Sie sind auf Seite 1von 32

Bill of Quantitiy

PELAKSANA : PT. SARANA MEDIKAL PRISMA


JENIS PEKERJAAN : PEMASANGAN INSTALASI GAS MEDIS

No. JENIS PEKERJAAN

A PEKERJAAN INSTALASI GAS MEDIS


01. PEKERJAAN GAS SENTRAL

1 Compressor air
2 Vacuum Pump
3 Manifold Oxygen

4 Cooper tube ASTM B-819 Type L


- Pipa Ø 28 mm
- Pipa Ø 20 mm `

PEKERJAAN RUANG CENTRAL


02. LANTAI 1

1 Cooper tube ASTM B-819 Type L


- Pipa Ø 20 mm
- Pipa Ø 15 mm
- Pipa Ø 12 mm
- Pipa Ø 10 mm

3 Zone Box Valve


Zone Valve Box with pressure 3 Gas (O,MA,VAC)

4 Area Alarm
Digital Medical Gas Area Alarm - 3 Gas (O,MA,VAC)

5 Medical gas walloutlet NFPA'99


- wall outlet quick conect Oxygen
- wall outlet quick conect Medical Air
- wall outlet quick conect Vacuum

6 Bed Head panel alumminium powder coutting


- bed head type 120 CM

PEKERJAAN LANTAI DASAR


03. LANTAI 2
1 Cooper tube ASTM B-819 Type L
- Pipa Ø 15 mm
- Pipa Ø 12 mm
- Pipa Ø 10 mm

3 Zone Box Valve


Zone Valve Box with pressure 2 Gas (O,VAC)

4 Area Alarm
Digital Medical Gas Area Alarm - 2 Gas (O,VAC)

5 Medical gas walloutlet NFPA'99


- wall outlet quick conect Oxygen
- wall outlet quick conect Vacuum

6 Bed Head panel alumminium powder coutting


- bed head type 120 CM

PEKERJAAN LANTAI DASAR


SAT. VOL. HARGA SATUAN HARGA TOTAL BOBOT (%)

Unit 1.00 Rp 20,000,000 Rp 20,000,000 12.50%


Unit 1.00 Rp 15,000,000 Rp 15,000,000 9.38%
Unit 1.00 Rp 5,000,000 Rp 5,000,000 3.13%

m 45.00 Rp 150,000 Rp 6,750,000 4.22%


m 45.00 Rp 100,000 Rp 4,500,000 2.81%

SUB TOTAL Rp 51,250,000 32.03%

m 100.00 Rp 100,000 Rp 10,000,000 6.25%


m 50.00 Rp 90,000 Rp 4,500,000 2.81%
m 150.00 Rp 80,000 Rp 12,000,000 7.50%
m 100.00 Rp 80,000 Rp 8,000,000 5.00%

Unit 1.00 Rp 750,000 Rp 750,000 0.47%

Unit 1.00 Rp 1,000,000 Rp 1,000,000 0.63%

Unit 10.00 Rp 300,000 Rp 3,000,000 1.88%


Unit 10.00 Rp 300,000 Rp 3,000,000 1.88%
Unit 10.00 Rp 300,000 Rp 3,000,000 1.88%

Unit 10.00 Rp 250,000 Rp 250,000 0.16%

SUB TOTAL Rp45,500,000 28.44%


m 150.00 Rp 90,000 Rp 13,500,000 8.44%
m 200.00 Rp 80,000 Rp 16,000,000 10.00%
m 150.00 Rp 80,000 Rp 12,000,000 7.50%

Unit 2.00 Rp 750,000 Rp 1,500,000 0.94%

Unit 2.00 Rp 1,000,000 Rp 2,000,000 1.25%

Unit 30.00 Rp 300,000 Rp 9,000,000 5.63%


Unit 30.00 Rp 300,000 Rp 9,000,000 5.63%

Unit 25.00 Rp 250,000 Rp 250,000 0.16%

SUB TOTAL Rp 63,250,000 39.53%


GRAND TOTAL Rp 160,000,000 100.00%
TIME SCHEDULE & KURVA S
PELAKSANA : PT. SARANA MEDIKAL PRISMA
JENIS PEKERJAAN : PEMASANGAN INSTALASI GAS MEDIS

