Kultur Dokumente
I SPAN
ROOFING SHEET
ROOF LINE
LOUVER BLOCKS
GENSET
7.25
BOTTOM OF BOTTOM OF
FASCIA BD. FASCIA BD.
FLOOR PLAN
SCALE 1:40MTS
PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
PROPOSED POWER HOUSE
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
A1
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE PHILIP LAWRENCE S ABAPO, III MARIA DEOVINA G SEVILLANO HONORIO R AGNILA MANUEL G FABROS ABELARDO C MATILLANO ANTONIO A TAYLAN, JR
ENGINEERING SERVICE POLICE SENIOR INSPECTOR Police Chief Inspector Police Superintendent Police Senior Superintendent Police Senior Superintendent Police Chief Superintendent
REGIONAL PROJECT MANAGEMENT UNIT 11
Camp Quintin M Merecido, Davao City Asst. Chief, RPMU Acting Chief, RPMU Acting Chief, ID, ES Chief of Staff, ES Deputy Director, ES Director, ES
LOCATION: Kidalapong, Malita, Davao Occidental
STREET LIGHTING LAYOUT SECU
RITY
OST
GENERAL NOTES: SCALE : 1:500M OUTP HP
0 5 10
U
ALL ELECTRICAL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THE NATIONAL BUILDING CODE, N
PROVISIONS OF THE LATEST APPROVED PHILIPPINE ELECTRICAL CODE, THE LAWS AND ORDINANCES OF CI EX
THE LOCAL CODE ENFORCING AUTHORITIES AND REQUIREMENTS OF THE LOCAL ELECTRIC, AND D U
BUILDING ADMINISTRATION REQUIREMENTS. IS
ALL WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF LICENSE DULY REGISTERED W E TIN
ELECTRICAL ENGINEER OR REGISTERED MASTER ELECTRICIAN. PI
U G
1. CONTRACTOR SHALL SECURE ALL WIRING PERMIT AND ALL FEES REQUIRED FOR THE WORKS AND
MIN G
NA
FURNISH THE OWNER THE CERTIFICATE OF FINAL ELECTRICAL INSPECTION, R
WE E
D
A DIN TIO
O IL PC
2. CONTRACTOR SHALL CONDUCT EARTH GROUND TEST, WIRE INSULATION AND LOAD TEST UPON S P US
HO BU LO NA
COMPLETION OF WORKS,
1 LR
3. INCASE OF DISCREPANCY BETWEEN PLANS AND SITE CONDITION, SPECIFICATIONS & REVISIONS
G
DIN T-4,5,6
T-2 OA
CHANGES, THE CONTRACTOR SHOULD IMMEDIATELY VERIFY & CONSULT TOWITH THE OFFICER-
I L 50kVA IA D
IN-CHARGE OF THE CONSTRUCTION (OICC) OF THE PNP ENGINEERING SERVICE (PNPES), BU N 37.5kVA L1, P4 S
U RE NSIO L123, P9
T
4. ALL LOCATION & MOUNTING HEIGHT ARE SUBJECT TO APPROVAL OF THE OICC OF PNPES,
FU EXPA
ITY P
5. CONTRACTOR SHALL BE RESPONSIBLE IN THE PREPARATION OF AS-BUILT PLANS DULY SIGNED C UR TPUM SE
SE POS HOU
2
AND SEALED BY PROFESSIONAL ELECTRICAL ENGINEER, AND ELECTRONIC AUTOCAD FILES,
T E O
OU OL
6. FINAL LIGHTING FIXTURES AND CONTROL DEVICES SHALL BE APPROVED BY PNPES,
G P BP N CE
REPRESENTATIVEENGINEER,
FLA L T RA
APE EN
TE
CH
7. CONTRACTOR SHALL BE RESPONSIBLE FOR PREPARATION OF SHOP OR CONSTRUCTION DRAWING
REQUIRED BY OWNERARCHITECHENGINEER, THIS INCLUDES DEVICES AND FIXTURES ELEVATION, GA
8. CONTRACTOR SHALL VISIT SITE CONDITION AND INCLUDE ALL COST NECESSARY TO COMPLETE
THE SYSTEM AT NO COST TO OWNER, INCLUDING COST OF CORING SERVICE AND EXPENSES FOR
THE RESTORATION OF ANY DAMAGE AFFECTED CIVIL STRUCTURAL ARCHITECTURAL OR
N D T-1
RELOCATION OF EXISTING FACILITIES ON BUILDING,
DSTA 3 50kVA
N L3, P3
9. CONTRACTOR SHALL LOCATE ALL HANDHOLE SPLICE BOXES TO ACCESSIBLE PLACE OR WITH
ACCESS PANELS, G RA
T OR
10. NOMINATED CONTRACTOR TO VERIFY ALL EQUIPMENTS TO BE INSTALLED OR PLACE WITHIN THE
MO OL
ND
ROADS, AND MAKE AN ADJUSTMENT WITH THE PNPES ENGINEER ARCHITECT CONSENT,
RE
TU E U PO
11. THIS DRAWINGS ARE DIAGRAMATIC LAYOUT ONLY, ANY MATERIALS AND FITTINGS NOT SHOWN ON F U S
-BA NG
RO
THIS PLANS BUT NEEDED TO COMPLETE THE SYSTEM AND OPERATION SHALL BE INCLUDED WITH
O N I D EG
THE CONTRACTOR'S SCOPE OF WORKS.
