Beruflich Dokumente
Kultur Dokumente
For the first time, when I went to a grocery shop to buy monthly groceries, I just bought items
which I could remember at that moment. Though I felt like I’m missing some important things, I
couldn’t remember them. Actually, I spent more money as well but not sure how much more.
After coming home, I realized that I forgot to buy basic items cheese, butter, curd, milk, lentils
and hair dye (for my husband) and bought items which are already at home in stock. As I spent
more money on unnecessary extra groceries, I couldn’t pay one of monthly bills. This is what
happens when you do not properly scope your project. If I had listed the requirements and
boundaries of my shopping project before I go the grocery shop, I could have avoided the extra
dollars, time and rework.
Now let’s try to understand more about scope and why it’s so important in project management.
Un-controlled or poorly managed scope can affect your project severely. It includes, missing
deadline, budget overrun and even project failure.
Let’s continue to learn more about scope and how it contributes to the success of the project.
Project scope comes under project planning. It aims at documentation of specific project
objectives, tasks, budget and deadlines.
“Give me six hours to chop down a tree and I will spend the first four sharpening the axe.” -
Abraham Lincoln
Inevitably in the fast moving world, we are forced to do everything fast. Projects are not
an exception. As project managers, we are expected to deliver the faster results. To get faster
results, we tend to comprise on a few project management steps. Particularly in the planning
stage of the project. Having 12 years of project management experience I understand it’s difficult
to spend much time for planning, however with the same experience I also understood,
investing time in the planning stage would reduce the enormous time and rework.
Plan scope management includes preparing detailed project documentation which captures and
defines all the work that needs to be done in the project.
Controlling:
Controlling the scope means that closely monitoring and controlling the project changes. The
main focus is to avoid scope creep and gold plating.
Closing:
The final step closing includes reviewing the project deliverables against the original plan.
For many projects, deciding what needs to be done is more difficult than getting it done.
Requirement gathering and analysis is the first and most important step of the project scope
management. This
step would help the project team to understand the stakeholder’s expectations and also
identifying project boundaries. Project charter will contain the high level requirements. In this
requirement gathering step, project team will be involved into in depth and detailed requirement
gathering.
Identifying all the project stakeholders is a vital step in requirement gathering. Once the
stakeholders are identified, techniques like, one on one and group interview, Brainstorming,
questionnaires, Prototyping (Creating an initial version of the solution using the gathered
preliminary requirements) can be followed.
Thanks to technology. It makes our job easier. There are project requirement gathering apps also
available in the market which helps the project managers to save much time.
Scope creep:
Business world is becoming very competitive day by day. An organization can survive only
when it delivers an additional value to its customers. While adding value to the customers,
project managers
should understand what the scope creep for the project is and how it would impact the project.
The gradual, uncontrolled increase in scope of the project is referred as scope creep.
You are expected to build a 10-foot wall for the client, and client requests the team to increase
the length of wall by half foot. Team does not know the consequences and think that since there
is lot of
material lying around, it’s not going to make any difference to build just half foot. As a result,
they build the extra length of wall.
It is necessary to define the project scope boundaries and not let people randomly add to the
project scope without going through the change control process.
Gold plating:
Gold plating is providing more than what the customer initially asked for. Team members
individually or collaboratively add a feature or functionality, thinking that it might add value to
the customer. Many
times it happens without the knowledge of the Project Manager.
Suppose, you are doing a software program for your customer. One of the programmers comes to
you and suggests an additional feature to the program. He also mentions that it won’t require
any additional effort or cost to add the extra functionality and customer will love it. As project
manager you also agree to implement the same.
Though it’s good to provide additional value to the customer, the customer expectation
would increase. There are chances, he would expect the same additional features in his next
project as well. Hence it must be controlled and avoided by the project manager.
Define Scope:
Define scope is the process of developing a detailed description of the project and product will
be created with a goal or scope. To define the scope, the following things have to be identified
from the requirement documentation and other project related base documents like project
charter.