BOBOT
No. JENIS PEKERJAAN 1
(%)

A PEKERJAAN INSTALASI GAS MEDIS


01. PEKERJAAN GAS SENTRAL

1 Compressor air 12.50%


2 Vacuum Pump 9.38%
3 Manifold Oxygen 3.13%
4 Cooper tube ASTM B-819 Type L
- Pipa Ø 28 mm 4.22%
- Pipa Ø 20 mm 2.81%
02. LANTAI DASAR
1 Cooper tube ASTM B-819 Type L
- Pipa Ø 20 mm 6.25%
- Pipa Ø 15 mm 2.81%
- Pipa Ø 12 mm 7.50%
- Pipa Ø 10 mm 5.00%
2 Zone Box Valve
Zone Valve Box with pressure 3 Gas (O,MA,VAC) 0.47%
3 Area Alarm
Digital Medical Gas Area Alarm - 3 Gas (O,MA,VAC) 0.63%
4 Medical gas walloutlet NFPA'99
- wall outlet quick conect Oxygen 1.88%
- wall outlet quick conect Medical Air 1.88%
- wall outlet quick conect Vacuum 1.88%
5 Bed Head panel alumminium powder coutting
- bed head type 120 CM 0.16%
02. LANTAI DASAR
1 Cooper tube ASTM B-819 Type L
- Pipa Ø 15 mm 8.44%
- Pipa Ø 12 mm 10.00%
- Pipa Ø 10 mm 7.50%
2 Zone Box Valve
Zone Valve Box with pressure 3 Gas (O,MA,VAC) 0.94%
3 Area Alarm
Digital Medical Gas Area Alarm - 3 Gas (O,MA,VAC) 1.25%
4 Medical gas walloutlet NFPA'99
- wall outlet quick conect Oxygen 5.63%
- wall outlet quick conect Vacuum 5.63%
5 Bed Head panel alumminium powder coutting
- bed head type 120 CM 0.16%
WEEK
CUM
2 3 4 5 6 7 8 9 10 11
1 2
BULAN PEKERJAAN
12 13 14 15 16 17 18 19 20 21
2 3
22 23 24 25 26 27 28 29 30
4 5
TIME SCHEDULE & KURVA S
PELAKSANA : PT. SARANA MEDIKAL PRISMA
JENIS PEKERJAAN : PEMASANGAN INSTALASI GAS MEDIS

BOBOT
No. JENIS PEKERJAAN 1
(%)

A PEKERJAAN INSTALASI GAS MEDIS


01. PEKERJAAN GAS SENTRAL

1 Compressor air 12.50%


2 Vacuum Pump 9.38%
3 Manifold Oxygen 3.13%
4 Cooper tube ASTM B-819 Type L
- Pipa Ø 28 mm 4.22% 1.05%
- Pipa Ø 20 mm 2.81% 0.70%
02. LANTAI DASAR
1 Cooper tube ASTM B-819 Type L
- Pipa Ø 20 mm 6.25%
- Pipa Ø 15 mm 2.81%
- Pipa Ø 12 mm 7.50%
- Pipa Ø 10 mm 5.00%
2 Zone Box Valve
Zone Valve Box with pressure 3 Gas (O,MA,VAC) 0.47%
3 Area Alarm
Digital Medical Gas Area Alarm - 3 Gas (O,MA,VAC) 0.63%
4 Medical gas walloutlet NFPA'99
- wall outlet quick conect Oxygen 1.88%
- wall outlet quick conect Medical Air 1.88%
- wall outlet quick conect Vacuum 1.88%
5 Bed Head panel alumminium powder coutting
- bed head type 120 CM 0.16%
02. LANTAI DASAR
1 Cooper tube ASTM B-819 Type L
- Pipa Ø 15 mm 8.44%
- Pipa Ø 12 mm 10.00%
- Pipa Ø 10 mm 7.50%
2 Zone Box Valve
Zone Valve Box with pressure 2 Gas (O,VAC) 0.94%
3 Area Alarm
Digital Medical Gas Area Alarm - 2 Gas (O,VAC) 1.25%
4 Medical gas walloutlet NFPA'99
- wall outlet quick conect Oxygen 5.63%
- wall outlet quick conect Vacuum 5.63%
5 Bed Head panel alumminium powder coutting
- bed head type 120 CM 0.16%
WEEK 1.76%
CUM 1.76%
2 3 4 5 6 7 8 9 10
1 2