HO
US RA
12. ADDITIONAL NOTES: PA AIR
E
ON
SI
ES ITIES
KS
· USE OF 3.5 MMSQ CU WIRE IS LIMITED ONLY FROM THE SPLICE BOX UP TO THE FIXTURE C
· PROVIDE DOUBLE COAT OF RUST PROTECTIVE PAINT (RED OXIDE PRIMER) C ON CIL
RA R E C R FA
R TU E
BA FU & OTH
RE
FUTU E
AS
SPECIFICATIONS: ON-B NG
SI
HOU
1. THE POWER SUPPLY SHALL BE 230V, SINGLE PHASE, 3-WIRES, 60HZ.
2. ALL MATERIALS TO BE USED SHALL BE NEW AND APPROVED TYPE FOR PURPOSE & LOCATION.
3. ALL MATERIALS TO BE USED SHALL BE BRAND NEW AND SHALL HAVE THE "P.S." MARKS.
4. CONDUIT CROSSING ROADWAY SHALL BE ENCASED WITH CONCRETE WITH REINFORCEMENT BARS
AS SPECIFIED IN THE PLAN.
RED
COVE BALL
9. VOLTAGE DROP SHALL BE LIMITED TO 2.5 FROM SOURCE TO PANEL BOARD AS P.E.C.
ET
REQUIREMENT OR ACCEPTABLE TO THE LABORATORY EQUIPMENT.
BASK RT
10. CIRCUIT BREAKERS SHALL BE BOLT-ON OF APPROVED TYPE WITH MINIMUM OF 14kAIC AND COU
MOUNTED IN NEMA 3R ENCLOSURES.
11. ALL WIRES AND CABLES SHALL BE BRAND NEW AND APPROVED TYPE. PPSC G
IN
12. PHOTOVOLTAIC SWITCH SHALL BE INSTALLED IN A LOCATION WHERE THE ILLUMINATION INTENSITY
BUILD C U RITY
WILL NOT BE AFFECTED BY THE STREET LIGHTS.
SE TABLE OF CONTENTS
G P OST
13. MAGNETIC CONTACTOR SHALL BE MOUNTED BESIDE THE CIRCUIT BREAKER IN NEMA 3R FIRIN O U T
E SHEET DRAWING
RANG
ENCLOSURE WITH HIGHER AMPERE RATING THAN THE CIRCUIT BREAKER.
NO
SHEET CONTENTS NO
14. USE SOLDERLESS CONNECTOR, MECHANICAL 1 PRESSURE TYPE COPPER LUGS FOR CONNECTION
OF WIRES LARGER THAN 8mm².
E1 GENERAL NOTE & SPECIFICATIONS 1
RITY
15. USE FILLER COMPOUND, "SCOTCH FILL" OR APPROVED EQUAL AT SHARP EDGES TO PROVIDE
SECU
SMOOTH SURFACE BEFORE TAPING WITH ELECTRICAL TAPE.
OUTP
OST NOTE: Sign and Seal of Electrical plans is the sole authority of a PROFESSIONAL ELECTRICAL ENGINEER LEGEND & SYMBOLS 2
R.A. 7920 Section 31, 32 & 34. Field of Practice and Prohibition in the Practice of Electrical Engineering STREET LIGHTING LAYOUT 3
and preparation of plans, supervision of installation, application of the Philippine Electrical Code.
