Generating Bank Casing-to-Sidewall SAFETY ALERT

WARNING
Tube Welds on Two-Drum Boilers Technical Service Bulletin

Purpose One incident reported was a cata-


This Technical Service Bulletin strophic tube failure of the fur-
alerts customers to a safety hazard nace sidewall tube adjacent to the
which could occur in the event of generating bank hopper sidewall.
a membrane furnace sidewall tube The failure is believed to have been
failure adjacent to the generating caused by stress-assisted corro-
bank sidewall casing attachment sion fatigue from frequent temper-
on two-drum recovery boilers. The ature transients of the generating
location and nature of the attach- bank casing. Experience suggests
ment outside the furnace tube en- that this mechanism could be ag-
gravated by certain weld attach- Figure 2 – Tube leak
closure creates a risk of SERIOUS
PERSONAL INJURY OR DEATH in ments and/or water chemistry.
the event of a tube failure. More- Because the buckstay and tie
over, the risk is not necessarily channel system is integral with
limited to recovery boilers or to a the generating bank casing, any
specific boiler manufacturer. boiler ties between the buckstays
or drums and the building struc-
tural steel near this area may cause
Problem additional distortion at the failure
A problem has been detected location. See Figures 2 and 3.
on two-drum Babcock & Wilcox
(B&W) recovery boilers where the Figure 3 – Tube failure
Severe generating bank pluggage
generating bank hopper and side- causes increased pressure drop
wall casing attach to the furnace in the casing attachment at the
which leads to gas bypassing un-
sidewall membrane wall tubes. sidewall tube.
derneath the lower drum through
Units that have a history of severe and around the hopper gas baffle.
generating bank pluggage are This causes the generating bank The attachment is shown in Figure
believed to be more susceptible. hopper and sidewall casing to 4. The failure was at the approxi-
Because the damage may initiate experience large temperature tran- mate location defined by the red
by stress-assisted corrosion cracks sients. The frequent temperature circled area in Figure 4, near
at the inside diameter (ID) of the transients cause thermal stresses where the membrane wall panel
tube, early detection requires in the hopper sidewall casing tie bar meets the generating bank
nondestructive examination of the which can lead to a fatigue failure tie channel at about the centerline
second sidewall tube in the vicinity of the lower drum elevation.
of the generating bank sidewall
casing attachment. See Figure 1.
Lower Drum C Sidewall Generating Bank Tube

C Lower Drum
Plan
View
Bar on Tube
Tie Channel
Lower Drum Tie Bar
Hopper

2nd Sidewall Tube


Side
View
Screen Supply Tube
(if applicable)
C Hopper
Gas Baffle Detail

Figure 1 – Failure location Figure 4 – Attachment (Continued on reverse side)


Inspection Support
Plant owners and operators Contact B&W Field Engineering
should inspect the lower drum Services through your local district
hopper baffle plate for evidence service office to coordinate your
of distortion or gaps which can research and inspection efforts and
allow gas bypassing. If a history to identify and locate potential cor-
of generating bank pluggage with rosion damage. B&W is continuing
high pressure drop, and casing or the investigation of this problem
hopper repairs and/or signs of gas and will keep customers informed
bypassing is present, then inspect of further developments.
the sidewall tube-to-casing welds Figure 6 – Tube failure
as soon as possible. The damage
to the tube may originate in cracks 2. Inspect adjacent tube and
at the tube ID, so radiographic in- casing attachment welds for
spection of the tube in the area of cracking, and repair as needed.
the casing attachment is required Review all boiler ties to build-
for early detection. See Figures 5 ing structural steel near the
and 6. generating bank and drums to
assure they are installed cor-
Recommendations rectly and are not damaged.
1. If evidence of gas bypass-
ing is present, take whatever 3. If the attachment is replaced
actions are needed, including and/or the tube section is
additional sootblowing in the removed, utilize an upgraded
generating bank to reduce attachment as shown in Figure
plugging, and repair the lower 7. This arrangement better
drum hopper baffle to prevent distributes the casing load
excessive bypassing. across the first and second
sidewall tubes at the generat-
ing bank sidewall.

Original Tube
Profile

Figure 5 – Failed tube cross-section


showing tube distortion and attachment
damage Figure 7 – Upgraded attachment

Energy | Environmental www.babcock.com

Babcock & Wilcox Established in 1867, Babcock & Wilcox is a global leader in advanced
20 S. Van Buren Avenue energy and environmental technologies and services for the power
Barberton, Ohio 44203 USA and industrial markets, with operations, subsidiaries and joint
Phone: 330.753.4511 ventures worldwide.
Fax: 330.860.1886
For more information, or a complete listing of our sales and service
The information contained herein is provided for general information offices, send an e-mail to info@babcock.com, or access our website
purposes only and is not intended nor to be construed as a warranty, an
offer, or any representation of contractual or other legal responsibility.
at www.babcock.com.

© 2015 The Babcock & Wilcox Company. All rights reserved.

November 2015

Das könnte Ihnen auch gefallen