Project Name : Nuppche likhu HPP Ref.

: 123
Location : Date : 5/8/2019
Type : Detail Design Calculated by :
Engineering Department Title : Main Cutoff of Likhu Checked by :
Approved by :

Geometry of the structure Soil Properties


Top width, B1 1.00 m Angle of internal friction 30.00 deg
Bottom width of sloping face river side, B4 0.00 m Angle made by back wall with vertical - deg
Bottom width of sloping face hillside, B5 0.00 m Angle of interface friction between wall and soil - deg
Width of projection at riverside, B3 2.00 m Angle of backfill with horizontal - deg
Width of projection at hillside, B6 2.00 m Coefficient of earth pressure at rest (Ko) 0.50
Thickness of base slab, H2 1.00 m Coefficient of active earth pressure 0.33
Height of flood stem, H1 6.00 m Coefficient of Passive earth pressure 3.00
Total height of the flood wall 7.00 m Coefficient of dynamic active earth pressure -
Total base width of the flood wall, B2 5.00 m Coefficient of dynamic Passive earth pressure -
Unit weight of soil 18.00 KN/m3
Main Cutoff of Likhu Unit weight of concrete 25.00 KN/m3
Soil Bearing Envelope Unit weight of water 9.81 KN/m3
8.00 300.00 Friction coefficient 0.65
261.22 Adopted safe bearing capacity of the soil 150.00 KN/m2
6.00 235.37
200.00 Loads
4.00 100.00 Height of soil :hillside, Hhg 8.50 m
79.04 Height of Normal ground water in wet season :hillside, Hhw 8.50 m
2.00 14.02 0.00 Height of High ground water in wet season :hillside, Hhw 10.5 m
0.00 -4 -2 0 2 4 Surcharge load:hillside, w 0.00 KN/m2
-4.00 -2.00 0.00 2.00 4.00 Height of soil/sediment :riverside, Hrg 8.50 m
-2.00
Height of water table in normal flow :riverside, Hrw nor 8.50 m
Height of max water in max flow :riverside, Hrw hi 10.50 m
Coefficients
Consider 1m width of section Percentage of passive pressure to use 11%
Result Dynamic loads (% of self wt) 10%
Factor of safety Horizontal seismic coeff. 0.23
Usual Unsusal Extreme Vertical seismic coeff. 0.12
1. Sliding 999.00 8.91 1.74 Uplift coefficient 0.70
2. Overturning 2.0 1.73 1.72
Bearing
3.Maximum 193.60 247.61 261.22
4. Minimum 81.52 14.02 22.29

Calculations
Minimum
1 Primary load cases Intensity of force
Direction
Definition Type Start Value End value
P1a Dry: Earth pressure-riverside Rpassive Triangular 0.00 51.02 +x
P1b Dry: Earth pressure-riverside Rpassive Triangular 0.00 50.98
P2 Dry: Weight of soil on projection - riverside UDL 144.50 144.50 +y
P3 Dry: Weight of soil on projection - riverside, in sloping face Triangular 0.00 0.00 +y
P4a Normal flow: Earth pressure-riverside Rpassive Triangular 0.00 23.21 +x
P4b Normal flow: Earth pressure-riverside Rpassive Triangular 0.00 23.19
P5 Normal flow: Water pressure-riverside Triangular 14.72 83.39 +x
P6 Normal flow: Weight of sediments on the projection riverside UDL 61.43 61.43 +y
P7 Normal flow: Weight of sediments on the projection riverside, in sloping face Triangular 0.00 0.00 +y
P8 Normal flow: Weight of water riverside on the projection riverside UDL 83.39 83.39 +y
P9 Normal flow: Weight of water riverside on the projection riverside, in sloping face Triangular 0.00 0.00 +y
P10a High flow: Earth pressure-riverside Rpassive Triangular 0.00 23.21 +x
P10b High flow: Earth pressure-riverside Rpassive Triangular 0.00 23.19
P11 High flow: Water pressure-riverside Triangular 34.34 103.01 +x
P12 High flow: Weight of sediments on the projection riverside UDL 69.62 69.62 +y
P13 High flow: Weight of sediments on the projection riverside, in sloping face Triangular 0.00 0.00 +y
P14 Hight flow: Weight of water on the projection riverside UDL 103.01 103.01 +y