1.05% 1.05%
0.70% 0.70%

0.89% 0.89% 0.89% 0.89% 0.89% 0.89% 0.89%


0.40% 0.40% 0.40% 0.40% 0.40% 0.40% 0.40%
1.07% 1.07% 1.07% 1.07% 1.07% 1.07% 1.07%
0.71% 0.71% 0.71% 0.71% 0.71% 0.71% 0.71%

0.47%

1.41% 1.41%
1.67% 1.67%
1.25% 1.25%
1.76% 4.84% 3.08% 3.08% 3.55% 3.08% 3.08% 7.40% 4.32%
3.52% 8.35% 11.43% 14.51% 18.06% 21.14% 24.22% 31.63% 35.95%
BULAN PEKERJAAN
11 12 13 14 15 16 17 18 19
2 3

6.25% 6.25%
4.69% 4.69%
1.56% 1.56%

1.05%
0.70%

0.04% 0.04% 0.04% 0.04%

1.41% 1.41% 1.41% 1.41%


1.67% 1.67% 1.67% 1.67%
1.25% 1.25% 1.25% 1.25%

0.94%
0.05%
4.32% 5.26% 4.32% 4.32% 0.04% 12.54% 12.54% 1.80% 0.05%
40.27% 45.53% 49.86% 54.18% 54.22% 66.76% 79.30% 81.09% 81.15%
20 21 22 23 24 25 26 27 28
4

0.63%

0.47% 0.47% 0.47% 0.47%


0.47% 0.47% 0.47% 0.47%
0.47% 0.47% 0.47% 0.47%

1.25%

1.41% 1.41% 1.41%


1.41% 1.41% 1.41%
0.05% 0.05%
0.05% 0.05% 1.41% 1.41% 2.03% 1.41% 2.81% 2.81% 4.06%
81.20% 81.25% 82.66% 84.06% 86.09% 87.50% 90.31% 93.13% 97.19%
29 30
5

100%

90%

80%

70%

60%

50%

40%

30%

20%

10%
1.41%
1.41%

0%
10%

0%

2.81% 0.00%
100.00% 100.00%
LAPORAN PROGRES PEKERJAAN
KONTRAKTOR : PT. ADHI KARYA (PERSERO)
PELAKSANA : PT. SARANA MEDIKAL PRISMA
JENIS PEKERJAAN : PEMASANGAN INSTALASI GAS MEDIS
PERIODE : MINGGU KE- (BULAN) (TAHUN)

PRO
BOBOT MINGGU LALU
No. JENIS PEKERJAAN SAT. VOL. BOBOT (%) TERCAPAI
(%) VOL BOBOT (%)

A PEKERJAAN INSTALASI GAS MEDIS


01. PEKERJAAN GAS SENTRAL

1 Compressor air Unit 1.00 12.50% 0.00% 0.00 0.00%


2 Vacuum Pump Unit 1.00 9.38% 0.00% 0.00 0.00%
3 Manifold Oxygen Unit 1.00 3.13% 0.00% 0.00 0.00%

4 Cooper tube ASTM B-819 Type L


- Pipa Ø 28 mm m 45.00 4.22% 0.00% 0.00 0.00%
- Pipa Ø 20 mm m 45.00 2.81% 0.00% 0.00 0.00%

