Onsite Consultation: Verification of the onsite construction work by the Structural
Engineer at the following critical stages of the project: a. Site Marking. b. Fabrication of reinforcement. c. Alignment of the anchor bolts from the foundation. d. Fabrication of the steel structures. e. Erecting the structure. f. Integration of the roof of the 1st floor of the proposed G+2 classrooms with the existing structure. 2. Onsite Consultation: Verification of the onsite construction work by the Structural Engineer at the following critical stages of the project: g. Site Marking. h. Fabrication of reinforcement. i. Alignment of the anchor bolts from the foundation. j. Fabrication of the steel structures. k. Erecting the structure. l. Integration of the roof of the 1st floor of the proposed G+2 classrooms with the existing structure. 3. Onsite Consultation: Verification of the onsite construction work by the Structural Engineer at the following critical stages of the project: m. Site Marking. n. Fabrication of reinforcement. o. Alignment of the anchor bolts from the foundation. p. Fabrication of the steel structures. q. Erecting the structure. r. Integration of the roof of the 1st floor of the proposed G+2 classrooms with the existing structure. 4. Onsite Consultation: Verification of the onsite construction work by the Structural Engineer at the following critical stages of the project: s. Site Marking. t. Fabrication of reinforcement. u. Alignment of the anchor bolts from the foundation. v. Fabrication of the steel structures. w. Erecting the structure. x. Integration of the roof of the 1st floor of the proposed G+2 classrooms with the existing structure. 5. Onsite Consultation: Verification of the onsite construction work by the Structural Engineer at the following critical stages of the project: y. Site Marking. z. Fabrication of reinforcement. aa. Alignment of the anchor bolts from the foundation. bb. Fabrication of the steel structures. cc. Erecting the structure. dd. Integration of the roof of the 1st floor of the proposed G+2 classrooms with the existing structure. 6. Onsite Consultation: Verification of the onsite construction work by the Structural Engineer at the following critical stages of the project: ee. Site Marking. ff. Fabrication of reinforcement. gg. Alignment of the anchor bolts from the foundation. hh. Fabrication of the steel structures. ii. Erecting the structure. jj. Integration of the roof of the 1st floor of the proposed G+2 classrooms with the existing structure. 7. Onsite Consultation: Verification of the onsite construction work by the Structural Engineer at the following critical stages of the project: kk. Site Marking. ll. Fabrication of reinforcement. mm. Alignment of the anchor bolts from the foundation. nn. Fabrication of the steel structures. oo. Erecting the structure. pp. Integration of the roof of the 1st floor of the proposed G+2 classrooms with the existing structure. 8. Onsite Consultation: Verification of the onsite construction work by the Structural Engineer at the following critical stages of the project: qq. Site Marking. rr. Fabrication of reinforcement. ss. Alignment of the anchor bolts from the foundation. tt. Fabrication of the steel structures. uu. Erecting the structure. vv. Integration of the roof of the 1st floor of the proposed G+2 classrooms with the existing structure. 9. Onsite Consultation: Verification of the onsite construction work by the Structural Engineer at the following critical stages of the project: ww. Site Marking. xx. Fabrication of reinforcement. yy. Alignment of the anchor bolts from the foundation. zz. Fabrication of the steel structures. aaa. Erecting the structure. bbb. Integration of the roof of the 1st floor of the proposed G+2 classrooms with the existing structure. 10. Onsite Consultation: Verification of the onsite construction work by the Structural Engineer at the following critical stages of the project: ccc. Site Marking. ddd. Fabrication of reinforcement. eee. Alignment of the anchor bolts from the foundation. fff. Fabrication of the steel structures. ggg. Erecting the structure. hhh. Integration of the roof of the 1st floor of the proposed G+2 classrooms with the existing structure. 11. Onsite Consultation: Verification of the onsite construction work by the Structural Engineer at the following critical stages of the project: iii. Site Marking. jjj. Fabrication of reinforcement. kkk. Alignment of the anchor bolts from the foundation. lll. Fabrication of the steel structures. mmm. Erecting the structure. nnn. Integration of the roof of the 1st floor of the proposed G+2 classrooms with the existing structure. 12. Onsite Consultation: Verification of the onsite construction work by the Structural Engineer at the following critical stages of the project: ooo. Site Marking. ppp. Fabrication of reinforcement. qqq. Alignment of the anchor bolts from the foundation. rrr. Fabrication of the steel structures. sss.Erecting the structure. ttt. Integration of the roof of the 1st floor of the proposed G+2 classrooms with the existing structure. 13. Onsite Consultation: Verification of the onsite construction work by the Structural Engineer at the following critical stages of the project: uuu. Site Marking. vvv. Fabrication of reinforcement. www. Alignment of the anchor bolts from the foundation. xxx. Fabrication of the steel structures. yyy. Erecting the structure. zzz. Integration of the roof of the 1st floor of the proposed G+2 classrooms with the existing structure.