Stability of Main Cutoff 1 of 4


Project Name : Nuppche likhu HPP Ref. : 123
Location : Date : 5/8/2019
Type : Detail Design Calculated by :
Engineering Department Title : Main Cutoff of Likhu Checked by :
Approved by :

P15 Hight flow: Weight of water on the projection riverside, in sloping face Triangular 0.00 0.00 +y
P16a Dry: Earth pressure-hillside Hactive Trapezoidal 0.00 50.98 -x
P16b Dry: Earth pressure-hillside Hpassive Trapezoidal 0.00 51.02
P17 Dry: Weight of soil on projection - hillside UDL 153.00 153.00 +y
P18 Dry: Weight of soil on projection - hillside, in sloping face Triangular 0.00 0.00 +y
P19a Normal: Earth pressure-hillside Hactive Triangular 0.00 23.19 -x
P19b Normal: Earth pressure-hillside Hpassive Triangular 0.00 23.21
P20 Normal: Water pressure-hillside Triangular 14.72 83.39 -x
P21 Normal: Weight of soil & surcharge on projection - hillside UDL 61.43 61.43 +y
P22 Normal: Weight of soil & surcharge on projection - hillside, in sloping face Triangular 0.00 0.00 +y
P23 Normal: Weight of water on projection- hillside UDL 83.39 83.39 +y
P24 Normal: Weight of water on projection- hillside, in sloping face Triangular 0.00 0.00 +y
P25 Normal flow: Uplift on slab-dry hillside Trapezoidal, start at riverside corner 48.07 0.00 -y
P26 Normal flow: Uplift on slab-Normal hillside Trapezoidal, start at riverside corner 48.07 48.07 -y
P27 High flow: Uplift on slab-dry hillside Trapezoidal, start at riverside corner 48.07 0.00 -y
P28 High flow: Uplift on slab-High Flow hillside Trapezoidal, start at riverside corner 48.07 48.07 -y
P29 High FLow: Earth pressure-hillside Hactive Triangular 0.00 23.19
P30 High Flow: Earth pressure-hillside Hpassive Triangular 0.00 23.21
P31 High: Water pressure-hillside Triangular 34.34 103.01
P32 High: Weight of soil & surcharge on projection - hillside UDL 61.43 61.43
P33 High: Weight of soil & surcharge on projection - hillside, in sloping face Triangular 0.00 0.00
P34 High: Weight of water on projection- hillside UDL 103.01 103.01
P35 High: Weight of water on projection- hillside, in sloping face Triangular 0.00 0.00

2 Dead and dynamic Loads


D1 Total dead weight of the structure Point (see centroid of structure) 275.00 +y
D2 Dynamic loads 27.50 +x

3 Seismic load in normal operation


S1 Horizontal seismic force(+x) Converted to Point 63.25 +/-x
S2 Vertical seismic force: uplift Converted to Point 31.63 +/-y
S3 Horizontal seismic force(-x) Converted to Point 63.25 +/-y
S4 Vertical seismic force: bearing Converted to Point 31.63 +/-y