It shall be unlawful for any person not authorized under this Act to prepare plans, electrical
LEGEND & SYMBOLS valuations or specifications for any electrical wiring, equipment or system; and no installation thereof shall
be undertaken unless the plans, designs, valuations and specifications have been prepared by or under the PROFESSIONAL ELECTRICAL ENGINEER
PROPOSED CONCRETE CIRCUIT HOMERUN responsible charge of, and signed and sealed by a professional electrical engineer; and the construction
LIGHTING FIXTURE 1
POLE
permit for the execution thereof is first secured; and unless the work is done in accordance with the
UNDERGROUND LINE 45' CONCRETE POLE SERVICE ENTRANCE Philippine Electrical Code and is executed under the responsible charge or supervision of a
with TRANSFORME POLE PROFESSIONAL ELECTRICAL ENGINEER or REGISTERED ELECTRICAL ENGINEER or Registered Master
Electrician, as the case may be, and the routinary fiscal and ministerial requirements of the government REG NO: PTR NO: TIN:
agency, if any, exercising jurisdiction over the particular installation have been complied with. ISS. AT: ISS. ON: TEL:
PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
PROPOSED STREET LIGHTS
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
E-1
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE PHILIP LAWRENCE S ABAPO, III MARIA DEOVINA G SEVILLANO HONORIO R AGNILA MANUEL G FABROS ABELARDO C MATILLANO ANTONIO A TAYLAN, JR
ENGINEERING SERVICE POLICE SENIOR INSPECTOR Police Chief Inspector Police Superintendent Police Senior Superintendent Police Senior Superintendent Police Chief Superintendent
REGIONAL PROJECT MANAGEMENT UNIT 11
Camp Quintin M Merecido, Davao City Asst. Chief, RPMU Acting Chief, RPMU Acting Chief, ID, ES Chief of Staff, ES Deputy Director, ES Director, ES
LOCATION: Kidalapong, Malita, Davao Occidental
475 475
CONCRETE
SCHEDULE OF LOADS
300
425 425 PAVEMENT
50 50 50 50
30
425MM x 425MM x 25MM THK
300
BASEPLATE 4 - 25mm x 100mm ANCHOR BOLTS
NO. & SIZE of
L O A D OCPD
34" THK STIFFENER PLATE EARTHFILL
WARNING TAPE
CKT
WIRE & CONDUIT
200mm DIA BASE (ELECTRICAL)
NO.
290
Control AT, AF, POLE, Cu. Wire mm² /PVC
Description No. Volts kVA Amps Length
12 - 20mm DIA VERTICAL BARS with 3 - SETS
Switching kAIC, Enclosure mmØ
10mm DIA TIES 1@50, 2@100, REST @200mm 4 - 10mm DIA DEFORMED BAR
O.C. Photo Switch
75 75 with 10mm DIA TIES @ 200mm 1 60 W Street Lighting 3 230 0.18 0.78 85 w contactor
15, 20, 2, 18, 3R 2-8.0+1-3.532
O.C.
@ PLAN VIEW CONCRETE PEDESTAL TERMINATION OF BASE PLATE TO CONCRETE PEDESTAL 32mm DIA PVC Photo Switch
2 60 W Street Lighting 8 230 0.48 2.09 220 15, 20, 2, 18, 3R 2-8.0+1-3.532
290 w contactor
0.20
HAND HOLE COVER
3
1-8mm sq BARE CU GROUNDING WIRE
1.80
4 - 25mm x 100mm ANCHOR BOLTS 60.3 DIA (2") x 60.3 DIA (2") x
650
PHOTOVOLTAIC SWITCH
3.91 WALL PIPE 3.91 WALL PIPE
15 AT CIRCUIT BREAKER in NEMA 3R Enclosure
8.00 M
CONCRETE PAVEMENT
600
LINE OF CONDUIT CASEMENT LINE OF CONDUIT CASEMENT SPOT WELD SPOT WELD
0.60
E2 SECTION DETAIL OF CONCRETE PEDESTAL 1
FOOTING DETAIL OF CONCRETE PEDESTAL 2
400
0.50
7 - 16mm DIA RSB BOTH WAYS
0.50
PARKING PAVEMENT
PLANT BOX
PARKING PAVEMENT
PLANT BOX DETAIL OF CONCRETE CASING 3
