1 Cargo Hold #4 trackway to be derusted and painted.

2 FWD (Stbd and Port side) stains observed in Ship' Name.Same to be repainted.
Rust patches observed on the underside of buckets of all 4 grabs.Same to be derusted
3 and upgraded.
Draft marks FWD and AFT found stained.To be painted.
5 Hatch cover cross joints - bottom - rusted drain channels to derust and paint

6 Grab platforms for all 4 grabs underside rusted.Same to be derusted and painted.

7 Stains and decoloured patches observed on Hatch cover #1.Same to be repainted.

8 Life raft (fwd) embarkation lights'Source area to be painted.Bulkheads to be upgraded.


9 Fwd crossdeck area "No-Smoking" sign and other markings to be painted.
10 Conduit
Helicopterpipe lines to stores
operation be painted.Boxes to be at
to be kept clean painted and stencilled.
all times.Mop and buckets to be removed
11 from stores.

12 Rescue boat tool box to be changed.


13 LSA/FFA locker Exh fan Motor to be cleaned.
14 LSA/FFA locker to be cleaned and painted.
15 Bridge Window wiper LOW insulation alarm to be rectified.
16 Bridge A/C out door unit box to be derusted and painted.
Air horn Pneumatic line Drain valve found Jammed and rusted.Same to be
17 Derusted,Overhauled and to be tried out periodically.
18 Galley Griller to be cleaned.

19 Place for Chopping boards to be designated and all boards to be kept at one place.
TARGET DATE COMPLETED DATE
31-Jan-19
10-Feb-19

15-Jan-19
10-Jan-19
5-Jan-19

5-Feb-19

1-Mar-19

20-Jan-19
5-Jan-19
10-Mar-19
25-Dec-18

5-Jan-19
10-Jan-19
20-Jan-18
25-Dec-18
28-Dec-18

18-Jan-18
1
A/C room to be kept free of Things unrelated to Airconditioning.Among other things,Bulbs
and tubes to be removed.
2 Incinerator furnace to be thorougly cleaned and refractory to be patch worked.
3
Found traces of oil in the Aux Engines #1,#2&#3 fuel pump area.Same to be kept clean at
all the times.
4
Main engine fuel pump area to be cleaned and area around main engine to be upgraded.
5
Work Shop work table and Welding table found unarranged.Same to be arranged and
leftover scrap from previous jobs to be collected and landed ashore.
6 OWS drain lines to be checked periodically to prevent from clogging.
7
OWS working principle and function of each part including OCM to be explained to new
joiners and all the engineers onboard.
8 Blower rooms all blowers' terminal boxes to be derusted and painted.
9
Blower rooms to be upgraded and bulkheads to be painted and kept clean at all the
times.
10
E/O store near LSA/FFA locker to be arranged and Floor to be cleaned and painted.
11
Engine Room spares to be kept only on the racks provided for the purpose.Spares' room
to be upgraded.
12
Aux Boiler Fuel oil pump found Leaking.Same to be rectified.
13
Slight Leakage observed from FO transfer pump seal.Same to be rectified found leaking.
14
Life boat engine FO tank cap found not tightening properly.Same to be rectified.
15
Engine Room funnel space stair case and adjoining areas to be cleaned and upgraded.
TARGET DATE COMPLETED DATE

25-Dec-18 28.12.2018
1-Jan-19

23-Dec-18 22.12.2018

5-Jan-19 02.01.2019

10-Jan-19 02.01.2019
25-Dec-18

20-Dec-18 17.12.2018
15-Jan-19 20.12.2018

21-Jan-19 20.12.2018

10-Jan-19 29.12.2018

23-Jan-19
1-Jan-19 18.12.2018

23-Dec-18

27-Dec-18 17.12.2018

1-Mar-18