Project objectives
Goal
Sub-phases
Tasks
Resources
Budget
Schedule
As a project manager, understanding and being able to define project scope will give you a focus
and sense of purpose when executing the project.
Scope Statement:
While defining project scope, we should be able to come up with project scope statement which
describes in detail the project’s deliverables and the work required to create those deliverables.
Many could confuse Project scope statement with project charter. Though while creating project
charters, project executives envision the scope, only project scope statement will have the
detailed project’s product scope description, product acceptance criteria, assumptions, project
deliverables, and project constraints.
“Running a project without a WBS is like going to a strange land without a roadmap.”
WBS otherwise called as decomposition technique, is all about breaking down project
deliverables and project work into manageable components that can be effectively measured and
supervised. This is a great tool which would help the stakeholders and the teams to understand
the project precisely. It reflects the scope baseline of the entire project.
Project manager and subject matter experts determine the main deliverables for the project based
on the project scope statement. Once this is completed, with the team they start decomposing the
deliverables in to small activities.
A WBS diagram expresses the project scope in simple graphic terms. Below is an example of
a simple WBS. Generally, the upper components are the deliverables and the lower level
elements are the activities that create the deliverables. The lowest level in WBS is called as work
package level. It is the point at which the cost and activity duration of the work can be reliably
estimated and managed.
5 rules of WBS:
1. 100% rule:
100% rule means that the WBS should capture all the deliverables and actives defined in
the project scope.
2. Avoid Overlapping:
With the 100% rule, it is also important to ensure that there is no duplication or overlap in
the different elements of scope definition of work breakdown structure.
3. Outcomes matters:
The best way to adhere to the 100% rule is to define WBS elements in terms of outcomes
or results, not actions
4. Detailing rules:
Being a project manager, one should be able to decide when to stop dividing the
deliverables into smaller elements. There are few “rules of thumb” used, when
decomposing the deliverables and determining the duration of the activities. This is crucial
to produce the expected deliverable defined by the WBS.
a. “80-hour rule": Any activity or group of activities defined at the lowest level of
WBS, should not produce any deliverable which is more than 80 hours of effort.
b. Second rule: None of the activities defined at the lowest level of the WBS should
exceed the defined reporting period of the deliverables.
c. Final rule: While calculating the duration of the activities to produce a
deliverable, apply “common sense”.
5. Coding WBS:
Validating Scope:
As per Pmbok “Validate scope is the process of formalizing acceptance of the completed project
deliverables”. Validating scope includes reviewing deliverables with the customer or sponsor to
ensure they are completed satisfactorily and obtain formal acceptance. To ensure the satisfactory
level of the customer, frequent and planned meetings need to be organized as a part of validating
scope phase.
Though the project team and quality team sends green signal for the project deliverables. It must
be validated against the scope baseline to conclude whether project team has produced what was
documented and planned. This is a process of acquiring formal acceptance on the completed
deliverables from the customer.
Control Scope:
Control scope process monitors the status of the project and product scope and changes to the
scope baseline. Controlling the project scope ensures all requested changes and recommended
corrective
or preventive actions are taken.
As a project manager, it is your job to keep monitoring the activities of the project and stop
unwanted actions which may lead your project into problems such as scope creep and gold
plating.
Conclusion:
Scope management seems to be easier. But remember, poor project scope management could
lead to project failure. Many times, project managers are caught by scope creep and realize the
impact only at the end of the project when it’s already too late. ‘Back in 1994 a whopping 80%
of 160 IS professionals surveyed by Computerworld said scope creep "always" or "frequently"
occurs, while only 20% said it seldom happened.
The job of the successful project manager is to ensure that the project has a clear scope. Project
manager should also make sure that the project is in line with the scope and does not encourage
the scope creep or gold plating. He should continuously check on the progress of the project.
Project management training would help to understand much more about project scope
management. It's much easier to manage the scope of your project in several proven ways: using
effective customer client communication throughout the process, staying within the limits of
your team, properly documenting important events in the development process and staying
within the guidelines provided are all great ways to manage your scope effectively. Proper scope
management greatly improves your team's ability to stay within budget and use time effectively.