PEKERJAAN RUANG CENTRAL 32.03% 0.00%


02. LANTAI 1

1 Cooper tube ASTM B-819 Type L


- Pipa Ø 20 mm m 100.00 6.25% 0.00% 0.00 0.00%
- Pipa Ø 15 mm m 50.00 2.81% 0.00% 0.00 0.00%
- Pipa Ø 12 mm m 150.00 7.50% 0.00% 0.00 0.00%
PRO
BOBOT MINGGU LALU
No. JENIS PEKERJAAN SAT. VOL. BOBOT (%) TERCAPAI
(%) VOL BOBOT (%)

- Pipa Ø 10 mm m 100.00 5.00% 0.00% 0.00 0.00%

3 Zone Box Valve


Zone Valve Box with pressure 3 Gas (O,MA,VAC) Unit 1.00 0.47% 0.00% 0.00 0.00%

4 Area Alarm
Digital Medical Gas Area Alarm - 3 Gas (O,MA,VAC) Unit 1.00 0.63% 0.00% 0.00 0.00%

5 Medical gas walloutlet NFPA'99


- wall outlet quick conect Oxygen Unit 10.00 1.88% 0.00% 0.00 0.00%
- wall outlet quick conect Medical Air Unit 10.00 1.88% 0.00% 0.00 0.00%
- wall outlet quick conect Vacuum Unit 10.00 1.88% 0.00% 0.00 0.00%

6 Bed Head panel alumminium powder coutting


- bed head type 120 CM Unit 10.00 0.16% 0.00% 0.00 0.00%

PEKERJAAN LANTAI 1 28.44% 0.00%


03. LANTAI 2

1 Cooper tube ASTM B-819 Type L


- Pipa Ø 15 mm m 150.00 8.44% 0.00% 0.00 0.00%
- Pipa Ø 12 mm m 200.00 10.00% 0.00% 0.00 0.00%
- Pipa Ø 10 mm m 150.00 7.50% 0.00% 0.00 0.00%

3 Zone Box Valve


Zone Valve Box with pressure 2 Gas (O,VAC) Unit 2.00 0.94% 0.00% 0.00 0.00%

4 Area Alarm
PRO
BOBOT MINGGU LALU
No. JENIS PEKERJAAN SAT. VOL. BOBOT (%) TERCAPAI
(%) VOL BOBOT (%)

Digital Medical Gas Area Alarm - 2 Gas (O,VAC) Unit 2.00 1.25% 0.00% 0.00 0.00%

5 Medical gas walloutlet NFPA'99


- wall outlet quick conect Oxygen Unit 30.00 5.63% 0.00% 0.00 0.00%
- wall outlet quick conect Vacuum Unit 30.00 5.63% 0.00% 0.00 0.00%

6 Bed Head panel alumminium powder coutting


- bed head type 120 CM Unit 25.00 0.16% 0.00% 0.00 0.00%

PEKERJAAN LANTAI 2 39.53% 0.00%

BOBOT TERCAPAI : 0.00%

Disetujui Oleh : Diketauhui Oleh : Diperiksa Oleh :

NAMA PM ADHI KARYA NAMA NAMA NAMA


Project Mangaer Comersil Coordinator MEP Inspector
LAPORAN PROGRES PEKERJAAN
KONTRAKTOR : PT. ADHI KARYA (PERSERO)
PELAKSANA : PT. SARANA MEDIKAL PRISMA
JENIS PEKERJAAN : PEMASANGAN INSTALASI GAS MEDIS
PERIODE : MINGGU KE- (BULAN) (TAHUN)

PRO
BOBOT MINGGU LALU MING
No. JENIS PEKERJAAN SAT. VOL. BOBOT (%) TERCAPAI
(%) VOL BOBOT (%) VOL

A PEKERJAAN INSTALASI GAS MEDIS


01. PEKERJAAN GAS SENTRAL

1 Compressor air Unit 1.00 12.50% 0.00% 0.00 0.00% 0.00


2 Vacuum Pump Unit 1.00 9.38% 0.00% 0.00 0.00% 0.00
3 Manifold Oxygen Unit 1.00 3.13% 0.00% 0.00 0.00% 0.00

4 Cooper tube ASTM B-819 Type L


- Pipa Ø 28 mm m 45.00 4.22% 0.00% 0.00 0.00% 0.00
- Pipa Ø 20 mm m 45.00 2.81% 0.00% 0.00 0.00% 0.00