4 Combination
C1 Both side of flood wall is dry D1+P1a+P2+P3+P16a+P17+P18
C2 Riverside Empty + Hill side dry D1+P16a+P17+P18
C3 Normal flow in riverside+Normal Flow hillside D1+P4a+P5+P6+P7+P8+P9+P19a+P20+P21+P22+P23+P24+P26
C4 Riverside Empty+Normal Flow hillside D1+P16a+P17+P18+P26+D2+P5+P8+D2+P20+P23
C5 High flow in riverside+High flow in hillside D1+P10a+P11+P12+P13+P14+P15+P29+P31+P32+P33+P34+P35+P28
C6 Empty in Riverside+High flow in hillside D1+D2+P11+P14+P29+P31+P32+P33+P34+P35+P28
C7 Both side of flood wall is dry+seismic(+x) D1+P1a+P2+P3+P16a+P17+P18+S1
C8 Both side of flood wall is dry+seismic (-x) D1+P1b+P2+P3+P16b+P17+P18+S3
C9 Both side of flood wall is dry+uplift(-y) D1+P1a+P2+P3+P16a+P17+P18+S2
C10 Both side of flood wall is dry+bearing(+y) D1+P1b+P2+P3+P16b+P17+P18+S4
C11 Normal flow in riverside+Normal flow hillside+seismic(+x) D1+P4a+P5+P6+P7+P8+P9+P19a+P20+P21+P22+P23+P24+P26+S1
C12 Normal flow in riverside+Normal flow hillside+seismic(-x) D1+P4b+P5+P6+P7+P8+P9+P19b+P20+P21+P22+P23+P24+P26+S3
C13 Normal flow in riverside+Noramal hillside+bearing(+y) D1+P4b+P5+P6+P7+P8+P9+P19b+P20+P21+P22+P23+P24+P26+S4
C14 Normal flow in riverside+dry hillside+upfilt(-y) D1+P4b+P5+P6+P7+P8+P9+P19b+P20+P21+P22+P23+P24+P26+S2
C15 High flow in riverside+High flow hillside+seismic(+x) D1+P10a+P11+P12+P13+P14+P15+P29+P31+P32+P33+P34+P35+P28+S1
C16 High flow in riverside+High FLow hillside+seismic(-x) D1+P10a+P11+P12+P13+P14+P15+P29+P31+P32+P33+P34+P35+P28+S3
C17 High flow in riverside+High Flow hillside+uplift(-y) D1+P10a+P11+P12+P13+P14+P15+P29+P31+P32+P33+P34+P35+P28+S2
C18 High flow in riverside+High hillside+bearing(+y) D1+P10a+P11+P12+P13+P14+P15+P29+P31+P32+P33+P34+P35+P28+S4

Stability of Main Cutoff 2 of 4


Project Name : Nuppche likhu HPP Ref. : 123
Location : Date : 5/8/2019
Type : Detail Design Calculated by :
Engineering Department Title : Main Cutoff of Likhu Checked by :
Approved by :

