoyancy Not Consider

PEDESTAL
Self Weight (except Pr.SW) 29.136 tonf

8-D19
3
400

125
TOP

137.5
D19@200

REV. DATE

1800
1600
125
137.5 137.5
400 The Origin coordinate

400
The Center of gravity (0,0) mm
D19@200

Unit : mmFt. Name F2


@200 100 Ft. Type MAT
50 50 D16 50 75
2000 Area 8.000 m2
Ft. Thickness 400.00 mm
Ft. Volume 3.200 m3
CRUSHED STONE 0 THK

Ft. Weight 7.680 tonf


D19

LEAN CONC. 50 THK

Soil Height 1600.00 mm


FOUNDATION PLAN

Soil Volume 11.920 m3


SECTION

Soil Weight 21.456 tonf


5

4000
(2 EA)
800

Buoyancy Not Consider


Self Weight (except Pr.SW) 29.136 tonf
7
Copyright (c) GS E&C. All Rights Reserved
400

1800
1600
400 75 PROJ.
800 700 The Origin coordinate

400
900 300 The Center of gravity (0,0) mm
TOC EL. + 200
12/15/2014

Copyright (c) GS E&C. All Rights Reserved


12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 26 Foundation Client : PT. Pupuk Sriwidj... Page 27

Unit : mmFt. Name F3 3.2 PIER DATA


Ft. Type ISO Off X , Off Y is offset position from the Center of the footing
800 Area 0.640 m2 If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Ft. Thickness 300.00 mm
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
Ft. Volume 0.192 m3
Unit( Length : mm , Weight : tonf , Area : m2 )
Ft. Weight 0.461 tonf
Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y
Soil Height 700.00 mm 1 Rectangle 550.000 500.000 1800.000 0.275 1.188 0.000 500.000
3
F1
Soil Volume 0.336 m 3 Rectangle 550.000 500.000 1800.000 0.275 1.188 0.000 -500.000

Soil Weight 0.605 tonf 5 Rectangle 550.000 500.000 1800.000 0.275 1.188 0.000 500.000
F2
800

7 Rectangle 550.000 500.000 1800.000 0.275 1.188 0.000 -500.000


Buoyancy Not Consider
F3 39 Rectangle 400.000 400.000 900.000 0.160 0.346 0.000 0.000
Self Weight (except Pr.SW) 1.066 tonf F4 45 Rectangle 400.000 400.000 900.000 0.346 0.000 0.000
0.160

3.3 SECTION DATA


Ft.Name / Sec.Name F1 / S1 Ft.Name / Sec.Name F2 / S1
900
700

Unit : mm Unit : mm
The Origin coordinate 2000 2000
300

The Center of gravity (0,0) mm

Unit : mmFt. Name F4

4000

4000
Ft. Type ISO
800 Area 0.640 m2
Ft. Thickness 300.00 mm
Ft. Volume 0.192 m3
Direction All Direct Section Area m2
Direction
8.000 All Direct Section Area 8.000 m2
Ft. Weight 0.461 tonf
F.Volume F.Weight 3.200
7.680 m3
F.Volume
tonf 3.200 m3 F.Weight 7.680 tonf
Soil Height 700.00 mm
S.Volume S.Weight 11.920
21.456 m3
S.Volume
tonf 11.920 m3 S.Weight 21.456 tonf
Soil Volume 0.336 m3
Pier Wt Total Weight Pier Wt
2.376
31.512tonf
tonf 2.376 tonf Total Weight 31.512 tonf
Soil Weight 0.605 tonf
800

Buoyancy Not Consider


Self Weight (except Pr.SW) 1.066 tonf
900
700

The Origin coordinate


300

The Center of gravity (0,0) mm

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 28 Foundation Client : PT. Pupuk Sriwidj... Page 29

Ft.Name / Sec.Name F3 / S1 Ft.Name / Sec.Name F4 / S1 10 0.089 0.000 0.059 0.000 0.000


1 0.000 0.000 -1.188 0.000 0.000
Unit : mm Unit : mm
2 -0.681 -0.004 -1.549 0.000 0.000
800 800
3 0.000 0.000 0.000 0.000 0.000
4 0.142 0.000 0.035 0.000 0.000
5 -0.002 -1.394 -8.243 0.000 0.000
3
6 0.108 0.000 0.045 0.000 0.000
800

800
7 0.000 -0.218 -1.470 0.000 0.000
8 0.000 0.000 -0.117 0.000 0.000
9 -0.256 -0.001 -0.437 0.000 0.000
10 0.089 -0.003 0.022 0.000 0.000
Footing SW 0.000 0.000 -29.136 0.000 0.000
Direction All Direct Section Area 0.640 m 2
Direction All Direct Section Area 0.640 m 2 1 0.000 0.000 -1.188 0.000 0.000
2 0.673 0.004 -1.549 0.000 0.000
F.Volume 0.192 m3 F.Weight 0.461 tonf F.Volume 0.192 m3 F.Weight 0.461 tonf
3 0.000 0.000 0.000 0.000 0.000
S.Volume 0.336 m3 S.Weight 0.605 tonf S.Volume 0.336 m3 S.Weight 0.605 tonf
4 0.140 0.000 -0.034 0.000 0.000
Pier Wt 0.346 tonf Total Weight 1.411 tonf Pier Wt 0.346 tonf Total Weight 1.411 tonf 5 -0.003 -0.023 8.243 0.000 0.000
5
6 0.108 0.000 -0.053 0.000 0.000
3.4 LOAD CASE 7 0.000 0.002 1.470 0.000 0.000
8 0.000 0.000 -0.099 0.000 0.000
Fz
9 0.093 0.001 -0.159 0.000 0.000
Fy
Mz 10 0.089 0.000 -0.059 0.000 0.000
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are based on
My the right hand rule. F2 1 0.000 0.000 -1.188 0.000 0.000
Fx 2 0.681 -0.004 -1.549 0.000 0.000
Mx
3 0.000 0.000 0.000 0.000 0.000
4 0.142 0.000 -0.035 0.000 0.000
Index Load Case Name
5 0.002 -1.394 -8.243 0.000 0.000
1 SW 7
6 0.108 0.000 -0.045 0.000 0.000
2 DL 7 0.000 -0.218 -1.470 0.000 0.000
3 Live Load (l) 8 0.000 0.000 -0.117 0.000 0.000
4 Wind Load (wx) 9 0.256 -0.001 -0.437 0.000 0.000
10 0.089 0.003 -0.022 0.000 0.000
5 Wind Load (wz)
Footing SW 0.000 0.000 -29.136 0.000 0.000
6 Seismic Load (vx)
1 0.000 0.000 -0.346 0.000 0.000
7 Seismic Load (vz) 2 0.000 0.000 -0.024 0.000 0.000
8 Seismic Load (vy) 3 0.000 0.000 0.000 0.000 0.000
9 Piping Operating P(o) 4 0.015 0.000 0.000 0.000 0.004
5 0.000 0.000 0.000 0.000 0.000
10 Thermal Load (tf) 39
F3 6 0.100 0.000 0.000 0.000 0.030
Unit( tonf , tonf-m ) 7 0.000 -0.100 0.000 0.030 0.000
Ft.Name Pr.Name Load Case Fx Fy Fz Mx My 8 0.000 0.000 -0.100 0.000 0.000
1 0.000 0.000 -1.188 0.000 0.000 9 0.000 0.000 -0.602 0.011 0.000
2 -0.673 0.004 -1.549 0.000 0.000 10 0.180 0.000 0.000 0.000 0.054
3 0.000 0.000 0.000 0.000 0.000 Footing SW 0.000 0.000 -1.066 0.000 0.000
4 0.140 0.000 0.034 0.000 0.000 1 0.000 0.000 -0.346 0.000 0.000
F1 1 5 0.003 -0.023 8.243 0.000 0.000 2 0.000 0.000 -0.024 0.000 0.000
6 0.108 0.000 0.053 0.000 0.000 3 0.000 0.000 0.000 0.000 0.000
F4 45
7 0.000 0.002 1.470 0.000 0.000 4 0.015 0.000 0.000 0.000 0.004
8 0.000 0.000 -0.099 0.000 0.000 5 0.000 0.000 0.000 0.000 0.000
9 -0.093 0.001 -0.159 0.000 0.000 6 0.100 0.000 0.000 0.000 0.030

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 30 Foundation Client : PT. Pupuk Sriwidj... Page 31

7 0.000 -0.100 0.000 0.030 0.000 237 -0.482 0.003 -0.787 0.000 0.000
8 0.000 0.000 -0.100 0.000 0.000 238 -0.482 0.003 -1.405 0.000 0.000
9 0.000 0.000 -0.602 0.011 0.000 239 -0.384 0.004 -0.019 0.000 0.000
10 0.180 0.000 0.000 0.000 0.054 240 -0.429 0.004 -0.041 0.000 0.000
Footing SW 0.000 0.000 -1.066 0.000 0.000 241 -0.384 0.002 -2.077 0.000 0.000
242 -0.429 0.002 -2.099 0.000 0.000
111 -0.679 0.005 -1.689 0.000 0.000
3.5 LOAD COMBINATION
112 -0.812 0.006 -1.979 0.000 0.000
In Pier Top In Footing Bottom In Footing Bottom Center 113 -0.588 0.006 -1.924 0.000 0.000
without Self Weight with Pier Self Weight, with Pier & Footing Self Weight & Soil Weight, 114 -0.808 -0.031 11.210 0.000 0.000
But without Footing Self Weight, Case PileType 115 -0.704 0.007 -1.584 0.000 0.000
in centroid of Pile Group 116 -0.704 0.005 -2.466 0.000 0.000
Case NonPileType 117 -0.920 0.007 -1.690 0.000 0.000
in centroid of Footing 118 -0.920 0.005 -2.572 0.000 0.000
119 -0.780 0.008 -0.592 0.000 0.000
120 -0.845 0.008 -0.624 0.000 0.000
121 -0.780 0.004 -3.532 0.000 0.000
122 -0.845 0.004 -3.564 0.000 0.000
123 -0.385 0.005 -1.430 0.000 0.000
124 -0.604 -0.032 11.705 0.000 0.000
3.5.1 Load Combination in Pier Top (Without SW) 125 -0.501 0.005 -1.089 0.000 0.000
126 -0.501 0.004 -1.971 0.000 0.000
Group 1 - F1 Unit( tonf , tonf-m ) 127 -0.717 0.005 -1.195 0.000 0.000
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My 128 -0.717 0.004 -2.077 0.000 0.000
F1 211 -0.677 0.005 -1.649 0.000 0.000 129 -0.577 0.007 -0.097 0.000 0.000
212 -0.677 0.005 -1.649 0.000 0.000 130 -0.642 0.007 -0.129 0.000 0.000
213 -0.537 0.005 -1.615 0.000 0.000 131 -0.577 0.003 -3.037 0.000 0.000
214 -0.674 -0.018 6.594 0.000 0.000 132 -0.642 0.003 -3.069 0.000 0.000
215 -0.601 0.005 -1.373 0.000 0.000 211 -0.848 -0.008 -1.964 0.000 0.000
216 -0.601 0.005 -1.990 0.000 0.000 212 -0.848 -0.008 -1.964 0.000 0.000
217 -0.753 0.005 -1.447 0.000 0.000 213 -0.706 -0.008 -1.929 0.000 0.000
218 -0.753 0.005 -2.064 0.000 0.000 214 -0.850 -1.402 -10.207 0.000 0.000
219 -0.654 0.006 -0.678 0.000 0.000 215 -0.772 -0.054 -2.323 0.000 0.000
220 -0.700 0.006 -0.700 0.000 0.000 216 -0.772 0.038 -1.706 0.000 0.000
221 -0.654 0.004 -2.736 0.000 0.000 217 -0.924 -0.054 -2.386 0.000 0.000
222 -0.700 0.004 -2.758 0.000 0.000 218 -0.924 0.038 -1.769 0.000 0.000
223 -0.572 0.005 -1.623 0.000 0.000 219 -0.825 -0.161 -3.065 0.000 0.000
1
224 -0.675 -0.012 4.533 0.000 0.000 220 -0.871 -0.161 -3.084 0.000 0.000
225 -0.620 0.005 -1.442 0.000 0.000 221 -0.825 0.145 -1.007 0.000 0.000
226 -0.620 0.005 -1.905 0.000 0.000 3
222 -0.871 0.145 -1.026 0.000 0.000
227 -0.734 0.005 -1.497 0.000 0.000 223 -0.742 -0.008 -1.938 0.000 0.000
228 -0.734 0.005 -1.960 0.000 0.000 224 -0.850 -1.054 -8.146 0.000 0.000
229 -0.660 0.006 -0.921 0.000 0.000 225 -0.791 -0.042 -2.233 0.000 0.000
230 -0.694 0.006 -0.938 0.000 0.000 226 -0.791 0.026 -1.770 0.000 0.000
231 -0.660 0.004 -2.464 0.000 0.000 227 -0.905 -0.042 -2.281 0.000 0.000
232 -0.694 0.004 -2.481 0.000 0.000 228 -0.905 0.026 -1.818 0.000 0.000
233 -0.266 0.003 -0.955 0.000 0.000 229 -0.831 -0.122 -2.790 0.000 0.000
234 -0.403 -0.020 7.254 0.000 0.000 230 -0.865 -0.122 -2.804 0.000 0.000
235 -0.331 0.003 -0.713 0.000 0.000 231 -0.831 0.106 -1.247 0.000 0.000
236 -0.331 0.003 -1.330 0.000 0.000 232 -0.865 0.106 -1.261 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 32 Foundation Client : PT. Pupuk Sriwidj... Page 33

233 -0.367 -0.005 -1.143 0.000 0.000 226 0.912 0.005 -2.078 0.000 0.000
234 -0.511 -1.399 -9.421 0.000 0.000 227 0.798 0.005 -1.560 0.000 0.000
235 -0.433 -0.051 -1.538 0.000 0.000 228 0.798 0.005 -2.023 0.000 0.000
236 -0.433 0.041 -0.920 0.000 0.000 229 0.872 0.006 -1.056 0.000 0.000
237 -0.584 -0.051 -1.600 0.000 0.000 230 0.838 0.006 -1.039 0.000 0.000
238 -0.584 0.041 -0.983 0.000 0.000 231 0.872 0.004 -2.599 0.000 0.000
239 -0.486 -0.157 -2.280 0.000 0.000 232 0.838 0.004 -2.582 0.000 0.000
240 -0.531 -0.157 -2.299 0.000 0.000 233 0.653 0.003 -1.094 0.000 0.000
241 -0.486 0.148 -0.222 0.000 0.000 234 0.510 -0.020 7.183 0.000 0.000
242 -0.531 0.148 -0.241 0.000 0.000 235 0.589 0.003 -0.858 0.000 0.000
111 -0.915 -0.010 -2.130 0.000 0.000 236 0.589 0.003 -1.475 0.000 0.000
112 -1.018 -0.010 -2.357 0.000 0.000 237 0.437 0.003 -0.784 0.000 0.000
113 -0.790 -0.010 -2.301 0.000 0.000 238 0.437 0.003 -1.401 0.000 0.000
114 -1.021 -2.240 -15.546 0.000 0.000 239 0.536 0.004 -0.112 0.000 0.000
115 -0.910 -0.075 -2.870 0.000 0.000 240 0.490 0.004 -0.089 0.000 0.000
116 -0.910 0.056 -1.988 0.000 0.000 241 0.536 0.002 -2.170 0.000 0.000
117 -1.126 -0.075 -2.960 0.000 0.000 242 0.490 0.002 -2.147 0.000 0.000
118 -1.126 0.056 -2.078 0.000 0.000 111 0.928 0.005 -1.854 0.000 0.000
119 -0.985 -0.228 -3.930 0.000 0.000 112 1.026 0.006 -2.120 0.000 0.000
120 -1.050 -0.228 -3.957 0.000 0.000 113 1.250 0.006 -2.175 0.000 0.000
121 -0.985 0.208 -0.990 0.000 0.000 114 1.021 -0.031 11.068 0.000 0.000
122 -1.050 0.208 -1.017 0.000 0.000 115 1.134 0.007 -1.831 0.000 0.000
123 -0.536 -0.007 -1.712 0.000 0.000 116 1.134 0.005 -2.713 0.000 0.000
124 -0.766 -2.238 -14.956 0.000 0.000 117 0.918 0.007 -1.725 0.000 0.000
125 -0.655 -0.073 -2.281 0.000 0.000 118 0.918 0.005 -2.607 0.000 0.000
126 -0.655 0.058 -1.399 0.000 0.000 119 1.058 0.008 -0.765 0.000 0.000
127 -0.871 -0.073 -2.371 0.000 0.000 120 0.994 0.008 -0.734 0.000 0.000
128 -0.871 0.058 -1.489 0.000 0.000 121 1.058 0.004 -3.705 0.000 0.000
129 -0.731 -0.225 -3.341 0.000 0.000 122 0.994 0.004 -3.674 0.000 0.000
130 -0.796 -0.225 -3.368 0.000 0.000 123 0.993 0.005 -1.645 0.000 0.000
131 -0.731 0.211 -0.401 0.000 0.000 124 0.765 -0.032 11.599 0.000 0.000
132 -0.796 0.211 -0.428 0.000 0.000 125 0.877 0.005 -1.301 0.000 0.000
126 0.877 0.004 -2.183 0.000 0.000
Group 2 - F2 Unit( tonf , tonf-m ) 127 0.661 0.005 -1.195 0.000 0.000
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My 128 0.661 0.004 -2.077 0.000 0.000
F2 211 0.855 0.005 -1.767 0.000 0.000 129 0.802 0.007 -0.235 0.000 0.000
212 0.855 0.005 -1.767 0.000 0.000 130 0.737 0.007 -0.203 0.000 0.000
213 0.995 0.005 -1.801 0.000 0.000 131 0.802 0.003 -3.175 0.000 0.000
214 0.852 -0.018 6.476 0.000 0.000 132 0.737 0.003 -3.143 0.000 0.000
215 0.931 0.005 -1.565 0.000 0.000 211 1.026 -0.002 -2.008 0.000 0.000
216 0.931 0.005 -2.182 0.000 0.000 212 1.026 -0.002 -2.008 0.000 0.000
217 0.779 0.005 -1.491 0.000 0.000 213 1.168 -0.002 -2.043 0.000 0.000
5 218 0.779 0.005 -2.108 0.000 0.000 214 1.028 -1.396 -10.251 0.000 0.000
219 0.878 0.006 -0.818 0.000 0.000 215 1.102 -0.048 -2.430 0.000 0.000
220 0.832 0.006 -0.796 0.000 0.000 7 216 1.102 0.044 -1.813 0.000 0.000
221 0.878 0.004 -2.876 0.000 0.000 217 0.950 -0.048 -2.367 0.000 0.000
222 0.832 0.004 -2.854 0.000 0.000 218 0.950 0.044 -1.750 0.000 0.000
223 0.960 0.005 -1.793 0.000 0.000 219 1.049 -0.155 -3.128 0.000 0.000
224 0.853 -0.012 4.415 0.000 0.000 220 1.003 -0.155 -3.109 0.000 0.000
225 0.912 0.005 -1.615 0.000 0.000 221 1.049 0.151 -1.070 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 34 Foundation Client : PT. Pupuk Sriwidj... Page 35