PEKERJAAN RUANG CENTRAL 32.03% 0.00%


02. LANTAI 1

1 Cooper tube ASTM B-819 Type L


- Pipa Ø 20 mm m 100.00 6.25% 0.00% 0.00 0.00% 0.00
- Pipa Ø 15 mm m 50.00 2.81% 0.00% 0.00 0.00% 0.00
- Pipa Ø 12 mm m 150.00 7.50% 0.00% 0.00 0.00% 0.00
PRO
BOBOT MINGGU LALU MING
No. JENIS PEKERJAAN SAT. VOL. BOBOT (%) TERCAPAI
(%) VOL BOBOT (%) VOL

- Pipa Ø 10 mm m 100.00 5.00% 0.00% 0.00 0.00% 0.00

3 Zone Box Valve


Zone Valve Box with pressure 3 Gas (O,MA,VAC) Unit 1.00 0.47% 0.00% 0.00 0.00% 0.00

4 Area Alarm
Digital Medical Gas Area Alarm - 3 Gas (O,MA,VAC) Unit 1.00 0.63% 0.00% 0.00 0.00% 0.00

5 Medical gas walloutlet NFPA'99


- wall outlet quick conect Oxygen Unit 10.00 1.88% 0.00% 0.00 0.00% 0.00
- wall outlet quick conect Medical Air Unit 10.00 1.88% 0.00% 0.00 0.00% 0.00
- wall outlet quick conect Vacuum Unit 10.00 1.88% 0.00% 0.00 0.00% 0.00

6 Bed Head panel alumminium powder coutting


- bed head type 120 CM Unit 10.00 0.16% 0.00% 0.00 0.00% 0.00

PEKERJAAN LANTAI 1 28.44% 0.00%


03. LANTAI 2

1 Cooper tube ASTM B-819 Type L


- Pipa Ø 15 mm m 150.00 8.44% 0.00% 0.00 0.00% 0.00
- Pipa Ø 12 mm m 200.00 10.00% 0.00% 0.00 0.00% 0.00
- Pipa Ø 10 mm m 150.00 7.50% 0.00% 0.00 0.00% 0.00

3 Zone Box Valve


Zone Valve Box with pressure 2 Gas (O,VAC) Unit 2.00 0.94% 0.00% 0.00 0.00% 0.00

4 Area Alarm
PRO
BOBOT MINGGU LALU MING
No. JENIS PEKERJAAN SAT. VOL. BOBOT (%) TERCAPAI
(%) VOL BOBOT (%) VOL

Digital Medical Gas Area Alarm - 2 Gas (O,VAC) Unit 2.00 1.25% 0.00% 0.00 0.00% 0.00

5 Medical gas walloutlet NFPA'99


- wall outlet quick conect Oxygen Unit 30.00 5.63% 0.00% 0.00 0.00% 0.00
- wall outlet quick conect Vacuum Unit 30.00 5.63% 0.00% 0.00 0.00% 0.00

6 Bed Head panel alumminium powder coutting


- bed head type 120 CM Unit 25.00 0.16% 0.00% 0.00 0.00% 0.00

PEKERJAAN LANTAI 2 39.53% 0.00%

BOBOT TERCAPAI : 0.00%

Disetujui Oleh : Diketauhui Oleh : Diperiksa Oleh : D

NAMA PM ADHI KARYA NAMA NAMA NAMA


Project Mangaer Comersil Coordinator MEP Inspector
OWNER CONSULTANT
Project :
Contractor : PT. SMP
Periode :
Date :

PLAN (PL) REAL (RE) DEVIATION


WEEK
NO PERIODE MONTH WEEK
WEEK (%) CUM (%) WEEK (%) CUM (%) PL-RE
(%)

