 Finalized Basis of Design Fire Protection.

 Verified and finalized foam system input in Tank Technical Specification


 Finalized hydraulics
 Run model on Pipenet software to validate foam system requirement
 Finalized Fire Hazardous Layout
 Attended meeting with SAPMT for SAMIR item
 Attended meeting with SAPMT / PMOD for ER estimation
 Finalized SOW for SAMIR–Foam System and prepared estimate
 Provided input to other discipline for SAMIR item
 Performed discipline check
 Update progress report
 Issued package to fire protection PE third party
 Coordinated and obtained certified package from third party