Stability analysis Moment shall be taken at toe of riverside


Force Moment Arm Moments Remarks
Descriptions Horizontal Vertical X Y Overturning Resisting
KN KN m m KNm KNm
Primary load
P1a Dry: Earth pressure-riverside 216.83 2.83 614.36 +x
P1b Dry: Earth pressure-riverside 216.64 2.83 613.83
P2 Dry: Weight of soil on projection - riverside 289.00 1.00 289.00 +y
P3 Dry: Weight of soil on projection - riverside, in sloping face 0.00 2.00 0.00 +y
P4a Normal flow: Earth pressure-riverside 98.66 2.83 279.53 +x
P4b Normal flow: Earth pressure-riverside 98.57 2.83 279.29
P5 Normal flow: Water pressure-riverside 416.93 2.33 972.83 +x
P6 Normal flow: Weight of sediments on the projection riverside 122.85 1.00 122.85 +y
P7 Normal flow: Weight of sediments on the projection riverside, in sloping face 0.00 2.00 0.00 +y
P8 Normal flow: Weight of water riverside on the projection riverside 166.77 1.00 166.77 +y
P9 Normal flow: Weight of water riverside on the projection riverside, in sloping face 0.00 2.00 0.00 +y
P10a High flow: Earth pressure-riverside 98.66 2.83 279.53 +x
P10b High flow: Earth pressure-riverside 98.57 2.83 279.29
P11 High flow: Water pressure-riverside 583.70 2.33 1361.96 +x
P12 High flow: Weight of sediments on the projection riverside 139.23 1.00 139.23 +y
P13 High flow: Weight of sediments on the projection riverside, in sloping face 0.00 2.00 0.00 +y
P14 Hight flow: Weight of water on the projection riverside 206.01 1.00 206.01 +y
P15 Hight flow: Weight of water on the projection riverside, in sloping face 0.00 2.00 0.00 +y
P16a Dry: Earth pressure-hillside -216.64 2.83 613.83 -x
P16b Dry: Earth pressure-hillside -216.83 2.83 614.36
P17 Dry: Weight of soil on projection - hillside 306.00 4.00 1224.00 +y
P18 Dry: Weight of soil on projection - hillside, in sloping face 0.00 3.00 0.00 +y
P19a Normal: Earth pressure-hillside -98.57 2.83 279.29 -x
P19b Normal: Earth pressure-hillside -98.66 2.83 279.53
P20 Normal: Water pressure-hillside 343.35 2.33 801.15 -x
P21 Normal: Weight of soil & surcharge on projection - hillside 122.85 4.00 491.40 +y
P22 Normal: Weight of soil & surcharge on projection - hillside, in sloping face 0.00 3.00 0.00 +y
P23 Normal: Weight of water on projection- hillside 166.77 4.00 667.08 +y
P24 Normal: Weight of water on projection- hillside, in sloping face 0.00 3.00 0.00 +y
P25 Normal flow: Uplift on slab-dry hillside -120.17 1.67 200.29 -y
P26 Normal flow: Uplift on slab-Normal hillside -240.35 2.50 600.86 -y
P27 High flow: Uplift on slab-dry hillside -120.17 1.67 200.29 -y
P28 High flow: Uplift on slab-High Flow hillside -240.35 2.50 600.86 -y
P29 High FLow: Earth pressure-hillside -98.57 2.83 279.29
P30 High Flow: Earth pressure-hillside -98.66 2.83 279.53
P31 High: Water pressure-hillside 480.69 2.33 1121.61
P32 High: Weight of soil & surcharge on projection - hillside 122.85 4.00 491.40
P33 High: Weight of soil & surcharge on projection - hillside, in sloping face 0.00 3.00 0.00
P34 High: Weight of water on projection- hillside 206.01 4.00 824.04
P35 High: Weight of water on projection- hillside, in sloping face 0.00 3.00 0.00
0
Dead and dynamic Loads
D1 Total dead weight of the structure 275.00 2.50 687.50 +y
D2 Dynamic loads 27.50 2.50 68.75 +x
Seismic load
S1 Horizontal seismic force 63.25 4.45 281.75
S2 Vertical seismic force -31.63 2.50 79.06
S3 Horizontal seismic force -63.25 4.45 281.75
S4 Vertical seismic force 31.63 2.50 79.06

Stability of Main Cutoff 3 of 4


Project Name : Nuppche likhu HPP Ref. : 123
Location : Date : 5/8/2019
Type : Detail Design Calculated by :
Engineering Department Title : Main Cutoff of Likhu Checked by :
Approved by :