222 1.003 0.151 -1.051 0.000 0.000 215 0.250 -0.021 -0.696 0.017 0.075
223 1.133 -0.002 -2.034 0.000 0.000 216 0.250 0.021 -0.696 0.005 0.075
224 1.028 -1.048 -8.190 0.000 0.000 217 0.110 -0.021 -0.696 0.017 0.033
225 1.083 -0.036 -2.325 0.000 0.000 218 0.110 0.021 -0.696 0.005 0.033
226 1.083 0.032 -1.862 0.000 0.000 219 0.201 -0.070 -0.696 0.032 0.060
227 0.969 -0.036 -2.277 0.000 0.000 220 0.159 -0.070 -0.696 0.032 0.048
228 0.969 0.032 -1.814 0.000 0.000 221 0.201 0.070 -0.696 -0.010 0.060
229 1.043 -0.116 -2.848 0.000 0.000 222 0.159 0.070 -0.696 -0.010 0.048
230 1.009 -0.116 -2.834 0.000 0.000 223 0.191 0.000 -0.626 0.011 0.057
231 1.043 0.112 -1.305 0.000 0.000 224 0.180 0.000 -0.626 0.011 0.054
232 1.009 0.112 -1.291 0.000 0.000 225 0.233 -0.016 -0.678 0.016 0.070
233 0.758 -0.001 -1.240 0.000 0.000 226 0.233 0.016 -0.678 0.006 0.070
234 0.618 -1.395 -9.448 0.000 0.000 227 0.128 -0.016 -0.678 0.016 0.038
235 0.691 -0.047 -1.627 0.000 0.000 228 0.128 0.016 -0.678 0.006 0.038
236 0.691 0.045 -1.010 0.000 0.000 229 0.196 -0.052 -0.678 0.027 0.059
237 0.540 -0.047 -1.564 0.000 0.000 230 0.164 -0.052 -0.678 0.027 0.049
238 0.540 0.045 -0.947 0.000 0.000 231 0.196 0.052 -0.678 -0.005 0.059
239 0.638 -0.154 -2.325 0.000 0.000 232 0.164 0.052 -0.678 -0.005 0.049
240 0.593 -0.154 -2.306 0.000 0.000 233 0.123 0.000 -0.376 0.007 0.036
241 0.638 0.151 -0.267 0.000 0.000 234 0.108 0.000 -0.376 0.007 0.032
242 0.593 0.151 -0.248 0.000 0.000 235 0.178 -0.021 -0.446 0.013 0.053
111 1.164 -0.001 -2.192 0.000 0.000 236 0.178 0.021 -0.446 0.000 0.053
112 1.231 -0.002 -2.410 0.000 0.000 237 0.038 -0.021 -0.446 0.013 0.011
113 1.458 -0.002 -2.466 0.000 0.000 238 0.038 0.021 -0.446 0.000 0.011
114 1.234 -2.233 -15.598 0.000 0.000 239 0.129 -0.070 -0.446 0.028 0.039
115 1.339 -0.068 -3.013 0.000 0.000 240 0.087 -0.070 -0.446 0.028 0.026
116 1.339 0.063 -2.131 0.000 0.000 241 0.129 0.070 -0.446 -0.014 0.039
117 1.123 -0.068 -2.923 0.000 0.000 242 0.087 0.070 -0.446 -0.014 0.026
118 1.123 0.063 -2.041 0.000 0.000 111 0.252 0.000 -0.867 0.015 0.076
119 1.264 -0.220 -4.010 0.000 0.000 112 0.216 0.000 -0.751 0.013 0.065
120 1.199 -0.220 -3.983 0.000 0.000 113 0.240 0.000 -0.751 0.013 0.071
121 1.264 0.216 -1.070 0.000 0.000 114 0.216 0.000 -0.751 0.013 0.065
122 1.199 0.216 -1.043 0.000 0.000 115 0.316 -0.030 -0.851 0.022 0.095
123 1.151 -0.002 -1.863 0.000 0.000 116 0.316 0.030 -0.851 0.004 0.095
124 0.927 -2.232 -14.996 0.000 0.000 117 0.116 -0.030 -0.851 0.022 0.035
125 1.031 -0.067 -2.410 0.000 0.000 118 0.116 0.030 -0.851 0.004 0.035
126 1.031 0.064 -1.528 0.000 0.000 119 0.246 -0.100 -0.851 0.043 0.074
127 0.815 -0.067 -2.320 0.000 0.000 120 0.186 -0.100 -0.851 0.043 0.056
128 0.815 0.064 -1.438 0.000 0.000 121 0.246 0.100 -0.851 -0.017 0.074
129 0.956 -0.220 -3.408 0.000 0.000 122 0.186 0.100 -0.851 -0.017 0.056
130 0.891 -0.220 -3.381 0.000 0.000 123 0.186 0.000 -0.563 0.010 0.055
131 0.956 0.216 -0.468 0.000 0.000 124 0.162 0.000 -0.563 0.010 0.049
132 0.891 0.216 -0.441 0.000 0.000 125 0.262 -0.030 -0.663 0.019 0.079
126 0.262 0.030 -0.663 0.001 0.079
Group 3 - F3 Unit( tonf , tonf-m ) 127 0.062 -0.030 -0.663 0.019 0.019
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My 128 0.062 0.030 -0.663 0.001 0.019
F3 211 0.180 0.000 -0.626 0.011 0.054 129 0.192 -0.100 -0.663 0.040 0.058
212 0.180 0.000 -0.626 0.011 0.054 130 0.132 -0.100 -0.663 0.040 0.040
39
213 0.195 0.000 -0.626 0.011 0.058 131 0.192 0.100 -0.663 -0.020 0.058
214 0.180 0.000 -0.626 0.011 0.054 132 0.132 0.100 -0.663 -0.020 0.040

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 36 Foundation Client : PT. Pupuk Sriwidj... Page 37

F4 211 0.180 0.000 -0.626 0.011 0.054 129 0.192 -0.100 -0.663 0.040 0.058
212 0.180 0.000 -0.626 0.011 0.054 130 0.132 -0.100 -0.663 0.040 0.040
213 0.195 0.000 -0.626 0.011 0.058 131 0.192 0.100 -0.663 -0.020 0.058
214 0.180 0.000 -0.626 0.011 0.054 132 0.132 0.100 -0.663 -0.020 0.040
215 0.250 -0.021 -0.696 0.017 0.075
216 0.250 0.021 -0.696 0.005 0.075
217 0.110 -0.021 -0.696 0.017 0.033
3.5.2 Load Combination in Footing Bottom (With Pier SW)
218 0.110 0.021 -0.696 0.005 0.033 Group 1 - F1 Unit( tonf , tonf-m )
219 0.201 -0.070 -0.696 0.032 0.060 Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
220 0.159 -0.070 -0.696 0.032 0.048 F1 211 -0.677 0.005 -2.837 -0.011 -1.489
221 0.201 0.070 -0.696 -0.010 0.060 212 -0.677 0.005 -2.837 -0.011 -1.489
222 0.159 0.070 -0.696 -0.010 0.048 213 -0.537 0.005 -2.803 -0.011 -1.181
223 0.191 0.000 -0.626 0.011 0.057 214 -0.674 -0.018 5.406 0.040 -1.483
224 0.180 0.000 -0.626 0.011 0.054 215 -0.601 0.005 -2.560 -0.012 -1.323
225 0.233 -0.016 -0.678 0.016 0.070 216 -0.601 0.005 -3.178 -0.010 -1.323
226 0.233 0.016 -0.678 0.006 0.070 217 -0.753 0.005 -2.635 -0.012 -1.656
227 0.128 -0.016 -0.678 0.016 0.038 218 -0.753 0.005 -3.252 -0.010 -1.656
228 0.128 0.016 -0.678 0.006 0.038 219 -0.654 0.006 -1.866 -0.014 -1.440
229 0.196 -0.052 -0.678 0.027 0.059 220 -0.700 0.006 -1.888 -0.014 -1.539
230 0.164 -0.052 -0.678 0.027 0.049 221 -0.654 0.004 -3.924 -0.008 -1.440
231 0.196 0.052 -0.678 -0.005 0.059 222 -0.700 0.004 -3.946 -0.008 -1.539
232 0.164 0.052 -0.678 -0.005 0.049 223 -0.572 0.005 -2.811 -0.011 -1.258
233 0.123 0.000 -0.376 0.007 0.036 224 -0.675 -0.012 3.345 0.027 -1.484
234 0.108 0.000 -0.376 0.007 0.032 225 -0.620 0.005 -2.630 -0.012 -1.365
235 0.178 -0.021 -0.446 0.013 0.053 226 -0.620 0.005 -3.093 -0.010 -1.365
45
236 0.178 0.021 -0.446 0.000 0.053 227 -0.734 0.005 -2.685 -0.012 -1.614
237 0.038 -0.021 -0.446 0.013 0.011 228 -0.734 0.005 -3.148 -0.010 -1.614
238 0.038 0.021 -0.446 0.000 0.011 229 -0.660 0.006 -2.109 -0.013 -1.452
239 0.129 -0.070 -0.446 0.028 0.039 230 -0.694 0.006 -2.126 -0.013 -1.527
240 0.087 -0.070 -0.446 0.028 0.026 1 231 -0.660 0.004 -3.652 -0.009 -1.452
241 0.129 0.070 -0.446 -0.014 0.039 232 -0.694 0.004 -3.669 -0.009 -1.527
242 0.087 0.070 -0.446 -0.014 0.026 233 -0.266 0.003 -1.668 -0.007 -0.586
111 0.252 0.000 -0.867 0.015 0.076 234 -0.403 -0.020 6.541 0.044 -0.887
112 0.216 0.000 -0.751 0.013 0.065 235 -0.331 0.003 -1.426 -0.008 -0.727
113 0.240 0.000 -0.751 0.013 0.071 236 -0.331 0.003 -2.043 -0.006 -0.727
114 0.216 0.000 -0.751 0.013 0.065 237 -0.482 0.003 -1.500 -0.008 -1.060
115 0.316 -0.030 -0.851 0.022 0.095 238 -0.482 0.003 -2.117 -0.006 -1.060
116 0.316 0.030 -0.851 0.004 0.095 239 -0.384 0.004 -0.731 -0.010 -0.844
117 0.116 -0.030 -0.851 0.022 0.035 240 -0.429 0.004 -0.754 -0.010 -0.944
118 0.116 0.030 -0.851 0.004 0.035 241 -0.384 0.002 -2.789 -0.004 -0.844
119 0.246 -0.100 -0.851 0.043 0.074 242 -0.429 0.002 -2.812 -0.004 -0.944
120 0.186 -0.100 -0.851 0.043 0.056 111 -0.679 0.005 -3.352 -0.012 -1.493
121 0.246 0.100 -0.851 -0.017 0.074 112 -0.812 0.006 -3.404 -0.013 -1.787
122 0.186 0.100 -0.851 -0.017 0.056 113 -0.588 0.006 -3.350 -0.013 -1.294
123 0.186 0.000 -0.563 0.010 0.055 114 -0.808 -0.031 9.784 0.068 -1.777
124 0.162 0.000 -0.563 0.010 0.049 115 -0.704 0.007 -3.009 -0.015 -1.550
125 0.262 -0.030 -0.663 0.019 0.079 116 -0.704 0.005 -3.891 -0.012 -1.550
126 0.262 0.030 -0.663 0.001 0.079 117 -0.920 0.007 -3.115 -0.015 -2.025
127 0.062 -0.030 -0.663 0.019 0.019 118 -0.920 0.005 -3.997 -0.012 -2.025
128 0.062 0.030 -0.663 0.001 0.019 119 -0.780 0.008 -2.018 -0.018 -1.716

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 38 Foundation Client : PT. Pupuk Sriwidj... Page 39

120 -0.845 0.008 -2.049 -0.018 -1.859 116 -0.910 0.056 -3.413 -0.123 -2.001
121 -0.780 0.004 -4.958 -0.009 -1.716 117 -1.126 -0.075 -4.385 0.165 -2.476
122 -0.845 0.004 -4.989 -0.009 -1.859 118 -1.126 0.056 -3.503 -0.123 -2.476
123 -0.385 0.005 -2.499 -0.010 -0.848 119 -0.985 -0.228 -5.356 0.501 -2.167
124 -0.604 -0.032 10.635 0.071 -1.330 120 -1.050 -0.228 -5.383 0.501 -2.310
125 -0.501 0.005 -2.158 -0.011 -1.103 121 -0.985 0.208 -2.416 -0.458 -2.167
126 -0.501 0.004 -3.040 -0.009 -1.103 122 -1.050 0.208 -2.443 -0.458 -2.310
127 -0.717 0.005 -2.264 -0.011 -1.578 123 -0.536 -0.007 -2.781 0.016 -1.179
128 -0.717 0.004 -3.146 -0.009 -1.578 124 -0.766 -2.238 -16.026 4.923 -1.686
129 -0.577 0.007 -1.166 -0.014 -1.269 125 -0.655 -0.073 -3.350 0.160 -1.441
130 -0.642 0.007 -1.198 -0.014 -1.412 126 -0.655 0.058 -2.468 -0.128 -1.441
131 -0.577 0.003 -4.106 -0.006 -1.269 127 -0.871 -0.073 -3.440 0.160 -1.917
132 -0.642 0.003 -4.138 -0.006 -1.412 128 -0.871 0.058 -2.558 -0.128 -1.917
211 -0.848 -0.008 -3.152 0.018 -1.866 129 -0.731 -0.225 -4.410 0.495 -1.608
212 -0.848 -0.008 -3.152 0.018 -1.866 130 -0.796 -0.225 -4.437 0.495 -1.750
213 -0.706 -0.008 -3.117 0.018 -1.553 131 -0.731 0.211 -1.470 -0.464 -1.608
214 -0.850 -1.402 -11.395 3.084 -1.870 132 -0.796 0.211 -1.497 -0.464 -1.750
215 -0.772 -0.054 -3.511 0.118 -1.699
216 -0.772 0.038 -2.894 -0.083 -1.699 Group 2 - F2 Unit( tonf , tonf-m )
217 -0.924 -0.054 -3.574 0.118 -2.032 Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
218 -0.924 0.038 -2.957 -0.083 -2.032 F2 211 0.855 0.005 -2.955 -0.011 1.881
219 -0.825 -0.161 -4.253 0.353 -1.816 212 0.855 0.005 -2.955 -0.011 1.881
220 -0.871 -0.161 -4.272 0.353 -1.915 213 0.995 0.005 -2.989 -0.011 2.189
221 -0.825 0.145 -2.195 -0.318 -1.816 214 0.852 -0.018 5.288 0.040 1.874
222 -0.871 0.145 -2.214 -0.318 -1.915 215 0.931 0.005 -2.753 -0.012 2.047
223 -0.742 -0.008 -3.126 0.018 -1.631 216 0.931 0.005 -3.370 -0.010 2.047
224 -0.850 -1.054 -9.334 2.318 -1.869 217 0.779 0.005 -2.678 -0.012 1.715
225 -0.791 -0.042 -3.421 0.093 -1.741 218 0.779 0.005 -3.296 -0.010 1.715
226 -0.791 0.026 -2.958 -0.058 -1.741 219 0.878 0.006 -2.006 -0.014 1.931
227 -0.905 -0.042 -3.469 0.093 -1.990 220 0.832 0.006 -1.984 -0.014 1.831
228 -0.905 0.026 -3.006 -0.058 -1.990 221 0.878 0.004 -4.064 -0.008 1.931
3 229 -0.831 -0.122 -3.978 0.269 -1.828 222 0.832 0.004 -4.042 -0.008 1.831
230 -0.865 -0.122 -3.992 0.269 -1.903 223 0.960 0.005 -2.980 -0.011 2.112
231 -0.831 0.106 -2.435 -0.234 -1.828 224 0.853 -0.012 3.227 0.027 1.876
232 -0.865 0.106 -2.449 -0.234 -1.903 225 0.912 0.005 -2.803 -0.012 2.006
5
233 -0.367 -0.005 -1.856 0.011 -0.807 226 0.912 0.005 -3.266 -0.010 2.006
234 -0.511 -1.399 -10.134 3.077 -1.124 227 0.798 0.005 -2.748 -0.012 1.756
235 -0.433 -0.051 -2.250 0.111 -0.953 228 0.798 0.005 -3.211 -0.010 1.756
236 -0.433 0.041 -1.633 -0.090 -0.953 229 0.872 0.006 -2.244 -0.013 1.918
237 -0.584 -0.051 -2.313 0.111 -1.286 230 0.838 0.006 -2.227 -0.013 1.844
238 -0.584 0.041 -1.696 -0.090 -1.286 231 0.872 0.004 -3.787 -0.009 1.918
239 -0.486 -0.157 -2.993 0.346 -1.069 232 0.838 0.004 -3.770 -0.009 1.844
240 -0.531 -0.157 -3.012 0.346 -1.169 233 0.653 0.003 -1.807 -0.007 1.437
241 -0.486 0.148 -0.935 -0.325 -1.069 234 0.510 -0.020 6.470 0.044 1.122
242 -0.531 0.148 -0.954 -0.325 -1.169 235 0.589 0.003 -1.571 -0.008 1.295
111 -0.915 -0.010 -3.793 0.021 -2.013 236 0.589 0.003 -2.188 -0.006 1.295
112 -1.018 -0.010 -3.782 0.021 -2.239 237 0.437 0.003 -1.497 -0.008 0.962
113 -0.790 -0.010 -3.726 0.021 -1.739 238 0.437 0.003 -2.114 -0.006 0.962
114 -1.021 -2.240 -16.971 4.928 -2.246 239 0.536 0.004 -0.824 -0.010 1.178
115 -0.910 -0.075 -4.295 0.165 -2.001 240 0.490 0.004 -0.802 -0.010 1.079

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 40 Foundation Client : PT. Pupuk Sriwidj... Page 41

241 0.536 0.002 -2.882 -0.004 1.178 237 0.540 -0.047 -2.277 0.103 1.188
242 0.490 0.002 -2.860 -0.004 1.079 238 0.540 0.045 -1.659 -0.098 1.188
111 0.928 0.005 -3.517 -0.012 2.041 239 0.638 -0.154 -3.038 0.338 1.404
112 1.026 0.006 -3.546 -0.013 2.257 240 0.593 -0.154 -3.019 0.338 1.304
113 1.250 0.006 -3.600 -0.013 2.750 241 0.638 0.151 -0.980 -0.333 1.404
114 1.021 -0.031 9.643 0.068 2.247 242 0.593 0.151 -0.961 -0.333 1.304
115 1.134 0.007 -3.257 -0.015 2.495 111 1.164 -0.001 -3.855 0.003 2.561
116 1.134 0.005 -4.139 -0.012 2.495 112 1.231 -0.002 -3.835 0.005 2.709
117 0.918 0.007 -3.151 -0.015 2.020 113 1.458 -0.002 -3.891 0.005 3.208
118 0.918 0.005 -4.033 -0.012 2.020 114 1.234 -2.233 -17.024 4.912 2.716
119 1.058 0.008 -2.191 -0.018 2.328 115 1.339 -0.068 -4.438 0.149 2.946
120 0.994 0.008 -2.159 -0.018 2.186 116 1.339 0.063 -3.556 -0.139 2.946
121 1.058 0.004 -5.131 -0.009 2.328 117 1.123 -0.068 -4.348 0.149 2.471
122 0.994 0.004 -5.099 -0.009 2.186 118 1.123 0.063 -3.466 -0.139 2.471
123 0.993 0.005 -2.714 -0.010 2.186 119 1.264 -0.220 -5.436 0.485 2.780
124 0.765 -0.032 10.529 0.071 1.682 120 1.199 -0.220 -5.409 0.485 2.637
125 0.877 0.005 -2.371 -0.011 1.930 121 1.264 0.216 -2.496 -0.474 2.780
126 0.877 0.004 -3.253 -0.009 1.930 122 1.199 0.216 -2.469 -0.474 2.637
127 0.661 0.005 -2.265 -0.011 1.455 123 1.151 -0.002 -2.932 0.004 2.531
128 0.661 0.004 -3.147 -0.009 1.455 124 0.927 -2.232 -16.065 4.911 2.039
129 0.802 0.007 -1.304 -0.014 1.764 125 1.031 -0.067 -3.479 0.148 2.269
130 0.737 0.007 -1.273 -0.014 1.622 126 1.031 0.064 -2.597 -0.140 2.269
131 0.802 0.003 -4.244 -0.006 1.764 127 0.815 -0.067 -3.389 0.148 1.794
132 0.737 0.003 -4.213 -0.006 1.622 128 0.815 0.064 -2.507 -0.140 1.794
211 1.026 -0.002 -3.196 0.004 2.257 129 0.956 -0.220 -4.477 0.484 2.103
212 1.026 -0.002 -3.196 0.004 2.257 130 0.891 -0.220 -4.450 0.484 1.960
213 1.168 -0.002 -3.231 0.004 2.570 131 0.956 0.216 -1.537 -0.476 2.103
214 1.028 -1.396 -11.439 3.071 2.262 132 0.891 0.216 -1.510 -0.476 1.960
215 1.102 -0.048 -3.618 0.105 2.424
216 1.102 0.044 -3.001 -0.096 2.424 Group 3 - F3 Unit( tonf , tonf-m )
217 0.950 -0.048 -3.555 0.105 2.091 Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
218 0.950 0.044 -2.938 -0.096 2.091 F3 211 0.180 0.000 -0.972 0.011 0.270
219 1.049 -0.155 -4.316 0.340 2.307 212 0.180 0.000 -0.972 0.011 0.270
220 1.003 -0.155 -4.297 0.340 2.207 213 0.195 0.000 -0.972 0.011 0.292
221 1.049 0.151 -2.258 -0.331 2.307 214 0.180 0.000 -0.972 0.011 0.270
222 1.003 0.151 -2.239 -0.331 2.207 215 0.250 -0.021 -1.042 0.043 0.375
223 1.133 -0.002 -3.222 0.004 2.492 216 0.250 0.021 -1.042 -0.021 0.375
7
224 1.028 -1.048 -9.378 2.305 2.261 217 0.110 -0.021 -1.042 0.043 0.165
225 1.083 -0.036 -3.513 0.080 2.382 218 0.110 0.021 -1.042 -0.021 0.165
226 1.083 0.032 -3.050 -0.071 2.382 219 0.201 -0.070 -1.042 0.116 0.302
227 0.969 -0.036 -3.465 0.080 2.132 39 220 0.159 -0.070 -1.042 0.116 0.239
228 0.969 0.032 -3.002 -0.071 2.132 221 0.201 0.070 -1.042 -0.094 0.302
229 1.043 -0.116 -4.036 0.256 2.295 222 0.159 0.070 -1.042 -0.094 0.239
230 1.009 -0.116 -4.022 0.256 2.220 223 0.191 0.000 -0.972 0.011 0.287
231 1.043 0.112 -2.493 -0.247 2.295 224 0.180 0.000 -0.972 0.011 0.270
232 1.009 0.112 -2.479 -0.247 2.220 225 0.233 -0.016 -1.024 0.035 0.349
233 0.758 -0.001 -1.953 0.003 1.667 226 0.233 0.016 -1.024 -0.013 0.349
234 0.618 -1.395 -10.161 3.069 1.359 227 0.128 -0.016 -1.024 0.035 0.191
235 0.691 -0.047 -2.340 0.103 1.521 228 0.128 0.016 -1.024 -0.013 0.191
236 0.691 0.045 -1.722 -0.098 1.521 229 0.196 -0.052 -1.024 0.090 0.294

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 42 Foundation Client : PT. Pupuk Sriwidj... Page 43

