Beruflich Dokumente
Kultur Dokumente
ACCION ESPACIO UN
S
M A E
I A A D R
R R N M E
N D V
E E T L I X
S Q P C .
P P E I N T
ELEMENTOS DE INTERVENCION
T U I O A S
O A N M A I E
A I N M U S U
S R N P U S R
L S T E X . N
I A I I L T I
A I A D I H D
C C M E A R O
C C D O L H
I I I Z A R
I I O R I
O O E A T E
O O A
N N N I S
N N R
T V E
O O S
3.01 PISOS INTERIORES ANTIDESLIZANTE DE ALTO TRANSITO CON LOSETA SERAMICO U OTROS X X
CERAMICA ALTO TRANSITO 45X45
LISTELOS 0,40 X 6 CM
PGEMANENTO PARA CERAMICA
FRAGUA CELIMA
PERFILES DE 8 MM ESQUINEROS
CRUCETAS 2-3 MM
FLETE TERRESTRE
MANO DE OBRA
TOTAL
12.00 SEGURIDAD
12.01 SEÑALIZACION DE SEGURIDAD
12.02 EXTINTORES
12.03 SISTEMA DE DETECCION Y ALARMA (PREVIA EVALUACION)
FLETE TERRESTRE
MANO DE OBRA
TOTAL
15.00 PINTURA
PINTADO DE MUROS, VIGAS, COLUMNAS Y TECHOS (SOLO EN CASO QUE NO EXISTAN FALLAS
15.01 ESTRUCTURALES GRAVES)
PINTADO DE ELEMENTOS DE ESTRUCTURA METALICA CON PINTURA ANTICORROSIVA (SOLO EN
15.02 CASO QUE NO EXISTAN FALLAS GRAVES)
15.03 PINTADO DE ELEMENTOS DE MADERA
15.04 PINTADO DE LOSAS DEPORTIVAS
PINTADO DE CANALETAS, TUBERIA EXTERIORES ALA EDIFICACION Y ELEMENTOS DE SUJECION
15.05 CON ELEMENTOS ANTICORROSIVA Y ESMALTE
15.06 PINTADO DE CARPINTERIA METALICA DE MADERA
FLETE TERRESTRE
MANO DE OBRA
SUB TOTAL
TOTAL
MONTO ASIGNADO
DEBE LLEGAR A CERO
TENIMIENTO
UNIDAD DE MEDIDA
M
E M P
M T E I
E R T K
E
E T O R I
S G R S O L L
T L O S C
U O I
MEDIDAS
COSTO CANT. COSTO TOTAL
I
M
O
B L
C
U C A G
R
T
R
UNITARIO S/.
D
A A I A U A O
R
D L N D B M S
A
. E R I O
D
A A C S
O
L D O S
O S
S
S/0.00
X 50.75
26.00 50.75 1,319.50
12.50 46.00 575.00
16.00 30.00 480.00
6.00 8.00 48.00
2.50 8.00 20.00
3.00 1.00 3.00
S/350.00 1.00 350.00
S/1,800.00 1.00 1800.00
S/4,595.50
X 9.2
318.00 1.00 318.00
S/100.00 1.00 100.00
S/286.50 1.00 286.50
S/704.50
X
22.00 5.00 110.00
300.00 1.00 300.00
X
45.00 1.00 45.00
45.00 1.00 45.00
S/500.00
S/5,800.00
S/5,800.00
S/0.00