1 Hari ke - 1 1.76% 1.76% 1.80% 1.80% 0.04%


2 Hari ke - 2 1.76% 3.52% 1.60% 3.40% -0.16%
3 Hari ke - 3 4.84% 8.35% 1.60% 5.00% -3.24%
4 Hari ke - 4 1 3.08% 11.43% 2.00% 7.00% -1.08%
5 Hari ke - 5 3.08% 14.51% 5.80% 12.80% 2.72%
6 Hari ke - 6 3.55% 18.06% 6.00% 18.80% 2.45%
7 Hari ke - 7 3.08% 21.14% 7.20% 26.00% 4.12%
8 Hari ke - 8 3.08% 24.22% 8.10% 34.10% 5.02%
9 Hari ke - 9 7.40% 31.63% 1.90% 36.00% -5.50%
10 Hari ke - 10 4.32% 35.95% 1.80% 37.80% -2.52%
BULAN PEKERJAAN

11 Hari ke - 11 2 4.32% 40.27% 1.70% 39.50% -2.62%


12 Hari ke - 12 5.26% 45.53% 1.60% 41.10% -3.66%
13 Hari ke - 13 4.32% 49.86% 1.50% 42.60% -2.82%
14 Hari ke - 14 4.32% 54.18% 11.40% 54.00% 7.08%
16 Hari ke - 15 0.04% 54.22% 12.50% 66.50% 12.46%
16 Hari ke - 16 12.54% 66.76% 0.52% 67.02% -12.02%
17 Hari ke - 17 12.54% 79.30% 1.60% 68.62% -10.94%
18 Hari ke - 18 3 1.80% 81.09% 5.00% 73.62% 3.20%
19 Hari ke - 19 0.05% 81.15% 1.50% 75.12% 1.45%
20 Hari ke - 20 0.05% 81.20% 1.60% 76.72% 1.55%
21 Hari ke - 21 0.05% 81.25% 1.80% 78.52% 1.75%
22 Hari ke - 22 1.41% 82.66% 1.90% 80.42% 0.49%
23 Hari ke - 23 1.41% 84.06% 5.00% 85.42% 3.59%
24 Hari ke - 24 2.03% 86.09% 4.00% 89.42% 1.97%
25 Hari ke - 25 4 1.41% 87.50% 1.00% 90.42% -0.41%
26 Hari ke - 26 2.81% 90.31% 1.00% 91.42% -1.81%
27 Hari ke - 27 2.81% 93.13% 1.00% 92.42% -1.81%
28 Hari ke - 28 4.06% 97.19% 1.00% 93.42% -3.06%
29 Hari ke - 29 2.81% 100.00% 5.00% 98.42% 2.19%
30 Hari ke - 30
5 0.00% 100.00% 1.58% 100.00% 1.58%
31
32
33
34
35
36
37
38
39
40

Disetujui oleh : Diketahui oleh : Diperiksa ole


PT. Adhi Karya (Persero)

NAMA NAMA NAMA NAMA


Project Manager Comersil Koordinator MEP Inspector
MAIN CONTRACTOR CONTRACTOR

DEVIATION
CUM PROGRESS MONITORING
PL-RE PROYEK MEDICAL GAS RSKIA. BANDUNG
(%)

0.04% Month : Bulan Pekerjaan


-0.12% Week :3
-3.35% Date Periode : Hari ke - 17
-4.43%
-1.71% PLAN REAL DEV
0.74% 79.30% 68.62% -10.68%
4.86%
9.88%
4.37%
1.85% Live Chart Progression
-0.77%
-4.43%
-7.26%
-0.18%
12.28%
0.26%
-10.68%
-7.47%
-6.03%
-4.48%
1 2 3 4 5
-2.73%
Pl an Rea l
-2.24%
1.36%
3.33%
2.92%
1.11%
-0.70%
-3.77%
-1.58%
0.00%
Diperiksa oleh: Dibuat Oleh :
PT. Sarana Medikal Prisma

NAMA IBRAHIM
Inspector Project Manager