230 0.164 -0.052 -1.024 0.090 0.246 226 0.233 0.016 -1.024 -0.013 0.349
231 0.196 0.052 -1.024 -0.068 0.294 227 0.128 -0.016 -1.024 0.035 0.191
232 0.164 0.052 -1.024 -0.068 0.246 228 0.128 0.016 -1.024 -0.013 0.191
233 0.123 0.000 -0.583 0.007 0.184 229 0.196 -0.052 -1.024 0.090 0.294
234 0.108 0.000 -0.583 0.007 0.162 230 0.164 -0.052 -1.024 0.090 0.246
235 0.178 -0.021 -0.653 0.038 0.267 231 0.196 0.052 -1.024 -0.068 0.294
236 0.178 0.021 -0.653 -0.025 0.267 232 0.164 0.052 -1.024 -0.068 0.246
237 0.038 -0.021 -0.653 0.038 0.057 233 0.123 0.000 -0.583 0.007 0.184
238 0.038 0.021 -0.653 -0.025 0.057 234 0.108 0.000 -0.583 0.007 0.162
239 0.129 -0.070 -0.653 0.112 0.194 235 0.178 -0.021 -0.653 0.038 0.267
240 0.087 -0.070 -0.653 0.112 0.131 236 0.178 0.021 -0.653 -0.025 0.267
241 0.129 0.070 -0.653 -0.098 0.194 237 0.038 -0.021 -0.653 0.038 0.057
242 0.087 0.070 -0.653 -0.098 0.131 238 0.038 0.021 -0.653 -0.025 0.057
111 0.252 0.000 -1.351 0.015 0.378 239 0.129 -0.070 -0.653 0.112 0.194
112 0.216 0.000 -1.166 0.013 0.324 240 0.087 -0.070 -0.653 0.112 0.131
113 0.240 0.000 -1.166 0.013 0.359 241 0.129 0.070 -0.653 -0.098 0.194
114 0.216 0.000 -1.166 0.013 0.324 242 0.087 0.070 -0.653 -0.098 0.131
115 0.316 -0.030 -1.266 0.058 0.474 111 0.252 0.000 -1.351 0.015 0.378
116 0.316 0.030 -1.266 -0.032 0.474 112 0.216 0.000 -1.166 0.013 0.324
117 0.116 -0.030 -1.266 0.058 0.174 113 0.240 0.000 -1.166 0.013 0.359
118 0.116 0.030 -1.266 -0.032 0.174 114 0.216 0.000 -1.166 0.013 0.324
119 0.246 -0.100 -1.266 0.163 0.369 115 0.316 -0.030 -1.266 0.058 0.474
120 0.186 -0.100 -1.266 0.163 0.279 116 0.316 0.030 -1.266 -0.032 0.474
121 0.246 0.100 -1.266 -0.137 0.369 117 0.116 -0.030 -1.266 0.058 0.174
122 0.186 0.100 -1.266 -0.137 0.279 118 0.116 0.030 -1.266 -0.032 0.174
123 0.186 0.000 -0.874 0.010 0.278 119 0.246 -0.100 -1.266 0.163 0.369
124 0.162 0.000 -0.874 0.010 0.243 120 0.186 -0.100 -1.266 0.163 0.279
125 0.262 -0.030 -0.974 0.055 0.393 121 0.246 0.100 -1.266 -0.137 0.369
126 0.262 0.030 -0.974 -0.035 0.393 122 0.186 0.100 -1.266 -0.137 0.279
127 0.062 -0.030 -0.974 0.055 0.093 123 0.186 0.000 -0.874 0.010 0.278
128 0.062 0.030 -0.974 -0.035 0.093 124 0.162 0.000 -0.874 0.010 0.243
129 0.192 -0.100 -0.974 0.160 0.288 125 0.262 -0.030 -0.974 0.055 0.393
130 0.132 -0.100 -0.974 0.160 0.198 126 0.262 0.030 -0.974 -0.035 0.393
131 0.192 0.100 -0.974 -0.140 0.288 127 0.062 -0.030 -0.974 0.055 0.093
132 0.132 0.100 -0.974 -0.140 0.198 128 0.062 0.030 -0.974 -0.035 0.093
F4 211 0.180 0.000 -0.972 0.011 0.270 129 0.192 -0.100 -0.974 0.160 0.288
212 0.180 0.000 -0.972 0.011 0.270 130 0.132 -0.100 -0.974 0.160 0.198
213 0.195 0.000 -0.972 0.011 0.292 131 0.192 0.100 -0.974 -0.140 0.288
214 0.180 0.000 -0.972 0.011 0.270 132 0.132 0.100 -0.974 -0.140 0.198
215 0.250 -0.021 -1.042 0.043 0.375
216 0.250 0.021 -1.042 -0.021 0.375
217 0.110 -0.021 -1.042 0.043 0.165 3.5.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
45 218 0.110 0.021 -1.042 -0.021 0.165 Load Combination of Elastic Condition
219 0.201 -0.070 -1.042 0.116 0.302 Group 1 - F1
220 0.159 -0.070 -1.042 0.116 0.239 - C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
221 0.201 0.070 -1.042 -0.094 0.302
222 0.159 0.070 -1.042 -0.094 0.239 Ft.Name L.Comb. Fx Fy Fz Mx My C.G. of Loads
223 0.191 0.000 -0.972 0.011 0.287 F1 211 -1.525 -0.003 -35.125 0.164 -3.355 1000.0 , 1995.5
224 0.180 0.000 -0.972 0.011 0.270 212 -1.525 -0.003 -35.125 0.164 -3.355 1000.0 , 1995.5
225 0.233 -0.016 -1.024 0.035 0.349

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 44 Foundation Client : PT. Pupuk Sriwidj... Page 45

213 -1.243 -0.003 -35.056 0.164 -2.735 1000.0 , 1995.5 218 1.730 0.048 -35.370 -0.285 3.806 1000.0 , 2005.1
214 -1.524 -1.420 -35.125 11.524 -3.353 1000.0 , 1760.8 219 1.926 -0.148 -35.459 1.481 4.238 1000.0 , 1967.4
215 -1.374 -0.048 -35.208 0.582 -3.022 1000.0 , 1986.5 220 1.836 -0.148 -35.418 1.483 4.038 1000.0 , 1967.3
216 -1.374 0.042 -35.208 -0.235 -3.022 1000.0 , 2004.0 221 1.926 0.154 -35.459 -1.242 4.238 1000.0 , 2025.5
217 -1.676 -0.048 -35.345 0.576 -3.688 1000.0 , 1986.7 222 1.836 0.154 -35.418 -1.241 4.038 1000.0 , 2025.4
218 -1.676 0.042 -35.345 -0.241 -3.688 1000.0 , 2004.2 223 2.092 0.003 -35.339 0.114 4.604 1000.0 , 1996.6
219 -1.480 -0.154 -35.256 1.533 -3.255 1000.0 , 1966.1 224 1.880 -1.060 -35.287 8.634 4.137 1000.0 , 1821.4
220 -1.570 -0.154 -35.297 1.531 -3.455 1000.0 , 1966.2 225 1.994 -0.031 -35.452 0.423 4.388 1000.0 , 1990.0
221 -1.480 0.148 -35.256 -1.190 -3.255 1000.0 , 2024.5 226 1.994 0.037 -35.452 -0.190 4.388 1000.0 , 2003.1
222 -1.570 0.148 -35.297 -1.192 -3.455 1000.0 , 2024.5 227 1.768 -0.031 -35.349 0.427 3.889 1000.0 , 1989.8
223 -1.313 -0.003 -35.073 0.164 -2.890 1000.0 , 1995.5 228 1.768 0.037 -35.349 -0.186 3.889 1000.0 , 2002.9
224 -1.524 -1.066 -35.125 8.684 -3.353 1000.0 , 1819.5 229 1.915 -0.110 -35.416 1.139 4.213 1000.0 , 1974.7
225 -1.412 -0.037 -35.187 0.477 -3.106 1000.0 , 1988.8 230 1.847 -0.110 -35.385 1.140 4.063 1000.0 , 1974.6
226 -1.412 0.031 -35.187 -0.135 -3.106 1000.0 , 2001.9 231 1.915 0.116 -35.416 -0.903 4.213 1000.0 , 2018.3
227 -1.638 -0.037 -35.290 0.473 -3.604 1000.0 , 1988.9 232 1.847 0.116 -35.385 -0.902 4.063 1000.0 , 2018.3
228 -1.638 0.031 -35.290 -0.140 -3.604 1000.0 , 2002.0 233 1.411 0.002 -21.241 0.069 3.103 1000.0 , 1997.8
229 -1.491 -0.116 -35.223 1.191 -3.280 1000.0 , 1973.5 234 1.128 -1.415 -21.172 11.429 2.481 1000.0 , 1746.7
230 -1.559 -0.116 -35.254 1.189 -3.430 1000.0 , 1973.5 235 1.280 -0.044 -21.392 0.480 2.816 1000.0 , 1988.4
231 -1.491 0.110 -35.223 -0.852 -3.280 1000.0 , 2017.3 236 1.280 0.047 -21.392 -0.337 2.816 1000.0 , 2007.0
232 -1.559 0.110 -35.254 -0.853 -3.430 1000.0 , 2017.3 237 0.977 -0.044 -21.255 0.486 2.150 1000.0 , 1988.1
233 -0.633 -0.002 -21.006 0.098 -1.393 1000.0 , 1997.1 238 0.977 0.047 -21.255 -0.331 2.150 1000.0 , 2006.9
234 -0.914 -1.419 -21.075 11.459 -2.011 1000.0 , 1745.3 239 1.174 -0.149 -21.344 1.435 2.583 1000.0 , 1966.5
235 -0.764 -0.047 -21.158 0.516 -1.680 1000.0 , 1987.4 240 1.083 -0.149 -21.303 1.437 2.383 1000.0 , 1966.4
236 -0.764 0.044 -21.158 -0.301 -1.680 1000.0 , 2006.3 241 1.174 0.153 -21.344 -1.288 2.583 1000.0 , 2028.8
237 -1.066 -0.047 -21.295 0.510 -2.346 1000.0 , 1987.7 242 1.083 0.153 -21.303 -1.286 2.383 1000.0 , 2028.8
238 -1.066 0.044 -21.295 -0.307 -2.346 1000.0 , 2006.4
Group 3 - F3
239 -0.870 -0.153 -21.206 1.467 -1.913 1000.0 , 1965.6
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
240 -0.960 -0.153 -21.247 1.466 -2.113 1000.0 , 1965.7
Ft.Name L.Comb. Fx Fy Fz Mx My C.G. of Loads
241 -0.870 0.149 -21.206 -1.256 -1.913 1000.0 , 2028.2
F3 211 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0
242 -0.960 0.149 -21.247 -1.258 -2.113 1000.0 , 2028.2
212 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0
Group 2 - F2 213 0.195 0.000 -2.037 0.011 0.292 400.0 , 400.0
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m ) 214 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0
Ft.Name L.Comb. Fx Fy Fz Mx My C.G. of Loads 215 0.250 -0.021 -2.107 0.043 0.375 400.0 , 400.0
F2 211 1.881 0.003 -35.287 0.114 4.138 1000.0 , 1996.6 216 0.250 0.021 -2.107 -0.021 0.375 400.0 , 400.0
212 1.881 0.003 -35.287 0.114 4.138 1000.0 , 1996.6 217 0.110 -0.021 -2.107 0.043 0.165 400.0 , 400.0
213 2.163 0.003 -35.356 0.114 4.759 1000.0 , 1996.6 218 0.110 0.021 -2.107 -0.021 0.165 400.0 , 400.0
214 1.880 -1.414 -35.287 11.474 4.136 1000.0 , 1763.0 219 0.201 -0.070 -2.107 0.116 0.302 400.0 , 400.0
215 2.032 -0.042 -35.507 0.526 4.471 1000.0 , 1987.8 220 0.159 -0.070 -2.107 0.116 0.239 400.0 , 400.0
216 2.032 0.048 -35.507 -0.291 4.471 1000.0 , 2005.2 221 0.201 0.070 -2.107 -0.094 0.302 400.0 , 400.0
217 1.730 -0.042 -35.370 0.531 3.806 1000.0 , 1987.6 222 0.159 0.070 -2.107 -0.094 0.239 400.0 , 400.0

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 46 Foundation Client : PT. Pupuk Sriwidj... Page 47

223 0.191 0.000 -2.037 0.011 0.287 400.0 , 400.0 232 0.164 0.052 -2.090 -0.068 0.246 400.0 , 400.0
224 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0 233 0.123 0.000 -1.222 0.007 0.184 400.0 , 400.0
225 0.233 -0.016 -2.090 0.035 0.349 400.0 , 400.0 234 0.108 0.000 -1.222 0.007 0.162 400.0 , 400.0
226 0.233 0.016 -2.090 -0.013 0.349 400.0 , 400.0 235 0.178 -0.021 -1.292 0.038 0.267 400.0 , 400.0
227 0.128 -0.016 -2.090 0.035 0.191 400.0 , 400.0 236 0.178 0.021 -1.292 -0.025 0.267 400.0 , 400.0
228 0.128 0.016 -2.090 -0.013 0.191 400.0 , 400.0 237 0.038 -0.021 -1.292 0.038 0.057 400.0 , 400.0
229 0.196 -0.052 -2.090 0.090 0.294 400.0 , 400.0 238 0.038 0.021 -1.292 -0.025 0.057 400.0 , 400.0
230 0.164 -0.052 -2.090 0.090 0.246 400.0 , 400.0 239 0.129 -0.070 -1.292 0.112 0.194 400.0 , 400.0
231 0.196 0.052 -2.090 -0.068 0.294 400.0 , 400.0 240 0.087 -0.070 -1.292 0.112 0.131 400.0 , 400.0
232 0.164 0.052 -2.090 -0.068 0.246 400.0 , 400.0 241 0.129 0.070 -1.292 -0.098 0.194 400.0 , 400.0
233 0.123 0.000 -1.222 0.007 0.184 400.0 , 400.0 242 0.087 0.070 -1.292 -0.098 0.131 400.0 , 400.0
234 0.108 0.000 -1.222 0.007 0.162 400.0 , 400.0
235 0.178 -0.021 -1.292 0.038 0.267 400.0 , 400.0 Load Combination of Ultimate Condition
Group 1 - F1
236 0.178 0.021 -1.292 -0.025 0.267 400.0 , 400.0
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
237 0.038 -0.021 -1.292 0.038 0.057 400.0 , 400.0
Ft.Name Sec.Nam L.Comb. Fx Fy Fz Mx My C.G. of Loads
238 0.038 0.021 -1.292 -0.025 0.057 400.0 , 400.0
111 -1.593 -0.004 -7.145 0.230 -3.505 1000.0 , 1993.9
239 0.129 -0.070 -1.292 0.112 0.194 400.0 , 400.0
112 -1.830 -0.004 -7.187 0.197 -4.026 1000.0 , 1994.8
240 0.087 -0.070 -1.292 0.112 0.131 400.0 , 400.0
113 -1.379 -0.004 -7.076 0.196 -3.033 1000.0 , 1994.8
241 0.129 0.070 -1.292 -0.098 0.194 400.0 , 400.0
114 -1.828 -2.271 -7.187 18.374 -4.022 1000.0 , 1631.7
242 0.087 0.070 -1.292 -0.098 0.131 400.0 , 400.0
115 -1.614 -0.068 -7.305 0.793 -3.551 1000.0 , 1982.4
F4 211 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0
116 -1.614 0.061 -7.305 -0.374 -3.551 1000.0 , 2006.6
212 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0
117 -2.046 -0.068 -7.501 0.785 -4.501 1000.0 , 1982.7
213 0.195 0.000 -2.037 0.011 0.292 400.0 , 400.0
118 -2.046 0.061 -7.501 -0.382 -4.501 1000.0 , 2006.7
214 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0
119 -1.765 -0.220 -7.373 2.152 -3.883 1000.0 , 1954.3
215 0.250 -0.021 -2.107 0.043 0.375 400.0 , 400.0
120 -1.895 -0.220 -7.432 2.150 -4.169 1000.0 , 1954.4
216 0.250 0.021 -2.107 -0.021 0.375 400.0 , 400.0
121 -1.765 0.212 -7.373 -1.738 -3.883 1000.0 , 2034.8
217 0.110 -0.021 -2.107 0.043 0.165 400.0 , 400.0 F1 S1
122 -1.895 0.212 -7.432 -1.740 -4.169 1000.0 , 2034.8
218 0.110 0.021 -2.107 -0.021 0.165 400.0 , 400.0
123 -0.921 -0.003 -5.280 0.147 -2.027 1000.0 , 1995.9
219 0.201 -0.070 -2.107 0.116 0.302 400.0 , 400.0
124 -1.371 -2.270 -5.390 18.324 -3.016 1000.0 , 1613.9
220 0.159 -0.070 -2.107 0.116 0.239 400.0 , 400.0
125 -1.156 -0.068 -5.508 0.744 -2.544 1000.0 , 1982.8
221 0.201 0.070 -2.107 -0.094 0.302 400.0 , 400.0
126 -1.156 0.062 -5.508 -0.423 -2.544 1000.0 , 2008.3
222 0.159 0.070 -2.107 -0.094 0.239 400.0 , 400.0
127 -1.588 -0.068 -5.704 0.736 -3.495 1000.0 , 1983.1
223 0.191 0.000 -2.037 0.011 0.287 400.0 , 400.0
128 -1.588 0.062 -5.704 -0.431 -3.495 1000.0 , 2008.4
224 0.180 0.000 -2.037 0.011 0.270 400.0 , 400.0
129 -1.308 -0.219 -5.577 2.103 -2.877 1000.0 , 1953.3
225 0.233 -0.016 -2.090 0.035 0.349 400.0 , 400.0
130 -1.437 -0.219 -5.635 2.101 -3.162 1000.0 , 1953.4
226 0.233 0.016 -2.090 -0.013 0.349 400.0 , 400.0
131 -1.308 0.213 -5.577 -1.787 -2.877 1000.0 , 2038.0
227 0.128 -0.016 -2.090 0.035 0.191 400.0 , 400.0
132 -1.437 0.213 -5.635 -1.790 -3.162 1000.0 , 2038.0
228 0.128 0.016 -2.090 -0.013 0.191 400.0 , 400.0
229 0.196 -0.052 -2.090 0.090 0.294 400.0 , 400.0
230 0.164 -0.052 -2.090 0.090 0.246 400.0 , 400.0
231 0.196 0.052 -2.090 -0.068 0.294 400.0 , 400.0

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 48 Foundation Client : PT. Pupuk Sriwidj... Page 49

Group 2 - F2 124 0.162 0.000 -0.874 0.010 0.243 400.0 , 400.0


- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m ) 125 0.262 -0.030 -0.974 0.055 0.393 400.0 , 400.0
Ft.Name Sec.Nam L.Comb. Fx Fy Fz Mx My C.G. of Loads 126 0.262 0.030 -0.974 -0.035 0.393 400.0 , 400.0
111 2.092 0.004 -7.372 0.159 4.602 1000.0 , 1995.4 127 0.062 -0.030 -0.974 0.055 0.093 400.0 , 400.0
112 2.257 0.004 -7.381 0.137 4.966 1000.0 , 1996.0 128 0.062 0.030 -0.974 -0.035 0.093 400.0 , 400.0
113 2.708 0.004 -7.492 0.137 5.958 1000.0 , 1996.0 129 0.192 -0.100 -0.974 0.160 0.288 400.0 , 400.0
114 2.256 -2.264 -7.381 18.313 4.962 1000.0 , 1634.9 130 0.132 -0.100 -0.974 0.160 0.198 400.0 , 400.0
115 2.473 -0.061 -7.695 0.725 5.441 1000.0 , 1984.0 131 0.192 0.100 -0.974 -0.140 0.288 400.0 , 400.0
116 2.473 0.068 -7.695 -0.442 5.441 1000.0 , 2007.9 132 0.132 0.100 -0.974 -0.140 0.198 400.0 , 400.0
117 2.041 -0.061 -7.499 0.733 4.491 1000.0 , 1983.7 111 0.252 0.000 -1.351 0.015 0.378 400.0 , 400.0
118 2.041 0.068 -7.499 -0.434 4.491 1000.0 , 2007.7 112 0.216 0.000 -1.166 0.013 0.324 400.0 , 400.0
119 2.322 -0.212 -7.627 2.090 5.108 1000.0 , 1955.9 113 0.240 0.000 -1.166 0.013 0.359 400.0 , 400.0
120 2.192 -0.212 -7.568 2.092 4.823 1000.0 , 1955.7 114 0.216 0.000 -1.166 0.013 0.324 400.0 , 400.0
121 2.322 0.220 -7.627 -1.801 5.108 1000.0 , 2035.8 115 0.316 -0.030 -1.266 0.058 0.474 400.0 , 400.0
F2 S1
122 2.192 0.220 -7.568 -1.798 4.823 1000.0 , 2035.8 116 0.316 0.030 -1.266 -0.032 0.474 400.0 , 400.0
123 2.144 0.003 -5.646 0.103 4.717 1000.0 , 1996.9 117 0.116 -0.030 -1.266 0.058 0.174 400.0 , 400.0
124 1.691 -2.265 -5.536 18.279 3.721 1000.0 , 1616.5 118 0.116 0.030 -1.266 -0.032 0.174 400.0 , 400.0
125 1.909 -0.062 -5.850 0.691 4.200 1000.0 , 1984.2 119 0.246 -0.100 -1.266 0.163 0.369 400.0 , 400.0
126 1.909 0.067 -5.850 -0.476 4.200 1000.0 , 2009.4 120 0.186 -0.100 -1.266 0.163 0.279 400.0 , 400.0
127 1.477 -0.062 -5.654 0.699 3.249 1000.0 , 1983.8 121 0.246 0.100 -1.266 -0.137 0.369 400.0 , 400.0
F4 S1
128 1.477 0.067 -5.654 -0.468 3.249 1000.0 , 2009.2 122 0.186 0.100 -1.266 -0.137 0.279 400.0 , 400.0
129 1.758 -0.213 -5.781 2.056 3.867 1000.0 , 1954.6 123 0.186 0.000 -0.874 0.010 0.278 400.0 , 400.0
130 1.628 -0.213 -5.723 2.058 3.582 1000.0 , 1954.4 124 0.162 0.000 -0.874 0.010 0.243 400.0 , 400.0
131 1.758 0.219 -5.781 -1.835 3.867 1000.0 , 2038.8 125 0.262 -0.030 -0.974 0.055 0.393 400.0 , 400.0
132 1.628 0.219 -5.722 -1.832 3.582 1000.0 , 2038.8 126 0.262 0.030 -0.974 -0.035 0.393 400.0 , 400.0
127 0.062 -0.030 -0.974 0.055 0.093 400.0 , 400.0
Group 3 - F3
- C.G. of Load is coordinate from left bottom. Unit : mm 128 0.062 0.030 -0.974 -0.035 0.093 400.0 , 400.0
Unit( tonf , tonf-m )
Sec.Nam L.Comb. 129 0.192 -0.100 -0.974 0.160 0.288 400.0 , 400.0
Ft.Name Fx Fy Fz Mx My C.G. of Loads
130 0.132 -0.100 -0.974 0.160 0.198 400.0 , 400.0
F3 111 0.252 0.000 -1.351 0.015 0.378 400.0 , 400.0
131 0.192 0.100 -0.974 -0.140 0.288 400.0 , 400.0
112 0.216 0.000 -1.166 0.013 0.324 400.0 , 400.0
132 0.132 0.100 -0.974 -0.140 0.198 400.0 , 400.0
113 0.240 0.000 -1.166 0.013 0.359 400.0 , 400.0
114 0.216 0.000 -1.166 0.013 0.324 400.0 , 400.0
115 0.316 -0.030 -1.266 0.058 0.474 400.0 , 400.0
116 0.316 0.030 -1.266 -0.032 0.474 400.0 , 400.0
S1 117 0.116 -0.030 -1.266 0.058 0.174 400.0 , 400.0
118 0.116 0.030 -1.266 -0.032 0.174 400.0 , 400.0
119 0.246 -0.100 -1.266 0.163 0.369 400.0 , 400.0
120 0.186 -0.100 -1.266 0.163 0.279 400.0 , 400.0
121 0.246 0.100 -1.266 -0.137 0.369 400.0 , 400.0
122 0.186 0.100 -1.266 -0.137 0.279 400.0 , 400.0
123 0.186 0.000 -0.874 0.010 0.278 400.0 , 400.0