SCHEDULE OF LOADS 4
EARTH FILL EARTH FILL
10 - 16mm DIA RSB BOTH WAYS
COMPACTED GRAVEL BED
EARTH FILL EARTH FILL TYPICAL SINGLE LINE DIAGRAM 5
SOLDERLESS GROUND ROD
CONNECTOR
TYPICAL LAMP POST ELEVATION 6
EXCESS 8mm sq BARE CU GROUNDING
WIRE UNDER THE FOUNDATION
1900 X 1900
PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
PROPOSED STREET LIGHTS
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
E-2
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE PHILIP LAWRENCE S ABAPO, III MARIA DEOVINA G SEVILLANO HONORIO R AGNILA MANUEL G FABROS ABELARDO C MATILLANO ANTONIO A TAYLAN, JR
ENGINEERING SERVICE POLICE SENIOR INSPECTOR Police Chief Inspector Police Superintendent Police Senior Superintendent Police Senior Superintendent Police Chief Superintendent
REGIONAL PROJECT MANAGEMENT UNIT 11
Camp Quintin M Merecido, Davao City Asst. Chief, RPMU Acting Chief, RPMU Acting Chief, ID, ES Chief of Staff, ES Deputy Director, ES Director, ES
LOCATION: Kidalapong, Malita, Davao Occidental
3.50
0.30
WATER TANK
10,000 GAL. CAP. W (ATS) FLOATER
4.00
2"G.I. PIPE
14" THK. MS PLATE
STEEL TANK WALLING
1.00
STRAINER W
3 1/2" Ø G.I. PIPE Sch. 40
1.50 1 1/2"Ø G.I. PIPE Sch. 40
WATERLINE
SOURCE PIPE 25MMØ PLAIN BAR
WITH TURN BUCKLE
1.50
COLLAR PLATE
0.50
SEE @ HORIZONTAL SUPPORT DETAIL
1.50
GATE VALVE
BY PASS PIPE GATE VALVE
NGL
DISTRIBUTION LINE
FROM PUMP
PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
INSTALLATION OF WATER SYSTEM
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
1
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE PHILIP LAWRENCE S ABAPO III MARIA DEOVINA G SEVILLANO HONORIO R AGNILA MANUEL G FABROS ABELARIO C MATILLANO ANTONIO A TAYLAN, JR
ENGINEERING SERVICE Police Senior Inspector Police Chief Inspector Police Superintendent Police Senior Superintendent Police Senior Superintendent Police Chief Superintendent
REGIONAL PROJECT MANAGEMENT UNIT 11
Camp Quintin M Merecido, Davao City Asst. Chief, RPMU Acting Chief, RPMU Acting Chief, ID, ES Chief of Staff, ES Deputy Director, ES Director, ES
LOCATION: Kidalapong, Malita, Davao Occidental
0.80 0.50 3.20 1.00 3.20 0.50 0.80
CENTER ISLAND
CONCRETE
PAVEMENT
1.50
1.00
CENTER ISLAND
PLAN
1.00 1.00
0.15 0.70 0.15 AGGREGATE BASE COURSE 0.15 0.70 0.15
AGGREGATE SUB BASE COURSE
MANHOLE COVER 8" THK. CONCRETE PAVEMENT MANHOLE COVER
0.20
0.15 0.15
1.00
10MMØ RSB HOR.
10MMØ RSB VERT. 10MMØ RSB VERT.
10MMØ RSB VERT.
0.10 0.10
0.15 0.15
3 - 10MMØ RSB
Sp. @ 0.30M B.W. SECTION 3 - 10MMØ RSB
Sp. @ 0.30M B.W.
PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
CONSTRUCTION OF ROADNETWORK OF
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
1
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE PHILIP LAWRENCE S ABAPO III MARIA DEOVINA G SEVILLANO HONORIO R AGNILA MANUEL G FABROS ABELARIO C MATILLANO ANTONIO A TAYLAN, JR
ENGINEERING SERVICE Police Senior Inspector Police Chief Inspector Police Superintendent Police Senior Superintendent Police Senior Superintendent Police Chief Superintendent
REGIONAL PROJECT MANAGEMENT UNIT 11
Camp Quintin M Merecido, Davao City Asst. Chief, RPMU Acting Chief, RPMU Acting Chief, ID, ES Chief of Staff, ES Deputy Director, ES Director, ES
