Sie sind auf Seite 1von 1

3.

5" 13 Cr Tubing
Erosional Velocity (API RP 14E)
Oil 640 BOPD Date 04/05/00
Water 28 BWPD
Gas 40000 MCFD

INPUTS CALCULATIONS
ID (in) 2.9920 Area (sq in) 7.031
C 150

Temp (F) 120 Temp (R) 580

Oil Grav (API) 48.00 Liq Grav (SG) 0.79969


Gas Grav (SG) 0.58
Wtr Grav (SG) 1.06
Z Factor 1
Yld (bbl/mmcf) 16.0 GLR (scf/bbl) 59880
WC (%) 4.2%

FTP Wellstream Erosional Erosional Erosional Erosional Erosional


Pressure Density #/cuft Velocity Mass Flow Rate MMCFD BOPD BWPD

10000 28.24 28.23 38.92 67.28 1077 47


9100 25.83 29.52 37.22 64.34 1029 45
8200 23.39 31.02 35.42 61.23 980 43
7300 20.92 32.79 33.50 57.91 927 41
6400 18.43 34.94 31.44 54.36 870 38
5500 15.92 37.59 29.22 50.52 808 35
4600 13.38 41.00 26.79 46.32 741 32
3700 10.82 45.61 24.09 41.64 666 29
2800 8.23 52.29 21.01 36.32 581 25
1900 5.61 63.32 17.35 29.99 480 21
1000 2.97 87.06 12.62 21.81 349 15

EROSIONAL FLOW RATE VS FLOWING PRESSURE

80.00

70.00

60.00

50.00
MMCFD

40.00
Below Erosional Velocity

30.00

20.00

10.00
1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
PRESSURE

Das könnte Ihnen auch gefallen