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 50 Foundation Client : PT. Pupuk Sriwidj... Page 51

4. CHECK OF STABILITY 4.3 CHECK OF CONTACT PRESSURE


4.1 CHECK OF SLIDING 4.3.1 Contact Pressure Formula
Fz + P.F 'Handbook CONCRETE ENGINEERING' Second Edition edited by Mark Fintel
Formula : > Fs => OK (Bi-Axial)
Fx + Fy
2 2

P.F = Passive Force (apply only in case checked passive force, mark by P )
Group 1 - F1 Unit ( tonf ) Fz My X(i) Mx Y(i)
q1,q2 =
Ft.Name Dir. L.Comb. ( Fz + P.F ) / Fx + Fy
2 2
Fs(i) Result Af Iy Ix
if q1 or q2 < 0 , than q1 and q2 will be recalculated
F1 Bi-Axial 234 0.5 21.08 / 1.69 = 6.24 2 OK
by following formula
L
q(x) width(x) X dx
Group 2 - F2 Unit ( tonf ) Px = 0 L
0
q(x) width(x) dx
( Fz + P.F ) / Fx + Fy
2 2
Ft.Name Dir. L.Comb. Fs(i) Result P= L
0
q(x) width(x) dx
F2 Bi-Axial 234 0.5 21.17 / 1.81 = 5.85 2 OK

Group 3 - F3 Unit ( tonf )


( Fz + P.F ) / Fx + Fy
2 2
Ft.Name Dir. L.Comb. Fs(i) Result
F3 Bi-Axial 236 0.5 1.29 / 0.18 = 3.61 2 OK
F4 Bi-Axial 236 0.5 1.29 / 0.18 = 3.61 2 OK

4.2 CHECK OF OVERTURNING MOMENT 4.3.2 Input Data


2 4 4
Formula : (Mry / Moy or Mrx / Mox) > OVM(i) => OK Ft.Name Af (m ) Fl (m ) Fw (m ) Ix (m ) Iy (m )
Group 1 - F1 Unit ( tonf-m ) F1 8.000 2.000 4.000 10.6667 2.6667

Ft.Name Dir. L.Comb. Mry / Moy = OVM or Mrx / Mox = OVM OVM(i) Result F2 8.000 2.000 4.000 10.6667 2.6667

X 234 -21.07 / -2.01 = 10.48 1.5 OK F3 0.640 0.800 0.800 0.0341 0.0341
F1
Y 234 -42.15 / -11.46 = 3.68 1.5 OK F4 0.640 0.800 0.800 0.0341 0.0341

Group 2 - F2 Unit ( tonf-m ) 4.3.3 Pressure Check


Ft.Name Dir. L.Comb. Mry / Moy = OVM or Mrx / Mox = OVM OVM(i) Result - Qa = Soil bearing capacity
X 234 21.17 / 2.48 = 8.53 1.5 OK - Uc = Uplift Allowable capacity
F2 Group 1 - F1
Y 234 -42.34 / -11.43 = 3.71 1.5 OK
- XY-Direction (Bi-Axial) Unit( tonf , tonf-m , tonf/m2 )
Group 3 - F3 Unit ( tonf-m ) Ft.Nam L.Comb q1 q2 ci cj Qmax Qa Cont.A.R Result
Ft.Name Dir. L.Comb. Mry / Moy = OVM or Mrx / Mox = OVM OVM(i) Result F1 214 0.972 7.809 0.000 4.399 7.8 8.9 100 / 80 % OK
X 236 0.52 / 0.27 = 1.94 1.5 OK
F3 Group 2 - F2
Y 236 0.52 / 0.02 = 20.76 1.5 OK
- XY-Direction (Bi-Axial) Unit( tonf , tonf-m , tonf/m2 )
X 236 0.52 / 0.27 = 1.94 1.5 OK
F4 Ft.Nam L.Comb q1 q2 ci cj Qmax Qa Cont.A.R Result
Y 236 0.52 / 0.02 = 20.76 1.5 OK
F2 214 0.708 8.113 0.000 4.441 8.1 8.9 100 / 80 % OK

Group 3 - F3
- XY-Direction (Bi-Axial) Unit( tonf , tonf-m , tonf/m2 )
Ft.Nam L.Comb q1 q2 ci cj Qmax Qa Cont.A.R Result
F3 212 0.000 6.476 0.014 0.832 6.5 6.7 99.64 / 80 % OK
F4 212 0.000 6.476 0.014 0.832 6.5 6.7 99.64 / 80 % OK

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 52 Foundation Client : PT. Pupuk Sriwidj... Page 53

5. DESIGN OF FOOTING 120 4000.00 2000.00 7.432 2.150 7.432


121 4000.00 2000.00 7.373 -1.738 7.373
5.1 DESIGN MOMENT AND SHEAR FORCE
122 4000.00 2000.00 7.432 -1.740 7.432
Footing design is in accordance with unltimate strength method at footing bottom.
123 4000.00 2000.00 5.280 0.147 5.280
Calculated total pier load as
Q = Fz - Self Weight Factor (Soil Weight + Footing Weight) 124 4000.00 2000.00 5.390 18.324 5.390
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design 125 4000.00 2000.00 5.508 0.744 5.508
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width 126 4000.00 2000.00 5.508 -0.423 5.508
127 4000.00 2000.00 5.704 0.736 5.704
5.1.1 Data
Group 1 - F1 128 4000.00 2000.00 5.704 -0.431 5.704
Unit( mm , tonf , tonf-m )
129 4000.00 2000.00 5.577 2.103 5.577
Ft.Name Sec.Nam Dir. L.Comb. Fl or Fw Sl or Sw Fz M Q
130 4000.00 2000.00 5.635 2.101 5.635
111 2000.00 4000.00 7.145 -3.51 7.145
131 4000.00 2000.00 5.577 -1.787 5.577
112 2000.00 4000.00 7.187 -4.03 7.187
132 4000.00 2000.00 5.635 -1.790 5.635
113 2000.00 4000.00 7.076 -3.03 7.076
114 2000.00 4000.00 7.187 -4.02 7.187 Group 2 - F2 Unit( mm , tonf , tonf-m )
115 2000.00 4000.00 7.305 -3.55 7.305
Ft.Name Sec.Nam Dir. L.Comb. Fl or Fw Sl or Sw Fz M Q
116 2000.00 4000.00 7.305 -3.55 7.305
111 2000.00 4000.00 7.372 4.60 7.372
117 2000.00 4000.00 7.501 -4.50 7.501
112 2000.00 4000.00 7.381 4.97 7.381
118 2000.00 4000.00 7.501 -4.50 7.501
113 2000.00 4000.00 7.492 5.96 7.492
119 2000.00 4000.00 7.373 -3.88 7.373
114 2000.00 4000.00 7.381 4.96 7.381
120 2000.00 4000.00 7.432 -4.17 7.432
115 2000.00 4000.00 7.695 5.44 7.695
121 2000.00 4000.00 7.373 -3.88 7.373
S1 X 116 2000.00 4000.00 7.695 5.44 7.695
122 2000.00 4000.00 7.432 -4.17 7.432
117 2000.00 4000.00 7.499 4.49 7.499
123 2000.00 4000.00 5.280 -2.03 5.280
118 2000.00 4000.00 7.499 4.49 7.499
124 2000.00 4000.00 5.390 -3.02 5.390
119 2000.00 4000.00 7.627 5.11 7.627
125 2000.00 4000.00 5.508 -2.54 5.508
120 2000.00 4000.00 7.568 4.82 7.568
F1 126 2000.00 4000.00 5.508 -2.54 5.508
121 2000.00 4000.00 7.627 5.11 7.627
127 2000.00 4000.00 5.704 -3.49 5.704 S1 X
122 2000.00 4000.00 7.568 4.82 7.568
128 2000.00 4000.00 5.704 -3.49 5.704
F2 123 2000.00 4000.00 5.646 4.72 5.646
129 2000.00 4000.00 5.577 -2.88 5.577
124 2000.00 4000.00 5.536 3.72 5.536
130 2000.00 4000.00 5.635 -3.16 5.635
125 2000.00 4000.00 5.850 4.20 5.850
131 2000.00 4000.00 5.577 -2.88 5.577
126 2000.00 4000.00 5.850 4.20 5.850
132 2000.00 4000.00 5.635 -3.16 5.635
127 2000.00 4000.00 5.654 3.25 5.654
111 4000.00 2000.00 7.145 0.230 7.145
128 2000.00 4000.00 5.654 3.25 5.654
112 4000.00 2000.00 7.187 0.197 7.187
129 2000.00 4000.00 5.781 3.87 5.781
113 4000.00 2000.00 7.076 0.196 7.076
130 2000.00 4000.00 5.723 3.58 5.723
114 4000.00 2000.00 7.187 18.374 7.187
131 2000.00 4000.00 5.781 3.87 5.781
S1 Y 115 4000.00 2000.00 7.305 0.793 7.305
132 2000.00 4000.00 5.722 3.58 5.722
116 4000.00 2000.00 7.305 -0.374 7.305
111 4000.00 2000.00 7.372 0.159 7.372
117 4000.00 2000.00 7.501 0.785 7.501
S1 Y 112 4000.00 2000.00 7.381 0.137 7.381
118 4000.00 2000.00 7.501 -0.382 7.501
113 4000.00 2000.00 7.492 0.137 7.492
119 4000.00 2000.00 7.373 2.152 7.373

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 54 Foundation Client : PT. Pupuk Sriwidj... Page 55

114 4000.00 2000.00 7.381 18.313 7.381 130 800.00 800.00 0.974 0.20 0.974
115 4000.00 2000.00 7.695 0.725 7.695 131 800.00 800.00 0.974 0.29 0.974
116 4000.00 2000.00 7.695 -0.442 7.695 132 800.00 800.00 0.974 0.20 0.974
117 4000.00 2000.00 7.499 0.733 7.499 111 800.00 800.00 1.351 0.015 1.351
118 4000.00 2000.00 7.499 -0.434 7.499 112 800.00 800.00 1.166 0.013 1.166
119 4000.00 2000.00 7.627 2.090 7.627 113 800.00 800.00 1.166 0.013 1.166
120 4000.00 2000.00 7.568 2.092 7.568 114 800.00 800.00 1.166 0.013 1.166
121 4000.00 2000.00 7.627 -1.801 7.627 115 800.00 800.00 1.266 0.058 1.266
122 4000.00 2000.00 7.568 -1.798 7.568 116 800.00 800.00 1.266 -0.032 1.266
123 4000.00 2000.00 5.646 0.103 5.646 117 800.00 800.00 1.266 0.058 1.266
124 4000.00 2000.00 5.536 18.279 5.536 118 800.00 800.00 1.266 -0.032 1.266
125 4000.00 2000.00 5.850 0.691 5.850 119 800.00 800.00 1.266 0.163 1.266
126 4000.00 2000.00 5.850 -0.476 5.850 120 800.00 800.00 1.266 0.163 1.266
127 4000.00 2000.00 5.654 0.699 5.654 121 800.00 800.00 1.266 -0.137 1.266
S1 Y
128 4000.00 2000.00 5.654 -0.468 5.654 122 800.00 800.00 1.266 -0.137 1.266
129 4000.00 2000.00 5.781 2.056 5.781 123 800.00 800.00 0.874 0.010 0.874
130 4000.00 2000.00 5.723 2.058 5.723 124 800.00 800.00 0.874 0.010 0.874
131 4000.00 2000.00 5.781 -1.835 5.781 125 800.00 800.00 0.974 0.055 0.974
132 4000.00 2000.00 5.722 -1.832 5.722 126 800.00 800.00 0.974 -0.035 0.974
127 800.00 800.00 0.974 0.055 0.974
Group 3 - F3 Unit( mm , tonf , tonf-m )
128 800.00 800.00 0.974 -0.035 0.974
Ft.Name Sec.Nam Dir. L.Comb. Fl or Fw Sl or Sw Fz M Q 129 800.00 800.00 0.974 0.160 0.974
111 800.00 800.00 1.351 0.38 1.351
130 800.00 800.00 0.974 0.160 0.974
112 800.00 800.00 1.166 0.32 1.166
131 800.00 800.00 0.974 -0.140 0.974
113 800.00 800.00 1.166 0.36 1.166
132 800.00 800.00 0.974 -0.140 0.974
114 800.00 800.00 1.166 0.32 1.166
111 800.00 800.00 1.351 0.38 1.351
115 800.00 800.00 1.266 0.47 1.266
112 800.00 800.00 1.166 0.32 1.166
116 800.00 800.00 1.266 0.47 1.266
113 800.00 800.00 1.166 0.36 1.166
117 800.00 800.00 1.266 0.17 1.266
114 800.00 800.00 1.166 0.32 1.166
118 800.00 800.00 1.266 0.17 1.266
115 800.00 800.00 1.266 0.47 1.266
119 800.00 800.00 1.266 0.37 1.266
116 800.00 800.00 1.266 0.47 1.266
F3 S1 X 120 800.00 800.00 1.266 0.28 1.266
117 800.00 800.00 1.266 0.17 1.266
121 800.00 800.00 1.266 0.37 1.266
118 800.00 800.00 1.266 0.17 1.266
122 800.00 800.00 1.266 0.28 1.266 F4 S1 X
119 800.00 800.00 1.266 0.37 1.266
123 800.00 800.00 0.874 0.28 0.874
120 800.00 800.00 1.266 0.28 1.266
124 800.00 800.00 0.874 0.24 0.874
121 800.00 800.00 1.266 0.37 1.266
125 800.00 800.00 0.974 0.39 0.974
122 800.00 800.00 1.266 0.28 1.266
126 800.00 800.00 0.974 0.39 0.974
123 800.00 800.00 0.874 0.28 0.874
127 800.00 800.00 0.974 0.09 0.974
124 800.00 800.00 0.874 0.24 0.874
128 800.00 800.00 0.974 0.09 0.974
125 800.00 800.00 0.974 0.39 0.974
129 800.00 800.00 0.974 0.29 0.974
126 800.00 800.00 0.974 0.39 0.974

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 56 Foundation Client : PT. Pupuk Sriwidj... Page 57

127 800.00 800.00 0.974 0.09 0.974 5.1.2 Design Parameters


128 800.00 800.00 0.974 0.09 0.974 Yield Strength - D10 ~ D16 : fy1 , D19 ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
129 800.00 800.00 0.974 0.29 0.974
f_clt : Clear Cover for top of footing reinforcement
130 800.00 800.00 0.974 0.20 0.974
f_clb : Clear Cover for bottom of footing reinforcement
131 800.00 800.00 0.974 0.29 0.974 Loc. : Location of Critical Point from left side of footing
132 800.00 800.00 0.974 0.20 0.974
111 800.00 800.00 1.351 0.015 1.351 Unit(kgf/cm2,mm)

112 800.00 800.00 1.166 0.013 1.166 (Flexure) (Shear) fck fy1 fy2 f_cl f_clt f_clb
113 800.00 800.00 1.166 0.013 1.166 0.85 0.8 250.00 4000.00 4000.00 50.0 50.0 75.0
114 800.00 800.00 1.166 0.013 1.166
115 800.00 800.00 1.266 0.058 1.266
5.2 REQUIRED REINFORCEMENT
116 800.00 800.00 1.266 -0.032 1.266
5.2.1 Reinforcement Formula
117 800.00 800.00 1.266 0.058 1.266
- Shrinkage And Temperature Reinforcement ---- ACI CODE 7.12.2
118 800.00 800.00 1.266 -0.032 1.266
As As1 = fac b h , fac = following
119 800.00 800.00 1.266 0.163 1.266 Area of shrinkage and temperature reinforcement shall provide at least the following ratio
120 800.00 800.00 1.266 0.163 1.266 of reinforcement area to gross concrete area, but not less than 0.0014
121 800.00 800.00 1.266 -0.137 1.266 (a) Slabs where Grade 40 or 50 deformed bars are used ................................................................................0.0020
S1 Y (b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used............................................0.0018
122 800.00 800.00 1.266 -0.137 1.266
(c) Slabs where reinforcement with yield stress exceeding 60,000 psi measured at a yield
123 800.00 800.00 0.874 0.010 0.874 0.0018 60,000
strain of 0.35 percent is used ..............................................................................................................
fy
124 800.00 800.00 0.874 0.010 0.874
- Required Reinforcement by Analysis
125 800.00 800.00 0.974 0.055 0.974 As As2 = .req b d
126 800.00 800.00 0.974 -0.035 0.974 - At every section of flexural members where tensile reinforcement is required
127 800.00 800.00 0.974 0.055 0.974 3 fck 200
As (As5 = bw d) (As4 = b d) ---- ACI Eq (10-3)
fy fy
128 800.00 800.00 0.974 -0.035 0.974
- The requirements of Eq (10-3) need not be applied, if every section As provided is
129 800.00 800.00 0.974 0.160 0.974 at least one -third greater then that required by analysis ---- ACI CODE 10.5.3
130 800.00 800.00 0.974 0.160 0.974 As3 = 1.333 .req b d
131 800.00 800.00 0.974 -0.140 0.974 Asmax = 0.75 b b d
fck 0.003 Es
132 800.00 800.00 0.974 -0.140 0.974 b = 0.85  1 fy 0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!

Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu 0.85 fck 2Rn
Rn =
bd
2 ,  = 0.85 , .req =
fy ( 1- 1-
0.85fck )

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 58 Foundation Client : PT. Pupuk Sriwidj... Page 59

5.2.2 Check of Footing Reinforcement 113 bottom 0.975 1.153 0.0003


Group 1 - F1 2 2 2 2 2 2
Footing Name : F1 GroupType : Mat_Foundation
Sec.Name L.Comb. As1(cm ) As2(cm ) As3(cm ) As4(cm ) As5(cm ) Asmax(cm )
- X direction (Unit Width) 132 top 3.600 - - 11.968 10.705 69.180
S1
113 bottom 3.600 0.912 1.215 11.089 9.919 64.100
2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
2 2
132 top 5 - D19 @ 200 1.000 1.000 34.045 14.326
Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result
S1 132 top 14.326 3.600 OK
118 botom 5 - D19 @ 200 0.725 1.000 31.545 14.326 S1
113 bottom 14.326 3.600 OK
Sec.Name L.Comb. Mu (tonf-m) Rn .Req
- Y direction (Unit Width)
132 top - - -
S1
118 bottom 0.656 0.776 0.0002 Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
2

Sec.Name L.Comb. As1(cm )


2
As2(cm )
2
As3(cm )
2
As4(cm )
2
As5(cm )
2
Asmax(cm )
2 132 top 5 - D19 @ 200 2.000 1.000 32.135 14.326
S1
132 top 3.600 - - 11.968 10.705 69.180 119 botom 5 - D19 @ 200 1.750 1.000 29.635 14.326
S1
118 bottom 3.600 0.613 0.817 11.089 9.919 64.100 Sec.Name L.Comb. Mu (tonf-m) Rn .Req
Sec.Name L.Comb. Using As(cm )
2
Select As(cm )
2
Result 132 top - - -
S1
132 top 14.326 3.600 OK 119 bottom 1.147 1.537 0.0004
S1
118 bottom 14.326 3.600 OK Sec.Name L.Comb. As1(cm )
2
As2(cm )
2
As3(cm )
2
As4(cm )
2
As5(cm )
2
Asmax(cm )
2

- Y direction (Unit Width) 132 top 3.600 - - 11.297 10.104 65.299


S1
119 bottom 3.600 1.143 1.523 10.418 9.318 60.219
2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
2 2
132 top 5 - D19 @ 200 2.000 1.000 32.135 14.326
Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result
S1 132 top 14.326 3.600 OK
120 botom 5 - D19 @ 200 1.750 1.000 29.635 14.326 S1
119 bottom 14.326 3.600 OK
Sec.Name L.Comb. Mu (tonf-m) Rn .Req
132 top - - - Group 3 - F3
S1 Footing Name : F3 GroupType : Isolated
120 bottom 1.126 1.508 0.0004
- X direction (Unit Width)
2 2 2 2 2 2
Sec.Name L.Comb. As1(cm ) As2(cm ) As3(cm ) As4(cm ) As5(cm ) Asmax(cm )
2
132 top 3.600 - - 11.297 10.104 65.299
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
S1 132 top 5 - D19 @ 200 0.400 1.000 24.045 14.326
120 bottom 3.600 1.122 1.495 10.418 9.318 60.219 S1
116 botom 5 - D19 @ 200 0.600 1.000 21.545 14.326
2 2
Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result
132 top 14.326 3.600 OK
Sec.Name L.Comb. Mu (tonf-m) Rn .Req
S1 132 top - - -
120 bottom 14.326 3.600 OK S1
116 bottom 0.278 0.705 0.0002
Group 2 - F2 2 2 2 2 2 2
Footing Name : F2 GroupType : Mat_Foundation
Sec.Name L.Comb. As1(cm ) As2(cm ) As3(cm ) As4(cm ) As5(cm ) Asmax(cm )
- X direction (Unit Width) 132 top 2.700 - - 8.453 7.561 48.860
S1
116 bottom 2.700 0.380 0.507 7.574 6.774 43.780
2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
2 2
132 top 5 - D19 @ 200 1.000 1.000 34.045 14.326
Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result
S1 132 top 14.326 2.700 OK
113 botom 5 - D19 @ 200 1.275 1.000 31.545 14.326 S1
116 bottom 14.326 2.700 OK
Sec.Name L.Comb. Mu (tonf-m) Rn .Req
S1 132 top - - -

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 60 Foundation Client : PT. Pupuk Sriwidj... Page 61

- Y direction (Unit Width) Sec.Name L.Comb. As1(cm )


2
As2(cm )
2
As3(cm )
2
As4(cm )
2
As5(cm )
2
Asmax(cm )
2

2 132 top 2.700 - - 7.781 6.960 44.979


Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm ) S1
120 bottom 2.700 0.106 0.142 6.902 6.174 39.899
132 top 5 - D19 @ 200 0.400 1.000 22.135 14.326
S1 2 2
120 botom 5 - D19 @ 200 0.200 1.000 19.635 14.326 Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result
132 top 14.326 2.700 OK
Sec.Name L.Comb. Mu (tonf-m) Rn .Req S1
120 bottom 14.326 2.700 OK
132 top - - -
S1
120 bottom 0.071 0.217 0.0001
5.3 ONE WAY SHEAR FORCE
2 2 2 2 2 2
Sec.Name L.Comb. As1(cm ) As2(cm ) As3(cm ) As4(cm ) As5(cm ) Asmax(cm ) 5.3.1 One-Way Shear Formula
132 top 2.700 - - 7.781 6.960 44.979 ACI 318-05 CODE 11.3.1.1
S1
120 bottom 2.700 0.106 0.142 6.902 6.174 39.899 - For members subject to shear and flexure only.
-  Vc = 0.8 2 fck B'w d (eq 11-3)
2 2
Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result - Vu <=  Vc , then OK!!
132 top 14.326 2.700 OK
S1 5.3.2 Check of One-Way Shear
120 bottom 14.326 2.700 OK
Group 1 - F1

Footing Name : F1 GroupType : Mat_Foundation PileType : False


Footing Name : F4 GroupType : Isolated
- X direction (Unit Width) Unit : mm
2 2000
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
132 top 5 - D19 @ 200 0.400 1.000 24.045 14.326
S1
116 botom 5 - D19 @ 200 0.600 1.000 21.545 14.326

Sec.Name L.Comb. Mu (tonf-m) Rn .Req


132 top - - -

4000
S1 1
116 bottom 0.278 0.705 0.0002

2 2 2 2 2 2
Sec.Name L.Comb. As1(cm ) As2(cm ) As3(cm ) As4(cm ) As5(cm ) Asmax(cm ) 3

132 top 2.700 - - 8.453 7.561 48.860

935
S1
116 bottom 2.700 0.380 0.507 7.574 6.774 43.780

2 2
Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result 410
132 top 14.326 2.700 OK
S1
116 bottom 14.326 2.700 OK - X direction One-Way Shear (Unit Width)
- Y direction (Unit Width) Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
S1 117 410 315.5 1000 21.16 1.062 OK
2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
- Y direction One-Way Shear (Unit Width)
132 top 5 - D19 @ 200 0.400 1.000 22.135 14.326
S1 Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
120 botom 5 - D19 @ 200 0.200 1.000 19.635 14.326
S1 120 935 296.4 1000 19.879 1.157 OK
Sec.Name L.Comb. Mu (tonf-m) Rn .Req
132 top - - -
S1
120 bottom 0.071 0.217 0.0001

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 62 Foundation Client : PT. Pupuk Sriwidj... Page 63

Group 2 - F2 - X direction One-Way Shear (Unit Width)


Footing Name : F2 GroupType : Mat_Foundation PileType : False Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
S1 111 0 215.4 1000 14.452 0 OK
Unit : mm
- Y direction One-Way Shear (Unit Width)
2000
Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
S1 111 0 196.3 1000 13.171 0 OK

Footing Name : F4 GroupType : Isolated PileType : False

Unit : mm
4000

5 800

7
935

800
1590

- X direction One-Way Shear (Unit Width)


Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
S1 113 1590 315.5 1000 21.16 1.667 OK
- Y direction One-Way Shear (Unit Width)
Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
S1 119 935 296.4 1000 19.879 1.172 OK - X direction One-Way Shear (Unit Width)

Group 3 - F3
Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
S1 111 0 215.4 1000 14.452 0 OK
Footing Name : F3 GroupType : Isolated PileType : False
- Y direction One-Way Shear (Unit Width)
Unit : mm Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
800 S1 111 0 196.3 1000 13.171 0 OK
800

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 64 Foundation Client : PT. Pupuk Sriwidj... Page 65

5.4 TWO WAY SHEAR FORCE Ft.Name F3 Punching Area 3787.787 cm2
5.4.1 Two-Way Shear Formula 800 Pr.Name 39 Ratio Shade 0.408
Vu = Fz Shade Ratio
(a)  Vc1 = 0.8 2 (1 + 2/ c) fck bo d (eq 11-33) <- Vc1 Shape Rectangle  Vc1 106.734 tonf
(b)  Vc2 = 0.8 2 (1 + s d / 2 bo) fck bo d (eq 11-34) <- Vc2
L.Comb. 111  Vc2 97.852 tonf
(c)  Vc3 = 0.8 4 fck bo d (eq 11-35) <- Vc3

800
 Vc = Min( Vc1 ,  Vc2 ,  Vc3) ACI 318-05 CODE 11.12.2.1 Pl 400 mm  Vc3 71.156 tonf
Vu  Vc , then OK
39 Pw 400 mm  Vc 71.156 tonf
where
 = ratio of long side to short side of the column, concentrated load or reaction area bo / d 2461.8 / 215.45 mm Vu 0.551 tonf
s = 40 for interior colimns
= 30 for edge columns c / s 1 / 40 Result OK
= 20 for corner columns
bo = perimeter of critical section Ft.Name F4 Punching Area 3787.787 cm2
Footing Area - Punching Area
Shade Ratio = 800 Pr.Name 45 Ratio Shade 0.408
Footing Area

Shape Rectangle  Vc1 106.734 tonf


5.4.2 Check of Two-WayShear
L.Comb. 111  Vc2 97.852 tonf
Ft.Name F1 Punching Area 7057.310 cm2

800
Pl 400 mm  Vc3 71.156 tonf
2000 Pr.Name 3 Ratio Shade 0.912
45 Pw 400 mm  Vc 71.156 tonf
Shape Rectangle  Vc1 200.472 tonf
bo / d 2461.8 / 215.45 mm Vu 0.551 tonf
L.Comb. 114  Vc2 204.633 tonf
c / s 1 / 40 Result OK
4000

1
Pl 550 mm  Vc3 142.270 tonf

3
Pw 500 mm  Vc 142.270 tonf

bo / d 3361.8 / 315.45 mm Vu 15.474 tonf

c / s 1.1 / 40 Result OK

Ft.Name F2 Punching Area 7057.310 cm2

2000 Pr.Name 7 Ratio Shade 0.912

Shape Rectangle  Vc1 200.472 tonf

L.Comb. 114  Vc2 204.633 tonf


4000

5
Pl 550 mm  Vc3 142.270 tonf

7
Pw 500 mm  Vc 142.270 tonf

bo / d 3361.8 / 315.45 mm Vu 15.522 tonf

c / s 1.1 / 40 Result OK

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014

Project Na. : NPK Fusion Plan


Calculation Sheet
FOUNDATION CALCULATION SHEET of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 1

FOUNDATION LISTS
One-Stop Solution for Foundation Group Name No. Description No. Description
F1 1 F1
F2 2 F2

TITLE DESCRIPTION
PROJECT/JOB NO. 14-0602
PROJECT/JOB NAME NPK Fusion Plan
CLIENT NAME PT. Pupuk Sriwidjaja
SITE NAME Palembang
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME Piperack 2 4-12-14 span 20m
LOAD COMBINATION GROUP NAME
REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 2 Foundation Client : PT. Pupuk Sriwidj... Page 3

CONTENTS 1. GENERAL
1.1 CODE & STANDARD
1. GENERAL Items Description
Design Code American Concrete Institute (ACI 318) [Metric]
1.1 CODE & STANDARD
Horizontal Force for Wind UNIFORM BUILDING CODE (UBC-1997)
1.2 MATERIALS & UNIT WEIGHT
Horizontal Force for Seismic UNIFORM BUILDING CODE [UBC-1997]
1.3 SUBSOIL CONDITION & SAFETY FACTORS Unit System Input : MKS, Output : MKS, Calculation Unit : IMPERIAL
1.4 LOAD COMBINATION
1.2 MATERIALS & UNIT WEIGHT
2. DRAWING Items Value
2.1 LOCATION PLAN Concrete (fck : compressive strength) 250.000 kgf/cm2
Lean Concrete (Lfck : compressive strength) 0.000 kgf/cm2
2.2 DETAIL SKETCH
Reinforcement (D10 ~ D16 , yield strength) 4000.000 kgf/cm2
Reinforcement (D19 ~ , yield strength) 4000.000 kgf/cm2
3. FOUNDATION DATA
Rs (Soil unit weight) 1.800 ton/m3
3.1 FOOTING DATA Rc (Concrete unit weight) 2.400 ton/m3
3.2 PIER DATA Es (Steel Modulus of Elasticity) 2.000 106 kgf/cm2

3.3 SECTION DATA Ec (Concrete Modulus of Elasticity) 239154.000 kgf/cm2

3.4 LOAD CASE - Soil Capacity


3.5 LOAD COMBINATION Items Value
Soil Name Unit-01
4. CHECK OF STABILITY Footing List F1, F2

4.1 CHECK OF SLIDING Qa (Soil Bearing Capacity) 6.68 tonf/m2


Buoyancy Not Consider
4.2 CHECK OF OVERTURNING MOMENT
WL (Water Label from the EL = 0) 0 mm
4.3 CHECK OF CONTACT PRESSURE FD (Frost Depth from the EL = 0) 0 mm
Internal Friction Angle 0
5. DESIGN OF FOOTING Passive Soil Pressure Not Consider

5.1 DESIGN MOMENT AND SHEAR FORCE Cu (Undrained cohesion) Clay , 0 tonf/m2

5.2 REQUIRED REINFORCEMENT


1.3 SUBSOIL CONDITION & SAFETY FACTORS
5.3 ONE WAY SHEAR FORCE
Items Description
5.4 TWO WAY SHEAR FORCE Allowable Increase of Soil (Wind) 33.33 %
Allowable Increase of Soil (Seismic) 33.33 %
Allowable Increase of Soil (Test) 20 %
Safety factor against overturning for OVM1(FO1) 1.5
Safety factor against overturning for OVM2(FO2) 1.5
Safety factor against overturning for OVM3(FO3) 2
Safety factor against sliding for the SL1(FS1) 2

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 4 Foundation Client : PT. Pupuk Sriwidj... Page 5

Safety factor against sliding for the SL2(FS2) 2 234 .6 SW + .6 DL + 1.0 Wind Load (wz) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
Friction factor () 0.5 .6 SW + .6 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
235
Thermal Load (tf)
.6 SW + .6 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
1.4 LOAD COMBINATION 236
Thermal Load (tf)
1.4.1 Group - F1 .6 SW + .6 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
237
Footing List = F1 Thermal Load (tf)

Comb . ID Load Combination for stability .6 SW + .6 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
238
Thermal Load (tf)
211 1.0 SW + 1.0 DL + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
.6 SW + .6 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
212 1.0 SW + 1.0 DL + 1.0 Live Load (l) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 239
Thermal Load (tf)
213 1.0 SW + 1.0 DL + 1.0 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) .6 SW + .6 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
240
214 1.0 SW + 1.0 DL + 1.0 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
215 241
1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
216 242
1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + Comb . ID Load Combination for Reinforcement
217
1.0 Thermal Load (tf) 111 1.4 SW + 1.0 DL + 1.4 Piping Operating P(o) + 1.4 Thermal Load (tf)
1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 112 1.2 SW + 1.2 DL + 1.6 Live Load (l) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
218
1.0 Thermal Load (tf)
113 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wx) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) +
219 114 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wz) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
220 115
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)

1.0 SW + 1.0 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
221 116
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)

1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
222 117
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)

223 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
118
Piping Operating P(o) + 1.2 Thermal Load (tf)
224 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 119
225 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 120
226 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 121
227 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 122
228 Piping Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
123 .9 SW + .9 DL + 1.6 Wind Load (wx) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
229 124 .9 SW + .9 DL + 1.6 Wind Load (wz) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
230 125
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
231 126
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
232 127
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)

233 .6 SW + .6 DL + 1.0 Wind Load (wx) + .6 Piping Operating P(o) + .6 Thermal Load (tf) .9 SW + .9 DL + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
128
Thermal Load (tf)

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 6 Foundation Client : PT. Pupuk Sriwidj... Page 7

.9 SW + .9 DL + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
129 232
Thermal Load (tf) Piping Operating P(o) + 1.0 Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 233 .6 SW + .6 DL + 1.0 Wind Load (wx) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
130
Thermal Load (tf)
234 .6 SW + .6 DL + 1.0 Wind Load (wz) + .6 Piping Operating P(o) + .6 Thermal Load (tf)
.9 SW + .9 DL + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
131 .6 SW + .6 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
Thermal Load (tf) 235
Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
132 .6 SW + .6 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
Thermal Load (tf) 236
Thermal Load (tf)
1.4.2 Group - F2 .6 SW + .6 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
237
Footing List = F2 Thermal Load (tf)

Comb . ID Load Combination for stability .6 SW + .6 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
238
Thermal Load (tf)
211 1.0 SW + 1.0 DL + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
.6 SW + .6 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
212 1.0 SW + 1.0 DL + 1.0 Live Load (l) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 239
Thermal Load (tf)
213 1.0 SW + 1.0 DL + 1.0 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) .6 SW + .6 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
240
214 1.0 SW + 1.0 DL + 1.0 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
215 241
1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + .6 SW + .6 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + .6 Piping Operating P(o) + .6
216 242
1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + .21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + Comb . ID Load Combination for Reinforcement
217
1.0 Thermal Load (tf) 111 1.4 SW + 1.0 DL + 1.4 Piping Operating P(o) + 1.4 Thermal Load (tf)
1.0 SW + 1.0 DL + -.7 Seismic Load (vx) + -.21 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 112 1.2 SW + 1.2 DL + 1.6 Live Load (l) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
218
1.0 Thermal Load (tf)
113 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wx) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 SW + 1.0 DL + .21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) +
219 114 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.6 Wind Load (wz) + 1.2 Piping Operating P(o) + 1.2 Thermal Load (tf)
1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + .7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
220 115
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)

1.0 SW + 1.0 DL + .21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
221 116
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)

1.0 SW + 1.0 DL + -.21 Seismic Load (vx) + -.7 Seismic Load (vz) + .7 Seismic Load (vy) + 1.0 Piping Operating P(o) + 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
222 117
1.0 Thermal Load (tf) Operating P(o) + 1.2 Thermal Load (tf)

223 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wx) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf) 1.2 SW + 1.2 DL + 1.0 Live Load (l) + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
118
Piping Operating P(o) + 1.2 Thermal Load (tf)
224 1.0 SW + 1.0 DL + .75 Live Load (l) + .75 Wind Load (wz) + 1.0 Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 119
225 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + .525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 120
226 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2 Piping
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + .158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 121
227 Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.2 SW + 1.2 DL + 1.0 Live Load (l) + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + 1.2
1.0 SW + 1.0 DL + .75 Live Load (l) + -.525 Seismic Load (vx) + -.158 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 122
228 Piping Operating P(o) + 1.2 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
123 .9 SW + .9 DL + 1.6 Wind Load (wx) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0
229 124 .9 SW + .9 DL + 1.6 Wind Load (wz) + .9 Piping Operating P(o) + .9 Thermal Load (tf)
Piping Operating P(o) + 1.0 Thermal Load (tf)
1.0 SW + 1.0 DL + .75 Live Load (l) + -.158 Seismic Load (vx) + .525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
230 125
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)

1.0 SW + 1.0 DL + .75 Live Load (l) + .158 Seismic Load (vx) + -.525 Seismic Load (vz) + .525 Seismic Load (vy) + 1.0 .9 SW + .9 DL + 1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
231 126
Piping Operating P(o) + 1.0 Thermal Load (tf) Thermal Load (tf)

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 8 Foundation Client : PT. Pupuk Sriwidj... Page 9

127
.9 SW + .9 DL + -1.0 Seismic Load (vx) + .3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
Thermal Load (tf)
2. DRAWING
.9 SW + .9 DL + -1.0 Seismic Load (vx) + -.3 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9 2.1 LOCATION PLAN
128
Thermal Load (tf)
2.2 DETAIL SKETCH
.9 SW + .9 DL + .3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
129
Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + 1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
130
Thermal Load (tf)
.9 SW + .9 DL + .3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
131
Thermal Load (tf)
.9 SW + .9 DL + -.3 Seismic Load (vx) + -1.0 Seismic Load (vz) + 1.0 Seismic Load (vy) + .9 Piping Operating P(o) + .9
132
Thermal Load (tf)

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 Page 10

REFERENCE DWGS
NO. DWG NO. DWG TITLE

NOTES
* OUTPUT UNIT : mm

A01 A02

20000

1 5
01
3 7
NPK Fusion Plan PROJECT
F1 F2

FOUNDATION LOCATION PLAN


Piperack 2 4-12-14 span 20m
SQUAD CHECK

Y PROCESS PIPING VESSELS STRUCT. ELEC. INST.

Z X SCALE JOB NO. MICROFILM NO.

AS SHOWN 14-0602

Copyright (c) GS E&C. All Rights Reserved

12/15/2014 Page 11

2.2 DETAIL SKETCH

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


12/15/2014 Page 12

REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING

1800
900x2

NOTES
* OUTPUT UNIT : mm

CL FOOTING
3000
1000x3
NPK Fusion Plan PROJECT
3

FOUNDATION DETAIL FOR


F1

FOUNDATION PLAN
SQUAD CHECK

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN 14-0602

Copyright (c) GS E&C. All Rights Reserved

12/15/2014 Page 13

REFERENCE DWGS
NO. DWG NO. DWG TITLE

CL FOOTING

TOP BOTTOM
50
TYP.

NOTES
* OUTPUT UNIT : mm
D16@200
D16@200

NPK Fusion Plan PROJECT

FOUNDATION DETAIL FOR


F1
D16@200
D16@200

REINFORCEMENT PLAN
SQUAD CHECK

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN 14-0602

Copyright (c) GS E&C. All Rights Reserved


12/15/2014 Page 14

1600
1

400
3
LEAN CONC. 50 THK

ELEVATION S1 - X

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved

12/15/2014F1 Item No. Page 15

1 3
450 450
50 50
200 200 200 200
TYP. TYP.
50 50
200
200

50
50

D10 D10

450
450

200
200

12-D16 12-D16
75 PR.
75 PR.