Load combinitions
C1 D1+P1a+P2+P3+P16a+P17+P18 0.00 870.00 613.83 2814.86
C2 D1+P16a+P17+P18 216.64 581.00 613.83 1911.50
C3 D1+P4a+P5+P6+P7+P8+P9+P19a+P20+P21+P22+P23+P24+P26 0.00 613.90 1681.30 3387.96
C4 D1+P16a+P17+P18+P26+D2+P5+P8+D2+P20+P23 0.00 729.20 2153.34 3718.18
C5 D1+P10a+P11+P12+P13+P14+P15+P29+P31+P32+P33+P34+P35+P28 0.00 708.76 2001.76 3989.67
C6 D1+D2+P11+P14+P29+P31+P32+P33+P34+P35+P28 0.00 597.03 2070.51 3570.91
C7 D1+P1a+P2+P3+P16a+P17+P18+S1 0.00 870.00 895.58 2814.86
C8 D1+P1b+P2+P3+P16b+P17+P18+S3 63.44 870.00 614.36 3096.08
C9 D1+P1a+P2+P3+P16a+P17+P18+S2 0.00 838.38 692.89 2814.86
C10 D1+P1b+P2+P3+P16b+P17+P18+S4 0.19 901.63 614.36 2893.39
C11 D1+P4a+P5+P6+P7+P8+P9+P19a+P20+P21+P22+P23+P24+P26+S1 0.00 613.90 1963.05 3387.96
C12 D1+P4b+P5+P6+P7+P8+P9+P19b+P20+P21+P22+P23+P24+P26+S3 0.00 613.90 1681.55 3669.47
C13 D1+P4b+P5+P6+P7+P8+P9+P19b+P20+P21+P22+P23+P24+P26+S4 0.00 645.52 1681.55 3466.78
C14 D1+P4b+P5+P6+P7+P8+P9+P19b+P20+P21+P22+P23+P24+P26+S2 0.00 582.27 1760.61 3387.72
C15 D1+P10a+P11+P12+P13+P14+P15+P29+P31+P32+P33+P34+P35+P28+S1 0.00 708.76 2283.51 3989.67
C16 D1+P10a+P11+P12+P13+P14+P15+P29+P31+P32+P33+P34+P35+P28+S3 0.00 708.76 2001.76 4271.42
C17 D1+P10a+P11+P12+P13+P14+P15+P29+P31+P32+P33+P34+P35+P28+S2 0.00 677.13 2080.83 3989.67
C18 D1+P10a+P11+P12+P13+P14+P15+P29+P31+P32+P33+P34+P35+P28+S4 0.00 740.38 2001.76 4068.73

Result of all cases


Factor of safety Bearing pressure
Case Eccentricity
Slide Overturn riverside hillside
C1 Both side of flood wall is dry -0.03 999.00 4.59 167.75 180.25 us
C2 Riverside Empty + Hill side dry 0.27 1.74 3.11 153.36 79.04 un
C3 Normal flow in riverside+Normal Flow hillside -0.28 999.00 2.02 81.52 164.04 us
C4 Riverside Empty+Normal Flow hillside 0.35 999.00 1.73 207.80 83.88 un
C5 High flow in riverside+High flow in hillside -0.30 999.00 1.99 89.91 193.60 us
C6 Empty in Riverside+High flow in hillside -0.01 999.00 1.72 117.53 121.28 247.61
C7 Both side of flood wall is dry+seismic(+x) 0.29 999.00 3.14 235.37 112.63 165.0742
C8 Both side of flood wall is dry+seismic (-x) -0.35 8.91 5.04 100.39 247.61
C9 Both side of flood wall is dry+uplift(-y) -0.03 999.00 4.06 161.43 173.92
C10 Both side of flood wall is dry+bearing(+y) -0.03 3095.71 4.71 174.33 186.32
C11 Normal flow in riverside+Normal flow hillside+seismic(+x) 0.18 999.00 1.73 149.14 96.42
C12 Normal flow in riverside+Normal flow hillside+seismic(-x) -0.74 999.00 2.18 14.02 231.54
C13 Normal flow in riverside+Noramal hillside+bearing(+y) -0.27 999.00 2.06 87.96 170.25
C14 Normal flow in riverside+dry hillside+upfilt(-y) -0.29 999.00 1.92 75.31 157.60 261.22
C15 High flow in riverside+High flow hillside+seismic(+x) 0.09 999.00 1.75 157.53 125.98 208.9725
C16 High flow in riverside+High FLow hillside+seismic(-x) -0.70 999.00 2.13 22.29 261.22
C17 High flow in riverside+High Flow hillside+uplift(-y) -0.32 999.00 1.92 83.58 187.27
C18 High flow in riverside+High hillside+bearing(+y) -0.29 999.00 2.03 96.23 199.92
Bearing stress envelope 300.00 *999=structure doesn't move towards hillside
X Stress 261.22
235.37
At toe -2.5 14.02 200.00
MIN
At heel 2.5 79.04
100.00
At toe -2.5 235.37 79.04
MAX
At heel 2.5 261.22 14.02 0.00
-4 -2 0 2 4

Stability of Main Cutoff 4 of 4