Above all, the most important aspect of the process is coming up with an end result that satisfies
the customer.
Popular Posts
Join us!
Become our trainer
Become our affiliate
Create a course
Careers
sales@greycampus.com
USA +1 855 542 2678
USA +1 347 994 9941
IND +91 741 666 4433
HKG +852 5808 4350
Support
support@greycampus.com
Company
About us
Customer Speak
Contact us
For Enterprise
Sitemap
Privacy policy
Cookie policy
Terms of use
FAQ
Cancellation / Rescheduling policy
Disclaimer
"PMI®", "PMBOK®", "PMP®" and "PMI-ACP®" are registered marks of the Project
Management Institute, Inc.
ITIL is a registered trade mark of AXELOS Limited. Used under licence of AXELOS Limited.
All rights reserved.
PRINCE2 is a registered trade mark of AXELOS Limited. Used under licence of AXELOS
Limited. All rights reserved.
IASSC® is a registered trade mark of International Association for Six Sigma Certification.
Certified ScrumMaster® (CSM) and Certified Scrum Trainer® (CST) are registered trademarks
of SCRUM ALLIANCE®
Project Management :
o PMP® Certification Training |
o CAPM® Certification Training |
o PRINCE2® Foundation Training Classes |
o PRINCE2® Practitioner Training Classes |
o PRINCE2® Foundation and Practitioner Combo |
o Microsoft Project Training
Quality Management :
IT Service Management :
Information Technology :
Others :
Workshops By City
o Lean Six Sigma Black Belt Training & Certification
Kuala Lumpur
Sydney
Hyderabad
New York
Hong Kong
Chennai
Bangalore
Jakarta
Dallas
Pune
Toronto
Singapore
Abu Dhabi
Riyadh
Manila
Dubai
Mumbai
Jeddah
o PMP® Certification Training
Hyderabad
Los Angeles
Singapore
Kuala Lumpur
Chicago
New York
Jakarta
Charlotte
Mumbai
San Francisco
Atlanta
Dubai
Bangalore
Hong Kong
Toronto
Washington DC
Doha
Istanbul
Manila
Dallas
Sydney
Abu Dhabi
Jeddah
Kuwait
Raleigh
Houston
Pune
Chennai
Riyadh
o PMI-ACP® Certification Training
Hyderabad
Singapore
Dubai
Riyadh
Kuala Lumpur
o Certified ScrumMaster® (CSM®) Training and Certification Course
Hyderabad
Charlotte
New Delhi
Bangalore
Atlanta
Mumbai
Chennai
Pune
New York
o Lean Six Sigma Green & Black Belt Training & Certification Combo
Chennai
Mumbai
Singapore
Kuala Lumpur
Hong Kong
Hyderabad
Sydney
Jakarta
Jeddah
Bangalore
Riyadh
Manila
Pune
Dubai
Abu Dhabi
o Lean Six Sigma Green Belt Training & Certification
Chennai
Manila
Abu Dhabi
Dubai
Dallas
Jakarta
Singapore
Hong Kong
Sydney
Riyadh
Jeddah
Kuala Lumpur
New York
Toronto
Mumbai
Bangalore
Pune
Hyderabad
o PRINCE2® Foundation and Practitioner Combo
Hyderabad
o ITIL® Foundation Training & Certification
Hyderabad
Pune
Mumbai
Chennai
o CISSP Certification Training
Singapore
© GreyCampus
United States
o Canada
o Mexico
o United Kingdom
o Spain
o Switzerland
o Ireland
o Australia
o Singapore
o Hong Kong
o Indonesia
o Malaysia
o Philippines
o New Zealand
o Vietnam
o China
o United Arab Emirates
o Saudi Arabia
o Bahrain
o Oman
o Qatar
o Kuwait
o South Africa
o Egypt
o India
o Nigeria
o Netherlands
o Turkey
o Germany