30 GR.
30 GR.

50
50

50
50

D16 D16
1800
1800

D10
D10

@200
@200

100
100

Copyright (c) GS E&C. All Rights Reserved


12/15/2014 Page 16

2.2 DETAIL SKETCH

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved

12/15/2014 Page 17

REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING

1800
900x2

NOTES
* OUTPUT UNIT : mm

5
CL FOOTING
3000
1000x3

NPK Fusion Plan PROJECT


7

FOUNDATION DETAIL FOR


F2

FOUNDATION PLAN
SQUAD CHECK

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN 14-0602

Copyright (c) GS E&C. All Rights Reserved


12/15/2014 Page 18

REFERENCE DWGS
NO. DWG NO. DWG TITLE

CL FOOTING

TOP BOTTOM

50
TYP.
NOTES
* OUTPUT UNIT : mm

D16@200
D16@200
NPK Fusion Plan PROJECT

FOUNDATION DETAIL FOR


F2
D16@200
D16@200

REINFORCEMENT PLAN
SQUAD CHECK

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN 14-0602

Copyright (c) GS E&C. All Rights Reserved

12/15/2014 Page 19

7
1600

5
400

7
LEAN CONC. 50 THK

ELEVATION S1 - X

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


Page 20

12/15/2014

Project Na. : NPK Fusion Plan


Calculation Sheet
of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 21

3. FOUNDATION DATA
3.1 FOOTING DATA
Unit : mmFt. Name F1
Ft. Type MAT
1800 Area 5.400 m2
Ft. Thickness 400.00 mm
Ft. Volume 2.160 m3
Ft. Weight 5.184 tonf
Soil Height 1600.00 mm
Soil Volume 7.992 m3
1 Soil Weight 14.386 tonf

3000
50
Buoyancy Not Consider
200 200 50 @200 100
Self Weight (except Pr.SW) 19.570 tonf
50 D10
200

3
50
200

1800
1600
7

D10

The Origin coordinate

400
TYP.

The Center of gravity (0,0) mm


50

12-D16

D16
450

Unit : mmFt. Name F2


75 PR.
30 GR.
Ft. Type MAT
1800
1800 Area 5.400 m2
450 Ft. Thickness 400.00 mm
Ft. Volume 2.160 m3
Ft. Weight 5.184 tonf

50 Soil Height 1600.00 mm


200 200
50 @200 100 Soil Volume 7.992 m3
50 D10 5 Soil Weight 14.386 tonf
200

3000
Buoyancy Not Consider
50
200

Self Weight (except Pr.SW) 19.570 tonf


Copyright (c) GS E&C. All Rights Reserved

7
5

D10
Item No.

1800
TYP.

1600
50

12-D16

D16

The Origin coordinate

400
450

75 PR.
The Center of gravity (0,0) mm
30 GR.
F2

1800
12/15/2014

450

Copyright (c) GS E&C. All Rights Reserved


12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 22 Foundation Client : PT. Pupuk Sriwidj... Page 23

3.2 PIER DATA 8 Seismic Load (vy)

Off X , Off Y is offset position from the Center of the footing 9 Piping Operating P(o)
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter 10 Thermal Load (tf)
Area is pier concrete area
Unit( tonf , tonf-m )
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
Unit( Length : mm , Weight : tonf , Area : m2 )
Ft.Name Pr.Name Load Case Fx Fy Fz Mx My
1 0.000 0.000 -0.875 0.000 0.000
Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y
2 -0.199 0.001 -0.668 0.000 0.000
1 Rectangle 450.000 450.000 1800.000 0.203 0.875 0.000 500.000
F1 3 0.000 0.000 0.000 0.000 0.000
3 Rectangle 450.000 450.000 1800.000 0.203 0.875 0.000 -500.000
4 0.096 0.000 0.031 0.000 0.000
5 Rectangle 450.000 450.000 1800.000 0.203 0.875 0.000 500.000
F2 5 0.001 -0.717 3.541 0.000 0.000
7 Rectangle 450.000 450.000 1800.000 0.203 0.875 0.000 -500.000 1
6 0.083 0.000 0.048 0.000 0.000
7 0.000 -0.166 0.958 0.000 0.000
3.3 SECTION DATA 8 0.000 0.000 -0.082 0.000 0.000
9 -0.274 0.001 -0.652 0.000 0.000
Ft.Name / Sec.Name F1 / S1 Ft.Name / Sec.Name F2 / S1
10 0.203 -0.001 0.122 0.000 0.000
Unit : mm Unit : mm F1 1 0.000 0.000 -0.875 0.000 0.000
1800 1800 2 -0.206 -0.001 -0.668 0.000 0.000
3 0.000 0.000 0.000 0.000 0.000
4 0.095 0.000 0.030 0.000 0.000
5 0.000 -0.024 -3.541 0.000 0.000
3
6 0.083 0.000 0.047 0.000 0.000
3000

3000

7 0.000 0.001 -0.958 0.000 0.000


8 0.000 0.000 -0.084 0.000 0.000
9 -0.295 -0.001 -0.702 0.000 0.000
10 0.203 0.000 0.113 0.000 0.000
Footing SW 0.000 0.000 -19.570 0.000 0.000
Direction All Direct Section Area 5.400 m2 Direction All Direct Section Area 5.400 m2
1 0.000 0.000 -0.875 0.000 0.000
3 3
F.Volume 2.160 m F.Weight 5.184 tonf F.Volume 2.160 m F.Weight 5.184 tonf 2 0.199 0.001 -0.668 0.000 0.000
S.Volume 7.992 m3 S.Weight 14.386 tonf S.Volume 7.992 m3 S.Weight 14.386 tonf 3 0.000 0.000 0.000 0.000 0.000
Pier Wt 1.750 tonf Total Weight 21.319 tonf Pier Wt 1.750 tonf Total Weight 21.319 tonf 4 0.096 0.000 -0.031 0.000 0.000
5 -0.001 -0.717 3.541 0.000 0.000
5
6 0.083 0.000 -0.048 0.000 0.000
3.4 LOAD CASE
7 0.000 -0.166 0.958 0.000 0.000
Fz 8 0.000 0.000 -0.082 0.000 0.000
Fy 9 0.274 0.001 -0.652 0.000 0.000
Mz
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are based on
My 10 0.203 0.001 -0.122 0.000 0.000
the right hand rule.
Fx F2 1 0.000 0.000 -0.875 0.000 0.000
Mx 2 0.206 -0.001 -0.668 0.000 0.000
3 0.000 0.000 0.000 0.000 0.000
Index Load Case Name 4 0.095 0.000 -0.030 0.000 0.000
1 SW 5 0.000 -0.024 -3.541 0.000 0.000
7
2 DL 6 0.083 0.000 -0.047 0.000 0.000
7 0.000 0.001 -0.958 0.000 0.000
3 Live Load (l)
8 0.000 0.000 -0.084 0.000 0.000
4 Wind Load (wx)
9 0.295 -0.001 -0.702 0.000 0.000
5 Wind Load (wz) 10 0.203 0.000 -0.113 0.000 0.000
6 Seismic Load (vx) Footing SW 0.000 0.000 -19.570 0.000 0.000
7 Seismic Load (vz)

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 24 Foundation Client : PT. Pupuk Sriwidj... Page 25

3.5 LOAD COMBINATION 111 -0.298 0.001 -1.410 0.000 0.000


112 -0.324 0.001 -1.438 0.000 0.000
In Pier Top In Footing Bottom In Footing Bottom Center 113 -0.170 0.001 -1.388 0.000 0.000
without Self Weight with Pier Self Weight, with Pier & Footing Self Weight & Soil Weight, 114 -0.322 -1.146 4.228 0.000 0.000
But without Footing Self Weight, Case PileType 115 -0.241 -0.049 -1.184 0.000 0.000
in centroid of Pile Group 116 -0.241 0.051 -1.759 0.000 0.000
Case NonPileType 117 -0.407 -0.049 -1.280 0.000 0.000
in centroid of Footing 118 -0.407 0.051 -1.855 0.000 0.000
119 -0.299 -0.165 -0.547 0.000 0.000
120 -0.349 -0.165 -0.576 0.000 0.000
121 -0.299 0.167 -2.463 0.000 0.000
122 -0.349 0.167 -2.492 0.000 0.000
123 -0.089 0.001 -1.029 0.000 0.000
124 -0.241 -1.146 4.587 0.000 0.000
3.5.1 Load Combination in Pier Top (Without SW) 125 -0.160 -0.049 -0.825 0.000 0.000

Group 1 - F1 126 -0.160 0.051 -1.400 0.000 0.000


Unit( tonf , tonf-m )
127 -0.326 -0.049 -0.921 0.000 0.000
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My 128 -0.326 0.051 -1.496 0.000 0.000
F1 211 -0.270 0.001 -1.198 0.000 0.000
129 -0.218 -0.165 -0.188 0.000 0.000
212 -0.270 0.001 -1.198 0.000 0.000
130 -0.268 -0.165 -0.217 0.000 0.000
213 -0.174 0.001 -1.167 0.000 0.000
131 -0.218 0.167 -2.104 0.000 0.000
214 -0.269 -0.716 2.343 0.000 0.000
132 -0.268 0.167 -2.133 0.000 0.000
215 -0.212 -0.034 -1.021 0.000 0.000
211 -0.298 -0.002 -1.257 0.000 0.000
216 -0.212 0.036 -1.423 0.000 0.000
212 -0.298 -0.002 -1.257 0.000 0.000
217 -0.328 -0.034 -1.088 0.000 0.000
213 -0.203 -0.002 -1.227 0.000 0.000
218 -0.328 0.036 -1.490 0.000 0.000
214 -0.298 -0.026 -4.798 0.000 0.000
219 -0.253 -0.115 -0.575 0.000 0.000
215 -0.240 -0.002 -1.484 0.000 0.000
220 -0.287 -0.115 -0.595 0.000 0.000
216 -0.240 -0.002 -1.082 0.000 0.000
221 -0.253 0.117 -1.916 0.000 0.000
217 -0.356 -0.002 -1.550 0.000 0.000
222 -0.287 0.117 -1.936 0.000 0.000
218 -0.356 -0.002 -1.148 0.000 0.000
223 -0.198 0.001 -1.175 0.000 0.000
219 -0.281 -0.001 -1.977 0.000 0.000
224 -0.269 -0.537 1.458 0.000 0.000
220 -0.315 -0.001 -1.996 0.000 0.000
225 -0.226 -0.025 -1.065 0.000 0.000
221 -0.281 -0.003 -0.635 0.000 0.000
226 -0.226 0.027 -1.367 0.000 0.000
1 222 -0.315 -0.003 -0.655 0.000 0.000
227 -0.314 -0.025 -1.115 0.000 0.000
223 -0.227 -0.002 -1.235 0.000 0.000
228 -0.314 0.027 -1.417 0.000 0.000
224 -0.298 -0.020 -3.913 0.000 0.000
229 -0.257 -0.086 -0.731 0.000 0.000 3
225 -0.254 -0.002 -1.427 0.000 0.000
230 -0.283 -0.086 -0.746 0.000 0.000
226 -0.254 -0.002 -1.126 0.000 0.000
231 -0.257 0.088 -1.736 0.000 0.000
227 -0.342 -0.002 -1.477 0.000 0.000
232 -0.283 0.088 -1.752 0.000 0.000
228 -0.342 -0.002 -1.175 0.000 0.000
233 -0.066 0.001 -0.688 0.000 0.000
229 -0.285 -0.001 -1.797 0.000 0.000
234 -0.161 -0.716 2.822 0.000 0.000
230 -0.311 -0.001 -1.811 0.000 0.000
235 -0.104 -0.034 -0.541 0.000 0.000
231 -0.285 -0.003 -0.791 0.000 0.000
236 -0.104 0.035 -0.944 0.000 0.000
232 -0.311 -0.003 -0.806 0.000 0.000
237 -0.220 -0.034 -0.609 0.000 0.000
233 -0.084 -0.001 -0.724 0.000 0.000
238 -0.220 0.035 -1.011 0.000 0.000
234 -0.179 -0.025 -4.295 0.000 0.000
239 -0.145 -0.116 -0.096 0.000 0.000
235 -0.121 -0.001 -0.981 0.000 0.000
240 -0.179 -0.116 -0.116 0.000 0.000
236 -0.121 -0.001 -0.579 0.000 0.000
241 -0.145 0.117 -1.437 0.000 0.000
237 -0.237 -0.001 -1.047 0.000 0.000
242 -0.179 0.117 -1.457 0.000 0.000
238 -0.237 -0.001 -0.645 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 26 Foundation Client : PT. Pupuk Sriwidj... Page 27

239 -0.161 -0.001 -1.474 0.000 0.000 232 0.663 0.090 -1.980 0.000 0.000
240 -0.196 -0.001 -1.493 0.000 0.000 233 0.502 0.002 -0.896 0.000 0.000
241 -0.161 -0.002 -0.133 0.000 0.000 234 0.405 -0.715 2.676 0.000 0.000
242 -0.196 -0.002 -0.152 0.000 0.000 235 0.464 -0.033 -0.755 0.000 0.000
111 -0.335 -0.002 -1.493 0.000 0.000 236 0.464 0.037 -1.157 0.000 0.000
112 -0.358 -0.002 -1.508 0.000 0.000 237 0.347 -0.033 -0.688 0.000 0.000
113 -0.206 -0.002 -1.460 0.000 0.000 238 0.347 0.037 -1.090 0.000 0.000
114 -0.358 -0.041 -7.174 0.000 0.000 239 0.423 -0.114 -0.262 0.000 0.000
115 -0.275 -0.002 -1.833 0.000 0.000 240 0.388 -0.114 -0.242 0.000 0.000
116 -0.275 -0.003 -1.258 0.000 0.000 241 0.423 0.118 -1.603 0.000 0.000
117 -0.441 -0.002 -1.927 0.000 0.000 242 0.388 0.118 -1.583 0.000 0.000
118 -0.441 -0.003 -1.352 0.000 0.000 111 0.867 0.004 -1.752 0.000 0.000
119 -0.333 -0.001 -2.536 0.000 0.000 112 0.811 0.004 -1.730 0.000 0.000
120 -0.382 -0.001 -2.564 0.000 0.000 113 0.965 0.004 -1.780 0.000 0.000
121 -0.333 -0.003 -0.620 0.000 0.000 114 0.810 -1.144 3.935 0.000 0.000
122 -0.382 -0.003 -0.649 0.000 0.000 115 0.894 -0.046 -1.573 0.000 0.000
123 -0.116 -0.002 -1.083 0.000 0.000 116 0.894 0.053 -2.148 0.000 0.000
124 -0.268 -0.040 -6.797 0.000 0.000 117 0.728 -0.046 -1.477 0.000 0.000
125 -0.185 -0.002 -1.456 0.000 0.000 118 0.728 0.053 -2.052 0.000 0.000
126 -0.185 -0.002 -0.881 0.000 0.000 119 0.836 -0.162 -0.869 0.000 0.000
127 -0.351 -0.002 -1.550 0.000 0.000 120 0.786 -0.162 -0.840 0.000 0.000
128 -0.351 -0.002 -0.975 0.000 0.000 121 0.836 0.170 -2.785 0.000 0.000
129 -0.243 -0.001 -2.159 0.000 0.000 122 0.786 0.170 -2.756 0.000 0.000
130 -0.293 -0.001 -2.187 0.000 0.000 123 0.762 0.003 -1.347 0.000 0.000
131 -0.243 -0.003 -0.243 0.000 0.000 124 0.607 -1.145 4.368 0.000 0.000
132 -0.293 -0.003 -0.271 0.000 0.000 125 0.691 -0.047 -1.140 0.000 0.000
126 0.691 0.053 -1.715 0.000 0.000
Group 2 - F2 Unit( tonf , tonf-m ) 127 0.525 -0.047 -1.044 0.000 0.000
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My 128 0.525 0.053 -1.619 0.000 0.000
F2 211 0.676 0.003 -1.442 0.000 0.000 129 0.633 -0.163 -0.436 0.000 0.000
212 0.676 0.003 -1.442 0.000 0.000 130 0.583 -0.163 -0.407 0.000 0.000
213 0.772 0.003 -1.473 0.000 0.000 131 0.633 0.169 -2.352 0.000 0.000
214 0.675 -0.714 2.099 0.000 0.000 132 0.583 0.169 -2.323 0.000 0.000
215 0.734 -0.032 -1.332 0.000 0.000 211 0.704 -0.002 -1.483 0.000 0.000
216 0.734 0.038 -1.734 0.000 0.000 212 0.704 -0.002 -1.483 0.000 0.000
217 0.618 -0.032 -1.265 0.000 0.000 213 0.799 -0.002 -1.513 0.000 0.000
218 0.618 0.038 -1.667 0.000 0.000 214 0.704 -0.026 -5.024 0.000 0.000
219 0.693 -0.113 -0.839 0.000 0.000 215 0.762 -0.002 -1.776 0.000 0.000
220 0.659 -0.113 -0.819 0.000 0.000 216 0.762 -0.002 -1.374 0.000 0.000
5 221 0.693 0.119 -2.180 0.000 0.000 217 0.646 -0.002 -1.710 0.000 0.000
222 0.659 0.119 -2.160 0.000 0.000 218 0.646 -0.002 -1.308 0.000 0.000
223 0.748 0.003 -1.465 0.000 0.000 7 219 0.721 -0.001 -2.222 0.000 0.000
224 0.675 -0.535 1.214 0.000 0.000 220 0.687 -0.001 -2.203 0.000 0.000
225 0.720 -0.023 -1.359 0.000 0.000 221 0.721 -0.003 -0.881 0.000 0.000
226 0.720 0.029 -1.661 0.000 0.000 222 0.687 -0.003 -0.861 0.000 0.000
227 0.632 -0.023 -1.309 0.000 0.000 223 0.775 -0.002 -1.505 0.000 0.000
228 0.632 0.029 -1.611 0.000 0.000 224 0.704 -0.020 -4.139 0.000 0.000
229 0.689 -0.084 -0.990 0.000 0.000 225 0.748 -0.002 -1.703 0.000 0.000
230 0.663 -0.084 -0.975 0.000 0.000 226 0.748 -0.002 -1.401 0.000 0.000
231 0.689 0.090 -1.996 0.000 0.000 227 0.660 -0.002 -1.653 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 28 Foundation Client : PT. Pupuk Sriwidj... Page 29

228 0.660 -0.002 -1.352 0.000 0.000 219 -0.253 -0.115 -1.450 0.253 -0.556
229 0.717 -0.001 -2.037 0.000 0.000 220 -0.287 -0.115 -1.470 0.253 -0.632
230 0.691 -0.001 -2.023 0.000 0.000 221 -0.253 0.117 -2.791 -0.258 -0.556
231 0.717 -0.003 -1.032 0.000 0.000 222 -0.287 0.117 -2.811 -0.258 -0.632
232 0.691 -0.003 -1.017 0.000 0.000 223 -0.198 0.001 -2.050 -0.002 -0.436
233 0.517 -0.001 -0.920 0.000 0.000 224 -0.269 -0.537 0.583 1.181 -0.592
234 0.422 -0.025 -4.431 0.000 0.000 225 -0.226 -0.025 -1.940 0.055 -0.498
235 0.481 -0.001 -1.183 0.000 0.000 226 -0.226 0.027 -2.242 -0.060 -0.498
236 0.481 -0.001 -0.780 0.000 0.000 227 -0.314 -0.025 -1.990 0.055 -0.690
237 0.364 -0.001 -1.117 0.000 0.000 228 -0.314 0.027 -2.292 -0.060 -0.690
238 0.364 -0.001 -0.715 0.000 0.000 229 -0.257 -0.086 -1.605 0.190 -0.565
239 0.440 -0.001 -1.629 0.000 0.000 230 -0.283 -0.086 -1.620 0.190 -0.623
240 0.405 -0.001 -1.609 0.000 0.000 231 -0.257 0.088 -2.611 -0.194 -0.565
241 0.440 -0.002 -0.288 0.000 0.000 232 -0.283 0.088 -2.626 -0.194 -0.623
242 0.405 -0.002 -0.268 0.000 0.000 233 -0.066 0.001 -1.213 -0.001 -0.145
111 0.903 -0.002 -1.809 0.000 0.000 234 -0.161 -0.716 2.297 1.576 -0.354
112 0.845 -0.002 -1.780 0.000 0.000 235 -0.104 -0.034 -1.066 0.075 -0.229
113 0.997 -0.002 -1.828 0.000 0.000 236 -0.104 0.035 -1.469 -0.078 -0.229
114 0.845 -0.041 -7.445 0.000 0.000 237 -0.220 -0.034 -1.134 0.075 -0.484
115 0.928 -0.002 -2.198 0.000 0.000 238 -0.220 0.035 -1.536 -0.078 -0.484
116 0.928 -0.003 -1.623 0.000 0.000 239 -0.145 -0.116 -0.620 0.254 -0.318
117 0.762 -0.002 -2.104 0.000 0.000 240 -0.179 -0.116 -0.641 0.254 -0.395
118 0.762 -0.003 -1.529 0.000 0.000 241 -0.145 0.117 -1.962 -0.257 -0.318
119 0.870 -0.001 -2.836 0.000 0.000 242 -0.179 0.117 -1.982 -0.257 -0.395
120 0.820 -0.001 -2.808 0.000 0.000 111 -0.298 0.001 -2.635 -0.002 -0.656
121 0.870 -0.003 -0.920 0.000 0.000 112 -0.324 0.001 -2.487 -0.003 -0.713
122 0.820 -0.003 -0.892 0.000 0.000 113 -0.170 0.001 -2.438 -0.003 -0.375
123 0.786 -0.002 -1.383 0.000 0.000 114 -0.322 -1.146 3.178 2.521 -0.709
124 0.634 -0.040 -7.000 0.000 0.000 115 -0.241 -0.049 -2.234 0.107 -0.530
125 0.717 -0.002 -1.753 0.000 0.000 116 -0.241 0.051 -2.809 -0.112 -0.530
126 0.717 -0.002 -1.178 0.000 0.000 117 -0.407 -0.049 -2.330 0.107 -0.895
127 0.551 -0.002 -1.659 0.000 0.000 118 -0.407 0.051 -2.905 -0.112 -0.895
128 0.551 -0.002 -1.084 0.000 0.000 119 -0.299 -0.165 -1.597 0.363 -0.658
129 0.658 -0.001 -2.391 0.000 0.000 120 -0.349 -0.165 -1.626 0.363 -0.768
130 0.609 -0.001 -2.363 0.000 0.000 121 -0.299 0.167 -3.513 -0.368 -0.658
131 0.658 -0.003 -0.475 0.000 0.000 122 -0.349 0.167 -3.542 -0.368 -0.768
132 0.609 -0.003 -0.447 0.000 0.000 123 -0.089 0.001 -1.816 -0.002 -0.197
124 -0.241 -1.146 3.800 2.522 -0.531
125 -0.160 -0.049 -1.612 0.108 -0.352
3.5.2 Load Combination in Footing Bottom (With Pier SW) 126 -0.160 0.051 -2.187 -0.112 -0.352
Group 1 - F1 Unit( tonf , tonf-m ) 127 -0.326 -0.049 -1.708 0.108 -0.717
128 -0.326 0.051 -2.283 -0.112 -0.717
Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
F1 211 -0.270 0.001 -2.073 -0.002 -0.594 129 -0.218 -0.165 -0.975 0.363 -0.480
212 -0.270 0.001 -2.073 -0.002 -0.594 130 -0.268 -0.165 -1.004 0.363 -0.589
213 -0.174 0.001 -2.042 -0.002 -0.383 131 -0.218 0.167 -2.891 -0.367 -0.480
214 -0.269 -0.716 1.468 1.575 -0.592 132 -0.268 0.167 -2.920 -0.367 -0.589
1 211 -0.298 -0.002 -2.132 0.004 -0.656
215 -0.212 -0.034 -1.895 0.074 -0.466
216 -0.212 0.036 -2.298 -0.079 -0.466 212 -0.298 -0.002 -2.132 0.004 -0.656
3
217 -0.328 -0.034 -1.963 0.074 -0.722 213 -0.203 -0.002 -2.102 0.004 -0.447
218 -0.328 0.036 -2.365 -0.079 -0.722 214 -0.298 -0.026 -5.673 0.057 -0.656