LOCATION: Kidalapong, Malita, Davao Occidental
4.50
TIE BEAM
TIE BEAM
TIE BEAM
4.50 1.50 Sp. 5@ 0.10, Rest @ 0.15, O.C
0.25 0.25
1.20
TIE BEAM
0.40 0.50
GUSSET PLATE
0.30 SUPPORT MIDSPAN 14" Thk.
10MM Ø TIES
GROUND LEVEL FOUNDATION PLAN 1.60 Sp. 3@ 0.05, 5@ 0.10, 25 X 25 X 34" THK
0.50
Rest @ 0.15, O.C STEEL COLUMN
SCALE 1:50M
BEAM
4.50
20MMØ MACHINE BOLT
TIE
B1
0.50
1.60
TIE BEAM
STEEL COLUMN DETAIL
SCALE 1:30M
ON CENTER BOTHWAYS
14 - 20MM Ø BED BARS
B1
B1
4.50
0.50
1.60
COLUMNFOOTING DETAIL
SCALE 1:30M
B1
PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
INSTALLATION OF WATER SYSTEM
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
2
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE PHILIP LAWRENCE S ABAPO III MARIA DEOVINA G SEVILLANO HONORIO R AGNILA MANUEL G FABROS ABELARIO C MATILLANO ANTONIO A TAYLAN, JR
ENGINEERING SERVICE Police Senior Inspector Police Chief Inspector Police Superintendent Police Senior Superintendent Police Senior Superintendent Police Chief Superintendent
REGIONAL PROJECT MANAGEMENT UNIT 11
Camp Quintin M Merecido, Davao City Asst. Chief, RPMU Acting Chief, RPMU Acting Chief, ID, ES Chief of Staff, ES Deputy Director, ES Director, ES
LOCATION: Kidalapong, Malita, Davao Occidental
6" Ø PIPE CASING (PLASTIC BLUE PIPE)
CLASS 150
NGL
100 ft
SELECTED PACKING
MATERIALS
100 ft
150 ft SLOTTED PIPE
100 ft
SELECTED GRAVELLED
LAYER
AQUIFER
PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
INSTALLATION OF WATER SYSTEM
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
3
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE PHILIP LAWRENCE S ABAPO III MARIA DEOVINA G SEVILLANO HONORIO R AGNILA MANUEL G FABROS ABELARIO C MATILLANO ANTONIO A TAYLAN, JR
ENGINEERING SERVICE Police Senior Inspector Police Chief Inspector Police Superintendent Police Senior Superintendent Police Senior Superintendent Police Chief Superintendent
REGIONAL PROJECT MANAGEMENT UNIT 11
Camp Quintin M Merecido, Davao City Asst. Chief, RPMU Acting Chief, RPMU Acting Chief, ID, ES Chief of Staff, ES Deputy Director, ES Director, ES
LOCATION: Kidalapong, Malita, Davao Occidental
1
3
EX 0.40
IS
HP
G TIN
CI G
D U RO
A
RE
PC
A
GA
FH
LO
D
KIN
0.40
MIN NS
AD DING
PAR
IL U 3"Ø G.I.PIPE
BU
NS
's U
PD FF FH
STA - 0.20 SAND BEDDING
LTI
MU OSE E CE
LIC AN
's LE
RP
PU HALL E PO LDING TR
EN TE
PD S PO GV S
BA E BU
I
ER GA
ART FLA
G
FIC
QU GV O F
U
GV NS
GV EL
GV S TAN
D
CH
AP FH
TO
MO OL
R
PIPELINE LAYOUT
A ND PO
GR SCALE 1:10M
TER
WA OIR ND
RV O
PC O OU
SE R
RE N D EG
CO R AD
PA PACE
ING S
FH PARK
NESS
CO S
WELL
PN ACK
ER
CO
PN DO C T
EN
RR
LEGEND:
GV GATE VALVE 0.90
FH FIRE HYDRANT 3"Ø G.I.PIPE
0.60M X 0.10M THK.
GV 3" Ø PVC PIPE (BLUE) CONCRETE PAVEMENT
FH
NGL
2" Ø PVC PIPE (BLUE)
0.10
DARD
STAN SC 0.40 3"Ø G.I.PIPE ELBOW
PP 3" X 3"Ø TEE
ING
BUILD MAIN SOURCE
G
FIRIN
A NG E
R
FIRE HYDRANT DETAIL
5 WATER SYSTEM LAYOUT SCALE 1:20M
SCALE 1:20M
5
PROJECT TITLE: PREPARED BY: CHECKED BY: SUBMITTED BY: RECOMMEND APPROVAL: APPROVED BY: SHEET NO.
INSTALLATION OF WATER SYSTEM
DAVAO OCCIDENTAL POLICE PROVINCIAL OFFICE
4
Republic of the Philippines
NATIONAL POLICE COMMISSION
PHILIPPINE NATIONAL POLICE PHILIP LAWRENCE S ABAPO III MARIA DEOVINA G SEVILLANO HONORIO R AGNILA MANUEL G FABROS ABELARIO C MATILLANO ANTONIO A TAYLAN, JR
ENGINEERING SERVICE Police Senior Inspector Police Chief Inspector Police Superintendent Police Senior Superintendent Police Senior Superintendent Police Chief Superintendent
REGIONAL PROJECT MANAGEMENT UNIT 11
Camp Quintin M Merecido, Davao City Asst. Chief, RPMU Acting Chief, RPMU Acting Chief, ID, ES Chief of Staff, ES Deputy Director, ES Director, ES
LOCATION: Kidalapong, Malita, Davao Occidental