Sie sind auf Seite 1von 3

TRAINEE’S PROGRESS SHEET

Name : BRYAN RODICA Trainer : Mr. Emelito D. Padullon


Qualification : EIM NC-II Nominal Duration : 154 hrs
Training Activity Training Date Supervisor’s
Unit of Competency Duration Started Date Rating Trainee’s Initial
Finished Initial
1. Perform 1.1 Install
roughing-in, electrical
wiring and cabling metallic/non-
works for single- metallic (PVC
phase conduit)
distribution, 1.2 Install wire
power, lighting, ways and cable
and auxiliary tray
systems
1.3 Install
auxiliary
terminal cabinet
and distribution
panel

1.4 Prepare for


cable pulling and
installation

document #:
CBLM on date developed: Issued by:
Trainers Methodology Level 1 November 2018 Subic Bay Colleges, Inc. page 1of3
EIM NC-II developed by:
E.D. PADULLON
date modified:
modified by: revision #:00
Unit of Competency Training Activity Training Date Date Rating Trainee’s Supervisor’s
Duration Started Finished Initial Initial
1.5 Perform
wiring and
cabling lay-out

1.6 Notify
completion of
work
2. Install 2.1 Plan and 8hrs December December COMPETENT
electrical prepare work 15, 2018 15, 2018
protective devices 2.2 Install December December
for distribution electrical 16hrs 16-17, 17, 2018
power, lighting, protective 2018
auxiliary, devices
lightning 2.3 Install December December
protection and lighting fixture 16hrs 18-19, 19, 2018
grounding and auxiliary 2018
systems outlet
2.4 Notify December December
completion of 4hrs 20, 2018 20, 2018
work

.3. Install wiring 3.1 Select wiring

document #:
CBLM on date developed: Issued by:
Trainers Methodology Level 1 November 2018 Subic Bay Colleges, Inc. page 2of3
EIM NC-II developed by:
E.D. PADULLON
date modified:
modified by: revision #:00
devices of floor devices
and wall mounted
outlets, lighting
fixture/switches
and auxiliary
outlets
3.2 Install wiring
devices
3.3 Install
lighting
fixtures/switche
s
3.4 Notify
completion of
work
Average
Total
Note: The trainee and the supervisor must have a copy of this form. The column for rating maybe used either by giving a
numerical rating or simply indicating competent or not yet competent. For purposes of analysis, you may require industry
supervisors to give a numerical rating for the performance of your trainee’s. Please take note however that in TESDA, we
do not use numerical ratings.

document #:
CBLM on date developed: Issued by:
Trainers Methodology Level 1 November 2018 Subic Bay Colleges, Inc. page 3of3
EIM NC-II developed by:
E.D. PADULLON
date modified:
modified by: revision #:00

Das könnte Ihnen auch gefallen