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 30 Foundation Client : PT. Pupuk Sriwidj... Page 31

215 -0.240 -0.002 -2.359 0.004 -0.528 Group 2 - F2 Unit( tonf , tonf-m )
216 -0.240 -0.002 -1.957 0.005 -0.528 Ft.Name Pr.Name L.Comb. Fx Fy Fz Mx My
217 -0.356 -0.002 -2.425 0.004 -0.783 F2 211 0.676 0.003 -2.317 -0.007 1.487
218 -0.356 -0.002 -2.022 0.005 -0.783 212 0.676 0.003 -2.317 -0.007 1.487
219 -0.281 -0.001 -2.851 0.003 -0.617 213 0.772 0.003 -2.348 -0.007 1.698
220 -0.315 -0.001 -2.871 0.003 -0.694 214 0.675 -0.714 1.224 1.571 1.485
221 -0.281 -0.003 -1.510 0.006 -0.617 215 0.734 -0.032 -2.207 0.070 1.615
222 -0.315 -0.003 -1.530 0.006 -0.694 216 0.734 0.038 -2.609 -0.083 1.615
223 -0.227 -0.002 -2.109 0.004 -0.499 217 0.618 -0.032 -2.139 0.070 1.359
224 -0.298 -0.020 -4.788 0.044 -0.656 218 0.618 0.038 -2.542 -0.083 1.359
225 -0.254 -0.002 -2.302 0.004 -0.560 219 0.693 -0.113 -1.714 0.249 1.526
226 -0.254 -0.002 -2.000 0.005 -0.560 220 0.659 -0.113 -1.694 0.249 1.449
227 -0.342 -0.002 -2.351 0.004 -0.751 221 0.693 0.119 -3.055 -0.262 1.526
228 -0.342 -0.002 -2.050 0.005 -0.751 222 0.659 0.119 -3.035 -0.262 1.449
229 -0.285 -0.001 -2.671 0.003 -0.627 223 0.748 0.003 -2.340 -0.007 1.646
230 -0.311 -0.001 -2.686 0.003 -0.684 224 0.675 -0.535 0.339 1.176 1.486
231 -0.285 -0.003 -1.666 0.006 -0.627 225 0.720 -0.023 -2.234 0.051 1.583
232 -0.311 -0.003 -1.680 0.006 -0.684 226 0.720 0.029 -2.536 -0.064 1.583
233 -0.084 -0.001 -1.249 0.003 -0.184 227 0.632 -0.023 -2.184 0.051 1.391
234 -0.179 -0.025 -4.820 0.055 -0.393 228 0.632 0.029 -2.486 -0.064 1.391
235 -0.121 -0.001 -1.506 0.002 -0.266 229 0.689 -0.084 -1.864 0.185 1.516
236 -0.121 -0.001 -1.104 0.003 -0.266 230 0.663 -0.084 -1.849 0.185 1.458
237 -0.237 -0.001 -1.572 0.002 -0.521 231 0.689 0.090 -2.870 -0.198 1.516
238 -0.237 -0.001 -1.170 0.003 -0.521 232 0.663 0.090 -2.855 -0.198 1.458
239 -0.161 -0.001 -1.999 0.001 -0.355 233 0.502 0.002 -1.421 -0.004 1.104
240 -0.196 -0.001 -2.018 0.001 -0.432 234 0.405 -0.715 2.151 1.573 0.890
241 -0.161 -0.002 -0.657 0.004 -0.355 5
235 0.464 -0.033 -1.280 0.073 1.020
242 -0.196 -0.002 -0.677 0.004 -0.432 236 0.464 0.037 -1.682 -0.081 1.020
111 -0.335 -0.002 -2.717 0.005 -0.737 237 0.347 -0.033 -1.213 0.073 0.765
112 -0.358 -0.002 -2.558 0.005 -0.787 238 0.347 0.037 -1.615 -0.081 0.765
113 -0.206 -0.002 -2.510 0.005 -0.452 239 0.423 -0.114 -0.787 0.252 0.931
114 -0.358 -0.041 -8.224 0.090 -0.787 240 0.388 -0.114 -0.767 0.252 0.854
115 -0.275 -0.002 -2.883 0.005 -0.604 241 0.423 0.118 -2.128 -0.260 0.931
116 -0.275 -0.003 -2.308 0.006 -0.604 242 0.388 0.118 -2.108 -0.260 0.854
117 -0.441 -0.002 -2.977 0.005 -0.969 111 0.867 0.004 -2.976 -0.008 1.907
118 -0.441 -0.003 -2.402 0.006 -0.969 112 0.811 0.004 -2.780 -0.008 1.785
119 -0.333 -0.001 -3.586 0.003 -0.732 113 0.965 0.004 -2.830 -0.008 2.123
120 -0.382 -0.001 -3.614 0.003 -0.842 114 0.810 -1.144 2.885 2.516 1.781
121 -0.333 -0.003 -1.670 0.007 -0.732 115 0.894 -0.046 -2.623 0.102 1.967
122 -0.382 -0.003 -1.698 0.007 -0.842 116 0.894 0.053 -3.198 -0.117 1.967
123 -0.116 -0.002 -1.871 0.004 -0.256 117 0.728 -0.046 -2.527 0.102 1.602
124 -0.268 -0.040 -7.584 0.088 -0.590 118 0.728 0.053 -3.102 -0.117 1.602
125 -0.185 -0.002 -2.243 0.003 -0.407 119 0.836 -0.162 -1.919 0.357 1.839
126 -0.185 -0.002 -1.668 0.005 -0.407 120 0.786 -0.162 -1.890 0.357 1.730
127 -0.351 -0.002 -2.337 0.003 -0.773 121 0.836 0.170 -3.835 -0.373 1.839
128 -0.351 -0.002 -1.762 0.005 -0.773 122 0.786 0.170 -3.806 -0.373 1.730
129 -0.243 -0.001 -2.947 0.002 -0.535 123 0.762 0.003 -2.135 -0.006 1.676
130 -0.293 -0.001 -2.975 0.002 -0.645 124 0.607 -1.145 3.580 2.518 1.335
131 -0.243 -0.003 -1.031 0.006 -0.535 125 0.691 -0.047 -1.928 0.104 1.521
132 -0.293 -0.003 -1.059 0.006 -0.645 126 0.691 0.053 -2.503 -0.116 1.521

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 32 Foundation Client : PT. Pupuk Sriwidj... Page 33

127 0.525 -0.047 -1.832 0.104 1.156 123 0.786 -0.002 -2.170 0.004 1.728
128 0.525 0.053 -2.407 -0.116 1.156 124 0.634 -0.040 -7.788 0.088 1.394
129 0.633 -0.163 -1.224 0.359 1.393 125 0.717 -0.002 -2.540 0.003 1.577
130 0.583 -0.163 -1.195 0.359 1.284 126 0.717 -0.002 -1.966 0.005 1.577
131 0.633 0.169 -3.140 -0.371 1.393 127 0.551 -0.002 -2.446 0.003 1.211
132 0.583 0.169 -3.111 -0.371 1.284 128 0.551 -0.002 -1.872 0.005 1.211
211 0.704 -0.002 -2.358 0.004 1.549 129 0.658 -0.001 -3.178 0.002 1.449
212 0.704 -0.002 -2.358 0.004 1.549 130 0.609 -0.001 -3.150 0.002 1.339
213 0.799 -0.002 -2.388 0.004 1.758 131 0.658 -0.003 -1.262 0.006 1.449
214 0.704 -0.026 -5.899 0.057 1.549 132 0.609 -0.003 -1.234 0.006 1.339
215 0.762 -0.002 -2.651 0.004 1.677
216 0.762 -0.002 -2.248 0.005 1.677
217 0.646 -0.002 -2.585 0.004 1.421 3.5.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
218 0.646 -0.002 -2.183 0.005 1.421 Load Combination of Elastic Condition
219 0.721 -0.001 -3.097 0.003 1.587 Group 1 - F1
220 0.687 -0.001 -3.077 0.003 1.510 - C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
221 0.721 -0.003 -1.756 0.006 1.587
222 0.687 -0.003 -1.736 0.006 1.510 Ft.Name L.Comb. Fx Fy Fz Mx My C.G. of Loads
223 0.775 -0.002 -2.380 0.004 1.706 F1 211 -0.568 -0.001 -23.774 0.032 -1.250 900.0 , 1498.8
224 0.704 -0.020 -5.014 0.044 1.549 212 -0.568 -0.001 -23.774 0.032 -1.250 900.0 , 1498.8
225 0.748 -0.002 -2.577 0.004 1.645 213 -0.377 -0.001 -23.713 0.032 -0.829 900.0 , 1498.7
226 0.748 -0.002 -2.276 0.005 1.645
214 -0.567 -0.742 -23.774 5.203 -1.247 900.0 , 1349.8
227 0.660 -0.002 -2.528 0.004 1.453
228 0.660 -0.002 -2.226 0.005 1.453 215 -0.452 -0.036 -23.824 0.310 -0.994 900.0 , 1490.3

229 0.717 -0.001 -2.912 0.003 1.578 216 -0.452 0.034 -23.824 -0.245 -0.994 900.0 , 1507.2
230 0.691 -0.001 -2.897 0.003 1.520 217 -0.684 -0.036 -23.957 0.309 -1.505 900.0 , 1490.4
231 0.717 -0.003 -1.906 0.006 1.578
218 -0.684 0.034 -23.957 -0.245 -1.505 900.0 , 1507.2
232 0.691 -0.003 -1.892 0.006 1.520
7 219 -0.533 -0.116 -23.870 0.957 -1.173 900.0 , 1470.6
233 0.517 -0.001 -1.445 0.003 1.138
234 0.422 -0.025 -4.956 0.055 0.929 220 -0.603 -0.116 -23.910 0.957 -1.326 900.0 , 1470.7
235 0.481 -0.001 -1.708 0.002 1.057 221 -0.533 0.114 -23.870 -0.892 -1.173 900.0 , 1526.8
236 0.481 -0.001 -1.305 0.003 1.057 222 -0.603 0.114 -23.910 -0.892 -1.326 900.0 , 1526.8
237 0.364 -0.001 -1.642 0.002 0.801
223 -0.425 -0.001 -23.728 0.032 -0.934 900.0 , 1498.7
238 0.364 -0.001 -1.239 0.003 0.801
224 -0.567 -0.557 -23.774 3.910 -1.248 900.0 , 1387.1
239 0.440 -0.001 -2.154 0.001 0.968
240 0.405 -0.001 -2.134 0.001 0.891 225 -0.481 -0.027 -23.811 0.241 -1.058 900.0 , 1492.4
241 0.440 -0.002 -0.813 0.004 0.968 226 -0.481 0.025 -23.811 -0.176 -1.058 900.0 , 1505.1
242 0.405 -0.002 -0.793 0.004 0.891 227 -0.655 -0.027 -23.911 0.240 -1.441 900.0 , 1492.4
111 0.903 -0.002 -3.034 0.005 1.987
228 -0.655 0.025 -23.911 -0.176 -1.441 900.0 , 1505.1
112 0.845 -0.002 -2.829 0.005 1.859
113 0.997 -0.002 -2.877 0.005 2.193 229 -0.542 -0.088 -23.846 0.726 -1.192 900.0 , 1477.6

114 0.845 -0.041 -8.495 0.090 1.859 230 -0.594 -0.088 -23.876 0.726 -1.307 900.0 , 1477.7
115 0.928 -0.002 -3.248 0.005 2.041 231 -0.542 0.086 -23.846 -0.661 -1.192 900.0 , 1519.8
116 0.928 -0.003 -2.673 0.006 2.041
232 -0.594 0.086 -23.876 -0.661 -1.307 900.0 , 1519.8
117 0.762 -0.002 -3.154 0.005 1.676
233 -0.150 -0.001 -14.204 0.020 -0.330 900.0 , 1499.2
118 0.762 -0.003 -2.579 0.006 1.676
119 0.870 -0.001 -3.885 0.003 1.913 234 -0.340 -0.742 -14.265 5.190 -0.748 900.0 , 1338.9
120 0.820 -0.001 -3.857 0.003 1.804 235 -0.225 -0.035 -14.314 0.297 -0.494 900.0 , 1490.1
121 0.870 -0.003 -1.969 0.007 1.913 236 -0.225 0.034 -14.314 -0.257 -0.494 900.0 , 1508.2
122 0.820 -0.003 -1.941 0.007 1.804

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 34 Foundation Client : PT. Pupuk Sriwidj... Page 35

237 -0.457 -0.035 -14.447 0.297 -1.005 900.0 , 1490.2 242 0.793 0.116 -14.643 -0.913 1.745 900.0 , 1529.3
238 -0.457 0.034 -14.447 -0.258 -1.005 900.0 , 1508.2
239 -0.306 -0.116 -14.361 0.945 -0.673 900.0 , 1468.9 Load Combination of Ultimate Condition
Group 1 - F1
240 -0.376 -0.116 -14.401 0.944 -0.826 900.0 , 1469.0
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
241 -0.306 0.115 -14.361 -0.905 -0.673 900.0 , 1529.4
Ft.Name Sec.Nam L.Comb. Fx Fy Fz Mx My C.G. of Loads
242 -0.376 0.115 -14.401 -0.905 -0.826 900.0 , 1529.3
111 -0.633 -0.001 -5.352 0.044 -1.393 900.0 , 1498.3
Group 2 - F2 112 -0.682 -0.001 -5.046 0.038 -1.500 900.0 , 1498.6
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m ) 113 -0.376 -0.001 -4.948 0.039 -0.827 900.0 , 1498.5
Ft.Name L.Comb. Fx Fy Fz Mx My C.G. of Loads 114 -0.680 -1.187 -5.046 8.312 -1.496 900.0 , 1268.4
F2 211 1.380 0.001 -24.244 0.018 3.036 900.0 , 1499.2 115 -0.516 -0.051 -5.117 0.436 -1.134 900.0 , 1486.9
212 1.380 0.001 -24.244 0.018 3.036 900.0 , 1499.2 116 -0.516 0.048 -5.117 -0.357 -1.134 900.0 , 1510.1
213 1.571 0.001 -24.305 0.018 3.456 900.0 , 1499.2 117 -0.848 -0.051 -5.307 0.435 -1.865 900.0 , 1487.0
214 1.379 -0.740 -24.244 5.189 3.034 900.0 , 1353.1 118 -0.848 0.048 -5.307 -0.358 -1.865 900.0 , 1510.1
215 1.496 -0.034 -24.427 0.296 3.292 900.0 , 1490.9 119 -0.632 -0.166 -5.183 1.360 -1.390 900.0 , 1459.8
216 1.496 0.036 -24.427 -0.259 3.292 900.0 , 1507.4 120 -0.731 -0.166 -5.240 1.360 -1.609 900.0 , 1459.9
217 1.264 -0.034 -24.294 0.297 2.780 900.0 , 1490.8 121 -0.632 0.164 -5.183 -1.282 -1.390 900.0 , 1537.2
F1 S1
218 1.264 0.036 -24.294 -0.258 2.780 900.0 , 1507.4 122 -0.731 0.164 -5.240 -1.282 -1.609 900.0 , 1537.2
219 1.415 -0.114 -24.380 0.944 3.113 900.0 , 1471.6 123 -0.206 -0.001 -3.687 0.029 -0.452 900.0 , 1498.8
220 1.345 -0.114 -24.340 0.944 2.959 900.0 , 1471.6 124 -0.510 -1.187 -3.784 8.302 -1.121 900.0 , 1256.3
221 1.415 0.116 -24.380 -0.906 3.113 900.0 , 1526.6 125 -0.345 -0.050 -3.855 0.426 -0.759 900.0 , 1486.5
222 1.345 0.116 -24.340 -0.906 2.959 900.0 , 1526.7 126 -0.345 0.049 -3.855 -0.366 -0.759 900.0 , 1511.1
223 1.523 0.001 -24.290 0.018 3.351 900.0 , 1499.2 127 -0.677 -0.050 -4.045 0.425 -1.490 900.0 , 1486.7
224 1.379 -0.555 -24.244 3.897 3.034 900.0 , 1389.6 128 -0.677 0.049 -4.045 -0.367 -1.490 900.0 , 1511.0
225 1.467 -0.025 -24.381 0.227 3.228 900.0 , 1493.0 129 -0.461 -0.166 -3.922 1.351 -1.015 900.0 , 1458.0
226 1.467 0.027 -24.381 -0.189 3.228 900.0 , 1505.3 130 -0.561 -0.166 -3.979 1.350 -1.234 900.0 , 1458.2
227 1.293 -0.025 -24.281 0.227 2.844 900.0 , 1492.9 131 -0.461 0.164 -3.922 -1.291 -1.015 900.0 , 1539.6
228 1.293 0.027 -24.281 -0.189 2.844 900.0 , 1505.3 132 -0.561 0.164 -3.979 -1.292 -1.234 900.0 , 1539.5
229 1.406 -0.086 -24.346 0.712 3.094 900.0 , 1478.5
Group 2 - F2
230 1.354 -0.086 -24.316 0.712 2.978 900.0 , 1478.4
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
231 1.406 0.088 -24.346 -0.675 3.094 900.0 , 1519.8
Ft.Name Sec.Nam L.Comb. Fx Fy Fz Mx My C.G. of Loads
232 1.354 0.088 -24.316 -0.675 2.978 900.0 , 1519.8
F2 111 1.770 0.001 -6.010 0.026 3.894 900.0 , 1498.9
233 1.019 0.001 -14.608 0.010 2.242 900.0 , 1499.5
112 1.656 0.001 -5.610 0.022 3.643 900.0 , 1499.0
234 0.827 -0.740 -14.547 5.182 1.819 900.0 , 1341.2
113 1.962 0.001 -5.707 0.021 4.316 900.0 , 1499.1
235 0.944 -0.034 -14.729 0.289 2.077 900.0 , 1490.5
114 1.654 -1.184 -5.610 8.296 3.640 900.0 , 1274.0
236 0.944 0.035 -14.729 -0.266 2.077 900.0 , 1508.4
115 1.822 -0.048 -5.871 0.419 4.008 900.0 , 1487.7
237 0.712 -0.034 -14.596 0.289 1.566 900.0 , 1490.4 S1
116 1.822 0.051 -5.871 -0.374 4.008 900.0 , 1510.3
238 0.712 0.035 -14.596 -0.265 1.566 900.0 , 1508.4
117 1.490 -0.048 -5.681 0.420 3.278 900.0 , 1487.6
239 0.863 -0.115 -14.683 0.936 1.898 900.0 , 1469.6
118 1.490 0.051 -5.681 -0.373 3.278 900.0 , 1510.3
240 0.793 -0.115 -14.643 0.936 1.745 900.0 , 1469.6
119 1.706 -0.164 -5.804 1.344 3.753 900.0 , 1461.2
241 0.863 0.116 -14.683 -0.913 1.898 900.0 , 1529.2
120 1.606 -0.164 -5.747 1.344 3.534 900.0 , 1461.1

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 36 Foundation Client : PT. Pupuk Sriwidj... Page 37

121 1.706 0.166 -5.804 -1.298 3.753 900.0 , 1536.8 4. CHECK OF STABILITY
122 1.606 0.166 -5.747 -1.298 3.534 900.0 , 1536.8
4.1 CHECK OF SLIDING
123 1.548 0.001 -4.305 0.016 3.405 900.0 , 1499.3
Fz + P.F
124 1.240 -1.185 -4.207 8.290 2.729 900.0 , 1260.9 Formula : > Fs => OK (Bi-Axial)
Fx + Fy
2 2

125 1.408 -0.049 -4.468 0.413 3.098 900.0 , 1487.3 P.F = Passive Force (apply only in case checked passive force, mark by P )
126 1.408 0.050 -4.468 -0.379 3.098 900.0 , 1511.2 Group 1 - F1 Unit ( tonf )
( Fz + P.F ) / Fx + Fy
2 2
127 1.076 -0.049 -4.278 0.414 2.367 900.0 , 1487.1 Ft.Name Dir. L.Comb. Fs(i) Result
128 1.076 0.050 -4.278 -0.378 2.367 900.0 , 1511.2 F1 Bi-Axial 234 0.5 14.26 / 0.82 = 8.74 2 OK
129 1.292 -0.164 -4.402 1.338 2.842 900.0 , 1459.2
Group 2 - F2 Unit ( tonf )
130 1.192 -0.164 -4.345 1.339 2.623 900.0 , 1459.1
( Fz + P.F ) / Fx + Fy
2 2
Ft.Name Dir. L.Comb. Fs(i) Result
131 1.292 0.166 -4.402 -1.304 2.842 900.0 , 1539.2
F2 Bi-Axial 234 0.5 14.55 / 1.11 = 6.55 2 OK
132 1.192 0.166 -4.345 -1.303 2.623 900.0 , 1539.2

4.2 CHECK OF OVERTURNING MOMENT


Formula : (Mry / Moy or Mrx / Mox) > OVM(i) => OK
Group 1 - F1 Unit ( tonf-m )
Ft.Name Dir. L.Comb. Mry / Moy = OVM or Mrx / Mox = OVM OVM(i) Result
X 234 -12.84 / -0.75 = 17.17 1.5 OK
F1
Y 234 -21.4 / -5.19 = 4.12 1.5 OK

Group 2 - F2 Unit ( tonf-m )


Ft.Name Dir. L.Comb. Mry / Moy = OVM or Mrx / Mox = OVM OVM(i) Result
X 234 13.09 / 1.82 = 7.2 1.5 OK
F2
Y 234 -21.82 / -5.18 = 4.21 1.5 OK

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 38 Foundation Client : PT. Pupuk Sriwidj... Page 39

4.3 CHECK OF CONTACT PRESSURE 5. DESIGN OF FOOTING


4.3.1 Contact Pressure Formula 5.1 DESIGN MOMENT AND SHEAR FORCE
'Handbook CONCRETE ENGINEERING' Second Edition edited by Mark Fintel Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
Q = Fz - Self Weight Factor (Soil Weight + Footing Weight)
Fz My X(i) Mx Y(i) Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
q1,q2 =
Af Iy Ix Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width
if q1 or q2 < 0 , than q1 and q2 will be recalculated
by following formula 5.1.1 Data
L
q(x) width(x) X dx Group 1 - F1 Unit( mm , tonf , tonf-m )
Px = 0 L
q(x) width(x) dx
L
0
Ft.Name Sec.Nam Dir. L.Comb. Fl or Fw Sl or Sw Fz M Q
P= 0
q(x) width(x) dx
111 1800.00 3000.00 5.352 -1.39 5.352
112 1800.00 3000.00 5.046 -1.50 5.046
113 1800.00 3000.00 4.948 -0.83 4.948
114 1800.00 3000.00 5.046 -1.50 5.046
115 1800.00 3000.00 5.117 -1.13 5.117
116 1800.00 3000.00 5.117 -1.13 5.117
117 1800.00 3000.00 5.307 -1.86 5.307
118 1800.00 3000.00 5.307 -1.86 5.307
4.3.2 Input Data
119 1800.00 3000.00 5.183 -1.39 5.183
2 4 4
Ft.Name Af (m ) Fl (m ) Fw (m ) Ix (m ) Iy (m )
120 1800.00 3000.00 5.240 -1.61 5.240
F1 5.400 1.800 3.000 4.0500 1.4580
121 1800.00 3000.00 5.183 -1.39 5.183
F2 5.400 1.800 3.000 4.0500 1.4580 S1 X
122 1800.00 3000.00 5.240 -1.61 5.240
123 1800.00 3000.00 3.687 -0.45 3.687
4.3.3 Pressure Check
124 1800.00 3000.00 3.784 -1.12 3.784
- Qa = Soil bearing capacity
- Uc = Uplift Allowable capacity 125 1800.00 3000.00 3.855 -0.76 3.855

Group 1 - F1 F1 126 1800.00 3000.00 3.855 -0.76 3.855


- XY-Direction (Bi-Axial) Unit( tonf , tonf-m , tonf/m2 ) 127 1800.00 3000.00 4.045 -1.49 4.045
Ft.Nam L.Comb q1 q2 ci cj Qmax Qa Cont.A.R Result 128 1800.00 3000.00 4.045 -1.49 4.045

F1 214 1.706 7.100 0.000 3.337 7.1 8.9 100 / 80 % OK 129 1800.00 3000.00 3.922 -1.02 3.922
130 1800.00 3000.00 3.979 -1.23 3.979
Group 2 - F2
131 1800.00 3000.00 3.922 -1.02 3.922
- XY-Direction (Bi-Axial) Unit( tonf , tonf-m , tonf/m )2

132 1800.00 3000.00 3.979 -1.23 3.979


Ft.Nam L.Comb q1 q2 ci cj Qmax Qa Cont.A.R Result
111 3000.00 1800.00 5.352 0.044 5.352
F2 212 2.609 6.371 0.000 1.818 6.4 6.7 100 / 80 % OK
112 3000.00 1800.00 5.046 0.038 5.046
113 3000.00 1800.00 4.948 0.039 4.948
114 3000.00 1800.00 5.046 8.312 5.046
S1 Y 115 3000.00 1800.00 5.117 0.436 5.117
116 3000.00 1800.00 5.117 -0.357 5.117
117 3000.00 1800.00 5.307 0.435 5.307
118 3000.00 1800.00 5.307 -0.358 5.307
119 3000.00 1800.00 5.183 1.360 5.183

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 40 Foundation Client : PT. Pupuk Sriwidj... Page 41

120 3000.00 1800.00 5.240 1.360 5.240 114 3000.00 1800.00 5.610 8.296 5.610
121 3000.00 1800.00 5.183 -1.282 5.183 115 3000.00 1800.00 5.871 0.419 5.871
122 3000.00 1800.00 5.240 -1.282 5.240 116 3000.00 1800.00 5.871 -0.374 5.871
123 3000.00 1800.00 3.687 0.029 3.687 117 3000.00 1800.00 5.681 0.420 5.681
124 3000.00 1800.00 3.784 8.302 3.784 118 3000.00 1800.00 5.681 -0.373 5.681
125 3000.00 1800.00 3.855 0.426 3.855 119 3000.00 1800.00 5.804 1.344 5.804
126 3000.00 1800.00 3.855 -0.366 3.855 120 3000.00 1800.00 5.747 1.344 5.747
127 3000.00 1800.00 4.045 0.425 4.045 121 3000.00 1800.00 5.804 -1.298 5.804
128 3000.00 1800.00 4.045 -0.367 4.045 122 3000.00 1800.00 5.747 -1.298 5.747
129 3000.00 1800.00 3.922 1.351 3.922 123 3000.00 1800.00 4.305 0.016 4.305
130 3000.00 1800.00 3.979 1.350 3.979 124 3000.00 1800.00 4.207 8.290 4.207
131 3000.00 1800.00 3.922 -1.291 3.922 125 3000.00 1800.00 4.468 0.413 4.468
132 3000.00 1800.00 3.979 -1.292 3.979 126 3000.00 1800.00 4.468 -0.379 4.468
127 3000.00 1800.00 4.278 0.414 4.278
Group 2 - F2 Unit( mm , tonf , tonf-m )
128 3000.00 1800.00 4.278 -0.378 4.278
Ft.Name Sec.Nam Dir. L.Comb. Fl or Fw Sl or Sw Fz M Q 129 3000.00 1800.00 4.402 1.338 4.402
111 1800.00 3000.00 6.010 3.89 6.010
130 3000.00 1800.00 4.345 1.339 4.345
112 1800.00 3000.00 5.610 3.64 5.610
131 3000.00 1800.00 4.402 -1.304 4.402
113 1800.00 3000.00 5.707 4.32 5.707
132 3000.00 1800.00 4.345 -1.303 4.345
114 1800.00 3000.00 5.610 3.64 5.610
115 1800.00 3000.00 5.871 4.01 5.871
116 1800.00 3000.00 5.871 4.01 5.871 5.1.2 Design Parameters
117 1800.00 3000.00 5.681 3.28 5.681 Yield Strength - D10 ~ D16 : fy1 , D19 ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
118 1800.00 3000.00 5.681 3.28 5.681
f_clt : Clear Cover for top of footing reinforcement
119 1800.00 3000.00 5.804 3.75 5.804
f_clb : Clear Cover for bottom of footing reinforcement
120 1800.00 3000.00 5.747 3.53 5.747 Loc. : Location of Critical Point from left side of footing
121 1800.00 3000.00 5.804 3.75 5.804
S1 X
122 1800.00 3000.00 5.747 3.53 5.747 Unit(kgf/cm2,mm)
F2 123 1800.00 3000.00 4.305 3.40 4.305 (Flexure) (Shear) fck fy1 fy2 f_cl f_clt f_clb
124 1800.00 3000.00 4.207 2.73 4.207 0.85 0.8 250.00 4000.00 4000.00 50.0 50.0 75.0
125 1800.00 3000.00 4.468 3.10 4.468
126 1800.00 3000.00 4.468 3.10 4.468
127 1800.00 3000.00 4.278 2.37 4.278
128 1800.00 3000.00 4.278 2.37 4.278
129 1800.00 3000.00 4.402 2.84 4.402
130 1800.00 3000.00 4.345 2.62 4.345
131 1800.00 3000.00 4.402 2.84 4.402
132 1800.00 3000.00 4.345 2.62 4.345
111 3000.00 1800.00 6.010 0.026 6.010
S1 Y 112 3000.00 1800.00 5.610 0.022 5.610
113 3000.00 1800.00 5.707 0.021 5.707

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 42 Foundation Client : PT. Pupuk Sriwidj... Page 43

5.2 REQUIRED REINFORCEMENT Sec.Name L.Comb. Using As(cm )


2
Select As(cm )
2
Result
5.2.1 Reinforcement Formula 132 top 9.928 3.600 OK
S1
- Shrinkage And Temperature Reinforcement ---- ACI CODE 7.12.2 118 bottom 9.928 3.600 OK
As As1 = fac b h , fac = following
- Y direction (Unit Width)
Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014 2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
(a) Slabs where Grade 40 or 50 deformed bars are used ................................................................................0.0020
132 top 5 - D16 @ 200 1.500 1.000 32.615 9.928
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used............................................0.0018 S1
(c) Slabs where reinforcement with yield stress exceeding 60,000 psi measured at a yield 120 botom 5 - D16 @ 200 1.225 1.000 30.115 9.928
0.0018 60,000
strain of 0.35 percent is used ..............................................................................................................
fy Sec.Name L.Comb. Mu (tonf-m) Rn .Req
- Required Reinforcement by Analysis 132 top - - -
As As2 = .req b d S1
120 bottom 0.505 0.655 0.0002
- At every section of flexural members where tensile reinforcement is required
3 fck 200 Sec.Name L.Comb. As1(cm )
2
As2(cm )
2
As3(cm )
2
As4(cm )
2
As5(cm )
2
Asmax(cm )
2
As (As5 = bw d) (As4 = b d) ---- ACI Eq (10-3)
fy fy
132 top 3.600 - - 11.465 10.255 66.275
- The requirements of Eq (10-3) need not be applied, if every section As provided is S1
at least one -third greater then that required by analysis ---- ACI CODE 10.5.3 120 bottom 3.600 0.494 0.658 10.586 9.469 61.194

As3 = 1.333 .req b d 2 2


Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result
Asmax = 0.75 b b d
fck 0.003 Es 132 top 9.928 3.600 OK
b = 0.85  1 f S1
y 0.003 Es + fy 120 bottom 9.928 3.600 OK
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!! Group 2 - F2
Footing Name : F2 GroupType : Mat_Foundation
Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction. - X direction (Unit Width)
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
2
Where, Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
Mu 0.85 fck 2Rn
Rn =
bd
2 ,  = 0.85 , .req =
fy ( 1- 1-
0.85fck ) S1
132 top 5 - D16 @ 200 0.900 1.000 34.205 9.928
113 botom 5 - D16 @ 200 1.125 1.000 31.705 9.928

5.2.2 Check of Footing Reinforcement Sec.Name L.Comb. Mu (tonf-m) Rn .Req


Group 1 - F1 132 top - - -
Footing Name : F1 GroupType : Mat_Foundation S1
113 bottom 1.010 1.182 0.0003
- X direction (Unit Width)
2 2 2 2 2 2
Sec.Name L.Comb. As1(cm ) As2(cm ) As3(cm ) As4(cm ) As5(cm ) Asmax(cm )
2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm ) 132 top 3.600 - - 12.024 10.755 69.505
132 top 5 - D16 @ 200 0.900 1.000 34.205 9.928 S1
S1 113 bottom 3.600 0.940 1.252 11.145 9.969 64.425
118 botom 5 - D16 @ 200 0.675 1.000 31.705 9.928
2 2
Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result
Sec.Name L.Comb. Mu (tonf-m) Rn .Req 132 top 9.928 3.600 OK
132 top - - - S1
S1 113 bottom 9.928 3.600 OK
118 bottom 0.423 0.495 0.0001
- Y direction (Unit Width)
2 2 2 2 2 2
Sec.Name L.Comb. As1(cm ) As2(cm ) As3(cm ) As4(cm ) As5(cm ) Asmax(cm )
2
132 top 3.600 - - 12.024 10.755 69.505 Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
S1
118 bottom 3.600 0.393 0.524 11.145 9.969 64.425 132 top 5 - D16 @ 200 1.500 1.000 32.615 9.928
S1
114 botom 5 - D16 @ 200 1.225 1.000 30.115 9.928

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014 12/15/2014

Project Na. : NPK Fusion Plan Project Na. : NPK Fusion Plan
Calculation Sheet Calculation Sheet
of Project No. : 14-0602 of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 44 Foundation Client : PT. Pupuk Sriwidj... Page 45

Sec.Name L.Comb. Mu (tonf-m) Rn .Req Group 2 - F2

132 top - - - Footing Name : F2 GroupType : Mat_Foundation PileType : False


S1
114 bottom 2.357 3.058 0.0008
Unit : mm
2 2 2 2 2 2
Sec.Name L.Comb. As1(cm ) As2(cm ) As3(cm ) As4(cm ) As5(cm ) Asmax(cm ) 1800
132 top 3.600 - - 11.465 10.255 66.275
S1
114 bottom 3.600 2.319 3.091 10.586 9.469 61.194

2 2
Sec.Name L.Comb. Using As(cm ) Select As(cm ) Result
132 top 9.928 3.600 OK
S1 5

3000
114 bottom 9.928 3.600 OK

5.3 ONE WAY SHEAR FORCE


7
5.3.1 One-Way Shear Formula

458
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
-  Vc = 0.8 2 fck B'w d (eq 11-3) 1442
- Vu <=  Vc , then OK!!

5.3.2 Check of One-Way Shear - X direction One-Way Shear (Unit Width)


Group 1 - F1 Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
Footing Name : F1 GroupType : Mat_Foundation PileType : False S1 113 1442 317 1000 21.267 1.845 OK
- Y direction One-Way Shear (Unit Width)
Unit : mm
Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
1800
S1 114 458 301.1 1000 20.201 3.108 OK

1
3000

3
458

358

- X direction One-Way Shear (Unit Width)


Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
S1 117 358 317 1000 21.267 0.685 OK
- Y direction One-Way Shear (Unit Width)
Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) Vc (tonf) Vu (tonf) Result
S1 120 458 301.1 1000 20.201 0.64 OK

Copyright (c) GS E&C. All Rights Reserved Copyright (c) GS E&C. All Rights Reserved
12/15/2014

Project Na. : NPK Fusion Plan


Calculation Sheet
of Project No. : 14-0602

Foundation Client : PT. Pupuk Sriwidj... Page 46

5.4 TWO WAY SHEAR FORCE


5.4.1 Two-Way Shear Formula
Vu = Fz Shade Ratio
(a)  Vc1 = 0.8 2 (1 + 2/ c) fck bo d (eq 11-33) <- Vc1
(b)  Vc2 = 0.8 2 (1 + s d / 2 bo) fck bo d (eq 11-34) <- Vc2
(c)  Vc3 = 0.8 4 fck bo d (eq 11-35) <- Vc3
 Vc = Min( Vc1 ,  Vc2 ,  Vc3) ACI 318-05 CODE 11.12.2.1
Vu  Vc , then OK
where
 = ratio of long side to short side of the column, concentrated load or reaction area
s = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

5.4.2 Check of Two-WayShear

Ft.Name F1 Punching Area 5883.657 cm2

1800 Pr.Name 3 Ratio Shade 0.891

Shape Rectangle  Vc1 195.756 tonf

L.Comb. 114  Vc2 200.107 tonf


3000

1
Pl 450 mm  Vc3 130.504 tonf

3 Pw 450 mm  Vc 130.504 tonf

bo / d 3068.2 / 317.05 mm Vu 7.328 tonf

c / s 1 / 40 Result OK

Ft.Name F2 Punching Area 5883.657 cm2

1800 Pr.Name 7 Ratio Shade 0.891

Shape Rectangle  Vc1 195.756 tonf

L.Comb. 114  Vc2 200.107 tonf


3000

5
Pl 450 mm  Vc3 130.504 tonf

7 Pw 450 mm  Vc 130.504 tonf

bo / d 3068.2 / 317.05 mm Vu 7.569 tonf

c / s 1 / 40 Result OK

Copyright (c) GS E&C. All Rights Reserved


ATTACHMENT - 5
SOIL REPORT
PT. SOILENS
LABORATORY TEST TABLE
NPK FUSION PLANT PROJECT
PALEMBANG-SOUTH SUMATRA

Atterberg limits Triaxial UU

passing no 200 sieve


Unconfined

Void Ratio

Saturation
Density Consolidation

Degree of
Plasticity
Specific Water Compression

Liquidity

Porosity

% finer by weight
(Total Stress)

Plastic
Bore

Liquid
Depth in meter Gravity Content

Index

Index
Limit

Limit
Hole No.
Jm Jd qu St c I Cc Cr Cv Pc
Gs wn wL wP IP IL e n Sr
- - - t/m3 t/m3 % % % % - - % % kg/cm2 - kg/cm2 deg - - 2
m /Year kg/cm
2

B -1 2.00 - 2.70 2.54 1.52 0.93 64 98 31 67 0.49 1.73 63 93 97 - - 0.14 2.0 0.37 0.04 1.50 1.58
4.00 - 4.70 2.63 1.78 1.28 39 47 15 31 0.74 1.05 51 97 99 - - 0.21 4.1 0.54 0.05 1.50 1.81
6.00 - 6.70 2.62 1.83 1.35 35 74 22 52 0.26 0.94 48 98 99 - - 0.53 2.40 1.02 0.10 1.55 0.98
8.00 - 8.70 2.63 1.84 1.41 31 64 22 42 0.22 0.87 47 93 100 0.56 - - - 0.61 0.06 2.50 3.98

B-2 2.00 - 2.70 2.48 1.11 0.46 144 89 58 30 2.81 4.43 82 80 93 - - 0.22 4.50 0.47 0.05 14.00 0.76
4.00 - 4.70 2.67 1.70 1.16 46 86 28 58 0.31 1.30 56 95 100 - - - - 1.03 0.10 3.2 0.84
6.00 - 6.70 2.64 1.83 1.38 32 61 19 42 0.32 0.91 48 94 100 0.42 - - - 1.73 0.17 1.7 1.03

B-3 2.00 - 2.70 2.61 1.62 1.09 48 80 19 61 0.49 1.39 58 91 83 - - 0.27 1.70 0.51 0.05 12.00 0.75
4.00 - 4.70 2.77 1.88 1.39 35 81 23 58 0.21 0.99 50 99 99 - - - - 1.00 0.10 7.6 0.85
6.00 - 6.70 2.66 1.82 1.38 32 59 21 38 0.30 0.93 48 91 98 0.72 - - - 0.95 0.10 5.5 0.54

B-4 2.00 - 2.70 2.66 1.85 1.42 30 70 26 43 0.09 0.87 47 92 98 - - - - 1.59 0.16 1.80 1.00
6.00 - 6.70 2.68 1.76 1.27 38 80 26 53 0.22 1.11 53 93 97 - - - - 0.60 0.06 19.0 0.68
10.00 - 10.70 2.61 1.65 1.26 31 74 24 50 0.14 1.07 52 76 100 0.86 - - - 1.25 0.13 2.2 0.7

Minimum = 2.48 1.11 0.46 30 47 15 30 0.09 0.87 47 76 83 0.42 0.0 0.14 1.70 0.37 0.04 1.50 0.54
Maximum = 2.77 1.88 1.42 144 98 58 67 2.81 4.43 82 99 100 0.86 0.0 0.53 4.50 1.73 0.17 19.00 3.98
Avearge = 2.63 1.71 1.21 47 74 26 48 0.51 1.35 54 92 97 0.64 0.0 0.27 2.94 0.90 0.09 5.70 1.19